MRP Area query

Dear All
Client is having a trading plant which has almost 50000 materials approximately or more. Each Material has two MRP Areas already present in the system but due to some issue client wants to remove or delete one MRP Area and keep other MRP Area only for all materials .However but if MRP Area is deleted Client doesn't want stocks,Sales order, Purchase order of the deleted area to be affected they should be closed in that area only and Other MRP Area  is to be used effectively?
Please suggest

Hi,
       Please try FM: 'AUFBAUEN_MDPSX_ANZEIGEN'.
    MD06 dame come many table.
Example:
(Plant level)
  icm61w-fabkl  =  wk_fabkl.                  :Factory calender
  imt61d-matnr  =  p_matnr.                    : Materials
  imt61d-werks  =  it_tbl-werks.            : Plant
AUFBAUEN_MDPSX_ANZEIGEN 呼出
  CALL FUNCTION 'AUFBAUEN_MDPSX_ANZEIGEN'
    EXPORTING
      ecm61w      =  icm61w
      ecm61x      =  icm61x
      emt61d      =  imt61d
      et399d      =  it399d
      ECM61B      =
      ESFILT      =
    IMPORTING
      icm61m      =  wa_e_cm61m
      imdkp       =  wa_e_mdkp
      imdsta      =  wa_e_mdsta
    TABLES
      mdpsx       =  it_mdps
regards,
   Gaito

Similar Messages

  • Query related to RM maintained for two MRP areas.

    Hi PP Gurus,
    The scenario is we modeled two Storage location MRP Areas say 1001 and 2001. There are two FG getting manufactured at them, say FG-1 at 1001 and FG-2 at 2001. Say there are three RMs viz. RM-1, RM-2, and RM-3. RM-1 and RM-2 included in FG-1  BOM and RM-3 and RM-2 in FG-2 BOM. Means RM-2 is common in both MRP areas.
    Now I've extended FG-1 and FG-2 for respected MRP areas. RM-1 extended to MRP area 1001, and in MRP views of material master, Production storage location and Storage location for EP is maintained as 1001. Same is maintained for RM-3 except MRP area as 1001, it's 2001.
    The concern is about RM-2, though I extended RM-2 for both MRP areas i.e. 1001 and 2001 but I can maintain Production storage location and Storage location for EP either as 1001 or 2001. So whenever I'm taking MRP run, for RM-2 it's either proposing 1001 or 2001 as Storage location for withdrawl or EP.
    My requirement is when I run MRP for FG-1 system should show me Sloc for RM-2 as 1001 and in case of FG-2 as 2001.
    As a try I tried to remove Production and Issue Sloc from MRP views and maintained Issue Sloc/Receive Sloc in PV of FG-1 and FG-2 but still unable to get the requirement fulfil.
    Please make prompt comments
    Thanks & Regards,
    Abu Arbab

    Dear ALL
    my requirement is exactly same as above that i need my component to be issued from different slocs depending on diffreent MRP areas in which they are being planned.
    But in my case FG is same and is being planned in 2 different MRP areas. So my BOM is same in both cases.
    For eaxmple--2000 is MRP area 1 and 3000 is MRP area 2
    Requirement is components should be issued from 2000 when panned in 2000 and from 3000 when planned in FG is planned in 3000.
    Kindly let me know what settings are required at components level to do this
    thanks

  • MRP Area tables for MD06 information access like SQ01, DBM logical database

    We currently use SQ01 DBM logical database to access MD06 information (tables MDKP and MDTB).  The MRP results from the MRP Area are not showing in this query. This implies that the MRP area, MRP results are stored in other tables.
    I have reviewed tables (MDLV, MDMA, MDLG, DVER, MDIP) from a similiar thread.  However, they do not contain the MRP data (planned orders, stock, production orders ect) like in the DBM logical database.   This data access is very powerfull for exporting planning data for more robust analysis.
    Any help is much appreciated.
    Thank you

    Hi,
           Please try FM: 'AUFBAUEN_MDPSX_ANZEIGEN'.
        MD06 dame come many table.
    Example:
    (Plant level)
      icm61w-fabkl  =  wk_fabkl.                  :Factory calender
      imt61d-matnr  =  p_matnr.                    : Materials
      imt61d-werks  =  it_tbl-werks.            : Plant
    AUFBAUEN_MDPSX_ANZEIGEN 呼出
      CALL FUNCTION 'AUFBAUEN_MDPSX_ANZEIGEN'
        EXPORTING
          ecm61w      =  icm61w
          ecm61x      =  icm61x
          emt61d      =  imt61d
          et399d      =  it399d
          ECM61B      =
          ESFILT      =
        IMPORTING
          icm61m      =  wa_e_cm61m
          imdkp       =  wa_e_mdkp
          imdsta      =  wa_e_mdsta
        TABLES
          mdpsx       =  it_mdps
    regards,
       Gaito

  • DP forecast release on MRP area

    Hi Experts,
    We are having multiple MRP areas within a distribution center. The sales history is available in R3 with the associated sloc as the delivering sloc.
    Can i get this history in DP , do a forecast & release it on MRP areas in APO? What are the precautions to take care in this cycle.
    Regards,
    Vinay

    Hi Vinay,
    If you want to do forecast in MRP area level in DP, than follow the below steps:
    1. CIF MRP area to APO using integration model.( MRP area will be appeared in APO as Location)
    2. Create a characteristic with MRP Area.
    3. Do forecasting at MRP area level or dis-aggregate to MRP area level.
    4. Release the forecast to ECC.
    Hope this answer your query.
    Thanks
    kishor

  • Sales Plan At MRP area level

    Dear All,
    is it possible to maintain sales plan on MRP level? if yes How.
    or if I will enter sales plan on Plant level can i tranfer to demand management on MRP area level if yes how?
    Regards,
    Ahmed sobhi

    Hi,
    Please elaborate  your query.
    You must have gone to SE37 transaction to check this function module and you must have checked the import parameters on the the import tab.
    When we call this fiunction module in Z program, we need to ensure that data is supplied  so that import parameters are taken  and data is updated in MDMA table.
    Regards
    Datta

  • MRP Area - Vendor Stock separate MRP

    Dear Experts,
    I would like to consult this solution.  Currently we have a standard Subcon PO (MM).  In this solution, we provide stocks to vendor via 543.  Now, business doesnt want the vendor stocks to be included during MRP.  How to set up?
    Can I use MRP Area  (subcon type) with this just like MRP Area for Slocs?
    Appreciate your help.  Thank you!

    I reckon the business wants to see all the stock acquired though purchase made in that MRP area. Since they seemed to concerned about planning and may want to ignore the stock ordered manually (you need to confirm this with business). You may have to create SQL query to report this.
    In the table EBAN, filter out all the values the field ESTKZ  = 'B' and BERID = your MRP area (if BERID is empty you need to input all the storage locations assigned to that MRP area)  and the field EBELN, EBELP, BSMNG contain the purchase order data created from the purchase requisition. You need to inner join that to the purchase order table, EKPO and inner join this to table EKBE (there you can find the material document also) and out put the quantity received.
    Edited by: Jeevan Sagar on Oct 25, 2011 11:14 AM
    Optional analysis: If you just want to analyze all the stock per MRP area input all the storage locations in MB5B

  • Replenishment delivery for material with MRP areas and Avl Check

    HI We have MRP area at storage location level maintained for materials. Stock exists in the plant in the storage location which is part of the MRP area.
    Now when I create STO and try to create delivery for the same, system is giving message 0 stock available and not creating delivery. Material has 02 Avl Chck group.If I deactivate the MRP area in the material master, it allows creation of delivery.
    How can I ensure that system creates delivery even though stocks exist in MRP area relevant sloc only in the plant?
    Sriram

    1) According to SAP when inbound deliveries are used and your delivery item category is set up for mvt type 101, these should be received with transaction VL32N. If you use MIGO/MB0A instead the GR status in the delivery will not be updated. If you then report on open deliveries you'll notice that nothing is received in the course of time. Amazing. Now if you set up the delivery item category without the movement type your inbound will not even be GR relevant. Just one of these things that's nice to be aware of.
    Check note 199703.
    may b it helps...

  • Can PIR created at wbs element and MRP area of storage location level

    Hi,
    I tried to create an planned independent requirement at MRP area and WBS element level, but failed. The MRP area is not plant level, but storage location level.
    *When trying to create account assignment category Q for it, then there is an error message saying:*
    **only stock requirements are allowed when planning at MRP area level.**
    Does it mean it is not possible to create planned independent requirement for this case?
    Thanks!

    Select the "Issue storage location" as '2' here:
    spro -> production -> material requirement planning -> mrp groups -> overall maintenance of mrp groups -> overview -> mrp control parameters at material level -> (field) Issue storage location selection
    & make sure:
    1. In the BOM  issue storage location is blank for the components
    2. For the FG products , in mrp area prod.storage loc is maintained
    3. Components are extended to the mrp area.
    Pl. revert with the results

  • MRP area for running a sale order MRP

    Hello PP experts,
    I come across a scenario where , I need to do the  MRP run for sale order in a MRP area. I have checked , I can put PIR with respect to MRP AREA , but when I open MD50 screen for running MRP for sale order. I did not found the MRP AREA
    field in the screen.
    In short , my question is , How the sale order MRP run ,  system will do in a MRP
    area defined for the material ?
    Here , I have already defined the material is MRP AREA and also I have created
    MRP area segment in the material master.
    I have also configured the MRP area in SPRO.
    Waiting for your reply.
    Regards,

    Hello ,
    Thanks for reply.
    I am using plant MRP area. For FERT , I am using make to order strategy 20.
    I want to specify the real problem. It is like below.
    Suppose 'A ' is sumassembly goes to a variant configured MTO KMAT say 'V'.
    The same 'A'  subassembly is a child for a make to stock FERT say ' S'.
    Presently  using strtegy 11 for MTS fert 'S' and 10 for the subassembly ---'A'.
    Now the planner want to plan for the subassembly.
    He is putting the PIR for the subassembly as sales order is not availble and he is putting the PIR for FERT 'S'.
    When sales order is coming then additinal quantity planning is happening.
    So I suggested to use the strategy 70 for subassembly 'A' , so the sales order (of 'V') OF  quantity will be offset for the PIR of the SUBASSEMBLY 'A'.
    But the consumption of PIR of 'A' will  be apllicable to MTS  FERT that is 'S'.
    So how can we prevent the system from offsetting the dependent requiremet triggered from the PIR of 'A'.
    That means the consumption  (that is the usage of stategy 70) of the FERT requirement should only work for ' A' and sales order based KMAT 'V'.
    The same offseting should not work for subassembly 'A' and MTS FERT 'S'.
    For for Make to order KAMT 'V' , if I use MRP area and do the sales order planning in MRP area. Will I get the desired result ?
    Waiting for reply.
    Regards,
    Ravindra

  • MRP Area and SA Schedule Lines

    Hello All,
        We are looking at using MRP Areas and noticed it can not be turned off once on (ECC 5.0).  Given that, is the following true with reference to schedule agreements:
    - Will seperate schedule lines be created for each MRP Area (same material)?
    - Does the receiving storage location come from the material master or the MRP Area (Does it matter if it is a type 01 or type 02 MRP Area)?
    - Is it possible to define differen't receiving slocs in a schedule line for a Plant MRP Area?
    Thank you,
    Jerry

    Thank you Charlie,
        The link is helpful however it doesn't come straight out and answer the questions - meaning there is a bit of ambiguity there.
    It would be appreciated if you or anybody that is using MRP areas with schedule agreements is doing the above.
    Regards,
    Jerry

  • Availability check with MRP area at Sloc level

    HI We have MRP area at storage location level maintained for materials. Stock exists in the plant in the storage location which is part of the MRP area.
    Now when I create STO and try to create delivery for the same, system is giving message 0 stock available and not creating delivery. Material has 02 Avl Chck group.If I deactivate the MRP area in the material master, it allows creation of delivery.
    How can I ensure that system creates delivery even though stocks exist in MRP area relevant sloc only in the plant?
    Sriram

    I am sure you have already moved on from this issue, but what you mention is a limitation prior to ECC 6.  You can not identify on the purchasing document the source sloc of the supplying plant.  This is why you can not create the STO between sloc MRP areas.  I was told this was resolved in ECC 6.
    Jon

  • MRP AREA NETCH indicator missing in planning file entry

    Hi,
    MRP has been activated at MRP area level storage location level and there were no planning file entries for some materials because we were using the LSMW program RMDATIND for uploading the materials and there was no update flag for Planning File entries. Later we have updated the Direct input session with update Flag.
    I already ran the MDAB and MDRE so by the missing planning file entries.
    We are running the background job RMMRP000 for the MRP. There are some materials which are not being planned in the background job. When i run the MRP for the same materials in MD02/MD03, the procurement proposals are being created using MD02/MD03.
    I checked in MD21, we can see the Planning file entries then there no indicator for NETCH.
    What could be the reason?
    Regards,
    Kumar

    hi
    take t code-md20
    flag required field
    regards
    gyana

  • Planning file entry for MRP Area

    Hi,
    To create planning file entry in the background at plant level we use Transaction MDAB. I would like to know that if MRP area is active than whats the T-code for planning file entry in the background at mrp area level?? To create manualy in the Trx md20 we have that option to select mrp area & plant. So please let me know yours view on this.
    Thanks & Regards
    Kundan Kumar

    Dear,
    If planning file entry are there on plant level then system will convert same on MRp area level. Have you check that tables? (DBVM)
    For planning file entry at MRP area lvel , use report RMDBVM00 (transaction OM0F) to convert the existing table MDVM with the planning file entries into table DBVM. The conversion is also described in MRP Customizing: TA OPP1 -> Planning File Entries.
    There is no need of MDAB just check your entry in MD21 take a MRP run at MRP area lvel and come back if any problem.
    If you want to schedule it on MRP area lvel then use the MDRE or use program RMMDVM10 and in variant here select the MRP Area redio button.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Oct 26, 2009 6:25 PM

  • Creation of new MRP Areas.

    Hi All,
    While creating new MRP areas am facing problem like "ERROR IN CUSTOMIZING:MRP AREA 1002 IN PLANT 1002 DOES NOT EXIST.
    But I am creating MRP areas for another plant-1003.
    I didnt understand thatwhy this error is coming and unable to save.
    Can any body tell me how to slove this problem.
    Thanks
    Chindam

    dear 2009,
    frist create MRP area using SPRO->Prod>MRP>MRP areas-->Define MRP area(SM34)
    then come back and activate MRP for created MRP area
    sree

  • Use of report RMMDDIBE for MRP area creation

    Dear All
    I have this requirement where i have to extend already created materials to storage location MRP areas. In SAP documentation i found that,  standard report RMMDDIBE can be used for this.
    If anyone has worked with this earlier, kindly let me few things abt this report
    1- Exact fucntionality of this report
    2. How to run this report
    3. Is it a configuration or just front end report which has to be run everytime
    4. can we make front end batch job
    Any help on this would be great
    thanks
    bals

    Hi Murugesan,
    1. Exact fucntionality of this report
    The mass create & change MRP Area data instead of manually doing via material master MRP1 view
    2. How to run this report
    Select the materials and plant that you want to create or change the MRP areas, then select where to copy the MRP area data from, i.e. copy from material master MRP views, copy from other MRP area data.
    For example you can copy the material master data when creating, then use "create/change the data" to update some of the fields.
    3. Is it a configuration or just front end report which has to be run every time
    Yes, you must have configured MRP area and assigned storage locations in the IMG.  RMMDDIBE is a mass master data update program, it is not configuration.
    4. can we make front end batch job
    No real need, this is a mass create/change program.
    James

Maybe you are looking for

  • Caching in OBIEE

    Hi everyone, This should be an easy question. I know there are two levels of caching in OBIEE: the Presentation Server level and the BI Server level. I made a report that shows the last time the warehouse is refreshed, and I want to ensure that it's

  • Is it possible to open a csv into larger columns that display all the data that you need?

    Is there a way to get a csv file to open into larger columns without having to increase the column size by hand.  Maybe by opening a downloaded csv into a custom template,  or to have it open so you can see all the text/numbers in the columns?

  • Help with locked files???

    Hello everyone!!! i have a question, i have a mini mac with the MacOS 10.3 the thing is that i just saved some files from my old pc to my external hard drive, and when i plugged it into my mini mac everything looks good, so decided to work with photo

  • HDD RPM using powershell

    Hey guys, Do we have script with which i can pull HDD RPM of my remote server by using PowerShell script? i tried to check via WMI object, but couldn't get any clue related to HDD RPM.  Thank you.

  • When i try to access a banking internet site they tell me java script is not enabled

    I get an error message saying my browser is not equipped with java script and i cannot log into the site