Monitors are the same, but Mac won't let me set them the same in Preference

Odd issue.
Two exactly the same Samsung Synchmaster monitors connected to the Mac Pro to make an extended display.
The monitor on the right never has the right resolution. When I set it's resolution to the same as the left monitor (1280x800), it looks awful.
Finally, I checked under Preferences>Displays, and under "Arrangement" I see that the computer has the left monitor set to the right little blue box dimensions (widescreen) but the blue box on the right is more square. How do I change the blue box on the right to match the dimensions of the one on the left?
Thanks
Thanks

Okay, scratch that. I set the one on the right to 1280x800, and now the blue box matches the size, but it looks terrible! I mean, really bad. Yet the same monitor with the same resolution settings on the left side looks fantastic.
Plus, the right side monitor won't let me choose 60 MHz, whereas that is the setting for the one on the left.
Any ideas what's going on here?
Message was edited by: Chris Farrington1

Similar Messages

Maybe you are looking for

  • Need BAPI or custom report for the Vendor partial clearing like in F-44

    Hi exports, My requirement is for creating a Z-Report for Vendor partial clearing  like it happening in t-code F-44. But I didn't find any BAPI or any report for doing partial vendor clearing inside my report. Kindly suggest me any BAPI or  some code

  • Airport base station does NOT deliver a solid connection!

    I have an older Airport base station (an extreme-square, flat, white, you know the one). Ever since I installed the most recent firmware update I get next to no data flow through from the provider. If I connect direct to the provider router via ether

  • Unable to print AP Check with MICR on AIX. The PDF output displays the MICR

    I have peculiar situation here and I would really appreciate any help I can get. The issue: The requirement here is to print an AP Check with the MICR. Using XML I have defined a template and when I preview the output in PDF, the MICR string displays

  • Change of Basic Finish Date for a Maintenance Order

    Hi Experts, I have a requirement where I need to change the Basic Finish Date of an order. Currently in config for order type and plant combination, scheduling parameters are set as: Adjust to Basic Finish Dates Automatic Scheduling. If in an order,

  • PO7.31 and BPM: Using Operation Mapping within BPM

    Hello everyone! I am facing an issue while trying the import/execute an Operation Mapping within a BPM. Have a PO 7.31SP07 installation (NWDS also on 7.31 SP07), and the process already have some working interface calls to PI, however still having is