MR21 for split valuation & price control "V"

hi all,
Case: Split valuation is activated but parent has price control "V" and child i.e. diff valuation types have "S". We want to make std prices of all valuation types "0". It is done but the parent still shows value in MAP.
a. How do we make MAP of parent as "0" (price control "V"), will it allow?
b. Will it impact and how e.g. MB5L
c. Is it ok if we ignore the valuation of parent
d. All valuation types under parent are made "0"
Thx
Bhushan

Hi
The price control at the plant level will always be V,where at the valuation type level either V or S can be maintianed.It is not recommeneded to ignore the valuation class at the plalnt level in case of split valuation because if you are going for costing run then this needs to be maintained.becoz cost of a material procured needs to be determined at plant level
Regards
Sandeep
Edited by: sandeep13 on Feb 8, 2010 12:49 PM

Similar Messages

  • Split valuation-Price control with valuation category

    Hi,
    While creating halb material with valuation catergory Y,System select price control V,
    I wish,it should be S, as after cost run value updated with standard price.
    Regards,
    Devendra

    Hi,
    I am not sure about moving thread to other forum since I don't find any such option in our purview. You can check the option to contact moderator who has right to do the same.
    Also you can try with creating new thread in MM forum and close this thread here in PP forum thereby you can avoid duplication.
    Regards,
    Tejas

  • Only price control "V" is possible for split valuation'

    Hi
    For  semi finished items price control has been assigned as 'V'.when i am trying to change the same to S' I got the error message is"Only price control "V" is possible for split valuation''.Even i checked and corrected the MRP views in Material master.
    Can any one help me to sort out this issue
    Regards,
    P.Selvakumar

    Hi,
    I guess that you are getting the error message M3 185  ('Only price control "V" is            
    possible for split valuation').   This message is correct.                                                                               
    ONLY materials with Moving Average Price can use the split valuation          
    function.                                                                               
    The reason is the following one:                                                                               
    If there are 2 valuation types, named X and Y.                                                                               
    There is an equality:                                                                               
    Material pricetotal quantity = Price Xquantity X + Price Y*quantity Y                                                                               
    In order to balance,                                                                               
    When X and Y is 'V', the header material should use 'V'.                      
    When X is 'V', Y is 'S', the header material should use 'V'.                  
    When X and Y is 'S', the header material should use 'V'.                                                                               
    So only price control V is possible for split valuation.                                                                               
    In accordance with the text of the message M3185, split valuation             
    requires the price code 'V' (moving average price) for the header             
    record.                                                                               
    Please, refer to the SAP Library (http://help.sap.com) documentation          
    under the menu path (for your current release level, 470):                                                                               
    MM - Material Price Change (MM-IV-MP)                                         
    -> Split Valuation                                                            
       -> Creating Material Subject to Split Valuation                                                                               
    "Creating Material Subject to Split Valuation:                                                                               
    1. First create a valuation header record for this material. This is            
       where the individual stocks of a material are managed cumulatively.                                                                               
    To do this, fill in the Valuation category field on the accounting           
       screen when you create the material master record and leave the              
       Valuation type field blank. In the Price control field, enter V              
       (moving average price), since a moving average price is constructed          
       in the valuation header record from the values and quantities of the         
       individual stocks. When you save, the system creates the valuation           
       header record.                                                                               
    2. Then create the material for a valuation type.                               
       To do this, call up the material in creation mode again. Due to the          
       fact that a valuation header record exists, the system requires you          
       to enter a valuation type for the valuation category.                                                                               
    3. Repeat step two for every valuation type planned."                                                                               
    In order for the system to take into account the different values of            
    the substocks, the material at the header level must necessarily have           
    a 'moving average price' (V) control.                                           
    Regards,
    MLM

  • Different price for split valuation

    hai
    for split valuation material shal we define different pricing?
    for ex :
    materail - Pen
    we split the category is "colour "
    the valuation type is red , blue ,black (with different prices)
    red - 12 Rs
    blue -15 Rs
    black -10 Rs
    i know that we can maintain in material master record .
    But we need while doing THE P.O for red colour pen the price must be Automatically taken from the system as 12 Rs,
    and same as blue colour pen as 15 Rs , and for black colour pen as 10 Rs.
    i searched in "INFO RECORD" .we can only define the "valuation type " .we cant able to dife different pricing for split valuation material in info record
    where we have to maintain the different pricing for valuation material .kindly explain.
    regards
    christo.

    hi,
    you need maintain records for your pricing condition say (pb00).For that u need to create a table in m/03 with  combination of material valuation type , price.and  then assign the table in accesses sequence of the pb00. then maintain records in mek1 with key combination of the above created table.it will help u.

  • Configuration steps for split valuation

    Dear Gurus,
    I have completed following steps in MM configuration.
    A.Defining  Enterprise structure
    A1. Defining controlling areas
    A1. Defining Plants
    A3. Defining Storage Locations for Plants
    A4. Defining Purchase Organization
    A5. Assigning Purchase Organization to Plants
    A6. Assigning Plants to company code
    A7. Assigning purchasing organisation s to company code
    A8. Assigning purchasing organisation s to plant
    A9. Creating Purchase Groups
    Now I am facing problem in Split evaluation.I am not able to create create valuation class & valuation type.
    What is the role of split valuation ?
    What are the configuration steps for split valuation?
    Can anybody guide me on this/
    Thanks & regards,
    NB

    Hi NB
    A fruit company is importing apple from America & Europe. The price of apple imported from America is Rs.10 per Kg. The apple imported from Europe is Rs.15 per Kg.  How do they maintain material master for Apple with two prices..?
    A chemical factory produces methanol. The cost of methanol produced internally is Rs.20 per liter.  But due to high production they purchases methanol from outside at Rs.30 per liter.  How do they maintain material master for methanol with two prices..?
    Petrol bunks have different varieties of petrol. Hi speed petrol costs Rs.52 and ordinary petrol costs Rs. 47. How do they maintain material master for petrol with two prices..?
    If your answer is to maintain two material codes i.e. one  for apple-America & one for apple-Europe then you are wrong. If your answer is Split Valuation, then you are right.!
    Steps:
    We have to activate split valuation if you want to use split valuation. But by default split valuation is Active.To activate the split valuation:
    tcode OMW0.
    To differentiate between material stocks, you must define valuation category and valuation type.
    The valuation category specifies which criterion should be used as the basis for differentiating between the various partial stocks.
    The valuation type specifies an individual characteristic of a partial stock.
    Go to tcode OMWC, create global types, then global category. assign global types to global categ. and then attach them to valuation area(plant).
    regards
    Yogesh

  • Prerequisites for split valuation?

    Dear Gurus,
    what are the Prerequisites for split valuation?
    thanks in advance..

    Hi mate,
    In split valuation you can valuate the material in MAP. The main accounting view should always be in MAP. The price control of the valuation types can be either of standard price or MAP.
    In split valuation the number of accounting 1 views will be Number of valuation types +1.
    Edited by: sriramkadiyam on Feb 3, 2010 6:22 AM

  • Query for MAP Calculation - Price Control ind V and S

    SAP Guru's
    Query regarding MAP Calculation Logic
    Scenario:
    *I have one material xyz
    1. It is split valuated material,
    2. Two valuation types with diff price control indicators
    3. Batch Management is also activated on this material.*
    Follwoing is the Material Master Accounting1 View :
    Vauation Type     Price Control     Total Value     Qty     MAP                  Batch     
         ZA1          V                     610835.00             37     16509.05(V)          01
         ZB1          S                     0                  1     20000.00(S)          02
    but when we are running MM03 w/o Valuation Type Accounting 1 View
    is showing MAP as 16074.60 i.e. 610835.00/38
    Diff. Reports Output------>
    MB5L - List of Stock Values: Balances --> Output
    ValArea          Total Stock          Total Value
    A101               1                          0
    A101               37                          610835.00
    Net-->               38                  610835.00
    MB52 - Display Warehouse Stocks
    Check Box - Display Batch Stocks
    Condition1: When Display Batch Stocks is selected on main screen of MB52
    Mat.     Palnt      Sloc      Unrestricted     Stck in Transit          Total Value
    xyz     A101     0010      0                    30                       482238.00
    XYZ     A101     0010      7                    0                       115563.00
    xyz     A101     0010      1                    0                        0
    This is not correct result as Total Values is 597801.00 only      
    Condition2: When Display Batch Stocks is not selected on main screen of MB52
    Mat.     Palnt     Sloc     Unrestricted     Stck in Transit          Total Value
    xyz     A101     0010         0                  30                       482238.00
    XYZ     A101     0010         8                   0                       128597.00
    This is correct result as Total Values is 610835 .00 only
    So my query on above issue is :
    1. How System is including 1 Qty of Std Price Control for MAP calculation?
    As per my understanding MAP is only for Price Control V indicator Materials Stock
    2. Whats the difference between these two report output from MM03 Accounting
       view?
    Thanks

    hi Animesh,
    For Split Valuated Material at header level Price control is always "V" i.e. Moving average price reagrdless of the Price control you have given for different valuation types.
    Due to this you are getting these kind of results. Please visit the following link for more information
    http:///saphelp/EN/8f/d1de34e4cb2300e10000009b38f83b/frameset.htm
    Check it and revert back.
    Regards,
    Jay
    Edited by: SAP_MM on Dec 4, 2008 10:19 AM

  • Inforecord for Split valuated materials

    Hi all,
    How can i maintain different prices for split valuated materials
    For Eg.  I have a material split valuated based on its Quality vendor supplies two diff quality materials with different prices
    how to maintain the prices in inforecords or any alternative to maintain both the prices.
    With regards,
    Krishna

    hi..
    Split valuation is for Valuation Purpose only...
    SAP does not support....Procuring same material with Diff. Split Valuation Type from Single Vendor is not allowed by SAP standard..
    You cannot Maintain Purchase Info for Material which is having 2 Split Valuation type......with One Vendor......
    Because For One vendor and One material combination, you can maintain One split valuation type only....
    Hope it works..
    Thanks..

  • Physical inventory document creation for split valuated material

    Hi
    We are doing stock count in our company. We are using split valuation for some of the materials. When I tried to create a PID for split valuated material which are not in stock, system issued a standard error message. What I understood from that error message, we can create a PID for split valuated materials which are in stock. Is it so? If so, then how can we count split valuated material?
    Let me know if you need any info.
    Thanks in advance..
    Jeny...

    Please refer to SAP note 30254 and it should help.
    Symptom
    If you create a physical inventory document for a material in a storage
    location without existing storage location segment, error message M7006
    is displayed: 'Material & (material number) & (plant) & (storage
    location) does not exist'. Thus, a storage location segment is not
    created automatically for this material.
    The same also applies to the batch segment. The batch segment is also
    not created automatically but, if a batch is specified for a material
    when creating a physical inventory document, that is not yet created for
    this material, error message M7042 is generated: 'Batch & & & & does not
    exist'.
    The same applies to the special stock segments which are also not
    created automatically. Different error messages are generated here
    depending on the special stock (see also Note 64448).
    Additional key words
    MI01, MI09, MI10, M7076, M7183, M7184, M7185, MARD, MCHA, MCHB, MSKA,
    MKOL, MSKU, MSPR, MSLB
    Cause and prerequisites
    If no storage location segment or batch segment or special stock segment
    exists to a material, this then means that a goods movement did never
    occur before in the system to this material (batch) to this storage
    location (special stock), that is that the material (batch) never had a
    stock to this storage location (special stock) in the system before and
    that it was never posted before on this segment. It is therefore not
    possible to carry out a physical inventory for such a material (batch).
    It is different, if a goods movement has already occurred to a material
    (batch) to this segment and if only the present stock is zero. A
    physical inventory is then necessary and also feasible for this material
    (batch) since the different segments are not deleted automatically in
    the moment in which the stock becomes zero.
    Solution
    For a material for that no storage location segment, batch segment or
    special stock segment exists, it is not necessary, to carry out a
    physical inventory on this storage location or for this batch or this
    special stock. If, however, a quantity is physically found to such a
    material, the corresponding segment must be created before the physical
    inventory.
    There are 3 options to create storage location data:
           -  maintain the 'Storage' view in the material master for the
              material and storage location or
                                                                      Page 2
           -  use the 'Enter storage locations' function in the material
              master or
           -  post the first goods receipt (providing, the automatic
              creation of storage location data is permitted in the plant
              and for the movement type).
    There are 2 options to create batch data}:
           -  create the batches in the material master manually via
              function 'Create batch'.
           -  post the first goods receipt for the batches to the respective
              material.
    You can only post the various special stock segments via posting a goods
    receipt. An exception is special stock 'K' (vendor consignment). You
    must define a consignment price in the material master for this special
    stock using the 'Create vendor consignment' function before a goods
    receipt can be posted for this special stock.

  • MR21 price changes for split valuation materials

    HI
    I have changed the material price for the material whcih are maintained with split valuation ie. in MR21 i could able to change the price for valuation types only.. i'm not able to change the main material price , its asking to enter the val type?? how to change the the price ? 
    Ex . Mat code : MAT 123, having val types as IN and OV, which has price control of S, here i have changed the price for the val types IN & OV, but i'm not able to change the  price for the main material MAT123, which has price control V?? how to change it

    hi Samuel,
    We have a similar case, need your help;
    Case: Split valuation is activated but parent has price control "V" and child i.e. diff valuation types have "S". We want to make std prices of all valuation types "0". It is done but the parent still shows value in MAP.
    a. How do we make MAP of parent as "0" (price control "V")
    b. Will it impact and how e.g. MB5L
    c. Is it ok if we ignore the valuation of parent
    d. All valuation types under parent are made "0"
    Thx
    Bhushan

  • Valuation strategy for Split Valuation.

    Dear SAP Experts,
    We have split valuation for some of the raw materials.
    Whaile running Std Cost estimate system gives following errors even if we have maintained the price under valuation type.
    CK465: No price could be determined
    CK240: Cost component split costed with value of zero
    CK168: Cost estimate for material is Incorrect.
    In Valuation varriant we have strategy 7 & 4 (ie price control as per material master & as per planned price). We dont want maintain any planned price.
    I would like to know is there any Standard Valuation strategy exist in the valuation variant.
    Best Regards
    Nikhil

    If you have maintained price at valuation type level then to consider them you will have to activate mixed costing for costing type and valuation variant you are using in configuration. You will also need to create a qty structure type for this. Once this is done, you will have to maintain procurement alternatives ( T code CK91N - process category BBV) and maintain mixing ratio (CK94). This will ensure correct costing.
    Assign points, if useful.
    Regards
    Rakesh Pawaskar

  • Vendor Consignment for Split Valuated Materials

    Dear All,
    We have a scenario where in our material is split valuated,we have 2 valuation type import and Domestic, both the valuation type is being supplied by a single distributor, the price of the import valuation type is different from the price of domestic valuation type.
    We are trying to configure consiginment process for split valuted material.While maintianing consignment info record, we are not able to maintian separate info record for import and domestic valuation type (since material /vendor/plant/purchase organization are same).Hence while doing goods issue using 201 K, the system is taking the price from the info record.Is there any solution available, to post the  goods issue for import valuation type at a different price and domestic valuation type at different price.
    Thanks,
    Vairavan.

    How system will pick the info record price for movement type 201 K ?
    As of my knowledge, system will create accounting entry as per the material price (MM03 - Accounting 1 view for the valuation type)
    It may create problem for 411 K movement type, but not for movement type 201 K.
    If you need to pick different price as per valuation type, then you can do this via condition table.
    Have a look into the discussion Info record Price on the basis of Valuation type

  • How do I update standard cost for split valuation material?

    We are using split valuation on our maintenance material.  Maintenance material is held in an inventory account separate from our production material.  We have materials that are set up with a Parent material as variable, and child materials  which are NEW or REFURBISHED or CORE.
    The Child materials are set as standard cost.  Some of the standards are old.  Unlike our production materials, which have their cost standards on the Costing 2 tab of the material master, split valuation child parts have their costing on the Accounting 1 tab.
    I attempted to update a cost standard by loading a future price manually in the material master.   I was able to load a future price, but could not get it to release in CK24.
    I have been unsuccessful in finding a process or procedure that tells me how to update a child standard once is already exists.  There was one blog that said that the standards could only be released using CK24N if the quantity is zero.  I attemped to update costs on part with zero quantity on hand. This was also unsuccessful.
    I am looking for a process- ie 1) load a future cost using tcode XYZ, 2) Mark and release cost using tcode XYZ, 3) validate changed inventory value using tcode XYZ.
    Thank you in advance for your assistance.

    Hi Govind
    If your valuation variant reads MAP as the strategy sequence - Then average MAP will be taken... i.e. the MAP in the parent accounting view of the material will be taken
    However, if your strategy sequence is intended to look for info records, then follow the link given in the earlier reply
    Regards
    Ajay M

  • Production costs for material with price control V

    Dear all,
    Can anyone pls tell me, how will the costing occur for a material produced in-house and having price control 'V' ? I am not able to see the target costs.
    Also kindly tell me the settings to be done in CO, like target cost version, valuation variant, costing variant, etc.
    Thank you,
    Shrenik

    Rather than giving my own versions I have compiled here SAP inputs. Pl let me know if you require any clarifications:
    Costing variant has the following components:
    <b>Define Costing Types
    Define Valuation Variants
    Define Date Control
    Define Quantity Structure Control
    Define Transfer Strategy
    Define Reference Variants</b>
    <u>Costing type:</u>
    In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to:
    Update Cost Estimate
    Standard price Standard cost estimate (01)
    Tax-based price Inventory cost estimate
    Commercial price Inventory cost estimate
    Price other than std price Modified standard cost estimate or
    current cost estimate
    No update Any cost estimate
    Define Valuation Variants:
    Define Valuation Variants
    Here you create a valuation variant containing the parameters required for valuation of a cost estimate.
    You also specify which costing sheet should be used to calculate overhead.
    Valuation Strategies
    Material valuation
    Here you define the sequence in which the system searches for prices from the accounting view or costing view of the material master record to valuate materials. You can also access prices from purchasing info records and condition types.
    For material cost estimates, you also specify whether additive costs can be added to the selected price.
    With configurable/configured material components and with procurement alternatives, the sequence defined here is ignored if the strategy "price from purchasing info record" was selected, in which case that strategy is always executed first. For more information, refer to the SAP Library in the component Product Cost Planning under Raw Material Costing or Mixed Costing.
    Activity Types / Processes
    Here you define the sequence in which the system searches for prices in activity type planning or actual activity price calculation in Cost Center Accounting or Activity-Based Costing to valuate the utilized activity types and business processes.
    You also specify which plan/actual version is used.
    Subcontracting
    Here you define the sequence in which the system searches for prices in the purchasing info record. In purchasing, quota arrangements are used to create a mixed price for materials that are manufactured with external vendors with parts provided by the customer. You can specify whether the quota of the individual vendors that are entered in the source list for the material to be processed should be determined through the planned quota arrangement or the actual quota arrangement.
    External processing
    Here you define the sequence in which the system searches for prices in the purchasing info record or routing operation for valuation of the external activities.
    Strategy Sequence
    You define the individual valuation methods for the valuation variant as strategy sequences. For the valuation of the material components you define a strategy sequence that reads the fields of the material master record in a particular sequence such as:
    1. Planned price 1
    2. Standard price
    3. Moving price
    The first price that is not zero is used to valuate the material component.
    Target versions:
    Target cost versions  are used in the following ways:
    In variance calculation:
    To control which variance (total variance, production variances or planning variance) is calculated
    To valuate unplanned scrap( scrap variance)
    Unplanned scrap is valuated in the period-end closing activities when the variances are calculated. You can specify in a valuation variant for WIP and scrap which cost estimate you want to use to calculate the target costs for the valuation of unplanned scrap. You assign the valuation variant to target cost version 0 if you want to include it in the valuation of scrap.
    When you are using a cost object hierarchy with active distribution, you use the target cost version to control which cost estimate the system uses to calculate the target costs, which are used as the basis for determining equivalences for actual cost distribution.
    The actual costs collected at the level of the hierarchy are distributed across the orders in accordance with these equivalences. This distribution is proportional to the target costs for the cost element under which the actual costs are written. Actual costs for material costs are distributed in proportion to the target costs for the origin group, such as for the material, if you have entered an origin group in the costing view of the material master record and have set the indicator Material origin, for example.
    If no target costs were calculated under this cost element, enter a cost element group in the target cost version. The actual costs are distributed in proportion to the target costs for this cost element group. This cost element group should be complete. If costs were updated under a cost element that is not in this cost element group, no distribution is possible.
    You can calculate equivalences on the basis of SAP standard target cost versions 0, 1 and 3.
    The standard system supplies the following target cost versions:
    Target cost version 0 ( total variance)
    The amount of the total variance generates a posting in Financial Accounting during settlement.
    For this version, select actual costs as the control costs and standard cost estimate as the target costs.
    Target cost version 1 ( production variance)
    For this version you choose actual costs as the control costs and planned costs as the target costs.
    Target cost version 2( planning variance)
    With target cost version 2, the costs from the preliminary order cost estimate are interpreted as control costs.
    For this version, select planned costs as the control costs and current cost estimate as the target costs. You cannot calculate planning variances for the product cost collector.
    Target cost version 3 (production variance of the period)
    You compare the planned costs of the period calculated on the basis of an alternative material cost estimate (such as a modified standard cost estimate) with the actual costs of the period on the basis of the yield delivered to stock in the period.
    The base quantity for variance calculation is the yield.
    For this version, you choose the actual costs as the control costs and the alternative material cost estimate as the target costs. To determine the alternative material cost estimate, enter a costing variant and choose a costing version.
    The target cost version specifies which data is to be compared. The target cost version also specifies which variance variant is used and therefore which variance catagories are calculated. You can define a different target cost version for each controlling area

  • CK40N - Update for material with price control 'V'

    i Experts,
    When im running standard cost estimate in CK40N, say for material types semi finished. The components that is raw materials of the SFG is also updated with the price, meaning for a raw material with price control 'V' has a price of 10, after
    releasing the cost estimate for the SFG, when i look into the material master of raw material, the price of 10 is also updated
    in the standard price.
    I am not sure why this is happening, i believe it should not happen. Because in the valuation variant, if i give the strategy as standard price, this price is easily picked up. And more over with price control 'V', i can change the standard price. Can anybody throw some light on this.
    Best regards
    gj

    Hi Rakesh,
    Thanks for the information. But i do agree even during release there is no impact on the inventory. But in my cost variant, say in PPC1, if i give the strategy say 1. standard price 2. moving average price, during cost estimate run, its going to take the standard price for the material irrespective of the price derived automatically for moving average price. For eg in our case for raw material with price control 'V' after sce run if the standard price is 10 and moving average price is 14, as per strategy of PPC1 above its going to take 10 and not 14.
    Is there any other way to avoid this. Please correct me if i had went wrong somewhere.
    Best regards
    gj

Maybe you are looking for

  • HKEY error message when installing Itunes

    "Could not open key: HKEY_LOCAL_MACHINE32\SOFTWARE\CLASSES\Cdda\OpenWithProgIds. Verify that you have sufficient access to that key. I have tried regedit, I've cleaned out the old files and tried a hundred different solutions but nothing seems to wor

  • Can't install OS 8.6 on Power Macintosh 6100/66

    I have a Power Macintosh 6100/66 with a 350MB hard drive I want to install MkLinux as well but the drive is just too small, so I got a 2GB drive and put that in instead. After booting from my CD I tried to run the installer but just got a "this progr

  • Can an swf movie be opened on a specific frame?

    When I call up an Flash-generated swf movie in its own browser window via a navigation bar button, it always open on its first frame. Is there a way to tell the browser in conjunction with the getURL command to open at a specific frame other than fra

  • Getting access to files

    I am using RAD 7.0 as IE I want to access all the files under a directory of my project using Java BUt my project cud be deployed at any location or path so How do I get the relative path using Java? My files are under this path C:\SDP70\workspace_au

  • HP Pavilion - Do I need external Recovery option?

    Hi, I have just bought a HP Pavilion 15.  Keep getting contractdictory advice.  Some say must have an external Recovery option; others say why, there is no need and it is a lot of hassle to create a set.  Need advice: 1)  is it really necessary to ha