"Modified date" changing on messages for what seems to be no reason. Very strange.

I have been working on an autoarchive issue with Outlook 2010 for a few days.  I found out that by selecting a message and pressing ALT+Enter you can see the modified date, sent and received dates, etc for the message.  I know if you move a message
or reply to a message it will change the "modified date" for that message. 
However, what is happening to me is when I look at a message it updates the "modified date".  This is crazy!  I didn't know that looking at a message changed the modified date.  If this is the case how are you supposed to check the modified
date because when you check it it changes it to the current date and time.  Again, crazy.  Can someone shed some light on this for me?   thanks

Hi,
You mean that when you view the message, the modified date change to the
current date and time? Based on my research, Editing, replying, or copying an Outlook item can change the last modified date.
So as this issue, start Outlook in safe mode to check the issue:
http://office.microsoft.com/en-us/excel-help/work-with-office-safe-modes-HP010354300.aspx
If the issue still occur in safe mode, then run Windows in clean boot mode - this will exclude 3rd-party services when starting Windows - for a period of time, and check if this behavior will
still occur.
http://support.microsoft.com/kb/929135
Jaynet Zhang
TechNet Subscriber Support
If you are
TechNet Subscription user and have any feedback on our support quality, please send your feedback
here.

Similar Messages

  • What makes an alias modified date change?

    Anybody knows what can make an alias "modified" date change by itself?

    Any modification of the file changes the Modified Date.

  • Change Default message for report total: in reports

    Hi,
    I want to change the message for subtotals in the report i.e "report total"
    pls help me
    tnks
    mani

    Go to Shared Components>Text Messages and find Message Name "REPORT_TOTAL" and set correct string for your language.

  • Open folder, date modified date changing

    I finally updated to OSX Lion and now when i access our Windows server 2012 server, as soon as i click to open a folder the date modified date changes to today. I am not opening any files just viewing the contents of the folder. This is causing a problem since we use the date modfied to sort customers jobs often.
    It started after I installed OSX Lion. Any ideas?

    I finally updated to OSX Lion and now when i access our Windows server 2012 server, as soon as i click to open a folder the date modified date changes to today. I am not opening any files just viewing the contents of the folder. This is causing a problem since we use the date modfied to sort customers jobs often.
    It started after I installed OSX Lion. Any ideas?

  • Modified date changes in Word 2010 without saving.

    Some files (made in Word 2k) I open and get asked if I want to update the links. I answer no. When closing the file the modified date is set to today. After turning off "update links" in the settings, I am not asked anything but still the modified
    date is changed. This is a very undesired behavior. I would even consider it a
    bug .

    The real issue is that it does not seem to be possible to stop Word from "updating" links to spreadsheets.  While it does not actually update the link if the option to update automatic links on open is unchecked, after opening a document containing
    a link to a spreadsheet and then attempting to close it without doing anything else, you will be asked if you want to save the changes to the document.
    -- Hope this helps.
    Doug Robbins - Word MVP,
    dkr[atsymbol]mvps[dot]org
    Posted via the Community Bridge
    "macropod" wrote in message news:[email protected]...
    I am not interested in the internal bookkeeping of Word. If I open a file to just read it, Word should not mess with the saved date under any circumstances.
    Hi victor,
    I understand well enough that you don't have any date-type fields in your document. My suggestion for using the SAVEDATE field was simply to obtain from Word it's interpretation of when the file was last saved.
    I fully agree that Word should not change the system 'modified' date if the file hasn't been changed. However, any such change is done by your system,
    not by Word itself. So, what OS are you using? Is it part of a network? Does your Word file include any macros? If so, have you checked whether any of those macros include code to save the file?
    -- Cheers
    macropod MS MVP - Word
    Doug Robbins - Word MVP dkr[atsymbol]mvps[dot]org

  • Modified Date changes to now by selecting (not opening) vmwarevm file

    Yosemite OSX 10.10.2
    VMware Fusion is currently not running, and it's disabled (an older version not compatible with Yosemite has not yet been upgraded) so I don't think Fusion is doing this....
    I have VM files (.vmwarevm) that were not opened for months. I want to see which is which by viewing the date stamp in Finder. Clicking once shows the old date, then almost instantly it is changed to Now.  Like this:
    Created 2009-04-13, 1:23 PM
    Modified Today, <now>
    Last Opened Today, <now>
    ... but once changed those dates do not change again.
    I found an un-clicked one and it did the same thing, with <now> as the time stamp on that one. Now I have files with slightly different "today" date stamps which is incorrect and not helpful to determine the age of these files.
    It appears something (Preview?) is opening the file to access the content and generate a "recent screenshot" for the current state of the VM.
    I found no other files [edit: no other file types] that behave this way.
    I duplicated and renamed an odt file to .vmwarevm and it does not result in a Modified or Last Opened date change.
    (one of the VMs also doesn't change so I suspect a bad file format).

    Acrobat 9 makes PDF versions 4.0 and higher. You need a PDF version 5.0 to handle transparencies well. PDF version 4.0 doesn't handle transparency effects well at all.
    Pagemaker needs Acrobat 5 to be able to directly export PDF's with custom job settings. It only generates a PDF version 4.0, but works for our needs in Pagemaker.
    I choose to keep both Distiller versions to make our work easier. When you have 20 ads open in Pagemaker, and you send the first one as a postscript through the print window, it sets up the "File, Export" in Pagemaker to use the correct PDF job setting, and then you can just do "File, Export to PDF" for the next 19 ads and it makes perfect PDF's. Works slick instead of having to make postscripts of all 20 ads first and then run them through Distiller. If you only have Distiller 9 installed, it doesn't let you select any custom job settings from your Distiller. Crazy, I know, but that's what I've figured out we have to do to get it to work. Have to have Distiller 5.0 to control PDF settings in Pagemaker and still be able to export from the file menu directly to PDF.
    Distiller 9 is used for all other more advanced design pieces created in InDesign or Photoshop that are saved as a postscript first and PDF's are made the long way in those cases (running postscript through Distiller 9 at the end).

  • Modified date changes when just opening PM file

    We use modified dates frequently at my business. We have lots of things that reoccur only once a year, and we'd like to keep the file dates listed as such in the folder views.
    All the sudden, however, Pagemaker files have started updating the modified date to the moment you touch the file, even if you make no changes. If you open it, it now becomes today's date & current time.  It's really messing up our method of doing things.
    It's not happening with any of our CS4 files, or any Microsoft Office files. Also, it's only happening on files stored on the server. It doesn't happen when we do a test of saving a Pagemaker file locally. The problem is, we don't store anything locally. Everything is stored on the server so everyone can access the file and so it's backed up.
    We have a Windows based computer environment but an Apple server with OS 10.3.8 (Tiger--- yeah, I know, old, but it's as far as we can update that server at this time and are looking at getting a new one sometime, but it might be a year or so.) 
    The "modified date" problem has taken place only in the past 2 weeks. We have not done anything significant for changes or updates for quite a while on either the local computer or server ends. We restarted the server recently just to refresh things, and also added another user to the server and set some permissions for that user in the past 2 weeks.
    What could be causing this all of the sudden, and how can it be fixed?

    Acrobat 9 makes PDF versions 4.0 and higher. You need a PDF version 5.0 to handle transparencies well. PDF version 4.0 doesn't handle transparency effects well at all.
    Pagemaker needs Acrobat 5 to be able to directly export PDF's with custom job settings. It only generates a PDF version 4.0, but works for our needs in Pagemaker.
    I choose to keep both Distiller versions to make our work easier. When you have 20 ads open in Pagemaker, and you send the first one as a postscript through the print window, it sets up the "File, Export" in Pagemaker to use the correct PDF job setting, and then you can just do "File, Export to PDF" for the next 19 ads and it makes perfect PDF's. Works slick instead of having to make postscripts of all 20 ads first and then run them through Distiller. If you only have Distiller 9 installed, it doesn't let you select any custom job settings from your Distiller. Crazy, I know, but that's what I've figured out we have to do to get it to work. Have to have Distiller 5.0 to control PDF settings in Pagemaker and still be able to export from the file menu directly to PDF.
    Distiller 9 is used for all other more advanced design pieces created in InDesign or Photoshop that are saved as a postscript first and PDF's are made the long way in those cases (running postscript through Distiller 9 at the end).

  • IMovie modified date changes if only opened

    Whenever I open an iMovie file only to view it, not make any changes, then close the file, the Finder changes the modified date and time to equal the "Last Opened" date and time. I have noticed this through several generations of iMovie so I assume that everyone experiences the same.
    What I wish to know is if this will have an impact on the backup process. For example, I have a pair of external hard drives containing iMovie projects. One is the source and the second is the backup. Many of the files are quite large, some as large as 25 GB. I surely wouldn't want my backup software to attempt to backup a 25 GB file simply because I opened it.
    Does anyone know why the Modified time and date should change simply by opening a file and if my backup concerns are real.

    My iMovie program, too, changes the modified date to the last opened date even if I don't modify it. I suspect that that's the way the program is designed.
    I don't know the answer to your backup concerns. Would depend on what preferences that you set for your backup software. Easiest way to find out would be to make a small iMovie project, save it, then reopen and resave, and see what your backup program does with it.
    You may get more definitive responses from others on this forum.

  • Modified date changes with get

    Hello,
    I am having trouble with synchronizing files with Dreamweaver CS6.
    When I Get files from the server, the modified date for all the local files changes to the date/time that I did the Get, they do not reflect the modified date/time of those on the server, even though I have not modified any of them.
    Then if I modify some of them (say 2 of 10 files) and go to synchronize, Dreamweaver will want to update all 10, not just the modified files.
    I have tried checking and unchecking "Maitain synchronizatin information" but it doesn't seem to make any difference.
    Sorry if this has been answered. I've been looking and have not found a solution.
    Any suggestions?
    Thanks in advance!

    If you "Get" all your files from the server, you are essentially saving over the top of the files you have locally, which changes the file modification date as would be expected.
    After that, all of your local files would then have the same, newer modificaiton date than anything on the server, so it would make sense that they all want to be uploaded again when you "Put" the entire site.
    If you are using Get and Put each time to try to synchronize your files, stop. Use the Synchronize function (circular arrows on the right end of the Files Window toolbar) instead. That will check the server files without transferring them to your computer and saving over your local copy and allow you to upload only the files that have changed (after the first use of Synchronize that is).

  • Files transferred via Bonjour have 'Created' and 'Modified' dates changed

    Okay, So I drag a file or folder of files to a name in the bonjour window to initiate a file transfer session between me and a co-worker. The transfer goes just fine; however, the "created", "modified", and "last opened" dates have all changed to the time when the file was transferred.
    I have never noticed this before. Or, perhaps I just never had reason to view the time stamps.
    I have tried transferring files to/from several different workstations running various system configurations. The results all seem the same. ALL the dates in the Get Info window are CHANGED!
    What the heck?? Anyone?

    If it is a transferred file that is new to that computer then it is likely the modified date will be changed.
    I am not sure about the Created date in these circumstances
    10:15 PM Friday; October 12, 2007

  • Why wont the modify date, change the creation date?

    I tried to use the "Adjust Content Created Date and Time" option but it doesn't change the creation date.  So I have footage from 1992 stuck in a 2010 event folder.  From things I read online it says this should change too.  Am I reading this wrong?  Will 1992 be stuck in 2010 forever, ha.  Any help is great.  I have also provided a screen shot of the Event from 1992 stuck in the 2010 Event Library.

    Yeah the change date inside of FCPX doesn't seem to work as advertised, however you can change the date, so that FCPX sorts it properly.  First delete the clip from FCPX, make sure you have the original somewhere though.
    Open a terminal window and use the following command:
    touch -t 199211280800.00 <path/filename>
    Where the format is:  (use leading zeros if necessary for date & time)
    first four digits: year
    next four:  month and day
    next four:  time of day (in 24 hour format)
    next 2:  seconds as a decimal (this is optional, if you leave it off you will get 00 seconds)
    The above example will change the file date to Nov. 8, 1992  08:00:00 AM
    This will change the created, modified and last access dates of the clip/file.
    Then reimport the clip and FCPX should recognize it properly.
    I've done a dozen or so rips from VHS of old home movies and here is how I change the dates.  Works every time.

  • Changing error message for mandatory field in me21n

    Hi,
    We had made the field "Collective no." of the additional data tab of the me21n transaction mandatory.
    We also change the name of that field to a custom name.
    Now if the user doesn't enter text in that field we get the error "Please enter Collective no.".
    I want to change the message to match our new field name.
    I checked in T100 for that message, but it's not there.
    Can anyone tell me from were that message come from, and how to change it.
    Thanks

    Hello,
    Tell us class and msg no so that we can find out coz it is pecular requirement.
    I suggest do not make it mandotary and dont change to custom field - give information message, place the cursor in field so user get message when he dont enter any value.
    yesterday we have discussed same we do not have any userexit - SAP direct modification required.
    PAI of the SAPMEGUI 1229 and MEPO1229-SUBMI field it contains value of collection no so just write your code there.
    *****Poorna********

  • No Data Change event generated for a XControl in a Type Def.

    Hello,
    Maybe I am missing something but the Data Change event of a XControl is not called when the XControl is used in a Type Def. or Strictly Type Def. (see the attached file).
    There may be some logics behind it but it eludes me. Any idea of why or any idea of a workaround still keeping the Type Def. ?
    Best Regards.
    Julian
    Windows XP SP2 & Windows Vista 64 - LV 8.5 & LV 8.5.1
    Attachments:
    XControl No Data Change event.zip ‏45 KB

    Hi TWGomez,
    Thank you for addressing this issue. It must be a XControl because it carries many implemented functions/methods (though there is none in the provided example).
    Also consider that the provided non-working example is in fact a reduction of my actual problem (in a 1000-VI large application) to the smallest relevant elements. In fact I use a  typedef of a mix of a lot of different XControls and normal controls, some of them being typedef, strictly typedef or normal controls and other XControls of XControls (of XControls...) in a object oriented like approach...
    Hi Prashant,
    I use a typedef to propagate its modifications automatically everywhere it is used in the application (a lot of places). As you imply a XControl would do the same, though one would like to construct a simple typedef when no additional functionality is wanted.
    The remark "XControl=typedef+block diagram" is actually very neat (never thought of it that way) because it provides a workaround by transforming every typedef into a XControl. Thanks very much, I will explore this solution.
    One issue remains: All normal controls update their displayed value when inserted into a typedef but not XControls. Data change event is not triggered. I known that XControls have some limitations (no array of XControls) but I would say, like TWGomez, that this is a “bug” considering the expected functionality.

  • How to change bounce message for spam tagged email?

    Hello,
    I'm checking outgoing email messages for spam. I will send bounce to email sender (user from my domain) if message is tagged as positive or suspected spam. ok, I can set it, but how can I change text in bounce message?
    default bounce if mail is tagged as spam is:
    Your message did not reach some or all of the intended recipients.
    Subject: FW: something
    Sent: 7/12/2009 8:33 PM
    The following recipient(s) could not be reached:
    [email protected] on 7/12/2009 8:35 PM
    The e-mail system was unable to deliver the message, but did not report a specific reason. Check the address and try again. If it still fails, contact your system administrator.
    <smtp.domain.com #5.0.0 smtp; 5.x.0 - Message bounced by administrator (delivery attempts: 0)>
    ^^ but there is no information for the sender that message is not possible deliver, because is tagged as spam.
    Is it possible to change this default message?
    (AsyncOS: v6.5.2-101)
    martin

    You are correct that it doesn't appear that the Positive Spam or Suspect Spam setting doesn't appear to give you any leeway on using a different bounce profile/message to whomever you bounce it back to.
    You may want to consider this workaround.
    1. In the Action, change it to "Deliver"
    2. In the Advanced section of both the Positive and Suspect spam, there is a section labeled "Add Custom Header". Add a custom header like the following:
    X-Internal-Spam-Message: true
    3. Then, since this message will still go through the outgoing content filters, you can create an outgoing content filter that looks for the "X-Internal-Spam-Message" header. If that header exist, then the outgoing content filter will match. For the action, you may need to use the "notify()" action and notify the original sender that it could not get delivered since it was detected to be spam. There is an option to attach the original message. The reason you need to use the notify() instead of the bounce() is because bounce doesn't currently have the option to specify which bounce profile to use.
    You can only specify a different bounce profile in the "Mail Policies > Destination Controls".
    Let me know if you have any question.

  • Finder "modified date" changes whenever I view a file

    I prefer to list files by date in the finder windows.
    Whenever I just open a file without modifying it, the Finder changes it's modified date to Today.
    Is it possible to set the Finder to only display actual content modification dates rather than any activity with the file?
    Thx,

    i've got the same issue....a huge pain. one way to "look at files" without changing the date is to hit the space bar in finder when you're on the file. that will launch the quick look feature and you can see if that's the file you want to open. i know its not the best solution, but a small step. if you find a real way to fix this... let me know.

Maybe you are looking for

  • Multiple MovieClips with same instance name

    I'm following a tower defence tutorial and part of the code is set up so I can build towers on the "grass" movie clip. I wanted to add more patches of "grass" and gave them all the same instance name so I can be able to place towers on them, but I ha

  • "This iPod cannot be used..." - Help!

    "This iPod cannot be used becuase Apple Mobile Device service is not started" Windows 7 & iTunes 10.7.0.21 using a 4th generation White iPod Touch, iO6 I keep getting this message when I connect my iPod to sync in iTunes. I've tried restarting AMDS t

  • Odi 11g functions and sequence

    hello what is the use of fucntions and sequence. How do i create them in odi11g . where in odi 11g is expression editor window available??

  • IReceivables 'Self-Register link' - How to Create?

    Hi, I'm implementing iReceivables R12 and having an issue with generating a link for users to self-register.  I've done all required setups as per the implementation guide, but only able to register users via the iReceivables Registration responsibil

  • I had to restore my system from a time machine backup. It Failed...

    I had to restore my system from a time machine backup. It seemed to go alright up to it asking me to resart to complete the installation, but it would not boot. It forced a panic screen that told me to force quit my computer and resart which did not