More Project Manager Woes...

So, I've created nested sequences in my edit for all the clips/sequences that I intend to send to my VFX artist. When I use project manager to create a trimmed project for these nested sequences, a load of the clips are randomly just not included. I open the generated project and about half of the sequences (in no discernible order) have clips missing from them, despite the Project Manager telling me that it had successfully managed the project.
Is there some mystical reason as to why I'm not supposed to be able to just have all of the clips in the nests be included in the trimmed project?

Peter,
According to several other users, the project manager actually ignores nested sequences, unless those sequences are selected by the tick box. Which, kind of makes sense. My problem was that I WAS selecting all of the nested sequences with the tick box, but after more investigation it seems as though the problem was this: if 'Nested Sequence 01' and 'Nested Sequence 02' both contain a clip from media file 'A001C001' then that media file would be trimmed to appear in 'Nested Sequence 01' but would then be ignored for 'Nested Sequence 02' and removed from the trimmed project, with no notification or indication at all unless I manually go through and check every sequence against it's counterpart in the original. This problem even occurs if, I go to each of the clips appearances in the different sequences, create subclips for each of them, place those subclips on the timeline in place of the original, and then convert those subclips to individual master clips. This is extremely frustrating and leaves with me with absolutely no confidence in Premiere's ability to do what is advertised. Furthermore, it's really screwing up my schedule for delivering my work to our VFX artist.
It's honestly really great that Adobe are constantly striving to have the most 'cutting edge' tools, like a project manager that finally contains features that have been included in Avid and FCP for ten years. But I believe I speak for a huge portion of customers when I say that, for the past few years, the updates to Premiere have felt like hopping from one damaged Beta version to the next. Please stop rushing out untested versions of the software with fancy new buttons and just focus on making the existing version, that people are already paying for, work properly and stably.
Best Regards,
Martin
PS. Kudos on successfully taking a complaint about a technical fault in your software and using it as an opportunity to sell me something instead of actually offering any real assistance.

Similar Messages

  • Project Management Institute and credentials

    Has anyone heard of the PMP (Project Management Professional) certification and is it well recognized? Is it worth going for if I want to do more project management type stuff? I'm just wondering if anyone's heard of it and has opinions on whether or not it will open any doors for me....
    https://www.pmi.org/certapp/Default.aspx

    Only if you're going to be a consultant teaching other printers/design studios how to implement Project Management sw. They may be swayed by the certification.
    Can't see it bringing your print shop/design studio more work off the street if that's what you're thinking.

  • Project Management Wishlist (hoping for software or online solutions)

    hi all.
    i've converted the office to mac over the last two plus years and need to put a second level of organization to bed.
    would anyone mind helping me find other websites and/or suggestions on how to get this finalized? apologies for the length and intricacy of the post but THANKS for any help on this! even just one good lead or recommendation (say for FileMaker or one of the Devon tools could help me get moving forward with it and not have to backtrack).
    i work on PROJECTS that seem to need various kinds of data. some notetaking, imagery, url's. pages documents, pages documents printed to pdf, some pdfs that others created, spreadsheets, various creative files such as CAD, photoshop, indesign etecetera - and of course email and text and phone conversations. i would really ideally love to pull all this together but of course i know this is not realistic.
    i also really need to communicate some of this information with clients and have them communicate back to me, right now this is a terrible mess and extremely unproductive with widely dispersed and duplicated information (at a bare minimum).
    i have finally customized my images in Aperture but still need to organize my pdf's and my videos. i also find Spotlight to be rather unhelpful for some items and in reading up on Devon, one of their tools has a /graphic/ search display that somehow shows linked items and whether they have been "read" or not. this kind of VISUAL ORGANIZATION would be absolutely fantastic [http://www.devontechnologies.com/products/devonagent/overview.html]. i should also add that what i /don't/ want to do is to have to catalog my project file by file and simply DRAGGING and DROPPING files to create a link if my ideal organizational method. tagging items with the GTD tools that i have tested is a non-starter for me and i actually don't even use tags in my Aperture database. i just drag and drop them to an appropriate Project.
    currently an example workflow for my Aperture database is that i POST these images to flickr to let a client see what kind of imagery i am using in their project (but they cannot upload /their/ imagery). nevertheless, this is very convenient because i can simply create an ALBUM in Aperture and drop the (pre-organized) imagery in there and post it to flickr from within the Aperture UI. this is really great but getting this link to a client is a bit of a pain because even flickr Pro uses some silly thing where you have to decide whether the recipient is a "friend" or "family" and ostensibly anyone that gets determined as one or the other can see all the other images in this category. it would be a whole lot better if i could just create an Album for a particular client. of course it would be great to
    in any event -
    in an ideal world (off the top of my head i would like) the ability to create a "Project" in my computer which organizes the following and /also/ allows me to post this to a place where Clients can have a LOGIN and PASSWORD that allows them to both view and UPLOAD information.
    1. bookmarks
    2. pdfs
    3. spreadsheets
    4. contact list
    5. images
    6. other files
    7. a lot that i am forgetting to include here.
    it would also be great to be able to organize PHONE CALLS and TEXTS and EMAILS on my computer so that i can have a record of communication with and FOR this client.
    i would also like to get most or much of this to my iPhone if at all possible!
    Devon for project organization and possibly other needs [http://www.devontechnologies.com]
    FileMaker for project organization [http://www.filemaker.com]
    Campfire for project management [http://campfirenow.com] 
    Papers for academic research [http://www.papersapp.com/papers/]
    Highrise for contact and prospect management [http://highrisehq.com]
    Project Wizard for critical path management [http://www.projectwizards.net/en/merlin/]
    Diigo for online bookmarking [https://www.diigo.com]
    what i use now:
    Notational Velocity (oh so awesome) iphone compatible [http://notational.net]
    Reminders (nice for the location tools but i have not maxed out my use of this tool)
    Contacts (for personal contacts and syncs usually well with my laptop and desktop and iphone. however, managing email addresses in here is a nightmare for a small business)
    Cardscan (for business card contacts. resides currently only on the Mac Pro and i am not sure how to get Cardscan to talk to my other devices)
    Mac Mail (meh)
    Sparrow (cool and quick but somewhat feature light)
    iPhone (yes-sir-eee bob)
    Safari (good at what it does)
    1Password (dig the syning across devices)
    Transmit (nice FTP tool)
    i also work on windows where i do quickbooks and CAD so i am open to software suggestions for windows if there is nothing for the mac (though i suspect i can do much of the above on the mac, even if i cannot corral all of it together).
    THANKS FOR READING and thanks for any constructive input!

    Ipolucci,
    I am a teacher and so I do not have your needs to really understand your requests.
    That said, I would reccomend you FileMaker Pro and Journler ( currently at version 1.1.62, running by Mac OS X 10.3.9 , the version I have and already in versio 2.0.1 for those who have 10.4).
    The first one is a relational commercial DB of an Apple subsidiary, with several template solutions ( probably one will fill your needs ) and the second one is a freeware, that has integration with Mail, Adress Book, Blogs, Photos, Audio recordings, iTunes and more.
    Just in case does not come anyone else with the complete solution, you should consider a free trial of FileMaker Pro (just released the version 8.5) and take a look at Journler.
    Both at <http://www.apple.com/downloads/macosx/>
    Regards,
    Jorge Lucas (the guy from Rio Grande do Sul)

  • Adding a New Folder in Project Manager Crashes RH

    For the past few days, I have been having problems creating
    new folders in RH 7, Project Manager. Sometimes, it works just
    fine, and I can add folders, drag topics into them, import into
    them, create new topics, whatever.
    But then sometimes, the project manager just goes to white
    and flashes at me for a while, then RH crashes. The only things I
    can see in the PM pane are the triangular colored icons that
    overlay folders / topic icons when they include conditional build
    tags. No topic names, no folder names, just a column of these
    triangles.
    When I come back into RH after the crash, most times there
    are topics to reimport and / or relocate. I have rebuilt the cpd
    file several times. Each time it seems to resolve the issue, but
    eventually another crash comes along as I try to add a folder.
    For the record, just updated to the new 7.02.001 a few
    minutes ago, but RH just crashed again. 3GB RAM, more than 40GB
    space available on hard drive. Nothing new on my PC that I can
    think of.
    Anyone else seeing this?

    I'm just wondering if anyone has found a cause or solution of this issue?
    I'm experiencing it too with one of my projects (currently, I'm on RH8.02.202 on Win7/64, but I've also experienced it in RH7 on WinXP/32, FWIW).
    Some other details:
    My project is on my C:\ drive.
    The folder names are all comprised solely of alphanumerics and underscores.
    I've deleted both the PSS and CPD files without any noticeable positive effect.
    Since I've been on RH8, the project is set to rebuild the .cpd cache upon opening, but I've also tried deleting it (this might be redundant, but I figured the RH "rebuild" might be different from generating a brand new one).
    After I force RH to close, the folder is there when I reopen the project, and the folder behaves normally.
    The project resides in the standard "My RoboHelp Projects" folder.
    The problem seems to be isolated to this project, which is my largest (~2065 topics in ~85 folders)
    I'm at the point where I just automatically force RH to close after I create a folder rather than waiting to for the application to become "officially" non-responsive.
    Are there any other files I might try deleting or examining?  I've poked around in the .xpj, .fpj, and .hhp files, but I don't see anything odd. I compared my old .pss with the new one RH created, and they were identical.
    Thanks!
    Dave

  • Unable to Open Project Site Access Denied Issue (Project Manager)

    Hi 
    We got an issue that one project manager is having 12 projects, in that she can able to view 5 projects-- project sites but remaining 7 projects --- she is not able to open the project site (access denied) error is throwing when she try to open.
    She is the project manager of the 12 projects and having project manager permissions on the project sites.
    Please suggest any solution for this.
    Geeth If you feel that the answer which i gave you is Helpful please select it as Answer/helpful.

    I believe I've found the fix for this issue.  After opening a ticket with MS support and not getting anywhere with this issue I decided to do an in-depth review of all the Project and SharePoint 2013 CU's starting with December 2013 to September 2014. 
    To my amazement buried inside the July 2014 CU was a hotfix for this issue described almost word for word. (I will list all the relevant KB's at the end)  I contacted my support engineer inquiring about this hotfix and he stated it wasn't relevant because
    the "Synchronize Project Web App permissions to Project Site" was not failing or even generating any warnings in our Prod or Test environments.  I stated that is not always an indicator as ULS doesn't always catch all relevant errors.
    I informed him that I also found a second hotfix pertaining to the same issue released August 2014, apparently the first hotfix in July didn't totally resolve the issue and a second hotfix was released.  He was adamant that this would not resolve
    our issue and he requested or production databases because he was unable to replicate the issue in his test environment.  The reason, you may wonder, is because he was at a higher patch level that our farm.... Obviously!  His farm had the most current
    CU which included the hotfixes from July and August.  Apparently he didn't see the flaw in his logic.
    I decided to install the September CU on our test farm. Low and behold that fixed the problem, even though MS support stated the hotfix was not relevant to our issue.  I learned a long time ago to take MS support comments as suggestions instead
    of gospel truth, this isn't the first time they have confidently given me erroneous information.
    We are currently doing further testing to verify that this CU didn't break something else.  Unfortunately these rollups are not GA and Microsoft is very clear that you should only install them if the hotfixes pertain directly to your issue.
    Finding the hotfixes was a chore as Microsoft loves to create multiple KB's for the same thing and then nest (bury) them so you have to dig through four or five KB's to find the relevant fix.  I'll save you the trouble and list them below.
    Watch the
    September CU Webcast Brian Smith and team go into depth explaining why this issue has been happening and how they fixed it.
    September 2014 CU http://support.microsoft.com/kb/2882990 (the one I installed)
    August 2014 CU https://support.microsoft.com/kb/2989078
    August Project site sync hotfix
    https://support2.microsoft.com/kb/2883083
    July 2014 CU http://support.microsoft.com/kb/2882990
    July Project Site Sync hotfix http://support2.microsoft.com/kb/2882995
    Microsoft Project Server Blog
    http://blogs.technet.com/b/projectsupport/  (I find this to be more helpful than the TechNet site)
    Frank Miranda Florida Hospital MIS

  • Images are missing in Project Manager

    I’m replacing old images with new ones in RoboHelp HTML 10.
    I’ve deleted the old pictures in Design view and pasted the new pictures in. (I know this is not the recommended way but with lake of time I found it to be the fastest way and we don’t feel the need to give the files described names at the moment.)
    It has worked fine until now when I noticed that some images are not showing in Project Manager. I see the “folder” Images and I see a lot off images there but some are missing. The “missing” images are shown in Design view and in the browser after publishing. But in the report Unused files the “missing” images are listed as unused.
    I have tried to
    close and reopen the project,
    generate and publish the project,
    delete an “missing” image from Design view and insert it by using Insert / Image. After saving this image, and some other “missing” images, are shown in Project Manager. But not all “missing” images.
    Does anyone know why this is, or more important how to get Project Manager to show all images that are used in the project (without having to go through all 154 images trying to figure out which are used but “missing”)?
    Some more facts:
    They are all gif-images.
    They are all stored at the top-level in the project folder. (Are there a limit how many images there can be in the top-level folder?  Should I create a separate folder and move the pictures there?)
    HTML-code for one “missing” image:
              <img src="image7.gif" alt="" style="border: none;"
                     border="0" />
    Grateful for any input!

    I would have said "Try renaming the folder containing the images in Rh's Project Manager. That sometimes fixes the problem. You can revert to the old name afterwards."
    Keeping all the images, and / or topics, in the root is never a good idea. It can slow things down and it's messy.
    You can move the images you can see but obviously you cannot move the others. Try moving a topic that has one of the images to a different folder and see if that refreshes. Also try deleting the CPD file and reopening Rh.
    Backup first.
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • Project Manager can´t see my .lso files

    Hello logicusers, I am new at the forum and this is my first trouble: Project Manager can´t see my .lso files. I would like to start using PM but it seems to be difficult without seeing .lso files in the navigator window.
    I´ve read the books, I´ve checked here for this tip and got a lot of useful information, but no solution found. I hope somebody could help me please:
    - Macbook white with LP 7.2.3
    - Reinstalled and cleaned all
    - Installed OSX upgrade 0.4.9 manually
    - Installed pro application support 3.1
    - PM Data and logic preferences deleted
    - permissions applied to "all enclosed folders"
    - Performed a complete scan in PM
    If I create a new song from logic, PM can´t see this .lso file.
    If I scan a external hard drive (lacie f.a.porsche) through PM, it only recognizes one .lso file from a lot of old songs, and I don´t imagine why.
    Yesterday I tried this: opened PM, copied a Template song from the Templates folder to the Desktop; renamed it as "Sidload" (my particular "Autoload" term); until here, everything correct, PM seems to be able to manage "Sidload". But when I open Sidload and save the first change, and .bak folder comes, I can´t make more "visible copies for PM" of this file. Finder can see the new copies, but PM not (files that has created "itself"); so I can´t manage a song that has been copied, renamed and saved for first time -through PM, from a Template; invisible, dissapears. No saving PM data, no checking folder, no advanced search helps.
    I wish to have a way to talk to logic support via mail, but I don´t know how. So I came here to beg you friends for your help. Thank you very much for being here.

    yep, I have scanned at every level, from everything to just a single folder that contains song files. After scanning a folder that conatins songs on my SATA B drive (the one that PM can't find songs), still the songs will not appear.
    I have copied over my songs to the drive that PM seems to see songs on and guess what? It doesn't see those songs copied over.
    This is driving me so nuts I have forgotten that I engaged in this thread...
    http://discussions.apple.com/thread.jspa?threadID=1046126&tstart=0
    Does anyone know what the option in the PM's file menu "import file maps" and delete all exported file maps" does? Or what its for?
    It feels to me that some sort of database or referrence list etc etc has gone very wrong, but I have already tried deleting (manually) the PM data file in somewhere in the library folder etc etc.
    Using file buddy I see that PM stores the a PM database as an invisable file on each drive you have connected. Presumably info for what is on that drive. Perhaps these invisable files need to be manually deleted???
    Message was edited by Thomas O'Carroll because this forum doesn't work properly

  • SAP PS & SAP Project Management

    Hi all of you,
    Can any one give me clarity on the available functionalities in SAP Project Systems and that of SAP Project Management. My requirement is, my client is using one Project Management tool, where can get all the project monitoring and as well as Project cost and revenue with Dashboards. I am implementing PS to take the accounting data from the tool, to get integration with FI,CO, SD, and MM. In their Project Management tool apart from the cost management, they have Change Management, defects management, test management, process templates, life cycle templates, project goals with specific and project performance monitoring like dashboards. Actually, I am taking the interface part like WBS, Planned cost, Schedules, Resource cost etc.. I am unable to take the non accounting data to SAP PS.
    My doubt is, can we implement SAP Project Management module to replace the tool, since in PS we have FI and CO data with schedules, for example. If I required the same things, non accounting data like Defects management track, change management, testing management, which SAP module we have to implement. More over, my client is also wish to discard the tool, if the same functionalities available in SAP.
    Please correct me, if I am wrong and also suggest me how we can get the same things in SAP.
    Thanks & Regards
    Ramki
    Edited by: Ramki on Oct 5, 2009 4:40 PM

    you can use Claims available in SAP PS.
    Transcript from SAP help:
    Claims are used to:
    Identify the persons or groups responsible for variances Defend against claims from third parties who your business responsible for a variance
    Customizing is divided as follows:
    Notification Customizing
    In this section, you stipulate the most important aspects of a claim, such as:
    Claim Management screen format
    Claim partner
    Catalogs and report profile for the claim
    Priorities for the claim
    Claim-specific Customizing
    Codes for detailed long texts
    Activating workflows for the claim
    I hope this is helpful.

  • A good project management app?

    I'm working on a large project (a book) and am looking for something to keep my deadlines together and to break my work into manageable chunks. I know there are a lot of good programs like OmniPlan, but I just need to plan out my own project—I'm not coordinating a team or working with other people—so a program like OmniPlan is way more than I need. Does anyone know of any good personal project management software?
    iMac 24"   Mac OS X (10.4.8)  

    If you happen to use Microsoft Office 2004, the Project Manager in Entourage is actually quite good. I started using it a few weeks ago.
    There are a bunch of open source web based project managers that you could setup pretty easily on your system as well. That with the use of MAMP, you could easily setup something up for free in no time.
    I did run across this this which was directed towards writers, when i was looking for some sort of project manager a few weeks ago.
    http://www.bartastechnologies.com/products/copywrite/
    Good luck

  • Integration with Third Party Project Management Software

    My company is looking for software that can be "bolted on" to Oracle Projects to provide more robust project managment functionality. We already know of two (Microsoft Project and Primavera), but we'd like to hear from other companies who may have implemented other solutions.

    <BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by James O'Brien ([email protected]):
    My company is looking for software that can be "bolted on" to Oracle Projects to provide more robust project managment functionality. We already know of two (Microsoft Project and Primavera), but we'd like to hear from other companies who may have implemented other solutions. <HR></BLOCKQUOTE>
    James:
    I've been involved on 2 projects that included integration into Projects. On both occasions Oracle's Activity Management Gateway (AMG) was used. AMG is the open interface for Projects. We used it on one occasion with Primavera Expedition to load budgets and the WBS and on another with MS Excel to upload budget information. ODBC and AMG was used on the MS Excel project.
    Regards,
    Robert
    null

  • Project Management System In Dreamweaver

    I'm looking to create project management system in Dreamweaver; similar to MS Outlook, only with an enhanced task hierarchy and detail section.
    Does anyone know of examples and / or books where I can see what I'm getting myself into?  Even better, does Dreamweaver have a template for this? (I haven't purchased the software yet)
    Thanks,,
    Mike

    I'm not looking for a full blown project management system; more like an activity (to-do) list in a subject lookup hierarchy, possible with email reminders of what's coming due. (something like expand-collapse subject areas with text, date, name and status fields).  I've done something similar in Visual Basic wtih an Access DB holding the information.  It doesn't look so great but does the job.

  • Free Project Management Software for Mac or windows!

    Hi all,
    Does anyone know of a good project management software that does more than what Microsoft project does and is freely available? I mean one that has a local application but also can update updates to the web side of the software? I saw sharedPlan which is really good so far but its not freely available. It runs on Mac and Windows but really looking for a windows version as all my team members only use windows.
    So I guess am asking for one that's open source?
    Please let me know.

    You might want to check out Wikipedia page and look for open source http://en.wikipedia.org/wiki/Comparisonof_project_managementsoftware
    The only free tools that I know of are web based such as Zoho projects, Basecamp etc..
    Or you can always download and use for 30 days tools from:
    http://www.geniusinside.com
    http://openproj.org/
    http://www.ganttproject.biz/
    or other

  • Project Manager: How to include the Trash as an Exclude Path

    I'm delving deep into the wonders of the Project Manager. Wondering if there's any way to add the Trash (on any drive) as an "exclude path" so that I can prevent the PM from going 'dumpster diving' for files in there.
    While on the subject of trash (OT) I really miss the OS9 trash scheme where you had an actual desktop icon for the trash. Also, when you'd open the trash in OS9 to see what was in there, a tally of the total MB/GB of trashed files would be displayed in the finder window. But not in OSX (why?!?!). Anyway, does anyone know how to achieve either a desktop icon and/or a file-size count of trashed items in OSX?
    Thanks, and Happy New Year!
    -=iS=-

    Surrrrrrre Dahlin'.
    Somebody in this forum said, it's the time of Red Red Wine.
    I am following this advice. Wait, is that party over already?
    Truly, the PM being as powerful of a tool it is, sometimes needs our (human) input to get it back in shape. Even the PM preferences DO GET STALE over time.
    One SI after another started to load really slow over here. Sometimes I even had multiple choices from where to take the samples from. Now I know, that I have some duplicates with all my drives attached, but PM designs a structure regarding where to look first. So, I re-scanned those folders concerned. Sure enough, no more "duplicates" messages and loading time was great again. Except for files I did not access since a long time, or files I never loaded.
    Yes, I trashed my PM preferences (user/library/preferences/Logic PMData).
    Did go to Window > Project Manager > Functions > Expanded Scan, with all my drives attached.
    Then I went to bed.
    The next morning, I saved the PM data, quit LP, restarted my computer and... voilá: EXS loading times are up to speed again.
    All under the influence of Red Red Wine.
    It works well.
    Summary:
    Set up as explained above, go to sleep and be amazed about the power of the PM.
    No punishment involved.
    Tschüß.

  • Baggage files in folder, in rhbag, NOT shown in Project Manager

    We use RH7 and have significant numbers of baggage files per project. We import the baggage files, they show up, life is good.  We drag/drop to them all over the place.  Then you rebuild the .cpd file and more than 50% of them disappear.  They are still in the folder, they are STILL in the rhbag file.  They just don't show in the project manager, which makes drag/drop pretty darn tough.  Also leads to duplicates with slightly different names as authors try to 'fix' the problem.
    I painstakenly add them back in...only to have them all disappear the first time I rebuild the .cpd.  The same ones stay...the same ones disappear.
    What is the issue?  This is so frustrating and there is no good answer to provide to people.
    Does anyone have a solution that works?  Does RH8 fix this?  Thank you!!!!

    Hi Teri
    How's the supply of Dissident going? Any left in the cellar?
    Last time you had a problem project, it was the number of images behind the problem. That didn't stop the images appearing but it affected the project in other ways. You say this project has 7,000 images. Isn't that the sort of level that gave you problems before? What is the number of images in the biggest project in the merge you finally created?
    Maybe the symptom is the baggage files not appearing in Project Manager but that doesn't mean they are the cause.
    What is the file size of this project zipped up? No I don't want you to send it, I want to compare it with the last one that gave grief and was over 100mb as I recall.
    See www.grainge.org for RoboHelp and Authoring tips

  • Project Management Add-on

    Hi
    One my client is looking for a Project Management solution ,is there any add-on for this? He is a real estate developer.

    Hi,
    Enprise job costing is one of a project management solution. you could write to them and find out more in this website:
    www.enprise.com
    Another link is as follows:
    https://websmp208.sap-ag.de/~sapidb/011000358700004044122006E/
    but you must have valid S-id and password.
    Rgds,

Maybe you are looking for

  • My Notes no longer sync between my mac and iPhone. I have tried everything.

    My notes used to sync between my phone and my mac until a week and a half ago when it all of a sudden stopped. I have done absolutely everything that I have seen given as rememdies to this and nothing is working. I am thinking it is an issue with the

  • Automatic Vendor

    Dear Sap Gurus, I have a requirement. we have different stores from where we receive PR for articles.I have to sort the PR vendor wise n then make PO. can something be done while PR making vendor is proposed by the system automatically article wise?o

  • Control to Stop Users Changing their Own Employee Master Data

    Hi all. I'm carrying out a security review of users on a SAP HR implementation as part of this we are looking at users that can change bank details, basic pay etc. I was wondering if there is a control in place on SAP that would stop a user with acce

  • Dynamic display of columns in pivot query

    I have a table called STUDENT_SCORE . I need to display the avarage score /month for past 2 years and the monthly score till today' month. So suppose this is April 2009. The report will look like Roll_id 2007avg 2008avg Jan09 Feb 09 Mar09 101 80.9 70

  • How to find the quatity of material in backorders

    hi in which table the backorders get saved. from the v.15 transaction i got the backorders. i like to know that how to find the quantity of material which is due in the backorders. what are the fields for backorder quantity of material. regards kq