Hi SAP Gurus,
I have requirement where i need to model particular business requirements on subcontracting and the same is resulting in need of modeling of dummy product and dummy planned orders. Please share your inputs on what would be impact of dummy product and dummy planned orders in ECC. and also how to make sure that it does cause any issues in costing.
I am modeling subcontracting requirement and i need to create following master data.
All the below products are at plant P.
P has the components as Q_D
Q_D has the components as Q
Q has the components as R
Where Q_D is the dummy product produced at plant P.
P and Q are subcontracted items to the vendor V.
P is the finished good, Q and Q_D are Semi finished goods, R is raw material.
When we plan we are creating Purchase orders for P and Q. And Q_D is made inhouse and we need to create planned order for it. how do we handle the planned orders created for Q_D. we dont want them to convert to production orders. we want a way to clear off these dummy planned orders once we close the POs of P and Q.
Please advise.
Thanks.
Jagadeesh

Hi senthil,
Check if the forecast date is beyond PPDS horizon.
Also in product master on PPDS tab, you should maintain 4 in PP Planning procedure.
Bye.
Nitin

Similar Messages

  • Mass update for production and planned order MRP controller

    Hi Gurus,
    It's anyway possible to mass update MRP controller for Production orders and  Planned orders. If any please provide me step by step process.
    Thanks,
    B.Deethya.

    I feel You have changed the MRP controller in Material master and want to incorporate same in production order & plan order.
    For Planned order Run MRP with delete and recreate mode, system will create a new plan order with MRP controller in Material master
    For production order, Mass change is not possible, create a simple BDC or LSMW, And change the MRP controller

  • Production and planned order not scheduling

    Dear Experts,
    Created new plant ,scheduling parameters,order type parameters ,confirmation parameters.
    Scheduling parameters: Detailed Scheduling ,Forward etc.
    created BOM, Routing,WC.
    Maintained Work center Scheduling Tab formulas entered,Routing Machine,setup time entered.
    System showing at the of creating production order Scheduling Start time and end time is same.
    scheduling not done in production order.
    Anyone explain process for scheduling
    Regards,
    Naresh Reddy.

    Hi Naresh,
               The problem is mainly due to the work center scheduling formulas only. Maintain the scheduling formulas as SAP001 for setup and SAP002 for machine. In OPU3 check the automatic scheduling check box, adjust dates as 'adjust basic dates , adjust basic requirements to operation date' and recreate the production order.
    Let me know if u are still facing the same problem after doing these settings.
    Regards,
    Krishna Chandra

  • Req. delivery date and plan order finish date relationship

    Dear Experts,
    I have a question on setting the req. delivery date and plan order finish date relationship. Now, I want the plan order finish date is one day before the req. delivery date, is it possible to set it in configuration? Please advised! Many thanks!
    Regards,
    Matt Yim

    Matt,
    Please use a schedule margin key(SMK) in the material master MPR2 view which has float after production defined as 1day.
    If there are no SMK with that defination then you can define you own in customisation and assign the same in the material master. (SPRO--->Production ->MRP->Planning ->Scheduling and Capacity Parameters->Define Floats).
    Regards,
    Prasobh

  • How Can i Calculate The shortages against production or planned Order

    Dear All
    how can i get the shortages against production or plan order .
    condition is Egg.----ITEM  <b>X (available qty is 6000)</b>is using for three assembly .A,B,C
    I have created one order For <b>A--5000 qty</b>. At this time <b></b> item x is reserve for Order Created Of A.
    Now i have created one another order for<b> B--4000 qty</b>. then it would showing the shortage of  3000 Qty.
    And same Order of <b>C Qty 5000</b> Material x would be showing the shortage
    5000.
    <b>Bcoz Shortage of 3000 is for B And Now i want only Shortage Of C.</b>
    How can this procedure done.
    Rgds
    Pankaj Agarwal

    Hi Prasobh
    Don't mind
    Points is not so major issue for me.Till i m not getting right answer or near by sothat i cant concentrate on point .almost all answer was clarify by me already . then if i cant get the right solution then  i will take help from experts like u.nothing more.and  point of view we have already touched with this community and i have given points more of them.so don't mind . take it as a challenge definitely u will get superior point from me.
    Rgds
    Pankaj Agarwal

  • Dependant Requirements and Planned Orders

    Hi,
    For dependant requirement, question is whether once the planned orders (of independent requirements) are converted to production orders, then only will the dependant requirements be converted to planned orders…or it is converted once independent requirements are converted to planned orders? I.e. independent requirements are blown down all the way in MRP.
    Thanks.
    Rgds,
    Sue

    Hi,
    Let us take some example so that it is easier to explain.
    Material A - Finished Good
    Material B - Raw material
    PIR generated for A - 100 Nos , MRP is run and Planned order created for A - 100 Nos. Now
    For Mtl B Dep reqt is generated for 100 Nos.
    If No stock is available then a planned order for 100 nos generated.
    IF Stock is availabel then no planned order is generated.
    When production order is created for Mtl A then the "dep reqt" status of Mtl B changes to
    "ordres"(order reservation)status.U can check this MD04.
    Thanks and regards,
    Rajesh

  • Copy Production Area Planned Orders to a corresponding processing plant

    Hi All,
       I am in need of design a dialog program which copy production area planned orders to a corresponding processing plant, In my requirement i am not able to find what are the tables involved and what is the bapi must be used to update the tables.
      I appreciate if anyone come with tips to start with this requirement.
    Thanks and Regards,
    Babu

    Hi folks,
          Thanks for the prompt reply, i have one basic doubt, whether the order no must be passed by us, if i am not giving order no it will returns the error.
    Thanks and Regards
    babu

  • VSF and planned orders same day

    Hello,
    When running MD04, forecast (VSF) and planned orders are landing on the same day. This is causing confusion for the users.  Is there a setting that's causing this to happen? We are using checking rule PP. Should we be using A instead?  The planned order should actually be showing up before the forecast because we don't want the inventory to show negative from the forecast.   Any  help will be appreciated.
    Thank you.
    MZ

    Hi MZ
    On the standard MRP process, the planned order basic finish date will generally match the requirement date.
    Check this document which explains the scheduling in more detail:
    Backward Scheduling for In-House Production - Material Requirements Planning (PP-MRP) - SAP Library
    BR
    Caetano

  • Colective Settlement and "CLSD"Status for Production and Maintenance Orders

    Hi dear experts,
    Is that possible to use transaction KO8G for collective settlement of Production Orders? Apparently it only works for Maintenance Orders.
    The same applies for transaction CO99 for getting "Closed" status in Orders. Apparently it does not take the Production Orders, even if the selection "With CO Production Orders" is active. Is there any additional configuration we should do?!
    We would like to do settlement (and mass set "Close" status after) for Production and Maintenance Orders at the same time.
    Thanks in advance,
    Lígia Moreira

    Hi,
    You can use CO88 for settlement of production orders. Normally, CO99 should take production orders if the flag is switched. Do you receive any error when you do it?
    Regards,
    Eli

  • Process Orders and Planned Orders data

    Hi,
    I am working on extracting process order and Planned Orders data into BW. I could not find any standard DataSources available for my req, so I want to develop generic extractor. the main key figures are Actual Labor and Machine Hours, Target Labor and Machine hours.
    Please help me if there are any standard datasource available or ECC tables to pull the data or any standard function modules available.
    Thanks,
    Reddy

    Hi Sanath,
    Thanks for your reply. I want to pull Actual Machine hours, Target Machine hours, Actual Labor hours and Target Labor hours.
    these fields are not there in PLAF table.
    I am looking for a table or datasource which can give those details.
    Thanks,
    Reddy

  • Production and Service order Release Log updation

    Hi,
    Can any one help me how to update the release log of Production and service order.
    I have a requirements to add new custom logs to the production and service order release process.
    sudha

    As far as I know the standard behaviour is that the PR is created upon order save and not upon the status of the order or items changing to released.
    To get around this you can set user status and use status management to prevent the PR getting created or use the BADI CRM_SRV_FIND_LOG_SC to supress creation of the PR.
    Hope this helps.

  • Table for process order and planned order in apo

    I would like to know the table for stratagy profile for particular process order and planned order.
    in /sapapo/rrp3 there is one filed RECEIPT/Reqt.Element ( process order ) for this  field which table it is coming and i required particular strategy profile for that process order .
    Please help me the table in apo.

    Hi Venkat,
    This value is stored in structure /SAPAPO/RRP_ORDREQ_STR
    under the field name EXTRA.
    You can check the details of the same in transaction se11
    Regards
    R. Senthil Mareeswaran.

  • Settings for the relation of requirement type and planned order type

    Dear Gurus
    Where we maintain the settings for the relation of requirement type and planned order type?Actually I have maintained strategy 60 for a particular material (planning material) so the requirement type is vsev and along with that the planned order type is coming is vp i.e non convertible planned order.That is ok the system is behaving right.But nowhere I can find the setting of vp with vsev how the system is picking vp?
    Regards
    Sandip Sarkar

    Hi!,
    That is an inbuilt sytem setting and you can't change that.
    Regards,
    Uday

  • Production order and planned order qty should not consider in MRP

    Dear All,
    i do not want to consider the previous month production order qty and plenned order qty (Nothing but WIP qty) in the current momth MRP, but the stock has to consider in MRP.
    Example,
    Before MRP,
    material : XYZ
    Stock : 1000
    Prod Qty : 500 for 02.04.2008
    PIR Qty : 2000 for 02.05.2008
    After MRP, the requirement should be as below said,
    material : XYZ
    Stock : 1000
    Prod Qty : 500 for 02.04.2008
    PIR Qty : 2000 for 02.05.2008
    Pld OrdQty : 1000 for 02.05.2008
    For the above requirement ,i have done settings in the availabilty check like , for include planned order and include production order are "DO NOT TAKE IN ACCOUNT".
    Even then also the planned order qty is generating for the "500" only.
    please give the solution for the above said requirement.
    thanx in advance
    Regards
    Srinivas

    hi
    MRP will always consider the prod order qty while doing nert req calculation.One thing u can do is TECo the prod orders and un MRP then it wont consider prod order qty.
    The Availability check will check whether the components r avalaible or not based on ur scope of check
    Reward points if useful
    Amit

  • Externally processed operation and planned order

    Hello experts,
    When an operation is defined as externally processed, once the production order (from a planned order generated via MRP) is created, the purchase requisition for that operation is automatically generated. My question is if it is possible to generate the purchase requisition before generating the production order, I mean, with the planned order.
    Although this external operation is defined in the routing, the planned order does not show it and it means that the purchase requisition is not generated.
    In our scenario we want to convert the production orders as late as possible to have automatic changes in BOM, but if we do not convert the planned orders to production orders, we won’t have this purchase requisitions.
    Is there any way to solve this?
    Regards

    Hi Laura
    No, it's not possible to generate the purchase requisition for an externally processed operation before the creation of the production order. The planned order routing is only exploded for scheduling and capacity requirements calculation and an operation is not actually created.
    As an alternative, you can create a separated material number and assign the special procurement 30 for subcontracting to this material. If you add this component to the BOM of the parent material, MRP will directly generate a purchase requisition for subcontracting.
    BR
    Caetano

Maybe you are looking for

  • How do I set up remote access to my HD thats hooked to New Airport Extreme

    Hi Everyone, I want to have remote access to my hard drive which is hooked up to the USB Port on the back of the Airport Extreme. I have tried many different configurations and watched youtube videos to help me, to no avail. Apparently there are many

  • Mail: wrong unread messages count – fix instead of workaround?

    hello. Although I welcome the idea to set up an unread mails smart folder in addressing this issue (http://discussions.apple.com/thread.jspa?messageID=5857003&#5857003, http://discussions.apple.com/thread.jspa?messageID=5657501&#5657501 etc.), I'd co

  • Late Apple Care Activation

    I bought an iBook G4 in August of 2005 and purchased the two-year Apple Care Protection Plan with it. Though I had already paid for it, I forgot to actually activate the plan (I'm sure my mother told me to do so, but freshman year in college can be q

  • BPM Mail Notification - Customizing

    Hi, While Configuring a BPM in CE 7.2 SP03, I configure mail notification for new task in the uwl. I am able to recieve the mail notification. It displays as shown below: Line: - Dear Potential Owners, You have new task(s) in your work item inbox. To

  • Download fails if initiating page is closed - What next?

    Clicking on a download link starts download, but -- If I close the window with the download link, the download fails with "can't read source". If the download link opens a temporary window, the download fails with the same error. This is repeatable a