Moving material from quality to unrestricted

Hi Experts,
                 We have a scenario where the user has given the UD but the stock posting tab was missing in the QA32 screen, so stock posting could not be done. Now in the stock overview the material is available in quality stock only. We want to take the material to unrestricted stock. Inspection types 01, 08 and 09 are active in material master. Please advise how to proceed? If we try to transfer material from quality to unrestrictedthrough 321 movement in MB1B, we are getting error message "change inspection stock in QM only ". Please advise.
Regards
Sm.

Hi
08 is Stock transfer
The QM component cannot manage stock movements for inspection lots that were created manually.
http://help.sap.com/saphelp_erp60_sp/helpdata/en/89/9bb43418e43b4ae10000009b38f83b/frameset.htm
This inspection lot is created automatically during stock transfer or created manually ?
Alagesan

Similar Messages

  • Movement of Material from Quality.

    Hi ALL,
    The inspection lot is created with Insp. type "04" ..'Goods receipt inspection from production'...The usage decision as "DEV2" has been  made for the lot...but the qty for offgrade  has been posted to Quality instead of unrestricted. and new insp lot of type '08' is created..for the offgrade..
    On analysis it is found "Post to insp stock " indiactor was not set...So this takes care of all future lots...But for the current lot how to move the material from Quality to Unrestricted...SAP does not allow to carry out UD for the 2nd lot.."08" .
    Your help is required..
    Thanks,
    Regards,
    Ameya K.

    Hi Sriramachandra,
    Thanks for the reply..Actually now two inspection lot exists...one with type"04' whose UD was done as "DEV2" devalue for scrap..and as a result system prompted to enter the Offgrade material ...
    As a result new lot got created with new batch for the offgrade...Now do i have to create insp plan for the offgrade...or is there any other alternative...?
    Thanks
    Ameya k.

  • Material movement from Quality to Unrestricted

    Dear All
       My problem is that i have given UD for a particular batch and posted the stock from quality inspection to unrestricted use.
    But when i see in the stock overview the quantity still lies in Quality i.e in MMBE
    But when i see in QA33 the stock is available in Unrestricted.
    Kindly give me a solution
    Regards
    Surender

    Dear,
    Use movement 321 to move material from QI to unrestricted and movement 343 from blocked to unrestricted.
    Regards,
    R.Brahmankar

  • QM: How to Move material from quality stock to unrestricted stock

    Hi,
    How to post material stock from quality to unrestricted without using 321.
    Regards,

    Hi,
    if you have quality management active then you have to mainttain quality view in material master along with the inspection lot settings. now this will result in quality lot creation at the time of GRN. then you have to execute QA32 and get the lot. make usage decision and there you will find tab with lot quantity. there you have to give qty in unrestricted and save it.
    if you dont have it then just do the transfer postingeither through MIGO or MB1B with movement type 321. give the mat. plant str loc. qty and save it.
    regards,
    Adwait Bachuwar

  • Process of moving TR from Quality to Production

    Dear Experts,
    we are in a process of moving TR from Quality to Production. While moving we faced transport incositencies like some old requests have been overwritten into the new one and dependant objects were failed during import in PRD. Now production rehearsal client is kind of messed up. what is the right procedure to transport the requests from Quality to Production. (actually we transferred the TR individually based on the list send by the respectivr module owners). Please help me to findout the solution for this issue.
    regards,
    Yasin.

    Hi,
    This situation comes every now & then when you don't have any client strategy define in your landscape I'm not blaming you but for your Project Manager and then rest of the team adopt SAP standard practice if you really want things to go well act NOW..!! here is the basic to start:
    Ex,
    DEV ::
    100 => Golden Client
    200 => Customizing Client
    300 => Test Client
    Things to check before importing request in QAS :
    1) Always get the request in sequence format ask the owner of the request for the sequence to avoid dependency issues
    2) Technical Specification doc - this doc will be prepare by Functional / Developer on what changes are included in TR
    QAS::
    400 => Quality Client
    Things to check before importing request in PRD :
    1) User acceptance doc i.e UAT - client / customer will check the functionality if it's on then move this to PRD
    2) Get the request in sequence format
    3) Approval for production transport
    PRD::
    500 => Production Client
    Thanks,
    Saleem

  • IDOC - message type WMMBXY(Stock transfer from quality to unrestricted)

    Hi Gurus,
    I have IDOC problem.
    Inbound message type WMMBXY(Stock transfer from quality to unrestricted), The status if I check in WM02 of Doc is "51-Application document not posted"
    Error Message ""Required function
    MB_CREATE_GOODS_MOVEMENT is not being processed".
    Please Help.
    Prashant

    Hi
    The Idoc whcile Posting using Message type WMMBXY calls the Function module L_IDOC_INPUT_WMMBXY & in turn this calls the function module MB_CREATE_GOODS_MOVEMENT.
    This function is not getting executed.
    Please check if the Movemnt type used is not active for WM movemnts.
    If you have used previously this movemnt type & now it is not working. Please take hlep of ABAPer  for debugging & finding the Root cause
    Thanks & Regards
    Kishore

  • How to list the transfer posting document from quality to unrestricted

    hi experts,
    i can get GR documents by using MB51
    but how to get list of documents from quality to unrestricted and blocked to quality tranferpostings
    thank you
    ganesh

    You can get all the Details in MB51 by Selecting Proper Movement types.
    For Eg: Gr Docs using 101, GR Blocked Using 103 and GR Blocked Released using 105 etc.
    Regards,
    Ashok

  • When moving material from Uml-zone, we -zone etc.

    When moving material from UML-zone, We-zone, etc. Can you get the system to generate individual SU#'s.
    I have 30 items of XYZ, I want to move all 30 at one time and generate 30 individual SU#'s......Is there a way?

    Yes, this is possible and standard
    If you post a material document to place the stock into the interum storage type try LT06 and use the document as a refrence, you will need to maintain the LE quantity in your material masters and the system will automaticaly propose the correct number of SU when you click "palletization".
    if you do not maintain the LE you can enter the qty as  (for example) 60 X 3000EA / 1 x 2500EA (or whatever unit of measure you use)
    This is very standard for WM and easy to do once the configuration is in place and you learn the transactions.
    LT06-LT12
    Edit: if this doesn't fit for your needs please provide more info about the transactions you currently use to put the stock into the WE-zone and how you are currently moving it out

  • MOVING MATERIAL FROM RETURN STOCK TO UNRESTRICTED

    Dear Gurus,
    A product is rejected by a particular customer as we were not meeting their quality specifications .the product is now in returns stock
    the product can be used for an customer since it meet their quality specifications.we want bring it into unrestricted stock but with a traceability in system.so that when an quality audit is done we can give solid reasons for moving this rejected product into unrestricted.
    Can we do this by creating a manual Notification and maintaining reason moving the product to unrestricted.
    or is there any other way of going about this so that auditors do create problem in future
    Regards
    Ram

    Hello Ram,
    You can use inspection type 05 for this purpose so that whenever post goods' receipt will be done the materials will be posted to quality inspection instead of returns stock.  You can do stock posting in this case with reference to inspection lot. You need to change the customization for this. Movement type would be 655 instead of 651.
    Best Regards,
    Anand Rao

  • Issue in moving material from unres to qual using 322 mvt. type

    There is a scenario in which user trying move the material from unres  to quality using movement type 322 in MB1B.
    error: Stock posting possible in qm only.
    Material Master: activated for the material.
    query;  Is it possible to use mb1b to move from unres to qual?
    What are other way to bring the unrestricted to quality, is that any material qm view setup required to achieve this.
    Edited by: kkr_chandran66 on Jan 7, 2011 1:57 PM

    We need to put it first into quality from unrestricted and then return.
    Dear from unrestricted to QI you can bring back through MB1B 322 movement type it is standard process but in your case it is not allowing because the stock which is in unrestricted was cleared means usage decision stock posted by UD so to bring back that stock in QI again you need to reverser that UD first for that refer my previous reply and apply note which will reverse the lot.
    what is the normal process steps for vendor return.{quote}
    Make a returnable purchase order,do the delivery to vendor through MIGO 161 movement type with reference to the returnable purchase order.
    Cheers
    KK

  • Run Time Error ASSERTION_FAILED while moving Transformation from Quality to Prodcution

    Hi All,
    Need your urgent Help here !
    we had moved 4 transformations into prodcution from Quality out of which 3 were succesful adn one Transformation has failed due to RC12 "ASSERTION_FAILED" . In the attached screenshot , you can find few more details.
    The transformation we are moving is a new one and after the transport failure we can still see that in Prodcution , but when we double click on it , it is throwing dump of "ASSERTION_FAILED"(I can see only T versions of routines and formula exisitng in RSTRANSTEPROUT Table in Production)
    we are currently in SAP 7.3 and with SP 8 . I have seen so many solutions with lot of SAP note recommendations but we are not sure of the exact solution .
    Please let know the correct solution .

    Hi Vinod,
    while moving to quality you didn't face any problem?
    Again try to import same request at bw prod and see.
    if its failed again then again collect into transport request at dev system and move to qua/prod.
    While collecting transformations you need to collect all routines.
    Best way to collect transformations is RSA1-->transport connection, expand middle pane, transforamtions-->select object-->find your transformations and drag to rigth side screen.
    at right side screen, expand your transformations and select all routines which are exist.
    After that you can released and import at target systems.
    Thanks

  • Moving Objects from Quality to Producton

    Hi,
    whts the process used to move BO Objects from Quality to Production system.
    Regards,
    Shiva Kumar G.C

    If you're talking about migrating a universe, then it's easier.
    Make sure you've go the latest version from the QA folder in the repository.
    Now do a File Save As.
    Navigate to the production folder and save in there.
    Change the connection to point to the production connection.
    Carry out an integrity check to make sure that everything still works.
    Then save the universe and export it to the Production folder in the CMS.

  • Posting goods from quality to unrestricted status CRTD CHCR......

    Hi Guru's,.
    I have one issue.
    In QA32 my lot is in CRTD CHCR SPRQ. I have not made quality plan for that.in MM01,quality view i activated inspection type 01.
    now in mmbe stock is showing in quality.
    i want to do transfer posting from quality to unristricted stock.i dont want to use quality plan assign to that lot.
    I tried MB1B movemet type 321. i am getting error Change the inspection stock of article 1111030200267 in QM only.
    Is any way to do that,transfer posting.
    Regards,
    siddharth

    Hi,
    As your lot has been at CRTD status you need to released by assigning inspection plan.
    In QA02 --change inspection lot or in QA32 select lot line item & click on inspection lot so that you can be able to enter in change lot.
    In which you can assign your inspection plan ,you will find icon  inspec tasl list ,click on same icon.so that you will get message inspection plan assigned , .If system wont allowe you then same screen usage ( You have to select same usage by which you created inspection plan.)
    Save the transaction & refresh the QA32 screen
    Regards
    SANIL

  • Moving the stock from quality to unrestricted.

    Hello Experts,
    This is regarding QM issue.
    in inspection lot certain lot quantity is entered in quality and it is not cleared.
    the system status for that lot in QA03 is UD   ICCO PRII STUP
    now the question is how to clear this one.
    even i checked for inconsistency,but there is no inconsistency exits.
    kindly tell me how to proceed further and solve this issue.
    Regards,
    santosh.

    Hi Santosh, Yes no problem. You can post.
    You have now identified the correct lot.
    Select this lot and click on execute button. Then go to stock posting tab and post the remaining quantity to unrestricted use.
    Itu2019s absolutely correct to post the stock against this lot.
    In fact we can say earlier selected lot was incorrect as it was not having status ending with SPRQ or SPST. I explain this to you.
    For material XYZ, 5 inspection lots are created containing 20 Qyt each (say lot numbers are 1,2,3,4 and 5). When you look at MMBE, you will see that quantity 100 is lying in quality inspection which is the sum of all lots quantities.
    Now one by one you go on posting stock to unrestricted and giving UD. Accidently you gave UD for lot number 3 without posting the stock. Now system will show 20 Qty in quality inspection in MMBE. Here the first task to identify the correct lot against which we did not carry out stock posting. In order to identify this correct lot number against which stock posting was not done, we execute QVM2 transaction. Here lot number 3 has status SPRQ  i.e. stock posting required. If you try to post the stock against lot other than 3, system will definitely throw error because it was already posted.
    Hence the output of QVM2 always gives the correct lot against which stock posting is not done.
    Regards,
    Anand Rao

  • Not able to clear material from quality stock

    Hi,
    There is a stock inconsistency between inspection stock in materials management and inspection stocks managed in inspection lots.Due to this, unable to clear inspection stock. I tried with QA08 ,MB1B also assiging inspection type 08 but still posting not happening fron inspection  stock to unrestricted stock.
    Regards,
    Ravi

    Hi Ravi,
    Please note / clarify following :
    1) If  in material master of QM you have activated  post to inspection (no lot generation with 01 or 04 type insp) then stock will appear in quality, and you should or can only clear it using MB1B 321 movement type.
    2) If already you have activated 01 or 04 or 08 then you will be allowed to post stock through inspection only (QA11).
    3) Check one more important point :
    From old lots somebody might have done result recording and given UD but forgot to do stock posting. you can find such lots with status 'SPRQ'. go to QA32 put particular material, remove range dates and select all insp lots. from the list apply filter to column 'system status' check for ' SPRQ ' in the filter. you will lots where UD given (green radio button)  but stock posting pending.
    Please elaborate if problem if not resolved.
    Best Regards,
    Shekhar

Maybe you are looking for