MOULD DIE as a PRT tool in CF01

Dear All,
I have created -MOULD DIE as a PRT tool in CF01.(I dont want to  create the Mould die as a Material it can only be a PRT tool)
I need to issue the Mould whenever it is required to production.
I need to have track on the PRT issued to production.
I need to issue the PRT from its storage location whenever the production requires it & track.
Keep in mind I need this Mould only as PRT TOOL (CF01).
Is this can be done ,Pls suggest a better solution.
Point will be awarded
Subbu.

Thanks Mario,
1. Whether I need to maintain the PRT material in the BOM or simply I can attach in routing.
Which will have better tracebility.
2. Basically what is the diff in creating PRT  as Material (MM01) and as PRT tool (CF01) (considering PM module not in the Scope).
Regards,
Subbu.
<< Moderator message - Personal information removed >>
Edited by: Rob Burbank on Oct 29, 2010 9:28 AM

Similar Messages

  • MRS: PRT Tool Resource does not appear in Planning Board

    Hi Experts,
    I am trying to perform tool assignment but somehow the tool resource does not appear in the planning board.  I have the following set up:
    - Tool created as both material and Equipment (category P)
    - Equipment assigned to work center linked to Org Unit
    - Order with operations created with PRT assigned
    What I am seeing in the planning board:
    - I can see the operation with the linked PRT
    - I can see the HR resource under the same work center Org Unit
    - However, I cannot see the Tool resource.
    Am I missing somethng here?  Any kind of pointers would be greatly appreciated.
    Thank you in advance,
    Jk

    Thank you for your response, Varun.
    I do have the equipment work center set to be the same as the operation work center.  Also, when I try to add the PRT manually in the planning board, I get 2 error messages:
    "Resource  is not available"
    "Selected equipment 0 is invalid"
    Have you encountered this before?
    Thank and Regards,
    jk

  • 2nd Monitor died - How does one grab tools back from "that" desktop?

    Hi -
    One of our two monitors died. There are tools on the 2nd monitor's desktop that we can't "see" until the 2nd monitor returns. How do we pull those tools over to the main desktop?
    Also, there are a few finder windows that are too large to grab the bottom scaler and shrink them back. (There is no tool bar on the top of the second monitor giving just a little bit more room.) Is there a minimize button somewhere for "finder" windows?
    Thanks!

    Ps - just found the "zoom" button on my own - so - I have the finder windows under control - now to learn how to get to that other desktop without the view into the other desktop!

  • Measuring Point for Tools and Die Maintenance

    Dear All,
    I am trying to map the following process:-
    My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
    Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
    What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
    What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
    I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
    Assigned the Die as a PRT to the material which is to be produced in the Routing.
    When i confirm the production order the counter of the PRT increases which i can check IK13.
    What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
    I would request you to please give me some input on this.
    Thanks and Regards,
    Rashmi

    Hello Rashmi;
    I have seen the screen shots & there are problems with the following:
    1) Counter overflow reading
    You have entered 130;  keep it as- 999999 (it is the reading after which system starts counting from 0 value)
    2) Formula that you have used;
    You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula)  = SAP_20 * SAP_09
    3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
    CREATE a single measuring document with reading as '0'.
    4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
    5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
    If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
    Do let me know if there is any problem in this.
    Regards
    Hemant

  • SAP process steps for tool room

    What will be the SAP process steps for tool room.
    Moulds are manufactured and maintenance of moulds are being done in the tool room

    Hi,
    Assuming the moulds are available, you may follow the steps below:
    > Create mould as Equipment with PRT screen data
    > Create measuring point for this equipment.
    > Create counter based maintenance plans for preventive maintenance.
    > Use applicable user exit to update the measuring point, in association with PP product confirmation, where this mould is used in respective work center.
    > This will give the preventive maintenance schedule in accordance with usage.
    > For unplanned repairs, use notification/Maintenance order route to calculate the costs and to maintain history.
    > When life expires, deactivate and set 'deletion' flag' to the respective mould equipment master, so that it can not be used in production.
    > Detailed scenario should be mapped, based on the actual customer requirement.
    James Prabaharan

  • PRT from In house Production

    Can anybody explain how to produce PRT tools inside?

    Hi ,
    You are talking about Production tools inhouse.
    For that u need to create a seperate Order Type Like tool manufacturubg or Die manufacturing . Then u need to craete seperate master data .

  • PRT(equipment) number in order table

    Dear Masters,
    Can anybody guide me in which table the PRT(equipment) number can be found that is used in any particular order?
    For Ex: I have an equipment "100002" that is defined as a PRT in my system and I am creating a maintenance order for other equipment "100003" and I am using euqipment "100002" in this order as a PRT tool.
    Now, I want to built a report that can show the linkage between the maintenance order and the PRT used in this order. I want to know the table in which this relationshjip is stored. Please do guide me.
    Thanks in advance.

    Hey Maheshwaran,
    Thanks for your reply, but I found my answer. I wanted to get exact equipment number that is used as PRT in order which I  found as below:
    From Table VIAUFKST with respect to a particular AUFNR i got AUFPL which i used in table AFFH and got OBJID which further I used in table CRVE_B and got EQUNR that is the exact equipment number I wanted in my report.
    Thanks once again.

  • Regarding Production Resource Tools in Plant Maintenance Module

    Dear All,
    In our client group we have 3 maintenance companies PM1, PM2 and PM3. Presently we are implementing SAP PM in PM1.
    My issue is like this...we have lubricants which is used for maintenance work in PM1.
    This material is brought from PM2 at free of cost, so we(PM1) no need to pay any amount to PM2.
    As if now we have created lubricants as material and getting the material with free of cost in PO. Now when I bring this material for free the price is zero.
    when we use this material in our maintenance order, we need the cost of the lubricants used for maintenance.
    After searching few forums, i came to know that lubricants can be used as PRT tools.
    If anyone has any idea about this...please tell me how to solve this...
    thanks in advance,
    Nagesh

    This is wrong. To fix the first wrong thing you should not do a second wrong thing. If a transaction happens between two company codes it should be seen from several angles. Please ensure that MM and FI have agreed for this. Also, using lubricants as PRTs is very odd. PRTs don't get consumed. Components do. The stock goes down when u issue them to the order. U don't return the lube oil cans after you complete the order!
    My suggestion is that you sit with the MM and FI consultants and together come to a conclusion. This can't be done in isolation.
    thanks
    Bala

  • PRT link with opeartion in order

    Hi All,
    In one scenario of Idoc we have created Y segement in the IDoc & in this segement we want to display the PRT assigned to specific  opeartion in the order.
    Please give me table name or any such link that will able me to fetch the PRT assiged to operation in the order
    Please note that my input will be Order no.
    Thanks & Regards
    Sachin

    Hi
    I hope you will get some info through this thread
    Re: PRT Tools
    Regards
    Brahmaji

  • Wo kann man nachschauen wie die antwort auf die Sicherheitsfargen lauten?

    Wo kann man nachschauen wie die antwort auf die Sicherheitsfragen lautet.

    Cleaner Tool laufen lassen, neu versuchen.
    Use the CC Cleaner Tool to solve installation problems | CC, CS3-CS6
    Mylenium

  • Print word document attached to an order

    my requirement is to print the sap script for the PM order and as well as word documents attached to the order.
    for an order, for an operations when PRT tools selected
    word documents attached to it.
    i need to print those word douments attached to PRT tools for an oparation.
    pgm used is RIPRJT00
    form PM_COMMON
    i am able to oepn the documents attached to the order in PRINT PREVIEW.
    when choosing print option it goes to update termination
    Ajay

    In order to save any type of document on your phone you need to have an app that supports that form of document.
    There are several word processing apps but I prefer Pages.  Buy this app. Once it is on your phone you can tap the Word document in your email to view it then tap the Share icon and Open in Pages.
    If you edit the document and email it you will have the choice to send it as a Pages document, a Word document or a PDF file.

  • Object link

    Hello
    All experts,
    I have to attached the document in delivery & in maintenance order.But as per my knowledge these are not standard object in SAP.So these can do with screen exit can any one tell is there are any standard exit are available for that?
    OR we have to create some functional module for both the object.
    Please mail me on [email protected]
    Regards
    Ajju

    Hi,
    You can link a document to a notification and the notification to the work order, that is i one solution. Other wise if you link a document to function location or a equipment a button will show up in the work order there you can reach the alocated document. You can also use PRT tool and conect a document to an operation on a work order
    Rgrds/Håkan
    Edited by: Hakan Anderberg on May 6, 2008 8:08 AM

  • Not enough RAM to install?

    Hi,
    When I try to re-install Mac OS X 10.5 Leopard, the installer now says I don't have enough RAM. Why does it tell me this?
    I have a Power Mac G4 that was happily running Mac OS X 10.5.4. I wanted to update the software and downloaded and installed the Mac OS X 10.5.8 Combined Update. After the installation, the hard drive got corrupted, and out of frustration I reinstalled the OS.
    I installed Mac OS X 10.4 first, and I can use the computer. Now I am trying to install Mac OS X 10.5 - when the install program starts up, I get a dialog box saying "This computer doesn't have enough memory?" What gives, Mac OS X 10.5 used to be on this machine, and I installed it with the same DVD! Why does the installer give me this message now?
    I've read the specs here: http://support.apple.com/kb/HT3759 and nothing has changed to my hardware - no modifications. Standard Power Mac G4, with an Airport card installed in it.
    Any ideas?
    Thanks,
    ohioguy1978
    Message was edited by: ohioguy1978

    Looks like one of the DIMMs died. I only have 256 MB now, according to the diagnostic tool. This explains why 10.5 won't install. I wonder if this is why 10.5.8 wouldn't boot. Kind of sucky that there is no error message about a DIMM dying. The diagnostic tool will tell you if you look through the power on self test info. Mystery solved - looks like I have to go shopping for Power Mac G4 memory.

  • Database Publishing

    Hallo,
    ich möchte einen Katalog erstellen, dessen Daten aus der Datenbank kommen. Es gibt verschiedene Produkte mit unterschiedlichen Layouts. Ausserdem werden Tabellen zur Darstellung von Varianten benötigt.
    Zur Realisierung benutze ich VB mit InDesign scripting.
    Jetzt meine Fragen:
    1. Bringt mir XML etwas?
    2. Wie kopiere ich ein Template?
    3. Wie kann ich Tabellen ggf. mit Vorlagen aufbauen?
    Da ich InDesign Anfänger bin, suche ich noch den rechten Weg zum Ziel. Gibt es Beispiele?
    Vielen Dank im voraus!
    Harald

    Hallo Harald,
    natürlich kann man mit InDesign einen Database Publishing Prozess erfolgreich umsetzen.
    Es gibt jedoch recht viele verschiedene Möglichkeiten, dies zu tun; es kommt immer darauf an,
    - welche Art von Katalog produziert werden soll
    - das Layout eher statisch ist (Seitenorientiert)
    - oder eher dynamisch (orientiert Produktdaten)
    - in elcher FOrm die Produkte gruppiert und sortiert werden sollen
    - Bilder zu den Produkten
    und vieles andere mehr.
    Die nahezu wichtigste Fragen lauten für den ersten Schritt:
    - in welchem FOrmat liegen die aten jetzt/zukünftig vor?
    - woher kommen die Daten / werden sie über ein ERP oder CMS System gepflegt?
    - sind die Daten medienneutral (Inhalt und Darstellung getrennt)?
    - wieviel "Handarbeit" ist nach dem Generieren des Kataloges noch erlaubt (soll der Katalog zu 100% automatisiert erstellt werden, dann wird leider etwas aufwendiger)?
    Prinzipiell lässt sich zu Deinen Fragen sagen:
    bringt XML was: das allein ist ja schon eine schwierige Frage! Also:
    XML Import in InDesign: ja, bringt was, wenn das Layout relativ statisch ist. XML Import kann sehr schön für Übersetzungsworkflows eingesetzt werden.
    Template kopieren: dazu müstest Du erst mal erklären, wa Du in diesem Fall unter Template verstehst. Meinst Du .indt - Dateien? Diese kannst Du per VbScript instanzzieren (also eine indd-Datei daraus ableiten) und daran dann weiterarbeiten (z.B. per Script mit Daten füllen).
    Indt Dateien könnten durchaus auch eine Lösung für deinen Katalog darstellen, wenn Deine Anforderungen nicht allzu hoch sind.
    Tabellen mit Vorlagen: das ist ein Punkt,, an dem sich die unterschiedlichen Databanse Publishing Tools erheblich voneinander unterscheiden. Aber auch hier kommt es auf Deine genauen Anforderungen an.
    Ich kann Dir empfehlen, Dir verschiedene Database-Publishing Produkte anzusehen, z.B. www.inforvision.de oder Woodwing Smart Catalog.
    Alternativ dazu kannst Du auch ohne jedes weitere Hilfsmittel alleine mit VB Scripting und InDesign arbeiten (da geht nahezu alles (auch Tabellen), aber man braucht schon ein bisschen zeit für die Erstellung des Scripts). Das macht natürlich nur Sinn, wenn die Daten in einem brauchbaren Format angeliefert werden (das könnte XML sein oder auch eine gute Datenbankstruktur, immer mit zugehörigem Bildmaterial)
    Viele Grüße
    Joachim Karl

  • Premiere, Handbücher usw. :-(

    Jeder der behauptete halbwegs Ahnung zu haben, hat mir zur Pinnacle DV500 Karte geraten, die mit Premiere geliefert wird. Die Pinnacle DV500 Tools sind toll, dat stimmt. Premiere aber selbst ist für den EDV erfahrenen Anwender eine echte Katastrophe ! !. Das Handbuch ist völlig unübersichtlich, hat nur Screenshots vom MAC und ausserdem bezieht es sich auf die Version 5.0. Sich ohne Vorwissen in die Materie einzuarbeiten ist mir nach 3 Wochen vergeudeter Zeit nur Ansatzweise gelungen und meine Fortschritte sind lächerlich. Die Ergebnisse, die ich bislang produziert, habe sind mehr als dürftig und wurden auf meinem nagelneuen Win98 Highend PC (Asus A7V Mo.bo., Asus V6800Deluxe 32MB DDR RAM AGP Grafikkarte, 256MB RAM, 30GB UDMA66 HD, Win98SE) von dutzenden Abstürzen begleitet. Ich hab ganz schön die Schnauze voll. Größtes Problem sind sämtliche Projekteinstellungen (allgemein, video, audio etc.) und die Exportsettings die irgendwie offensichtlich zusammenpassen sollen. Entweder hab ich kein Ton oder Ich seh im Monitorfenster nix oder dat W98 grätscht ab und friert ein. Dann geht nur noch ausschalten. Wenn ich die Pinnacle Plugins für MPEG-2 Export verwenden will klappt sowieso nix was nicht so schlimm ist weil man ja dann auch noch mit Minverva Impression umgehen können müßte.
    Das ist alles ein Dreck, Echt Super !, da kann ich nur sagen : Nie wieder Adobe Premiere. Mal schauen was es sonst noch gibt.
    gruß Lars 8-

    Dies ist eine mehrteilige Nachricht im MIME-Format.
    --------------E4872DA2E89E5ECD3EEA0493
    Content-Type: text/plain; charset=iso-8859-1
    Content-Transfer-Encoding: quoted-printable
    Hallo lieber Lars,
    hmmm... ich liebe ja objektive Kritik an Adobe Produkten aber irgendwie k=
    omme ich mit deiner nicht zurecht.
    Man kann nicht mit "ganz viel Geld" in den n=E4chsten Kistenschieber-Lade=
    n gehen sich ein Hai-Ent System kaufen und denken "Wow, jetzt bin ich der=
    Videot=B3 (hoch 3), wann kommt RTL und holt mich?". Getz ma unter uns Pa=
    storent=F6chtern - haste echt geglaubt du k=F6nntest alles ohne Einarbeit=
    ungszeit? Denkst du 3 Wochen sind viel?
    Wie Smudo rappte: "H=F6r mal Rudi, la=DF es sein mit der Gitarre..." soll=
    test du dir das mal mit digivideo =FCberlegen.
    Und deine 30MB 5400RPM Seagate Firebird aus dem Aldi PC kannste getrost g=
    egen ein SCSI System tauschen. Ram ein bischen aufr=FCsten (ich glaube 51=
    2 MB sind f=FCr DV nicht zu schlecht). Ne vern=FCnftige ELSA-Grafikkarte =
    kaufen. Oder du kaufst dir gleich nen Mac (Top-Choice) oder ne Silicon Gr=
    aphics-Station wenn du das Geld =FCbrig hast.
    So, nach der ganzen Flapsigkeit noch einige Hinweise.
    1. Schau mal in dem Motion Forum ein bischen unter den fr=FCheren Beitr=E4=
    gen nach. Probleme mit der Pinnacle und Premiere hatten schon mehrere geh=
    abt und gel=F6st.
    2. Such Hilfe im Web
    3. Kauf dir ein vern=FCnftiges Handbuch (die von ITP sind ganz okay oder =
    Addison-Wesley)
    4. Bem=FChe dich, deine Probleme Punkt f=FCr Punkt und konkreter zu besch=
    reiben. Vielleicht kann man dir doch noch helfen.
    5. Du bist nicht der einzige frustrierte User. Win98 ist nicht vollkommen=
    im Verwalten des Speichers. La=DF den ganzen Kram ne Woche stehen. Lies =
    einfach noch ein bischen. Wird schon besser.
    Gr=FC=DFe, Rainer
    LBaeter schrieb:
    > Jeder der behauptete halbwegs Ahnung zu haben, hat mir zur Pinnac=
    le DV500 Karte geraten, die mit Premiere geliefert wird. Die Pinnacle DV5=
    00 Tools sind toll, dat stimmt. Premiere aber selbst ist f=FCr den EDV er=
    fahrenen Anwender eine echte Katastrophe ! !. Das Handbuch ist v=F6llig u=
    n=FCbersichtlich, hat nur Screenshots vom MAC und ausserdem bezieht es si=
    ch auf die Version 5.0. Sich ohne Vorwissen in die Materie einzuarbeiten =
    ist mir nach 3 Wochen vergeudeter Zeit nur Ansatzweise gelungen und meine=
    Fortschritte sind l=E4cherlich. Die Ergebnisse, die ich bislang produzie=
    rt, habe sind mehr als d=FCrftig und wurden auf meinem nagelneuen Win98 H=
    ighend PC (Asus A7V Mo.bo., Asus V6800Deluxe 32MB DDR RAM AGP Grafikkarte=
    , 256MB RAM, 30GB UDMA66 HD, Win98SE) von dutzenden Abst=FCrzen begleitet=
    =2E Ich hab ganz sch=F6n die Schnauze voll. Gr=F6=DFtes Problem sind s=E4=
    mtliche Projekteinstellungen (allgemein, video, audio etc.) und die Expor=
    tsettings die irgendwie offensichtlich zusammenpassen sollen. Entweder
    > hab ich kein Ton oder Ich seh im Monitorfenster nix oder dat W98 gr=E4t=
    scht ab und friert ein. Dann geht nur noch ausschalten. Wenn ich die Pinn=
    acle Plugins f=FCr MPEG-2 Export verwenden will klappt sowieso nix was ni=
    cht so schlimm ist weil man ja dann auch noch mit Minverva Impression umg=
    ehen k=F6nnen m=FC=DFte.
    >
    > Das ist alles ein Dreck, Echt Super !, da kann ich nur sagen : Nie wied=
    er Adobe Premiere. Mal schauen was es sonst noch gibt.
    >
    > gru=DF Lars 8-
    --------------E4872DA2E89E5ECD3EEA0493
    Content-Type: text/x-vcard; charset=us-ascii;
    name="rainer.westerwinter.vcf"
    Content-Transfer-Encoding: 7bit
    Content-Description: Visitenkarte für Rainer Westerwinter
    Content-Disposition: attachment;
    filename="rainer.westerwinter.vcf"
    begin:vcard
    n:Westerwinter;Rainer
    tel;fax:+49-208-4950927
    tel;work:+49-208-4950926
    x-mozilla-html:FALSE
    adr:;;;;;;
    version:2.1
    email;internet:[email protected]
    fn:Rainer
    end:vcard
    --------------E4872DA2E89E5ECD3EEA0493--

Maybe you are looking for

  • How do I play play a dvd from my mac and send to apple tv

    Just got my Apple tv for my new Imac everything works fine. How do I play a dvd on my mac and send to apple tv

  • Ipod touch not recognised in windows or itnes since updating to itunes9

    Hi all, I upgraded to itunes9 and now my ipod touch (2nd gen 16gb) is not recognised in either windows or itunes. The ipod still charges via the USB lead so presmably there is nothing wrong there So far I have tried the following Uninstalled all itun

  • Unable to amend life of an asset

    I am attempting to amend the life of an asset by navigating to Assets => Asset Workbench, querying the asset and then selecting the 'Books' button. The details of the asset appear and then withih the depreciation tab under Method, I amend the life in

  • Mail Adapter Receiver

    Hi, I am trying to configure a receiver mail adapter.  I am not using the mail package, instead using the direct xml.  I tried the SMTP address of hotmail and gmail and it didn't work. Here are the connection parameters:- URL = smtp://smtp.gmail.com

  • ** How to debug ABAP Mapping at run time?

    Hi Friends, We have created one class using the interface IF_MAPPING and the method EXCUTE. Inside the class we have written coding. We refer this class in the interface mapping as mapping program. But, while execute the scenario, how do I debug my c