Move package from dev to prod

Hi:
Would you please tell me how to migrage a package from dev to prod? A customer package in 11.5.10. 10g db on unix.
thank you!!
Edited by: user9231603 on Feb 22, 2011 10:54 AM

user9231603 wrote:
How about the body? where is it?Is should be with the specification (when you move the package, you have to run the code of the specification as well as the body).
Thanks,
Hussein

Similar Messages

  • Move code from DEV to PROD

    Hi,
    I need to move my code dev to production.
    Please let me know how.
    I have seen the posts on exporing scenario and then importing them.
    However what about the dependencies like logical schema, models etc???? How do i move them?
    Also, what about contexts?
    I have a csv to db table scenario, which i need to move.
    For DB JNDI can be used, but what about file paths??
    Please let me know.
    Thanks,
    Rosh

    Hi RoseParab,
    We have two way to migrate from Dev to Prod.
    First Way:
    Using ODI import and export option.
    Login to Dev instance,
    Goto Topology> File Menu>Export>Export Master Repository in ZIP format
    File Menu>Export>Export Logical Schema in ZIP format
    In Designer, go to File menu>Export>Export Work Repository in ZIP format
    Quit from Dev instance
    Login to Production instance
    Goto Topology> Import>Import Master Repository in ZIP format (please select INSERT and UPDATE option from dropdown list)
    Import>Import Logical Schema in ZIP format (please select INSERT and UPDATE option from dropdown list)
    In Designer Import>Import Work Repository in ZIP format (please select INSERT and UPDATE option from dropdown list)
    Second Way:
    Using Oracle DB Export/Import command (Data pum)
    Hope it will helps you
    Note: Make sure that you should change Work Repository ID after moving Dev stuff to Production
    Regards,
    Phanikanth

  • SSIS packages from DEV to PROD

    I have created multiple SSIS packages on my DEV machine using a local SQL Server instance and Windows Authentication.
    When moving to production, I will need to update the Connection Manager details to point to our PROD SQL Server instance.
    When I do this, will I have to manually update each of the source and destination managers used in the package?

    Great, thanks.
    Is there a similar procedure for an Analysis Service project / OLAP model created in DEV using local data source/ destinations?
    Yes
    You've Analysis Services deployment wizard which can be used for generating the XMLA scripts based on environment details and can be used for migrating cube from environment to environment
    http://www.mssqltips.com/sqlservertip/1883/using-the-sql-server-analysis-services-ssas-deployment-wizard/
    Please Mark This As Answer if it solved your issue
    Please Vote This As Helpful if it helps to solve your issue
    Visakh
    My Wiki User Page
    My MSDN Page
    My Personal Blog
    My Facebook Page

  • Move page from Dev to Prod?

    I would like to copy/move a page from my Development application to Production. Both are on the same workspace. I go to the destination app and, while editing a page, select Create > New Page as a Copy. The page I'm moving already exists in the destination and I'd simply like to update with the new version of the page. However, it doesn't seem to allow you to "update" a pre-existing page. You have to copy to an unused page number. I believe I can delete the original page and then move it, but wanted to see if there's a more eloquent way to update the existing page.
    Ideas? I'm using APEX 4.2
    Thanks,
    Steve

    Hi Steve,
    you can export page from one application and modify line in export script:
    wwv_flow.g_flow_id := nvl(wwv_flow_application_install.get_application_id,APP_NUMBER );Modify APP_NUMBER with number off application where are you importing script but you'll probably have problems with constraints.
    The best way would be to separate workspaces. One for development, one for production version (copy of dev) and put them on different instances of APEX. Then you could easily do export/import.
    Br,
    Marko Goricki
    http://apexbyg.blogspot.com/

  • Sql server Configuration option when moving packages from dev env to production env

    hi folks:
      Our SSIS engine is SQL2008R2 and I am in charge of ssis package development and deployment from dev env to production env. 
      This is what I've done using configurations to move packages from dev to production.
      1. on my local machine, I've created a database called SSIS_Config and a table that stores all 
      configration settings
      CREATE TABLE [dbo].[SSIS Configurations]
    ConfigurationFilter NVARCHAR(255) NOT NULL,
    ConfiguredValue NVARCHAR(255) NULL,
    PackagePath NVARCHAR(255) NOT NULL,
    ConfiguredValueType NVARCHAR(20) NOT NULL
    2. on dev ssis server, there is the same table [dbo].[SSIS Configurations] on SSIS_Config db which stores all configurations
    Once package has been deployed to dev env and run with success, I'll move it from dev to prod
    3. On Prod ssis server, there is the same table [dbo].[SSIS Configurations]  on SSIS_COnfig db which stores all configurations
    once ssis pkg has been deployed using deployment manifest, it runs without errors as all production db connection
    will be updated manually in the table [dbo].[SSIS Configurations] 
    Our production env is unique as it's completely locked down and the only way to connect is through remote in session. 
    At this moment, I am maintaining three [dbo].[SSIS Configurations]  tables : on my local machine, on SSIS dev server and on SSIS prod server. 
    This works fine so far as I am the sole developer... Soon, we will have more developers joined to develop ssis package .
    I am wondering if there is anyway to cut the table maintained on my local machine and only use ones on dev server and prod server ? 
    I've tried using the table on dev server to disperse connectionstrings, it works file on dev env.  However, when I deployed to product server,
    since there is no sql connection between dev and prod, the configuration information can not be retrieved and theirfore package is failed.
    Any ideas on how to move packages from local to dev to prod env.? 
     Thanks
     Hui
    --Currently using Reporting Service 2000; Visual Studio .NET 2003; Visual Source Safe SSIS 2008 SSAS 2008, SVN --

    Thanks Nearby BI guy. Am I correct  that  in your SSIS packages, there is only one connection manager which gets ConnectionStr  populated from package configurations which is .xmlconfig
    file and  you then use expressions to populate  connectionStrs of other connection managers through the ssisconfiguration tables? 
    Also for the one on Production environment, the contents of .xmlconfig has to be manually
    changed in order to match the one on production env.
    Is that correct?
    I am thinking about using environment variables to point to the Config Database on each
    local/dev/prod environment, but some environments may have strict policy on the usage of environment variables.
     thanks
     Hui
    --Currently using Reporting Service 2000; Visual Studio .NET 2003; Visual Source Safe SSIS 2008 SSAS 2008, SVN --

  • Transporting standard table from DEV to PROD

    Hi All,
    I have updated a table called T166K and T166P for Purchase Order Printouts.
    I have entered few values in the above mentioned tables in DEV server.
    Now, i would like to move these tables to Production, since i can not create values to these tables in Production server.
    How to move tables from DEV till PROD...??
    NOTE: While updating these tables, system didnt prompt for saving under Transport Request Numbers in DEV server. 
    Regards
    Pavan

    Hi,
    You can use scatt tool to upload the data in the developement server. Prepare a file with data. Do it in developement environment only. then in SCATT you have remote logon facility using which you can run the scatt in developement environment and the result will be placed in the production server.
    Let me know if you what more information on this.
    Pls reward points if helpful
    rgds,
    Harikrishna

  • Transporting SLD objects from DEV to PROD

    Hi,
       I need to move My SLD objects from DEV to PROD. There is no QA. Also SLD is not common across DEV and PROD.
    Thanks!!
    Regards,
    Miten.

    Hi,
    How to handle SLD for Tranporting Dev to Quality ser
    https://service.sap.com/~sapdownload/011000358700001684302005E/HowToSLDandXI.pdf
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/0fa2c490-0201-0010-61b4-df12869c4753
    Transporting XI from DEV to QA
    Transporting XI from DEV to QA
    using CMS system. in XI
    1. /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    2. /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    3. /people/sap.india5/blog/2005/11/28/xi-software-logistics-solution-iii-cms
    4. /people/sravya.talanki2/blog/2005/11/02/overview-of-transition-from-dev-to-qa-in-xi --> Overview of Transition from Dev to QA in XI
    5. /people/sravya.talanki2/blog/2005/12/20/inconsistencies-while-transporting-rfc-objects-from-dev-to-qa-150-sp12
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/9e76e511-0d01-0010-5c9d-9f768d644808
    http://help.sap.com/saphelp_nw2004s/helpdata/en/93/a3a74046033913e10000000a155106/content.htm --> Transporting XI Objects
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content  .htm --> Configuring Groups and Transport Targets
    Look into this blog for how to export / improt IR and ID objects,
    /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    Please go through these links which actualy show you how to configure CMS and also gives you all information regarding it.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/43f5d790-0201-0010-2984-ff72d822b109
    http://help.sap.com/saphelp_nw04/helpdata/en/de/a4214174abef23e10000000a155106/content.htm
    /people/daniel.wirbser/blog/2005/10/27/tcsfilecreateexception--error-while-assembly-of-software-components-in-nwdi
    http://help.sap.com/saphelp_nw04/helpdata/en/f6/719a2172f74b67b150612a7cd3b7df/content.htm
    http://www.sap-hefte.de/download/dateien/964/074_lesesprobe.pdf
    Here are some blogs.
    /people/sravya.talanki2/blog/2005/11/02/overview-of-transition-from-dev-to-qa-in-xi
    /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    Re: Moving project from Dev to QA
    Error while exporting/transporting the Business system from Dev to Quality
    Transporting the scenario frm Dev Server to PRD Server
    transporting data from Dev to quality  using CMS
    Regards,
    Phani
    Reward points if Helpful

  • Best method to transport changes from DEV to Prod Environment

    Hi SDNers,
    I have a requirement here :
    I have made some changes to the DEV environment, which i want to move to the production Environment.
    Changes mainly include the Structural changes, XSD's, Import maps, Remote systems, Export Maps, Validations etc. Please note that I DO NOT WANT to transport the data from DEV to Prod environment.
    I can see 2 options available :
    1. Export/Import Repository schema - But as far as i know, the import and export maps will not be transported auomatically through Export/Import Schema.
    2. Archive/Unarchiving Without data -
    Here are my questions :
    1. Is the 2nd option feasible looking at the changes I need to transport? If yes, is there any recommended guide available by SAP suggesting the 2nd option for trnasport mechanism.( Please sendme the links)
    2. Will it affect the data in Prodcution in any chance?
    3. Is there anything Archiving/Unarchiving without data cannot handle.
    4. Will it impact any other normal running of Production environment.
    Please respond to my queries.
    Thanks and Regards
    Nitin Jain

    Hi Nitin,
    If you use Archive/UnArchive option without data then you cannot persists the PROD env since you need to UnArchive the entire repository which is empty and then you need to move the PROD data into this repository.
    1. Is the 2nd option feasible looking at the changes I need to transport? If yes, is there any recommended guide available by SAP suggesting the 2nd option for trnasport mechanism.( Please sendme the links)
    Ans. I don't think, 2nd option is feasible as a mentioned earlier. This option should be used when we need the entire repository without data which is not the case you are looking for.
    2. Will it affect the data in Prodcution in any chance?
    Ans. If you are using 2nd option then this question is not related because when you UnArchive, you will get the new repository so this wont affect the existing repository at all.
    3. Is there anything Archiving/Unarchiving without data cannot handle.
    Ans. Workflows
    4. Will it impact any other normal running of Production environment.
    Ans. If you are using 1st option then you need to unload the PROD repository first and then import the changes. For option 2 its not related.
    Regards,
    Jitesh Talreja

  • Error while importing request from DEV to PROD

    Dear Experts,
                      i am having the problems with request no.. There are two transport request nos and these have to be transported
                     from DEV to PROD. I relesed these two but while importing into PROD showing everthing completed successfully
                      with one error and error is Generation or programs and screens  for both transport  requests .
                      I am just enable to understand what this message is for ..
                       Please someone help me out in this....
    with regards.
    Praveen.
    Moderator message: please search for available information/documentation before asking, read the detailed transport logs, correct the errors, try again.
    Edited by: Thomas Zloch on Dec 13, 2010 6:05 PM

    Hi,
    First check the source system: ZSTGLDV110 is exists or not. check the rfc connections (Also check the source system assignment in both the system to each other). check the settings in the stms tcode. check the suppoet pack on your quality system,.... there are plenty of reasons.
    thanks.

  • Not updating Prompts when report is moved from Dev to Prod

    Hi,
    I have a report In development which uses a Prompt ( Dynamic Lov) pointed to an existing prompt group.
    When this report is moved to production the prompt does not give any values as the it is not pointed to any prompt group.
    Could any one help me why the prompt is not being updated when it is moved from DEV to PROD.
    Thank you..!!

    Need more info...
    What version and are you using BOE or CRS?
    Thank you
    Don

  • How to use the repository; uploading reports from DEV to PROD...

    Hello...
    I'm fairly new to CR-XIr2 (SP3) but have worked with Crystal Reports since v6.0.  I'm trying to figure out how to create a dynamic parameter list that someone can select an item from, which will get sent as an input parameter to the SQL Server 2005 stored proc that populates the report.  I'm also trying to figure out if there's an easy way to copy reports from a DEV environment into PROD.  We have BOE.
    Basically, I would like to find out resources online or in books on how to use the BOE repository for dynamic and/or cascading parameters (i.e. pulling a list of text values & their associated IDs from a lookup table that won't be used in the report), images (i.e. corporate logo), etc..  What complicates things for us is that IT is now requiring us to use a DEV environmentit was really easy when we had unlimited access in PROD!  We also need to put together a process where reports & other repository objects that are copied from DEV to PROD access the correct db, etc.  (Crystal Report in DEV accesses DEV db/repository/etc.when copied to PROD it accesses PROD db/repository/etc.)
    Anyway, I'm just looking for info on where to begin--whether it be a book, a BO/SAP knowledge base article, in-class training from a specific company, etc.  Thanks!

    Hey Markian,
    Can you let me know the process you have followed to migrate from Dev to Prod.
    We can migrate all the reports and objects and database fields through migrate wizard where you can import all the objects, reports and database fields and users to production enterprise.
    Just follow the above scenario and let us know if you are facing any error.
    Try  publish the reports using import wizard and run it in the crystal designer.
    Regards,
    Naveen.

  • Problems when transporting from DEV to PROD

    Hi experts, I have problem during transport from DEV to Production.
    We have a  DEV, QAS and PRODUCTION and we have transport from DEV to QAS very well. But when we transport from DEV to PROD, recibe an error  like:
    After beginning the import method RS_IOBC_AFTER_IMPORT for Objects types IOBC mode (activation)
      Failed to verify catalog InfoObjetos ZCM_UNIMET_CHA01
      The InfoObjeto ZCM_RENC version does not exist in active
      The InfoObjeto ZCM_RENM version does not exist in active
    1.The Query is: Wy if the transport go OK from DE to QAS, then The transport from DEV to PROD terminated in error?.
    2. There are any items to check in production before to transport?.
    PD: All of the Objects in DEV are in ACTIVE status
    Tanks,
    Ramon Sulvaran

    The transport ended in QAS with error code (4) and ended in Producion with error code (8), the detal of the error in Production begin with:
    Home After import RS_ODSO_AFTER_IMPORT method for type (s) ODSO object (trigger mode)
    Activation of DataStore objects of type Object
    Check DataStore objects of type Object
    DataStore Object Verification ZCM_DS01
    The DataStore object is consistent ZCM_DS01
    Burning the DataStore objects of type Object
    Internal activation (DataStore Object)
    Pretreatment / Creating DDIC objects to DataStore Object ZCM_DS01
    Table / View / BIC/AZCM_DS0100 (type 0) DataStore object recorded ZCM_DS01
    Create / Delete the indexes for the active table
    Table / View / BIC/AZCM_DS0140 (type 4) recorded ZCM_DS01 DataStore object
    Type of table / BIC/WAZCM_DS0100 recorded
    Table / View / BIC/VZCM_DS012 (type VIEW) recorded ZCM_DS01 DataStore object
    Log ZCM_DS01 DataStore object changes was recorded successfully
    Writing Object Catalog entries (Tadiran)
    He has written the object TABL / BIC/AZCM_DS0100 in catálgo objects (Tadiran)
    He has written the object TABL / BIC/AZCM_DS0140 in catálgo objects (Tadiran)
    He has written the object TABL / BIC/VZCM_DS012 in catálgo objects (Tadiran)
    He has written the object TTYP / BIC/WAZCM_DS0100 in catálgo objects (Tadiran)
    Activate all ABAP Dictionary objects (5):
    Error / Warning in progr.activación Dict., Detailed log> Detail
    Activate table / BIC/AZCM_DS0100.
    Lack of expansion to the category table
    Lack of extension category for include or subtype .......
    When i go to BW Production to check teh object. I see tha the Object was create but in inactive status (grey color). When y Try to Actiavate it y see the error:  Error/ Warning in program Activation Dcit. Detailed Log -> Detail

  • Catalog Migration from Dev to Prod

    Hello,
    Certain users of our system are unable to login to OBIEE after we migrate to Prod. Getting the below error
    access denied for user to path /users/*USERNAME*/_portal/dashboard layout
    USERNAME is the userid used to login to obiee
    In our Prod, Users have access to Answers and hence they save their reports under My Folders.
    While we migrate the new set of dashboards and reports from Dev to prod, we overwrite the System, System.atr, Shared, Shared.atr files of Prod with the corresponding files from Dev. Thus retaining the Users and Users.atr files of Prod.
    Security: All are users/pwd are stored in the RPD
    Is there something wrong with the migration procedure or is it a bug?
    Any help would be appreciated.
    Thanks,
    Joe

    +2) Why did you migrate the "System, System.atr" ? Try without this one, but just the "shared" folders and files.+
    System, System.atr are migrated since this folder stores the Privileges and data formatting etc. These configurations need to be migrated to prod as well.
    However I tried what you suggested and USERNAME is able to login and see the dashboards. But the Privileges and data formatting changes in Dev didnt get into Prod
    There is a Security folder under System. Do you know what it is used for. Should I try to retain this folder in Prod?I don't really know.
    The object permissions (like report permissions) are supposed to be in ATR file (i think so...), but there are other permissions and security things everywhere.
    But i appears to be a clue to solve your problem.
    +3) Do you have a backup of the previous Prod webcatalog ? If so, try to copy the USERNAME/_portal content into the new one.+
    This might work, but I really need to identify what is the root cause for this since we have migrations bi-weekly and this issue might pop-up again for a different userOf course. I just suggested that to see if if the /username/_portal were really different, despite you didn't upgrade them.

  • Transport from DEV to PROD  BPC 7.5

    Hi
    i had a question of transporting AppSets from DEV to PROD System.
    On the PROD Systems are no AppSets the PROD System is completly new.
    Is it possible to transport the AppSets directly from the DEV to the PROD or must we first make a Backup in the DEV and an Restore in the PROD.
    Thank you for your help.

    Hi Carsten,
    As far as i understand you need to transport application sets individually, from development to production. The object type ASET and APPM refer to an application set and application respectively.
    As mentioned above, you can check and confirm from SAP Support if the back up mode ia now available to users.
    Hope this helps.
    Regards,
    Poonam

  • What is the best way to port complete applications from DEV - Test - PROD

    Hi,
    One of my customers recently asked me, Supposing I do the complete integrations and modelling in SOA Suite on the DEV Environment. Then,
    What is the best way to port complete applications from DEV -> Test -> PROD ??
    Also, since the URLs in use in the DEV environment would be very different from other environments, what is the easiest way to maintain them, and to build in Access Control mechanisms ?
    Best Regards

    It has been discussed here in detail-
    SOA 11g  Composite Deployment across multiple Instances: Best Practice
    since the URLs in use in the DEV environment would be very different from other environments, what is the easiest way to maintain them, and to build in Access Control mechanisms ?You may use deployment plan for this purpose. For access control, you may use Role Based access of Weblogic and EM. Please refer -
    http://download.oracle.com/docs/cd/E17904_01/integration.1111/e10226/appx_roles_privs.htm#BABIHDFJ
    Regards,
    Anuj

Maybe you are looking for

  • Keynote (and iWork in general) will not update automatically or manually

    Keynote announced a new update (4.0.3), but the main software update center from the Apple menu did not find any update for it. Then I visited Apple.com to download the update manually. But once downloaded it would not install, saying that no eligibl

  • Java Proxy Generation not working - Support for Parallel Processing

    Hi Everyone, As per SAP Note 1230721 - Java Proxy Generation - Support for Parallel Processing, when we generate a java proxy from an interface we are supposed to get 2 archives (one for serial processing and another suffixed with "PARALLEL" for para

  • Split View App acting Strangely after Upgrades

    I have a Split View app with 6 views. I just upgraded to Xcode 3.2.5 (from 3.2.4) and also have the 4.2.1 OS update on the iPad. Before the updates, my app on launch would always open on the first view. Now the app opens on the whatever the last view

  • Just can't deploy any app from workshop, what magic word am I missing?

    I just can not deploy anything from workshop. not even a simple web service application contains only one method public String getIt(String id){ return id; I created my own domain which is a workshop enabled domain. In wlw-manifest.xml, there is no J

  • Drawing Aids: Gudline Sets

    in the Drawing Aids window you can choose some Guideline sets (e.g. US Letter, Us-Legal). How can I create own Guideline sets. Thank You for your help. Walter