Mobile Integration in ECC 6.0
Dear Experts
Is it possible for IS Retail ECC 6.0 to have mobile intergration without Netweaver.
Regards,
Richa Grover
Hi,
It depends on the kind of Mobile integration that would fit-in for a specific business usecase.
There are various ways of mobile integration even with out Netweaver like apps using Webdynpro online, other custom applications that directly talk to ECC via JCO etc mostly suiting light weight always connected scenarios.
There are pros and cons for any kind of Mobile integration .
Netweaver Mobile could be used to build mobile apps for occassionaly connected/disconnected scenarios and for wide variety of devices from windows mobile to smart phones available in the market.
Regards,
Liji
Similar Messages
-
How is the integration with ECC in SRM 7.0??
Hi,
Working with SRM 5.0 or 5.5 the use of XI for integration with ECC is not mandatory because when we send any document from ECC to SRM like requisitions (to convert them in shopping cards) or when we send any document from SRM to ECC like shopping cards, PO´s, contracts, we only use the RFC´s and the abap programs.
Is the same behavior with SRM 7.0?????
Could the integration from SRM 7 with ECC 6 work with RFC´S without XI or for this vertions is XI mandatory?????
ThanksSRM70 is closely integrated with XI for transferring docs between ECC and SRM. SAP introduces eSOA tech nology with SRM70 and hence all documents like PR from ECC to SRM, Central Contract from SRM to ECC, PO creation (Classic), etc uses this techn ology.
Thanks,
Jagadish -
SAP XI 2 BI Integration with ECC 6.0
Dear all,
we are planning to do XI integration between ECC 6.0 to BI
1) How to Get the BI Standard data from ECC 6.0?
2)We are planning to integrate Standard BI reports with ECC 6 0 through XI.
Please sugget the scenario for integration between ECC 6.0 to BI through SAP XI.
Thanks In Advance.
MaheshHi Mahesh,
Please go thru these links
To push data from BW to XI, please check
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20push%20data%20into%20bw%20from%20xi.pdf
To send data from XI to BW please check
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/integrate%20bw%20via%20xi.pdf
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40574601-ec97-2910-3cba-a0fdc10f4dce
XI-BI Integration unsing RFC
Pushing data from BI to XI using RFC Adapter
https://forums.sdn.sap.com/click.jspa?searchID=17734474&messageID=5878682
Thanks,
Shweta -
Hello,
I want to know if it is possible to access a task from a blackberry. I tried it but I could not, is there a way for doing this?
Thanks & Regards
SUHi SU,
This isn't possible in the current release. BPM-Mobile integration is indeed a hot topic
regards,
Harsha -
CRM2007 integration with ECC 5.0
Hi All,
Will appreciate if someone can send a document or link that can help me with ECC5.0 and CRM 2007
Regards,
Surenthis is copied from the installation guide
Prepare an OLTP Backend System:
n SAP R/3 or R/3 Enterprise systems as well as ECC 5.0
systems require the R/3 Plug-In 2004.1 with at least
SP10.
See SAP Note 704564 (R/3 plug-in:PI 2004.1
installation/delta upgrade) and SAP Service Marketplace at
http://service.sap.com/r3-plug-in
n As of SAP ECC 6.0, the R/3 Plug-In is no longer
required. New and extended interfaces for integrating
SAP ECC 6.0 are directly contained in SAP ECC 6.0.
[SAP ERP 6.0 <Technology> on <Operating System>: Database
then it should be done as with any OLTP system.
I've done a connection to a R/3 Enterprise 4.7 system and that worked fine.
Follow the Best Practices documenation and you will be fine!
http://help.sap.com/bp_crmv12007/CRM_DE/HTML/index.htm -
CRM 3.0 integration with ECC 6.0
Hi all, I wanted to confirm if CRM 3.0 can be integrated with ECC 6.0
If yes, then which support pack,etc. will be applicable and what all issues could be encountered in integration?
Thanks in advance.Hi Animesh,
just to be clear.
the CRM and the backend ECC60 are communicating via Plug -ins
you can read more information here
http://service.sap.com/r3-plug-in
http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000601131&
The other SP level of the systems (BASIS etc.) are independent.
Once you could conect the systems at basis level. You can begin your work at
Application level.
Whether you can have problems here please ask the CRM Gurus in a separate therad in other forum.
I Hope I have answered all of your questions.
Kind regards
Imre Takácsi-Nagy
Senior Support Consultant II.
SAP Global Support Center Austria
Netweaver WEB Application Server ABAP / JAVA -
Integration of ECC Scheduling Agreement (Doc Type LP) with SAP TM
Hello Experts,
I am trying to integrate ECC Scheduling Agreement (Doc Type LP) to create OTR in TM System. I have maintained below settings:
1. Create and Activate Control Key
2. Output determination procedure linked to LP has output type TRS0 with requirement 27 assigned.
3. Output condition record has been created
4. I have checked Business Functions are also active
I was able to transfer other Document Types like OR; RE; FD (ECC Free of Charge); SDF (ECC Subsequent Delivery - Free of Charge); Consignment Fill up and Consignment Pick up by maintaining these settings, but not able to push Scheduling Agreement LP to TM.
The output TRS0 is not appearing automatically and if I try to insert and execute this output in Scheduling agreement, Output is failing with error message: "Order is not TM-relevant"
Is there any other config or mapping or SAP Note that needs to be applied to achieve this integration? Because I believe standard integration is available for ECC Scheduling agreement (I have read in help.sap.com).
Thanks and Regards,
Vikram BhardwajHello Vikram,
You mean this documentation:http://help.sap.com/saphelp_tm81/helpdata/en/9c/787f3c0a771e57e10000000a114084/content.htm?frameset=/en/44/b0488e9c35612be10000000a155369/frameset.htm ?
I think there is talking about the integration for SCM Basis as SOS, not Order Integration.
Regards, Marcelo Lauria -
ITS Integration with ECC 6.0
Hi
we are doing upgrade from 4.6c to ECC 6.0. It is technical upgrade. In SAP HR, we are using ESS timesheet entry (CATW). Now during upgrade we are facing problem in using ESS timesheet as we are using ITS server and SAP ECC 6.0 does not support ITS anymore. As the result the system doesn't allow to enter time data and save it through ESS, the error message it gives is "No Posted Data for 5_CPR_EXTID 5( Include LCATS_ITSF10)" but if we enter time in SAP directly then it is working fine.Replying to this old post hoping for some answers.
We had researched this and converted to Integrated ITS using our ZCATW over a year ago. The notes read that while integrated ITS is a suppoted platform, ESS scenarios for which newer technology exists are no longer supported. We tested ZCATW under ECC5 and decided to move forward because of a pending technical upgrade. We are now in the middle of the technical upgrade and wishing to keep it technical we are trying to keep ZCATW going and then look at the newer components as a seperate project. Has anyone found a way to overcome the above issue in CATW/ECC6?
Thanks,
Doug -
Error Connecting to SLD, while CC integration with ECC 6.0
Dear All,
I am using the CC v and from ECC IDES. I cannot connect to the SLD. It is giving an Error.
When I try to register the Server Programs in Vis Admin and click the SET button I am getting an error "Error Adding Bundles". In the ABAP part I am getting the same error of RFC connection.
Now from ECC when I do a SM59, and then goto TCP/IP connections, on creating this connections I cannot make them UNICODE as the R3 system is Non-Unicode. So these dont work.
What am I supposed to do.
Please let me know. This is very urgent and useful replies will be awarded full points.
Thanks and Best Regards
Chakra and SomnathReplying to this old post hoping for some answers.
We had researched this and converted to Integrated ITS using our ZCATW over a year ago. The notes read that while integrated ITS is a suppoted platform, ESS scenarios for which newer technology exists are no longer supported. We tested ZCATW under ECC5 and decided to move forward because of a pending technical upgrade. We are now in the middle of the technical upgrade and wishing to keep it technical we are trying to keep ZCATW going and then look at the newer components as a seperate project. Has anyone found a way to overcome the above issue in CATW/ECC6?
Thanks,
Doug -
Steps: SNC (Supplier Network Collaboration) Integration with ECC through XI
Hi,
Has anyone worked on the SNC(Supplier Network Collaboration) integration with SAP ECC via SAP XI.
Could you pls share any documentation related to this. And also could anybody tell me the setup required to go ahead with the integration.
Thanks,
SHi Xavier,
SNC integration with XI has predefined mappings. So ask your basis guys to download the XI content for SNC using with PI. Once they deployed you will have a builtin predefined content in XI. Within the predefined content mostly they all are xsl mappings.
If your requirement is with the standard idocs then you can use them directly. Else if their is customization they you may need to change the mappings according to your requirements.
Also check this help:
http://help.sap.com/esoa_scm_snc2007/helpdata/en/index.htm
Regards,
---Satish -
Sourcing integration with ECC using PI (percentage rebate scenario)
Hi Experts,
Sourcing - OP 7
ECC - configurations done for rebate conditions as mentioned in standard configuratin guide
PI - SP02 patch 0
We are publishing percentage rebates in Master agreement from sourcing to ECC to create Online Agreement using standard predelivered content for PI from SAP, however ECC returns error in RFC response mentioning
No currency code found for ISO code P1 in field HEADER_CONDITION/CURRENCY_ISO
I checked PI content & I see for % rebates, field HEADER_CONDITION/CURRENCY_ISO is always populated in PI with P1.
What are the next steps to be done in ECC or in PI to overcome the mentioned error.
Any pointers will be appreciated, Thanks.Hello Jeet,
I would suggest to check first that in both your SAP ERP and SAP Sourcing an ISO Code P1 for percentage exists. Further I would check if a rebate with an absolute amount works fine (also create multiple amounts and check if a scale is created in ERP, just to ensure that it works in general). E.g. check if the price condition/condition type exists and is configured correctly in ERP.
If that all looks good you might want to check the ERP transaction BBP_ES_ANALYZE. I recently created a SDN blog about some tips and tricks, it also explains this transaction, please see ERP integration with SAP Sourcing tips and tricks Maybe the error message(s) in this transaction will help you to better understand what is going on.
Hopes that will help you
Markus -
Pro/E integration with ECC 6.0
I want to integrate Pro/E with ECC 6.0 in order to transfer/exchange engineering data such as materials, BOMs, engineering changes, documents, etc.
Does anyone know of Pro/E functionality or a 3rd party product that does this sort of thing?
Kind regards,
Rex L. FarrisA direct interface is developed by .riess GmbH and SAP. It is SAP certified and supported by SAP.
For more information,
Go to <a href="http://service.sap.com/plm">http://service.sap.com/plm</a>
Life-Cycle Process Support -> Product Development -> Integration -> MCAD Integration -> Pro/ENGINEER -
Integration of ECC 6.0 with SRM 5.0 SR2
Hi Guys,
Can any one please provide me with the steps for integrating ECC 6.0 with SRM 5.0 SR2.
Regards,
MaxHi ,
Can anyone please let me know if any one has any kind of documentation on this.
Regards,
Max -
C4C integration with ECC 5.0
Guru,
My company is looking for implementing cloud for customer, but our backend system is running on ECC 5.0.
SAP had strongly recommended us to upgrade our ECC before implementing C4C project.
Through some reading, it seems that integration prerequisite is ECC has to be version 5.0
Or there is any workaround to integrate (standard integration) C4C to ECC 5.0 through HCI? Like by applying or enhancing standard iflow that released for ECC 6.0?
Thanks.
Cheers,
JimNot sure where you have read that ECC 5.0 would be supported. The official SAP position is summarised in the table below. You can clearly see that some functionalities even depends on what EHP level you are at with ECC 6.0.
SAP PI and HCI leverage the same iFlow content. -
Integration of ECC 6.0 PM to EWM
Hi Friends,
I am going to Implement PM mpdule in ECC 6.0. WE are parallely implementing EWM (Extended warehouse mgmt).
What precaution should i take, I dont know what are the integration points between ECC and EWM.
Please Help
Regards,
ShashikantDear salunke
There is no major integration between PM & EWM .
EWM is majorly used for warehouse Inventory managements.It also integrates with EHS for harzardous material management.
More info refer http://help.sap.com/saphelp_scm50/helpdata/en/5f/c69040bca2ef4ae10000000a1550b0/frameset.htm
regards !
Ajay
Maybe you are looking for
-
How to use same DFF for two different forms with :BLOCK.field reference
Hi, Can anyone suggest how to use the same dff in two different forms by using :BLOCK.field reference. Scenario is the same DFF is referenced by two forms, viz. Form-1 & Form-2. Form-1 Reference Field is :BLOCK.field name, but the same block is not a
-
Hi All, We are using BI Pulisher 5.6.3 with EBS 11.5.10. Used bursting program to send the e-mails.But now the requirment is we want to have a return receipt(When ever user reads that mail an automatic notification). Is there any way that we can trac
-
I still don't know how to config the "DataSource" when I have made a bc4j and deploy it as an EJB Session Bean to OC4J. What should I input in the "Data Source"? What should I input in the "Data Source for Internal Connection:"? what different betwee
-
IdleRemover notifying pools, interval: 450000
Hi, I am using Jboss 3.2.1 and oracle 9.1 i. I have this error in the jboss error log. Does anyone know what's the problem? Thanks in advance. DEBUG [org.jboss.resource.connectionmanager.IdleRemover] run: IdleRemover notifying pools, interval: 450000
-
Re installing Workflow Manager SharePoint 2013
In my domain I have only 1 SharePoint Machine where I also install the Workflow Service Manager, but now I'm facing alot of problems with the workflow manager, What I want is to Totally Remove or Uninstall the workflow Manager, and re-Install it with