MM Upgrade Project

Hi
What are the roles & responsibilities of MM Consultant in a upgrade project ?
What are the major functionality difference between SAP 4.7 c & Ecc 6.0 version ?
Explain me in detail ?
Thanks & Regards ,
Mani.

HI,
Upgrade is of two types :
1. technical : in technical upgrade role of funcitonal consultant is to test all the existing functionalities in ECC development (unit testinf)and QA server(UAT )
Also MM consultatn has to sit with Abaper for some SPAU adn SPDD adjustments.
2. Fucntional Upgrade: respective consultatn has to identify teh new functions and take it up further with Business for approval and sign off and then implement the new funscitons.
http://solutionbrowser.erp.sap.fmpmedia.com is the site where in you can get the new  functionalities available in target source.
Award points if helpful as points collection awards through SAP goes to welfare of some of the poorest regions of the world
regards

Similar Messages

  • New Development project  in the middle of  ECC EHP7 upgrade project

    Hi All,
    We are performing ECC EHP7 upgrade project in our project system landscape and i have already started Dev system upgrade.Suddenly our development team wants to perform new project  which required to install add-on product from third party application. Installing new add-on will require us to regenerate stack.xml file right? if that is the case  do we need to perform re upgrade to Dev right?. As per my knowledge this is not recommended to perform parallel project with upgrade project.
    Is there any  best practice or recommended method to perform multiple projects with upgrade project at the same time.
    Thanks,
    Raghu

    Hi Raghu,
    First here i would like to suggest you & your development team i.e during an upgrade project dual maintenance is required as per SUM guide,as per SUM guide you need to maintain parallel systems to perform regular activities, for same you could refer SUM guides and follow the standard procedures.
    Installing new add-on will require us to regenerate stack.xml file right?
    Yes you need to regenerate the stack.xml file .
    if that is the case  do we need to perform re upgrade to Dev right?
    If you are under upgrade phase no need to perform re upgrade,required add on can be installed after completion of an upgrade as per availability for EHP7.
    Try to avoid perform multiple projects with upgrade project .
    Regards,
    Gaurav

  • How To Use SPDD and SPAU Transaction in An Upgrade Project

    Hi Friends,
    I will be working in an upgrade project very soon. this is my first experience for Upgrade project. Though I know these two transaction are used for Upgrade.
    Can anyone give me a step by step document for using these two transactions and other relevant information.
    Also, I have one query where do we use these transactions : On the old system e.g. R/3 4.7 or ECC 6.0
    Thanks,
    Pradeep
    <REMOVED BY MODERATOR - REQUEST OR OFFER POINTS ARE FORBIDDEN>
    Edited by: Alvaro Tejada Galindo on Dec 23, 2008 10:39 AM

    Hi Pradeep,
    For SPDD see this link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/2e/6d66587d9011d396b60000e82de14a/frameset.htm
    For SPAU
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/c8/61ec66e33611d1954b0000e82de14a/frameset.htm
    Why you need this Adjustments
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/60/d6ba7bceda11d1953a0000e82de14a/frameset.htm
    You use the transactions in the new system.
    Regards

  • 4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format

    Dear all,
    We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
    Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
    If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
    If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
    I shall modity the same to our customer and submit
    Thanks & Regards
    Senthil
    [email protected]

    Preparation Phase* 6 days
    Kick Off Meeting 1 day
    Upgrade Project Procedures Preparation 1 day
    Prepare Upgrade Project Plan 1 day
    Technical Requirements Assessment 3 days
    Assess Training needs of Key-users & End-users 1 day
    Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
    Business Blueprint Phase 6 days
    Develop System Landscape Upgrade Plan 1 day
    Functional Requirement Checklist 1 day
    ABAP Development check list 1 day
    Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
    Identify Testing Scope & Scenarios 1 day
    Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
    Develop Documents as per Basis Activity List 1 day
    Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
    Prepare Upgrade Deliverables Checklist 1 day
    Realization Phase 28 days
    Installation of Solution Manager 3.2 System 1 day
    Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
    Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
    Upgrade Frontend Software 4 days
    Perform SPAU & SPDD Corrections 5 days
    Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
    Perform Upgrade Testing for each Application Module 7 days
    Perform Unit & Integration Testing 6 days
    Perform Training to Key Users & End Users (Generic & Specific) 3 days
    Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
    Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
    Testing by end users on Quality System 1 day
    Production Realization & Go-Live Phase 6 days
    Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
    Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
    SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
    User Acceptance Testing 1 day
    Production System Go-Live 1 day
    Post Go-Live Support 14 days
    Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
    This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements.

  • What do you mean by changing a Function Group in upgradation projects

    Hi ABAPers,
    I am new to upgradation project will any one help me in understanding the concepts like.
    1) what do you mean by changing a Function Group in upgradation projects
    2) what is the relation b/w the Maintenance view and function group
    3) what happens when we regenerate the table maintenance in se11
    4) how can i restore the changes that have done to FG after regenerating
    5) Suggest me is there any Tcode or procedure to see the code in Remote system (like how we compare the versions of remote system)
    Could you please help me ..
    Any relevant docs you can send it to  [email protected]
    Thanks in advance..

    Hello Smriti,
              Exploding a BOM means to display all the components and sub-components for a BOM in a particular transaction (eg) VA01,CO01,ME22N etc..
    You can use the SAP FM's depend on the Functionality:
    CS_BOM_EXPLOSION               General BOM explosion
    CS_BOM_EXPLOSION_EQUI          BOM explosion - initial screen: equipment
    CS_BOM_EXPLOSION_MAT           BOM explosion (old version); as of 3.0, use CS_BOM_EXPL_MAT_V2
    CS_BOM_EXPL_EQU_V2             BOM explosion for equipment
    CS_BOM_EXPL_KND_V1             BOM explosion for material
    CS_BOM_EXPL_MAT_V2             BOM explosion for material
    CS_BOM_EXPL_PSP_V1
    CS_BOM_EXPL_TPL_V1             BOM explosion for functional location
    CSS7                           Explode BOM (Document)
    CS_BOM_EXPL_DOC_V1             BOM explosion: document sub-assemblies
    CS_BOM_EXPL_GNRL2_V1           General BOM explosion: document sub-assemblies
    CSSO
    CS_SO_MODE_BOM_EXPLOSION
    As per Garet in response to your question better talk to the Functional team to get the better underatanding for your requirement.
    Check the below link for more details on BOM:
    http://sap-img.com/sap-sd/what-is-bom-referring-to-sap-sd.htm
    Thanks,
    Greetson

  • Text Determination Error in Upgrade Project

    Hi All,
    I am working on Upgrade Project from 4.6C to ECC 6
    I encountered the error like the Text Determination is missing in all the Documents like Sales Order, Delviery and Billing Documents in ECC6.
    But the same is appearing in 4.6 C.
    I am getting the error " Error in Text Formating ".
    Message No.VX201.
    Could you please give your valuable inputs on this.

    Hi,
    Check the settings again in 6.0. Follow the path IMG-sales and distBasic Func--Text Control. It may that while migrating the data certain tax type is found missing in the new system.
    Regards,
    Saurabh

  • Cutover Activities for Upgrade Project

    Experts
    What are the cutover support activities for the administration of the ECC 6.0 (SAP) upgrade project. Also please do let me know how to prepare cutover strategy , and how do we develp cutover plans.
    Regards,
    Mahesh

    Hi,
    Check this thread.
    CutOver activities in BI7.0 while doing  production upgrade BI7.0 FromBW3.x
    Regards.

  • What is the role of an abaper in upgradation project from 4.7 to ecc6.0?

    Hi anybody pls forward  any documentation and ppts to understand the upgradation project
    What is the role of an abaper in upgradation project from 4.7 to ecc6.0?
    what we have to check and we have to upgrade give some guidance
    thanks in advance.

    Hi,
    check the below link..
    http://www.thespot4sap.com/upgrade_guide_v2.pdf
    reward if helpfu.
    Regards,
    Nagaraj

  • NWDI in upgrade project - Recommendations

    Dear All,
    We are upgrading ECC and Portal. Earlier client doesn't have NWDI.
    Now we are using NWDI, so the customer wants the below recommendations.
    1. Provide a recommendation for use of NWDI within the Upgrade project.
    2. Provide a recommendation for possible ongoing / expanded usage of NWDI at the project.
    Please provide your suggestions.
    Thanks.

    Hi,
    1. If you are implementing ESS/MSS you can upgrade the components using NWDI.
    In general for deploying components you either use JSPM or SDM to deploy. And NWDI uses the same method to deploy the components.
    It's upto you to use NWDI or to deploy them directly.
    Recommendation would be if implementing ESS/MSS you can use NWDI. If you are not modifying the standard SAP Delivered component then you can deploy the components directly.
    2. It depends on what all things are you planning to implement.
    Hope this helps.
    Cheers-
    Pramod

  • Upgrade Project - 4.7 to ECC 6.0

    Hello Gurus,
    I am HR Functional consultant and assigned to work on upgrade project (4.7 to ECC 6.0) for the first time. I am new to this environment. Can any one help me with suitable documents to start with. My mail id: [email protected]
    Points assured..
    Thanks in advance
    Regards
    kasi

    Dear kasi raj,
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh
    P.S. you can send me a mail at my mail id [email protected] for any specific details

  • BW Upgradation Project from BW 3.5 t o BI 7.0

    Dear SDNS,
                             We got an requirement to do an upgradation project for BW 3.5 to BI 7.0... This is the first time am involving for Upgradation..Am An BW Technical Consultant.. Can anyone one sugggest at scratch level wat are the roles should play by BW Technical consultant.. And Wat are the activities whould done by BW technical consultant.. An can anyone tell me.. How many SAP Consultants should involve in this Project.. i.e like how many Basis Consultants and how many ABAP Consultants should involve.. Who plays the Vital Role for Upgradation...
    Can anyone send me the Documents Related for BIW Upgradation for BW 3.5 to BI 7.0.. If anyone send me screen shots related to BW Tehcnical Consultant work it would be helpful.....
    My E-Mail - [email protected]
    Answering Getz Appreciated,
    Thanks & Regards,
    Aluri

    Hi
    I have some checklist ,do not exactly remember from where i got it but its really usefull
    There is no standard SAP checklist as it used to exist in 3.x for nw2004s upgrade and trust the master data guide available on market place is not upto the mark and expectations
    So Heads up..
    /message/2979584#2979584 [original link is broken]
    /message/2765713#2765713 [original link is broken]
    /message/2979576#2979576 [original link is broken]
    /message/3214476#3214476 [original link is broken]
    /message/3024448#3024448 [original link is broken]
    You may wish to have a look at draft portrayed below,rest you learn when you drive
    Lessons Learnt - Upgrade
    1)Convert Data Classes of InfoCubes. Set up a new data class as described in SAP OSS Note 46272.
    2)Pay attention to the naming convention. Execute the RSDG_DATCLS_ASSIGN report.
    3)Run the report RSUPGRCHECK to activate objects.
    4)Upgrading ABAP and JAVA in parallel may cause issues. If there is no custom development on J2EE instance, it is recommended to drop the J2EE instance and re-install the latest J2EE instance after the upgrade.
    5)Apply SAP OSS Note 917999 if you include the Support Patch 6 with the upgrade or you will get the error at PARCONV_UPG phase. When you upgrade to a product containing Basis 700, the phase PARCONV_UPG terminates. You included Basis Support Packages up to package level 6 (SAPKB70006) in the upgrade. The job RDDGENBB_n terminates with the error RAISE_EXCEPTION. In addition to this, the syslog contains the short dump TSV_TNEW_PAGE_ALLOC_FAILED. The program SDB2FORA terminates in the statement "LOOP AT stmt_tab". An endless loop occurs when the system creates the database table QCM8TATOPGA.
    6)Apply the OSS note 917999 if you get the following error during PARCONV_UPG phase: PARCONV_UPG terminates with TSV_TNEW_PAGE_ALLOG_FAILED
    Critical OSS Notes:
    819655 – Add. Info: Upgrade to SAP NW 2004s ABAP Oracle
    820062 - Oracle Database 10g: Patchsets/Patches for 10.1.0
    839574 – Oracle database 10g: Stopping the CSS services ocssd.bin
    830576 – Parameter recommendations for Oracle 10g
    868681 – Oracle Database 10g: Database Release Check
    836517 – Oracle Database 10g: Environment for SAP Upgrade
    853507 – Usage Type BI for SAP Netwaevers 2004s
    847019 - BI_CONT 7.02: Installation and Upgrade Information
    818322 – Add. Info: Upgrade to SAP NW 2004s ABAP
    813658 - Repairs for upgrades to products based on SAP NW 2004s AS
    855382 – Upgrade to SAP SEM 6.0
    852008 – Release restrictions for SAP Netweaver 2004s
    884678 - System info shows older release than the deployed one
    558197 – Upgrade hangs in PARCONV_UPG
    632429 – The upgrade strategy for the add-on BI_CONT
    632429 - The upgrade strategy for the add-on FINBASIS
    570810 - The upgrade strategy for the add-on PI_BASIS
    632429 - The upgrade strategy for the add-on SEM-BW
    069455 - The upgrade strategy for the add-on ST-A/PI
    606041 - The upgrade strategy for the add-on ST-PI
    632429 - The upgrade strategy for the add-on WP-PI
    Post upgrade Steps :-
    1. Read the Post Installation Steps documented in BW Component Upgrade Guide
    2. Apply the following SAP OSS Notes
    47019 - BI_CONT 7.02: Installation and Upgrade
    558197 - upgrade hangs in PARCONV_UPG, XPRAS_UPG, SHADOW_IMPORT_UPG2
    836517 – Oracle Database 10g: Environment for SAP Upgrade
    3. Install the J2EE instance as Add-in to ABAP for BI 7.0 and apply the Support Patch that equivalent to ABAP Support Patch.
    4. Run SGEN to recompile programs.
    5. Install the Kernel Patch.
    6. Missing Variants - (also part of test script)
    look at the RSRVARIANT table in SE16. If it is empty, then you will definitely need to run RSR_VARIANT_XPRA
    program - RSR_VARINT_XPRA
    OSS -953346 and 960206 1003481
    7. Trouble Shootauthorizations
    820183 - New authorization concept in BI
    I think the above material is sufficient but in case you face any issues feel free to revert back
    Reward suiatble points

  • SCM 5.1 Implementation Project, Upgrade Project

    Hello,
    Is any one working on SCM 5.1 Implementation or upgrade Projects..
    If you are doing SCM 4.0 to SCM 5.1 upgrade what are the Delta changes you have observed for DP, SNP , PPDS, GATP modules?

    i suppose its called SCM2007
    you can find the help file for this in help.sap.com
    you can also find the release restrictions and release notes for SCM 2007
    not sure of active customers
    the release date is 31/08/07 as per the PAM
    i think it wouldve been beta tested for the last 6 months at least
    one might fond some customer specific SCM 2007 notes and that might give an idea of the customers who are using it - nestle/ HP??.... am guessing

  • Role of ABAP Consultant in an Upgrade Project

    Hi Friends,
    I'm an ABAP consultant, I've worked on Implementation Projects till now. Last one was on ECC 6.0.
    I have been assigned to an upgrade project (from 4.6 to ECC 6.0).
    So can anybody let me know what is the role and what are the responsibilites of an ABAP consultant in an Upgrade Project?

    Hi,
    Role of technical consultant:
    1) Code fixes and bugs for upgrade objects
    2) SPAU / SPDD corrections
    3) removal of obselete statements by checking through the code inspector or EPC
    4) replacing the BDC on enjoy transactions with BAPI
    5) replacing the call transaction on obselet transactions with the corresponding new transactions.
    Few of them are listed above..
    Reward if useful
    Regards
    Shiva

  • Data transfer form 4.7 to ECC 6.0 in upgradation project. How to do?

    Hi Experts,
       The client is going for an up-gradation from 4.7 to ECC 6.0. The entire data needs to be transferred from 4.7 to ECC 6.0. What is the best possible way to do this?
    Please advise.
    Regards,
    Tomesh

    Hi ,
    Going for an up-gradation from 4.7 to ECC 6.0. The data needs gets migrated from 4.7 to ECC 6.0.
    SAP normally has defined better SAP functionalities in the new system .
    In any upgrade project use Tcode SPDD. In this all the dictionary objects u2013 data elements, database tables and structures in the version 4.7 are compared with the upcoming new system.
    All you need to do is the check whether the new change is suitable or not.You can make the modifications and then you need to make the migration of data, which can be automate.
    the links for your reference.
    Link:[https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/304b9de6-f84f-2b10-94af-e5ff7461c18c]
    link:[http://solutionbrowser.erp.sap.fmpmedia.com/Default.aspx]
    Thanks & Regards,
    link:[Lakshmi Narayana]

  • Role of a functional consultant in an upgrade project

    Hello friends,
    My client is planning for an upgrade of 4.7 to ECC 6.0.
    Could you pls give me some info regarding the Role of a functional consultant in an upgrade project.
    Naveen

    The role of a functional consultant in an Upgrade depends on the scope of the project.
    whether it is a Technical Upgrade or a Functional Upgrade.
    Following would be some of responsibilities -
    Coordinate with Client  Business/Functional Team to identify critical business processes, understand the functionality of the custom developments
    Overall Test Planning, Preparation of Test Plans, test scripts and executing Unit and Integration testing
    Providing clarifications for functional related issues during UAT
    It is is functional upgrade analyze which custom functionalities can be retired and which can be brought back to standard.
    Prepare a POC on the recommended new functionalities on how these would be useful for the Client.
    Training the Client super users
    Preparing training documents
    Analyzing the obsolete transacations and modifying the documents with the new transactions
    Hope this helps you.

  • SAP MM Functional Consultant's role in a Upgrade Project from 4.6C to 6.0

    Hi Guys,
    I will be thrown into a SAP Upgrade Project. I would appreciate if someone could shed some light on what a SAP MM Functional Consultants role would be in this kind of Project.
    I would appreciate a comprehensive guide where it includes role within each stage of the ASAP methodology for Upgrades.
    Thanks guys.

    > I will be thrown into a SAP Upgrade Project. I would appreciate if someone could shed some light on what a SAP MM Functional Consultants role would be in this kind of Project.
    - defining the core processes
    - test and customize them
    - release the customizing transports for production
    > I would appreciate a comprehensive guide where it includes role within each stage of the ASAP methodology for Upgrades.
    Since each project is different and each system has a different customizing/configuration it's not possible to generate a step-by-step guide what you have to do. The requirements are usually defined by the business.
    Your project leader should be able to give you a project plan (e. g. by using Solution Manager Upgrade Project) where you can get an idea based on the system you're going to upgrade.
    Markus