MR8M with e difference in EUR

Morning
The step are
1) PO in USD   - Date 28.02.2011 (15.37) - Exchange rate :  0,72945 - Amount : 7533,57 USD (5495,35 EUR)
2) MIRO in USD  - Date 28.02.2011 (15:38) - Exchange rate :  0,72945 - Amount : 7533,57 USD (5495,35 EUR)
3) MR8M from step 2 (USD) 10012010 - same day, same hour  ==> it generate another item with a difference in EUR in another account  like this :
Amount : 7533,57 USD (5471,58 EUR)
                                            22,77 EUR
Can somebody explain me why?
Thanks a lot.

its's means "Differences course currency s / reception"
MIRO
   PK = 31 / supplier account/ 7533,57 USD/ 5495,35 EUR
   PK = 86 / 406186              / 7533,57 USD/ 5495,35 EUR
MR8M
   PK = 21 / supplier account/ 7533,57 USD/ 5495,35 EUR
   PK = 96 / 406186               / 7533,57 USD/ 5471,58 EUR
   PK = 50 / 607106               /            0 USD/     23,77 EUR
406186 : No invoice received suspense account
607106 : Differences course currency s / reception
I thinks it's clear now.
Can you help me?

Similar Messages

  • Problem with exchange rate GBP/EUR

    Hi everyone,
    I have an issue regarding 2 documents that have been posted the same date (31.05.2011) but with different exchange rates.
    The first doc is type ZP, posted with exchange rate GBP/EUR=0,88XXX (entry date: 26.05.2011, T.Code: F110)
    The second one is type BK, posted with exchange rate GBP/EUR=0,87XXX (entry date: 01.06.2011, T.Code: FB01)
    Both documents use the same exchange rate type EURX.
    I checked in OBA7,  there is no default value for the field "Exchange rate type for foreign currency docs" in both cases.
    Do you have any idea how to solve this problem?
    Thanks in advance,
    Soumaya

    Hi,
    If the exchange rate is maintained in OB08 once a month, and in the meanwhile, if you are trying to post any transaction with foreign currency, the system would pick the last available/maintained rate in the table. For Eg: if the rate is maintained upto 30.04.2011 with 0,88XXX and if you have made a document with ZP with posting date as 31.05.11, the system would pick the rate of 30.04.2011 only as there is no rate maintained as on 31.05.11 on the date of transaction. And later, if you would have maintained the exchange rates for the entire month for the individual day of May, and when you processed a document type BK, the system would have picked the actual rate maintained in OB08 as on 31.05.11 ie 0,87XXX. Hence may be the difference.
    Please check whether the above was the scenario with you (by referring to the changes option referred by the experts).
    Regards
    Hari

  • Hello, we have both Creative Cloud and Creative Cloud for teams. Can you help me with the difference and if i need to have both?

    Hello, we have both Creative Cloud membership and Creative Cloud for team. Can you help me with the difference and if i need to have both? We have 9 employees that are using it. Just not sure if i'm paying for something i don't need.
    Thank you

    Please refer to Creative Cloud Help | Creative Cloud / Common Questions
    CC is for retail use with 20 GB of storage space, CCT is where number of seats are purchased & assigned by one program admin where each seat gets 100GB of storage space.
    You can not have both the CC & team in one account as it will only provide you added storage space of 120 GB but you can activate the CC any of them or either of them twice as CC is based on Adobe ID.
    Regards
    Rajshree

  • Automatic Clearing with Small Difference

    Hi all,
    I want to one GL Account to Automatic Clearing (f.13) with Small Difference consider with another GL account.
    Manual Clearing Working is fine.
    Regards,
    Spradip
    Edited by: spradip on Dec 20, 2011 1:24 PM

    you will have to setup the open item clearing config
    GL based tolerances
    tolerance grp
    assigning tolerance grp to users
    have a clearing GL to clear the difference amount.
    If these are setup correctly, the clearing is possible.
    once this config is setup, try manual clearing once and then use the same GL as part of F.13.
    if you have problems and If you are an ABAP savvy, try debugging and catch hold of what is it looking for....usually the above setting should help you clear.

  • Date BETWEEN query with a difference?

    Hi,
    I have a BETWEEN query (at least I think that's what it will need), but with a difference.
    Normally you would specific a field which was BETWEEN two set variables
    ie. {fieldname} BETWEEN 1 AND 3
    However I need mine the other way round.
    I have a series of records which have a startdate and enddate held against them.
    When a user submits a new record to the db, I need it to check that the starting and ending date range doesn't overlap any of the existing start-end date ranges that exist.
    In order to do that I'm trying to build a query which takes in the incoming startdate variable and see if that is within any of the existing start-date-enddate dates ranges of the existing records, and then same for the incoming endate. I actually want the ones that are going to cause a problem to appear...
    I;m sure there is a pretty easy way of coding this, but I'm struggling to get my head round it.
     Anyone offer any advice?

    You can try something like this
    use adventureworks
    go
    select birthdate from humanresources.employeetest where birthdate between
    (select min(birthdate) from humanresources.employee) and
    (select max(birthdate) from humanresources.employee)

  • Input currency GBP inconsistent with preferred vendor currency EUR for the

    Hello Experts,
    We are facing the below issue while creating the Shopping cart in production.
    "input currency GBP inconsistent with preferred vendor currency EUR for the line item 00001" .
    the same scenario we have replicated in the lower system, there we were able to create SC. we are using classic scenario.
    We have also checked that vendor currency in the backend system. everything seems to be fine.
    Please provide your valuable inputs.
    Regards,
    Santhosh Kumar. G

    Hello All,
    Issue has been resolved.
    There was a small mistake in the program.
    Regards,
    Santhosh Kumar G

  • How to solve the problem with time difference?

    Hi,
    I work in India with time difference about 12 hours faster than American time.
    I put a validation in my application as follows:
    IF :P2_FINISH_DATE > SYSDATE THEN
    return false;
    else
    return true;
    end if;
    Today (13-Mar-09) at 9:30 am according to my system, I entered 13-Mar-09 as FINISH_DATE.
    But it returned false with an error message: "Finish date cannot be greater than system date."
    I changed my system time as 13-Mar-09, 9:30 pm. Then it accepted 13-Mar-09 as FINISH_DATE.
    How can I solve this issue.
    Would appreciate your help.
    Thanks,
    Guy

    Hi Arie,
    Thanks for the code.
    Your code works perfect in SQL Commands.
    But I don't know how to use the code in my application.
    Would appreciate if you can help me know the followings:
    - How to define two application processes -- before header and after submit (before any processing) – with the proper alter session statement.
    - How to use the APEX VPD field to do the same.
    FYI, I use the following codes:
    - For file upload
    If (:p2_SUBMIT_FILE is not null) then
    insert into PM_DOCUMENT (id, name, blob_content, mime_type, PROJECT_NAME, SUBMIT_TIME, SUBMITTED_BY)
    select id, :p2_SUBMIT_FILE, blob_content, mime_type, :P2_NAME, SYSDATE , :P2_UPDATED_BY
    from apex_application_files
    where NAME = :p2_SUBMIT_FILE;
    Delete from apex_application_files where name = :p2_SUBMIT_FILE;
    end if;
    - For Data entry validation
    IF :P2_START_DATE > :P2_FINISH_DATE
    OR :P2_START_DATE > :P2_TARGET_DATE
    OR :P2_FINISH_DATE > SYSDATE THEN
    return false;
    else
    return true;
    end if;
    Thanks,
    Guy

  • MRKO with price difference

    Hi,
    We will use SAP consignment solution for vendor consignment, SAP using MRKO to sette the consignment stock, which not allow to change posting date and price difference.
    Do you have experience for MRKOfor:
    1. Change posting date
    2. Change price
    What developemnt need to be made?
    Thanks

    Hello!
            For Material Movement with price difference, i find that most of the transactions posted in reply to this thread do not allow us to enter the amount externally.
            You can use movement type 521 for posting a movement with price difference, by first issuing the material to the cost center and then receiving it by T. Code MIGO ->Goods Reciept -> Others and movement type 521.
            If you find this helpful, please reward me with points!
    Regards
    Kaashif M

  • How to use 2 Iphones with 2 difference IDs in one computer

    I and my girlfriend have 2 difference apple IDs. I am going to buy iphone 5s and will transfer my old iphone 5 to my girlfriend. She and I have difference music, difference app. What can i do to use 2 apple IDs for 2 iPhone in one computer without sharing anything (music, app, photo, etc.). Last time she connect her iphone 4s to my computer, her app were transfered to my library. I don't want it to happen again.

    http://support.apple.com/kb/TS1323
    http://manuals.info.apple.com/enUS/iPhone_UserGuide.pdf
    The iphone is designed to be synced with a computer. It is not a stand alone device. If the only place the contacts are is the iphone, then this (in my opinion) is a major mistake and not the way the iphone was designed.

  • Mr8m with freight charges maintain

    Hi,
    i have done miro for a PO with an freight charge included /maintain in the PO condition.
    the entry after miro is
    - AP
    + GR/IR acnt
    + Freight acnt
    Now am trying to reverse/cancel the miro
    but am having error message.
    "invoice document XXXXX cannot be proceed furhter"
    ..we do not have GR process and were using ecc6
    is there any special process to cancel this?
    thanks in advance.

    Probably the invoice is already cleared by payment run, then you cannot cancel the invoice using MR8M. Only option is to post a credit memo manually referring to the same PO item and the invoice.
    You can easily find out whether an MM invoice is paid or not by going to the vendor line details of the corresponding FI invoice. If you find a clearing document number there, then it is paid, if that field is blank then payment is yet to be done.

  • Asset Balances not tally to GL Balances with small difference .1 paisa

    Hi Guru,
    Asset balance report- s_alr_87011964 not tally to GL balance- FBL3N with a small difference .1 paisa,Please sombody can help me solve this issue.
    Advance thanks.
    Thanks,
    ND

    Hi,
    You need to pass some manual entries through OASV.
    Values appear in asset reports are coming from AS91.
    Entries passed through OASV are update in gl accounts.
    Before passing the entries please check the values.
    Hope this will clear.
    Regards,
    Sankar

  • Group by on date field with time difference of up to 1 minute

    Hi,
    I need to do a group by on a date field and some other fields, but want to include in the same group rows that are identical but may have a difference of up to a minute in the date field.
    group by trunc(datefield,'MI') wouldn't work in cases like 00:00:50 and 00:01:10 (20 sec difference).
    I can do a semi join with where exists and between on the date field, but am hoping for another solution.
    any ideas?
    thanks.
    Edited by: Pyrocks on Sep 14, 2011 2:16 PM

    Hi,
    It sounds like you want something like this:
    WITH     got_new_grp     AS
         SELECT     x.*     -- or whatever columns you need
         ,     CASE
                  WHEN  datefield > MAX (datefield)
                             OVER ( ORDER BY      datefield
                                    ROWS BETWEEN  UNBOUNDED PRECEDING
                                         AND          1         PRECEDING
                                  ) + ( 1 / (24 * 60))
                  THEN  1
              END     AS NEW_GRP
         FROM     table_x     x
    --     WHERE     ...
    ,     got_grp          AS
         SELECT     n.*
         ,     COUNT (new_group) OVER (ORDER BY  datefield)     AS grp
         FROM     got_new_grp     n
    SELECT       MIN (datefield)     AS start_datefield
    ,       MAX (datefield)     AS end_datefield
    ,       COUNT (*)          AS cnt
    FROM       got_grp
    GROUP BY  grp
    ORDER BY  grp
    ;Of course, this makes assumptions for all the things you didn't explain.
    I hope this answers your question.
    If not, post a little sample data (CREATE TABLE and INSERT statements, relevant columns only), and the results you want from that data.
    Explain, using specific examples, how you get those results from that data. Be sure to include an example like the one Kim posted, where rows a and c are more than a minute apart, but both are within a minute of row b, or are connected by a chain of rows each less than 1 minute apart from its neighbor.
    Always say what version of Oracle you're using.

  • Problem with .01 difference

    Hi Guys,
    Good day everyone!
    I had a problem with my process with this .01 difference. My process was i multiply the value of Debit or Credit with * 43.84, the result of my total Debit and total credit was my example below.
    Ex: Total Debit = 3,550.56
    Total Credit = 3,550.55
    difference = .01
    If you subtruct Total Debit - Total Credit the difference should be equal to zero (0) to make my process good meaning my computation was balance.
    Can anyone help me how to solve this problem?
    Thank you.
    Yesha

    Hi Abdetu,
    I already tried this syntax round(,) but still i encountered some differences of .01, .02 or .03.
    Im doing a procedure regarding convertion of a particular currency based on the rate given.
    Tha manual convertion below was the correct convertion. In my procedure, the -3,832,555.00 is -3,832,554.99 andi had this .01 difference.
    I used the round function but still i had this oudput of -3,832,554.99.
    Manual Convertion:
    RATE: 44.09
    FORMULA:
    DEBIT * RATE
    CREDIT * RATE
    Given Data:
    DEBIT CREDIT
    390,528.11 11.43
    250,000.00 727,442.40
    CONVERTED:
    DEBIT CREDIT
    17,218,384.37     503.95     
    11,022,500.00     32,072,935.42     
    ========== =========
    28,240,884.37     32,073,439.37 =      -3,832,555.00
    Regards,
    Yesha

  • HELP HELP...Question with some differences between 8 and 6

    We made a dvd in idvd and love the revolutions main menu. We love it so much that we wanted render to its own looping movie. ie: reflections in the earlier imovie and idvd could be used as the dvd menu in idvd or you could use it as a movie title or credits and drop pics onto it from imovie. Can we find something similar for the revolutions idvd 8 menu for imovie or export the looping menu from idvd 8 somehow? THANK YOU THANK YOU THANK YOU. We are on a time crunch.

    Hi
    The sofisticated way - NO not knowing
    In time cramp: Paper and clip way:
    • Do Your menu in iDVD as it should roll in iMovie
    • Burn out to a DVD disk
    • One way or another get it into iMovie:
    a. DVD-player and Camera onto a new miniDV tape -> import into iMovie
    b. Back enginer the DVD with eg Roxio Toast™ to streamingDV and import this into iMovie
    ∆ Quality about the same - can't see the differences
    This will get Your project done even though it was clumsy. You can't see it on the result.
    Yours Bengt W

  • Could someone please help with two differences between CS and CS4?

    Hello, I just moved from Photoshop CS to CS4 and have a couple of questions regarding some differences I'm seeing in the two versions.
    (1) When opening files, I'm used to them opening in a smaller view as individual windows.  CS4 opens all images in the expanded view.  Is there a way to prevent this from happening?  I create massive sports photo galleries (often more than 100 images) and usually open 25-30 images at a time, then minimize all images and work on them one at a time in chronological order.  The was CS4 opens these images in full screen mode, it prevents me from doing this in a timely manner - PS never opens a group of photos up in a true chrono order.  It misplaces the first image to the end.
    (2) In CS, I used to be able to Right-Mouse-Click on the image's title bar to change Image and Canvas sizes.  Any way to get this to work in CS4?  CTL+ALT and either I or C is a three-key process and takes considerably longer than right clicking my mouse and choosing the correct option.
    Thanks for any help you can provide.  And apologies for being such a newbie to the latest and greatest Photoshop version.  I've been living in CS for years
    Mike

    You are a life saver. Thanks!  I looked in the INTERFACE area about three times and never understood that TABBED meant that it was opening them full screen.
    Any idea how to deal with question #2?  Cannot set up an ACTION for this as the action makes me have to choose an image size.  I just want to have the Image or Canvas size windows open with one click, rather than holding down three keys.
    Thanks again.  You have been rewarded with a CORRECT ANSWER click
    Mike

Maybe you are looking for

  • How do I add a password to an unsecured Wi-Fi connection?

    My wireless network at home currently is unsecure. I want to change this, but for the life of me I can't figure out how. Can anyone help me? I use an SMC wireless router, if that helps. Thanks.

  • Export File Transformation

    Hi Experts, I have a issue with the Export package in BPC 7.5. I need to export the amount with comma, so i define in the TRANSFORMATION FILE" the option AMOUNTDECIMALPOINT= "," but BPC requires that option DELIMITER has to be different from option A

  • HP Pavillion DV6 FN Key

    Hey,   I currently have a DV6 Pavillion Laptop (may not survive much longer!)  I have googled to high ends to solve my problem, but I have found nothing. The problem is something will trigger the FN key randomly and I won't know about this until I pr

  • HT5654 IPHONE 5 will not restore

    iphone will not restore from backup after updating

  • ECC6 Installation

    Dear Sir or Madam, We are about to explore new ECC6 system. I have some questions regarding the installations. 1) Will ECC6 come together with some modules such as FI-CO,SD,MM,etc? 2) During installation, will I be able to select which module I want