Moving buttons from project to project

I have a button where the selected state and highlighted states took me a long time to create a long time ago.
I copy to the clipboard the button, paste into a new project and none of the attibutes, selected state or highlighted states work. whats more, the "selected Shape' shows "not set'
How do you correctly move a button from project to project????
Thanks
dvdsp 3

Right click on the button, and elect "create button style" not specific to the project.
Name it and save it self contained.

Similar Messages

  • Moving images from project to project

    Every time I try to MOVE an image from one project to another project, it COPIES it instead. That's not what the manual says should happen. Am I doing something wrong?
    Thanks, Fran

    Welcome to the list. Have you read the [Help & Terms of Use|http://discussions.apple.com/help.jspa] section yet?
    The only way you would be coping from project to project is if you were holding down the option key while you dragged the image.
    If that's not the case then it really sounds like either the source or destination (or both) are other than projects. Remember projects are the yellow file box looking things.
    regards

  • Moving Markers from Project to Clips in Event

    I have a student who put 100+ markers on a clip in a Project/Timeline.
    Is there a way to link up or move the clip (with the markers) back into the event so the markers appear?

    Can you explain this better......
    "Select and copy the clip in the Project."
    Done.
    "Right-click in the browser and choose New Compound Clip."
    Browser?    Do you mean Project or Event Library? (I assume Library if you used 7).
    If I have an event selected & go make new compound clip it puts it in the event.
    If I have the project selected, it changes the original clip into a compound clip.
    "Paste the Project clip into the Compound."
    Huh?  See above.

  • Moving iPhone App Project from one Mac to Another...HELP!!

    Hey guys,
    Im new to programming. I made a simple app and I want to most it from one mac to another. I copied the folder and tried running it but it gave me a whole bunch of errors along the lines of:
    - directory not writable
    - permission failed
    - errors permission denied
    etc...
    I do not know what I am doing wrong. Please please help!

    Hi GadgetAddicted & welcome to discussions...
    It sounds like you're not using the original locations that are constructed when Xcode is first installed.
    If your second install is the same as the original, moving a simple project that is intact to begin with shouldn't be a problem.
    Be sure that all the resources related to that project are local to the original project (inside the same parent folder), and then duplicate the parent folder...move that, but be sure the name of the parent folder in the second location is the same as in the original.
    Repair permissions via Disk Utility after the move.

  • Moving Composition from one project to another?

    Hi
    Is there any way to move a Composition from Project A into Project B with all it's layers,Keyframes etc...?
    I'm using AE CS3 ... never had to do it before ... but never say never hey?
    Thanks for the help
    Lee

    You might also want to do a Reduce Project on that composition, then save the project under another name, prior to importing it into the second project.

  • Moving table from one project to another project using metadata.

    I have exported metadata of one table from project owb_demo and I want the same table in project Owb_demo_1 by importing the metadata. I am newbie . When we export it even store project info like owb_demo . How to change this things in metadata. When I try to import it gives error saying table already exists.
    How do we migrate objects from one project to other using import and export of metadata.
    thanks

    Hi Vix,
    Regarding using multiple enviornments in OWB there is a case study on "How to manage multiple versions of BI implementation". You can find it the OWB case studies on the net. This guide is a useful one.
    One more thread you can look into in this forum - " How design with OWB", the link is below:
    How to design inside OWB
    Still if you want some specific explanations regarding this, better start a fresh new thread.
    Hope this helps
    Regards
    -AP

  • Moving Photos from a project

    I have put some photos in a project and now I want to move those photos to another projects album. So far I have tried to highlight all and drag them to the new album which works but it leaves me with 2 copies of the photos. How can I move these photos and delete the other project.
    Mac Pro 2.6   Mac OS X (10.4.8)  

    Hello
    that's an easy one:
    dragging pictures from one project to another moves the pictures (i.e pictures get removed from project A and added to project B). To do this you must move the images and drop them onto the project, not onto anything else.
    Albums behave differently: because they're a collection that serves a usage purpose, not a storage purpose, albums can accept images from wherever they are. but the image are NOT ADDED to the project, even if the album is within a project.
    projects are real image groups. album are virtual image groups.
    so be careful not to delete images from one project when it's only been added to an album in another project, not the project itself
    cheers

  • Moving photos between projects

    I'm having a problem - erratically - moving photos from one project to another. When I select one photo & drag it to a different project - the entire project gets moved instead of just the one selected photo. (I've double checked that there are no photos selected before I select the photo that I want to move.)
    If I cancel the move, I end up with missing thumbnails & sometimes missing photos.
    This is erratic because sometimes dragging one photo to another project works.

    It is really hard to tell what might be happening - we need more details:
    What is your Aperture version? The most recent Aperture 3.4.1?
    Are your images referenced or managed? Raw or jpegs?
    How did you edit them? With Aperture or an external editor?
    Do you create new versions when editing and stack them, or edit the current version?
    And after moving to a new project, the preview of the version shows the original master, but the thumbnail shows the original edits? Is that correct?
    I Suspect, when you moved the images, they lost their previews. As a test, duplicate an image version (Photo > Duplicate Version) and force the generation of a new preview (Ctrl-click, hold down the options key ⌥, select "Generate Preview"). Does that bring back the edits? Also you could try to export the image version ans see, if the edits are still there.
    Regards
    Léonie

  • Moved iMovie 09 project and timings became screwed up

    I moved an iMovie project including all files from my Mac Book to my Mac Pro using a USB drive. I had done the basic editing on the Mac Book and I wanted to do the last touch on the Mac Pro.
    After moving the project, all ins and outs became screwed up and sometimes even outside the ends of the clips making a lot of stills at the end of clips. Now I have to do the editing again, it's so disappointing.
    Is it a well known bug that you can't move projects without screwing up the timings in iMovie 09?

    Great question. I think the issue of backup is a important one, and one I always worry about since I have a lot of video footage that is irreplaceable.
    For back-up, it is helpful to define the risk you are trying to protect from.
    For example,
    1) risk of corruption in iMovie --> I might use Time Machine (but I do not because I have not had the issue)
    2) risk of hard drive failure --> I use SuperDuper! nightly
    3) Risk of theft or fire --> offsite backup
    Here is what I do...
    1) I back up my boot disk with SuperDuper automatically to alternate external partitions every other night so I always have two bootable systems. One is less than one day old, and one is less than two days old.
    2) I back up my original video files. For my Motion JPEG, VHS-->AIC, DV, and 8MM to DV, the EVENT is the copy I back up. For my AVCHD high def video, I back up the archive of the AVCHD, but I am not currently backing up the Event files, because I would need from 4 to 8 TB to back up these events depending on whether I made one copy or two.
    3) I use CrashPlan for my offsite backup. It costs less than $4 per month, and I seeded the initial backup to an external drive to minimize having to transfer video files over the Internet. I currently have 1.2TB of data backed up to CrashPlan, which includes my entire boot drive, and the files described in #2.
    4) All of the above is automated, so I don't have to think about it too much. If I have to manually do stuff, I tend to get behind.
    You have to consider the value of total multiple redundancy vs. the likelihood that 2 or three unlikely events would all happen at once. For example, CrashPlan could lose my data. My hard disk could fail. I could lose everything in a fire. But it is unlikely that they would all happen at once, except in nuclear war, in which case, who cares?
    I am considering adding Time Machine backup and some off-site backup of the Event files into the mix, but for now I am satisfied.

  • ProjectUID selected from the reporting database from Project Server OnPublished event is taking some delay

    Hi all,
    I'm invoking a stored procedure from the reporting database from the project server onPublished event.  I'm having some issues in getting the details of that particular project from the published event handler.  This i noticed that there is some
    delay is taking place in moving the data(project uid )  from the published to the reporting database .
    My stored procedure select statement is as follows:
    SELECT ProjectUID, ProjectName FROM MSP_EpmProject_UserView
     WHERE ProjectUID=value
    This stored procedure is invoked from the onPublished event of the project server event handler where that particular projectuid is passed in that stored procedure.I have noticed that some delay is taking palce to move  the data into the reporting database. 
    My stored procedure got invoked from the onPublished event of the project server event handler before the delay is complete.  So the row selected from the stored procedure is alwys zero (0).  Is there any other method to wait for repoting database
    to get refreshed. Please help me .

    Hi sabithad,
    The issue you are facing is because of the conflict of permissions, event handlers always works through administrative user credentials whereas the project is open in edit mode by the logged-in user. And you are tyring to update custom field at the back
    end with Administrative credentials, while project queue is in process by logged-in users credentials. Its not gonna work this way :) 
    The best option is to use Javascript on your PDP using CEWP, you can either build your complete logic in JavaScript and place that code on your PDP. OR you can use the combination of JavaScript and PSI and create a webpart to be placed on PDP.
    below blog link willgive you directions to go ahead with, but for sure the solution to your query is
    JavaScript :)
    http://epmxperts.wordpress.com/2012/05/21/generate-unique-id-for-project-using-a-webpart/
    hope this helps.
    Khurram Jamshed - MBA, PMP, MCTS, MCITP (
    Blog, Twitter, Linkedin )
    If you found this post helpful, please “Vote as Helpful”. If it answered your question, please “Mark as Answer”.

  • Sale Order Status Change after delivery of materials from projects

    have ETO sccenario which consists of all modules such as SD,PS.PP etc. Materials will be procured from external vendors & manufactured inhouse through project systems. After delivery of materials from project systems, billing & invoicing will be done at sales level.
    On delivery of materials from projects, sale order status remain open. Request you to look into the matter & suggest about status change of sale order after delivery / billing.
    Regards,
    Ranjan

    Hi,
    In sale order, WBSE is assigned. Delivery of materials are through cns0. then subsequently picking / packing / billing will happen at sales level. Billing is of delivery related. Please suggest to fix the issue.
    Thanks & Regards,
    Biplab Ranjan

  • Sale Order Status after dellivery of materials from Projects

    Hi,
    I have ETO sccenario which consists of all modules such as SD,PS.PP etc. Materials will be procured from external vendors & manufactured inhouse through project systems. After delivery of materials from project systems, billing & invoicing will be done at sales level.
    On delivery of materials from projects, sale order status remain open. Request you to look into the matter & suggest about status change of sale order after delivery / billing.
    Thank you in advance.
    Regards,
    Ranjan

    Hi,
    In sale order, WBSE is assigned. Delivery of materials are through cns0. then subsequently picking / packing / billing will happen at sales level. Billing is of delivery related. Please suggest to fix the issue.
    Thanks & Regards,
    Biplab Ranjan

  • Retrieve all values from project type when project type combo box is null

    Hi,
    We are facing a tight situation here. We have a scenario where we have 2 filter options.
    1) Department ID
    2) Project type
    When department ID is selected all the department IDs should be populated in the combo box and the project type combo box should be empty.
    Similarly, when project type is selected all the project types should be populated in the combo box and the department ID combo box should be empty.
    Then, when more than one value is selected from department ID box and all the values from project type must be retrieved from query level (as per business logic).
    How do we do this? Kindly help us with this situation.

    Basically my situation slightly different.
    I am trying to do a bulk insert on SQL Server table using prepared statement, during that time i am getting the exception. I am using JDBC-ODBC driver. However, if i do individual record insertion, it is working.
    Any idea about this type of problem ?
    Regards
    Ramesh

  • PS: WBS is not flowing for a Material, while creating delivery from Project

    Hi,
    While creating delivery from Project thro CNS0, WBS is not flowing for a Material in delivery, in turn WBS is not flowing in Billing document for same material, in turn not allowing to Post the Billing document to Accounting.
    Error while releasing Billing to the Accounting: Accounting Entry is not generated. Error Message:Assign Condition type
    YMRG in COPA.
    Pls let me know, what can be the reason ?
    Thanks.
    Amit.

    Hi Kuldeep,
    Check this note,
    Note 159387 - Message BP603: incorrect line item is displayed
    Its valid only till 4.6. Might give you some idea but.
    Regards,
    Gokul

  • Sales order stock from Projects

    Dear Gurus,
    The Scenerio is,
    I am procuring materials through project. Generally it will go into project stock, If it is mentioned as a stock item. But my requirement is, the procured material has to go into salesorder stock.( Bcoz delivery of material happening in SD thrpugh sales order.) Is that possible? If yes, what are all the settings, I have to do in PS module and other modules,if required. But the cost(Planned/Actual) has to be captured against Project.
    Awaiting for your reply.
    Regards
    Suresh

    Hi,
    When you are creating a PR from project , the "OPTT" customizing
    1.Should have the "D" setting for "Sales Doc- Project" setting.
    and in the sales order that is relevant to the project , you must have the WBS element assignment
    Both the project and the Sales order should have the material ! project having it as being procured ( to take care of PR & PO generation )
    and the SO having the material as being delivered ( to do the delivery and billing of the material supplied )
    The Sales order should have the material production or procurement getting triggered through the item category ( and the material master's MRP Type ) and the requirement type !!
    All these settings  once maintained, you can have GR of material to Sales order stock !
    Best Regards,
    M.Amarendra

Maybe you are looking for

  • Need help in installing a SATA hard drive with 865pe NEO2

    Hello there I need a help in installing a Sata hard drive ,it is WD 250 GB , my motherboard is 865PE Noe2 , the bios is the latest one already I got another old hard drive ,not a Sata ,a regular IDE one installed as a master hard drive I want to inst

  • How do I fix my home button?

    how do I fix my home button?

  • File adapter with QoS=EOIO  Is there any filesize limitation?

    Dear Experts, I'm using a File/FTP Sender adapter with Quality of Service = EOIO (Exactly Once In Order) to keep the polled order of the files. In the processing parameters I defined a queue name and everything is working well for small (~1 MByte) fi

  • How to use oracle reports?

    Hello, I succeed to install e-business suite and now I need to learn about oracle reports. Do I have to install it or it's already in the apps? If not, how do I install it? There isn't any oracle reports disk in the bundle I have. Thx.

  • Best jpg quality for website work?

    I realize that 72 dpi is the best resolution to use for website images, but at what quality level should I export my image files (1-12) ?