Moving project from one VSO to another VSO and transferring ownership

Hello,
I want to understand if we can move a project from VSO owned by one company to VSO owned by other company.
also is there any risk of moving and any data would be lost?
Is there any procedure that i need to follow and take care
Kindly assit.
Regards
Abhijeet 

Hi Abhijeet,
If you want to move team project from one VSO account to another VSO account, then you can use the tools that Vishal mentioned above. If you want to move Visual Studio projects under team projects to another VSO account, then you can unbind Visual Studio
to source control and add to team project in another VSO account.
For changing the VSO account ownership, you can check this
page for more details.
Best regards,
We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
Click
HERE to participate the survey.

Similar Messages

  • Trouble moving projects from one computer to another

    In the prospect of clearing up space, I am moving projects from my hard drive to an external.  In order to make sure things are moving properly I open up a project from the external onto another computer, different from the one I moved the projects off of.  When I open up the project, part of the original footage (.MTS file) does not show up in the timeline.  The blue rectangle that represents the footage is striped.  When I open up the exact same project onto the original computer from the external everything is fine.
    Also, when I was opening up a project from the external to the other computer the "Locate Media" pop up appears wanting me to link all the media, but all the media has been checked off, as if all the media has already been found.  Why does it do this?
    Thanks,
    Josh

    Hi Josh,
    Check this out: Moving projects to another computer: http://help.adobe.com/en_US/premierepro/cs/using/WS1BF3BAAB-A930-44e3-8DFA-50D5C58A1A1Aa.h tml#WS3D22F379-B6C7-4d8c-9548-26AA3E1EA74F
    Likely you have some of the MTS file structure missing. The best way to move projects, IMHO, is to use the Project Manager.
    Thanks,
    Kevin

  • Problem Moving Project from One Machine to Another

    Hi.
    I teach in the school of communication at a university. Tonight, I tried to share a FCP project with my students in a lab setting. I wanted them to continue to edit what I had started.
    I gave each of them the FCP project folder on a thumb drive. They downloaded the folder to their desktop.
    When they launched the project they got the "Media Offline" window. There is only one file, a WAV file, in the project, so it was easy to find and reconnect.
    The problem was that each of them got an error message about the "Media Start and End."
    I had cut the single WAV file into a much shorter edit, and all those edits went all screwy, I believe due to this error. For instance, the WAV file is an interview, and I'd cut out the interviewer's questions, leaving only the subject's replies. But when my students opened the project, the edits I'd made included the interviewer's questions, left out some of the subject's answers, etc.
    I'd really appreciate any input on what I need to do in order for a project to open on a student's computer exactly as I have saved it on my computer(s).
    Thanks very much.

    Go back to your original project file. Give the original media a *Reel Name*.
    Use Media Manager (in the File menu bar item) to consolidate a linked copy of the media and its project file to a folder of your choosing.
    Detailed information on using Media Manager can be found in the FCP User Manual.

  • Moving Project from one solman to another

    Hi Friends
    Can anyone help me in moving the project prepared in one solution manager to different solution manager.
    We have got solution manager and is productive and another is training and we are going to upgrade our productive solution manager 4.0 to 7.0 but before that we need to move the project into training solman.
    can any one suggest me what could be the procedure.
    Waiting for your precious response
    Thanks and Regards

    Hello,
    There is an option of project transport.........in solman.....so u can create a transport request for the project you had created..........and then import this transport request into the solman system u want to.....
    If both your solmans are not linked thru the TMS,then u got to manually copy the Data and CO-files...just consult basis guys for this........
    U find the option of transport project in tcode SOLAR_PROJECT_ADMIN... There is an icon just below on the left......u should use that to transport the project....basically u will be prompted for the transport request...this transport has to be imported into the solman system u want.....
    Inspire ppl by rewarding.........
    Regards,
    Anand

  • Moving Projects from One Computer to Another

    Is there a good way to do this?
    To be clear I mean the project, not a completed video

    To edit a project on another computer, you will need both the Project file and any event files that it references.
    You will need an external drive formatted Mac OS Extended (journaled) - not FAT32.
    Firewire and USB will both work fine for this.
    In iMovie, click VIEW/Group Events By Disk.
    Now you should see your external drive at the bottom of the Project Library List view. Hold down the Command Key while dragging the small icon for your project to the small icon for the external drive.
    Now, with the Project still selected, click FILE/CONSOLIDATE Media... and you can move over the Events, Music, and Photos for the project to the external drive as well.
    Plug this drive in to the other Mac and you are ready to edit.

  • Moving project from one Mac to another

    Hi,
    Sorry if this question has been asked before.
    I have a project on my MBA. All masters of this project is on an external HDD.
    I want to move this project to my iMac. I still want to retain the masters on the HDD.
    What's the best way to do it?
    Thanks in advance.
    -Kailas

    Well, this _should_ work.
    "File→Export Project as Library".  Do NOT consolidate Masters.
    "File→Import Project/Library".
    When your external drive is mounted on the second computer, Aperture should automatically connect the Images in the Project you copied to their correct Masters.
    Frank will send peckish pythons my way if this is not correct.

  • Moving Events and Projects from one location to another on the same hard drive.

    Hello.
    I've searched in the FCP X User Manual, on this forum and in Google, but have found no explanation of how to do this, so I'm posting this here in hopes that someone in our community will be able to help.
    I've previously stored my FCP X Events and Projects folders on an external 3TB hard drive, because there is more room on it than on the internal 1TB hard drive, but, since then, I've worked with other media apps, for video, photography and audio, the files for which are also stored on the external hard drive, and this has created a bit of clutter with no folder structure to keep it tidy.
    I like an organised file structure on my system, to keep it uncluttered, easy to navigate and efficient to use, so I put all the files for my photography, video and audio apps into their own folders, which are, in turn, stored in their appropriate folders for Audio, Photography and Video, and those three folders are stored in a folder called Media, and then I directed each app to its own files.
    The only app with which this has been a problem is FCP X. While there is a way of relocating projects and events from within FCP X, it allows the user to move them from one hard drive to another, and not, as I want, from one place to another on the same hard drive.
    I'm not sure if it matters, but perhaps it's relevant to mention before the next paragraph that the files that had previously been imported as events are, to save hard-drive space, stored in the events folder as shortcuts to the original files, which are stored elsewhere on the drive, rather than as duplicates of those files.
    In Finder, I copied the Events and Projects folders to their intended new locations and tried in the app to link the events and projects to their new Finder location. It seemed to have worked, until I moved the original folders to the Trash. On re-opening FCP X, it was clear that the linking hadn't worked. I returned the original folders from the Trash to their original location, but that didn't entirely reverse the problem. I noticed also that, in the original and duplicated Events folders, the shortcuts had lost their links to the original files stored elswehere on the drive.
    Fortunately I had run a backup before starting, so I restored the original folders and the app from the backup, and all was back to normal.
    I'd be grateful if anyone could advise me on whether or not it's possible to move FCP X events and projects from one place to another on the same hard drive with the app's compliance.
    Thank you.

    Ludio wrote:
    I'd be grateful if anyone could advise me on whether or not it's possible to move FCP X events and projects from one place to another on the same hard drive with the app's compliance.
    I
    Message was edited by: Russ H Apparently mis-read the questions.

  • Moved iMovie 09 project from one computer to another - now timing is wrong!

    Hello,
    I wanted to copy some Events and Projects from my Dad's older MacBook Pro to my iMac. So I just copied the event folders (from <Home Directory>/Movies/iMovie Events/) and the project files (from <Home Directory>/Movies/iMovie Projects/) to the corresponding folders on my iMac.
    I then opened up iMovie on my iMac and saw that the Events and Projects were there. So far, so good.
    The first problem I noticed was when I exported one of the projects from my iMac using QuickTime. The duration of the resulting .MOV file was about 30 seconds shorter than the duration of the project!
    I watched the Project in iMovie, and found that the clips in the Project were 'cut off'. For example, the clip in the Project would say it was 10 seconds long, but when you played the Project the clip was only 7 seconds long.
    How could this be? Is the speed of the Project somehow tied to the computer that created the project? i.e. perhaps the speed of the processor could impact this? I highly doubt it, as it would make it impossible to move projects from one computer to another.
    Bottom line - the identical Project file on my iMac (with the same underlying events) will produce a different exported movie file than the exact same Project file on my Dad's laptop. Specifically, my version will be shorter and the clips will be cut off.
    Any ideas would be greatly appreciated....

    The macrumours link just telss you how to move the events which is relatively straightforward.
    Alot of advice just seems to rest with leave the projects on your internal drive as they don't take up much space.
    However, http://karsten.schluter.googlepages.com/im08tricks has a description of how to move the projects and then 'fool' imovie into where the projects are stored.
    Not very flexible but it does allow you to 'clear' your macbook yet when you restore the sym-link file to the right place and restart imovie you can reconnect to all your old projects and events without yellow triangles of death appearing.
    By the by apple needs to sort this out as archiving old projects and events together and preserve the editing is a really basic requirment I think.
    PS anyone found out how to merge projects yet? Another basic function that seems to be lacking.

  • What is the easiest way to transfer a large imovie project from one computer to another in a different location.

    What is the easiest way to transfer an faairly large HD imovie project from one computer to another in a different location. Can you export to drop box? Will the other computer need the exact imovie version?

    OK it depends.
    If you have a finished movie, you can SHARE/EXPORT MOVIE and create your final movie. Then, depending on the size of the finished movie, you can transfer via dropbox or similar service. Ninety minutes is a very long movie for iMovie, but it may work for you. I would suggest 720P to keep the size down.
    If you need to transfer the entire iMovie Project so it can be edited in iMovie at the other end, then you need to transfer the project and event assets to an external hard drive and get the hard drive to the other location.
    Directions are here. Follow the directions for 1) Moving or copying Project to external drive. Then 2) Consolidate Media.
    https://discussions.apple.com/docs/DOC-4141

  • Need help coping project from one computer to another.

    I need help coping project from one computer to another.  I loaded all video on computer 1, copied events and project folder to computer 2.  I was told I only needed to copy the project folder back to computer 1 since the events folder is already there.   I copied project folder back to computer 1 but the files wont open.  I dont have computer 2 available. 
    Please help!!!

    Hi
    No that's not the way to do it - iMovie gets confused and in some cases the problems might be un-repairable.
    You've got several problems
    • iMovie'08 - CAN NOT MOVE PROJCTS - You NEED iMovie'09 or iMovie'11 - I see no other working solution
    • Never MOVE or alter any folder named
    iMovie Projects - or -
    iMovie Events
    on DeskTop/Finder - This might be very harmful
    • Moving (Projects) and Events - HAS TO be done within the iMovie Application.
    You've got an Evets window and here You can view Your Events in two ways - Yearly - or - Yearly per Hard disk
    Here You can move within this "window" to another location
    • Projects - NO they do not contain Your full movie - only a document on howto use the material in Event folder
    and there might be worse if You added Photos from iPhoto and Audio from iTunes/Garageband - then You have
    to get this over to the second Mac too, to be able to continue editing.
    So to move Your projects to another Mac You need
    • iMovie'09 or 11
    • an external hard disk -
    MUST BE Mac OS Extended formatted - as UNIX/DOS/FAT32/Mac OS Exchange will not work for VIDEO
    Should be a FireWire one - as UBS/UBS2 performs badly when used for video
    • Then move/copy over within Project resp Events window in iMovie Application
    Hopefully I've been not to confusing or badly structured to be followed.
    Yours Bengt W

  • How to move iMovie project from one computer to another

    I have been working on an iMovie 09 project on my desktop at home.
    Now I want to work on the same project on my computer at work.
    How can I move the project from one computer to another?   What I've already tried was to make a duplicate copy of the project and then use a thumb drive to move that to another computer.   It didn't work.
    Thanks for your help.

    Hello James Snedeker,
    After reviewing your post, it sounds like you want to move a file to another disk. I would recommend that you read this article, it may be able to help the issue.
    iMovie: How to Save Projects to Another Hard Disk
    To copy an iMovie project to another disk:
    1. Quit iMovie if it is open. 
    2. Locate the project folder in the Finder.
    3. Drag the project folder to the other disk.
    Note: You must move the complete project folder, intact, to the other disk in order to successfully copy the project. The project folder has the same name as the project listed in the iMovie window. This folder includes the iMovie project file, as well as a Media folder, which contains all of the clips associated with this project. If you don't copy all of these items, the project may no longer be readable in iMovie.
    Once you have copied the project, try opening it in iMovie to ensure that it copied to the other disk successfully.
    Thanks for using Apple Support Communities.
    Have a nice day,
    Mario

  • Project from one mac to another

    Hi
    How dose one take a project from one mac to another.
    On one of mac the fotage has been cut as a ruff cut and I would like to take that edited to another mac the fotage is on both mac. Is it as simple as a edl list and reconnect the fotage on the other mac.
    tips please as this is the first time I'm going to do this
    thanks for helping out going from 5.1 to 6
    trevor

    Just copy the project file to the other Mac, and open it. Reconnect if FCP asks you to.
    If you just want that single sequence, right-click the sequence in the Browser window, and choose File -> Export -> XML (version 3). Copy and import that in FCP on the other Mac. (File -> Import -> XML)

  • I have no problems copying iMovie Events from one Mac to another, however, how can I copy iMovie Projects from one Mac to another?

    I have no problems copying iMovie Events from one Mac to another, however, how can I copy iMovie Projects from one Mac to another?  Any help will be appreciated.  Thank you.

    This should give you some good insight, I'd probably store them on an External HD on the old machine and then just drag and drop to the new machine.
    https://discussions.apple.com/docs/DOC-4141

  • How can I script moving paths from one file to another?

    Hello. I have 1 image with various color correction layers. The other is the exact same size but only contains paths. How can I script moving paths from one file to another? Thanks, in advance, for any help you can offer. Thanks!

    Thanks! This one actually worked for me. Thanks for your help.
    http://forums.adobe.com/message/3305389#3305389

  • Moving Image from one Review to Another?

    I attempted to upload an image (open in Photoshop) to a specific review. However, I could not see the desired review in the Photoshop CS Review panel. Out of frustration - after attempting to "find" the desired review for several minutes - I uploaded the image to another review and then went online, using Safari, to Acrobat.com.
    There is no visible means of moving an image from one review to another. There is a way of dragging one review (with all sub-images) to another location. But I can't see a way of moving a sub-image from one review to another review.
    IF there is some "magic" that someone knows I would sure appreciate some education.

    This works quite well for a single image review. I've moved them from one workspace to another. The issue is when a review has multiple images and you want to take only one of them from that review and move it to another review in another workspace; I can't seem to get that to work at all.
    When I open a review and navigate to the desired image, then click in the lower left corner and select a new workspace to move the image to, it moves the entire review - not the single image - to the new workspace.
    I guess I could delete the "part" from the workspace it currently exists in and then create it as a stand alone review, but then I won't be able to imbed it into another review as I want to do.
    The source frustration here is that I can't get CS Review in CSPS5 to navigate to the desired workspace/review. I get "ALL REVIEWS" displayed but not the workspaces... Any ideas on how to display workspaces instead of reviews?

  • Moving Stack from one folder to another?

    Is there a way to keep a stack together while moving it from one folder to another. When I grab the stack and drop it to a folder, I view the folder and the images are no longer in a stack. It would save me a lot of time if they would stay stacked. Am I missing something?
    Thank you.

    Well your code is unreadable because you didn't post it properly, but I'd guess you've fallen into the old multiple-delete trap in a new way. It's like this:
    To start with you have messages numbered 0, 1, and 2, let's say. So you write a loop that lets i run from 0 to 2 and delete message number i in the loop. What really happens? The first time through the loop you delete message number 0, after which you are left with messages numbered 0 and 1. The second time through the loop you delete message number 1, after which you are left with message 0 only. The third time through the loop you delete message 2, which isn't there and you get that message.
    That's just a guess, I didn't have the patience to read that ugly unformatted code. There are two ways to do the multiple delete properly, if that's actually your problem: (1) run the loop upwards from 0 and always delete message 0; (2) run the loop downwards from N-1 to 0 and delete message i.

Maybe you are looking for