MRP Area Wise Run for Sales Requirenment

Greetings..
                            I have two raw material (Trading).....in MRP view i defines these material under MRP area ...(Respective setting done in SPRO)
Now i created sales order for these Raw material .
Now in MD04 ...i m getting requirement but under plant....if i choose MRP area i m not getting Requirement...so if i try MD01 ...under MRP i m not getting Result of MRP..
I need two Run MRP only for MRP area which assigned to Raw material in Material Master
i m using Startegy 40..
What else setting i have to do for getting Run with MRP area (MD01)

1) Convert planning file entries - you must first convert the existing planning file entries at plant level to MRP area level in the planning file  (OM0F)
2) Activate MRP for MRP areas (Production ->MRP -> Master Data -> MRP areas -> Activate MRP for MRP areas)
3) Define MRP areas
4) Assign material to MRP areas in Material master MRP1 view
The allocation to a storage location MRP area is made using the storage location that the system determines during the planning run. This is determined on the basis of the storage location entered in the BOM (BOM item), in the work center (production supply area), or in the production version or in the material master. This storage location must be included in the MRP area that you have assigned in the material master. In addition, it is necessary that the view "Storage 1" or "Storage 2" exists for this storage location in the material master.
Sales orders are assigned to a MRP area depending on their storage location (the issue storage location in the shipping screen of the item details).

Similar Messages

  • Why there are no books for sale in iBooks?

    Hej,
    I just want to ask everyone why there are no books for sale in iBooks in Sweden. I mean this is really disappointing because I want to buy and read new books and there are no books for sale. If anyone has an answer to my query please reply. Thank you

    It's unfortunately an issue of sorting out all of the legalities for apple to sell books in your country and unfortunately haven't been able to do that for Sweeden as of yet. And so your iBooks store will only have the out of copyright (or free) books available for download. I can only assume apple is working to bring the bookstore to more countries, if you really need books you can make iTunes account for a different country but to do so you would need either a credit card or an iTunes gift card from that country.
    Otherwise hold tight till they open they iBook store in your country

  • MRP to be run for those materials that is assigned to the MRP controller

    Dear Gurus,
    Pl. let me know how MRP can be run for materials assigned to the MRP controller only.
    Regards
    Veronica

    Hi
    You can run MRP for MRP controller using User Exit Key available in TCOde MD01.
    You have to define the user exit keys and make use of the same. ( in SPRO you can do that )
    Regards

  • My youtube videos are only running for a few seconds, then stop.  Is this an issue with my macbook?

    My youtube videos are only running for a few seconds, then stop.  Is this an issue with my macbook?

    Go step by step and test.
    1. System Preferences > Other/ Flash Player > Advanced >  Delete  All
         Press the "Delete All" button
         Install Adobe Flash Player.
        http://get.adobe.com/flashplayer/
        http://get.adobe.com/flashplayer/?PID=7105813 
        Follow the prompts.
        Quit Safari.
        Restart computer. Relaunch Safari.
    2.  Enable Plug-ins
        Safari > Preferences > Security
        Internet Plug-ins >  "Allow  plug-ins"
        Enable it.
        Press " Manage Website Settings" button for more options.
    3. Check  whether you are currently  in  YouTube HTML 5 trial.
         http://www.youtube.com/html5
        At the bottom  left of the page  uncheck the box beside
       "You are currently in the HTML5 trial".
    4. Reset Safari.
        Click Safari in the menu bar.
        From the drop down select "Reset Safari".
        Click "Reset".
    5. Turn off Extensions, if any.
        Safari > Preferences > Extensions
         Now try YouTube.
    Best.

  • Unable to create a new MRP area type 3 for subcontractor?

    In golden client for defining the MRP area type 3, its not accepting the vendor number in the subcontractor field ( since there wont be any master data) saying doest not exist in LFA1 table.
    But there are certain similar data already available in the golden client, I dont know how those have been created long back for company.
    we are using ECC 6.0,
    Can i move the TR without subcontractor number to Quality and Production clients and maintain the subcontractor in Material master.
    Please suggest me how to do that experts
    Thanks
    Srini

    Hello David,
    We are having S&OP 3.0 SP1 patch 1 on premise with HANA version 1.00.69.385057. We have old golden demo files imported.
    Could you please let us know...
    1) is it right combination..?
    2) Is it necessary to upgrade to patch 2.
    3) in case, we upgrade to patch 2, do we need to import golden demo file again for patch 2
    4) Do we have any release note for patch 2.
    Your quick response is highly appreciated. Thanks!!
    Regards,
    Dinesh Goyal

  • MRP run for sales orders

    Dear Friends,
    I want to run MRP based on the sales order delivery schedules. My sales orders are spread for the next 2 years.
    For example for material A, I am having sales order for 40 quantity (item 10) and material B -20 quantity (item 20). My sales order delivery scedule is defined such away that each month I may required to send 4 items of material A and 2 items of material B starting from March 08.
    In this case I need not to consider all the quantity. I want to run my MRP for which I need to deliver for the next 3 months period.
    If you need any further clairification, please let me know.
    Regards,
    Surya.

    Dear Surya,
    Make sure that the scheduleline in the sales order are having 4 qty of A and 2 qty of B for each month as below
    Schedule line of A
    31.03.2008 - 4 qty
    31.04.2008 - 4 qty
    31.05.2008 - 4 qty
    Schedule line of B
    31.03.2008 - 2 qty
    31.04.2008 - 2 qty
    31.05.2008 - 2 qty
    Make sue that your planning horizon is only one month. and you are running MRP with NETPL option.
    This with consider the sales order line item schedulelisewise and give planned order only for one month.
    i hope u got it

  • MRP run for sales order -- Collective requierements. how to correct?

    Dear All,
    Upon creation off a sales order we entered a material for which the avalability check was set to 01 collective requierements. So when the MRP run finished it created collective requirements. This was not our intention and we changed the availability check to 02 but now the MRP run doesn't pick it up anymore and the requirements remain collective.
    Can we correct this in any way without recreating the sales order?
    Best regards,
    Michaë

    its a MTO strategy
    then
    maintain 1-  individual requirement in individual./collective requirement in   MRP 4 view for the material
    and rerun the MRP with planning mode 3( delete and recreate planning data)
    then all the dependent requirement will be planned based on the sale order
    Regards,
    Sundaresan

  • What system config are you running for xMII 12.1.x?

    If you are running xMII 12.1.x, can you please briefly explain your setup?  I presume you are running Windows 64-bit, but what kind of processor, how much memory, and how many users?  Is the performance/response time good?

    Todd,
    The documents here on v12.1 performance may be useful as they go into performance numbers, performance monitor log analysis, and NetWeaver CE system settings.
    [https://wiki.sdn.sap.com/wiki/display/xMII/Guidelines|https://wiki.sdn.sap.com/wiki/display/xMII/Guidelines]
    Hope this helps,
    Sam

  • Business Area wise Proposal for Payment

    Dear All
    We have payment proposal created and distributed to our BU controller by business area. We are recently upgraded to ECC 6 and now planning to activate new gl with document splitting. We are having cases where one invoice belong to several business area in before new gl we enter the business area in vendor line item which has major value. But in document splitting, if we have invoice belong to multiple business area then we donot need to enter business area in vendor line item and system split it according to expense proportion but in this case our problem is that systme split general ledger view of document but vendor line will be shown without business area. In that case we will have a problem for displayign vendor  balances by business area and also unable to assign the open items to relevant BU controller. Please advise
    Regards

    Hi
    You face one of the new G/L issues: field segment and splitting are made at the G/L level and thus are not available in AR/AP.
    => you cannot use those functionalities to face organisational purposes (analyse customer/vendor by split value - dunning, payments etc...)
    ==> You will have to enter the business area directly in the entry view on the customer/vendor line items (why not use a substitution rule for mono-business area invoices).
    So for the multi-business areas invoices, you will have to 'manually' split the client positions by business area to fill the information... Maybe those multi-business area cases are rare...
    Regards,
    Bernard

  • Procurement proposals for Sales order.

    I have created material master record for Fert Material X having storage location A and B maintained in MR4 view.
    Also MRP area  for storage location A is assignned to material.
    When Sales order with delivery storage location A will be made then by which MRP(Plant or MRP area) procurement proposals for Sales order will be created.

    hi
    Mayuresh
    Your Plant will be same since you have defined two Storage Loaction in MRP Area. The procurement proposal will come for Storage Loaction A. If Sale order is created with delivry location A. Please also check Storage present in Work Scheduling view..
    rgds
    BV

  • MRP area for running a sale order MRP

    Hello PP experts,
    I come across a scenario where , I need to do the  MRP run for sale order in a MRP area. I have checked , I can put PIR with respect to MRP AREA , but when I open MD50 screen for running MRP for sale order. I did not found the MRP AREA
    field in the screen.
    In short , my question is , How the sale order MRP run ,  system will do in a MRP
    area defined for the material ?
    Here , I have already defined the material is MRP AREA and also I have created
    MRP area segment in the material master.
    I have also configured the MRP area in SPRO.
    Waiting for your reply.
    Regards,

    Hello ,
    Thanks for reply.
    I am using plant MRP area. For FERT , I am using make to order strategy 20.
    I want to specify the real problem. It is like below.
    Suppose 'A ' is sumassembly goes to a variant configured MTO KMAT say 'V'.
    The same 'A'  subassembly is a child for a make to stock FERT say ' S'.
    Presently  using strtegy 11 for MTS fert 'S' and 10 for the subassembly ---'A'.
    Now the planner want to plan for the subassembly.
    He is putting the PIR for the subassembly as sales order is not availble and he is putting the PIR for FERT 'S'.
    When sales order is coming then additinal quantity planning is happening.
    So I suggested to use the strategy 70 for subassembly 'A' , so the sales order (of 'V') OF  quantity will be offset for the PIR of the SUBASSEMBLY 'A'.
    But the consumption of PIR of 'A' will  be apllicable to MTS  FERT that is 'S'.
    So how can we prevent the system from offsetting the dependent requiremet triggered from the PIR of 'A'.
    That means the consumption  (that is the usage of stategy 70) of the FERT requirement should only work for ' A' and sales order based KMAT 'V'.
    The same offseting should not work for subassembly 'A' and MTS FERT 'S'.
    For for Make to order KAMT 'V' , if I use MRP area and do the sales order planning in MRP area. Will I get the desired result ?
    Waiting for reply.
    Regards,
    Ravindra

  • Use of report RMMDDIBE for MRP area creation

    Dear All
    I have this requirement where i have to extend already created materials to storage location MRP areas. In SAP documentation i found that,  standard report RMMDDIBE can be used for this.
    If anyone has worked with this earlier, kindly let me few things abt this report
    1- Exact fucntionality of this report
    2. How to run this report
    3. Is it a configuration or just front end report which has to be run everytime
    4. can we make front end batch job
    Any help on this would be great
    thanks
    bals

    Hi Murugesan,
    1. Exact fucntionality of this report
    The mass create & change MRP Area data instead of manually doing via material master MRP1 view
    2. How to run this report
    Select the materials and plant that you want to create or change the MRP areas, then select where to copy the MRP area data from, i.e. copy from material master MRP views, copy from other MRP area data.
    For example you can copy the material master data when creating, then use "create/change the data" to update some of the fields.
    3. Is it a configuration or just front end report which has to be run every time
    Yes, you must have configured MRP area and assigned storage locations in the IMG.  RMMDDIBE is a mass master data update program, it is not configuration.
    4. can we make front end batch job
    No real need, this is a mass create/change program.
    James

  • Run MRP by MRP area - Tcode?

    Experts -
    How I can run MRP for MRP area? We have few MRP areas and assigned to many materials. MD01 is for plant level, I am looking for simmliar transaction (not background job) that can run MRP for MRP area.
    Thanks for your time-

    Hi Air, 
    Normally Planning of materials takes place on a plant level
    By usung MRP Areas - Specific storage locations can also be grouped together and planning takes place on that grouping area (MRP Area)
    Ex : Plant 3200/Sloc 50 & Plant 3200 /Sloc 51 is one MRP Area this is done in Configuration
    When activated materials can now be planned per MRP area and MRP runs can also be done on MRP area
    Consumption history will be kept on MRP area level
    i'm also forwarding a link which would be very helpful to you
    www.sap123.com/showthread.php?t=57
    In case if this information is found helpful do please do reward
    accordingly
    Thanks & Regards
    Pavan

  • Depreciation run for specific depreciation area

    Hi,
    In AA, we defined 2 depreciation area for all the assets class, one for local(01), another one for group(30). all the area will be posted to FI.
    according to requirement, we would like to stop specific depreciation area depreciation run for certain asset(not asset class). this means that for depreciation area 01, it will be work, but for 30, it should be stopped. may be 3 months later, this asset will be restart run depreciation for area 30.
    Would anyone know how to do that? thanks.
    Ben

    Hi
    Hope you have to change the Config settings then.
    Go to AO21 and select your screen layout and double click Field Group rules and under FG 18 you have Deactiv. area make this enrty optional and also select the check box MnNo.
    Save the entry.
    Come back to AS02,now the dep area will be available for deactivation.
    Good Luck
    Hari

  • Sap pp -MRP-area

    Hello SAP-Guruu2019s
    Pls tell me the Procedure/steps/Details to maintain MRP-area for a Vendor & also for a Sub-Contractor.
    Any comments welcome   & Thanks in advanc

    Hi,
    Pls. find the following details regarding MRP Area :
    MRP Area
    Definition
    The MRP area represents an organizational unit for which material requirements planning is carried out independently.
    Basically, there are three types of MRP area:
    Plant MRP Area
    The plant MRP area initially contains the plant together with all its storage locations and stock with subcontractors.
    When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations. This is because they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location, by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant.
    You can also group several storage locations into one MRP area, by creating an MRP area and assigning the storage locations to it. These storage locations are then planned together.
    A storage location of a plant may be assigned to only one MRP area.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor.
    A subcontractor may be assigned to only one MRP area. An MRP area of the subcontractor type may also only contain one subcontractor.
    Use
    You can carry out MRP specifically for the determined MRP areas. This enables you to carry out differentiated material requirements planning. The requester can be, for example, the production on a particular assembly line or a subcontract order.
    The MRP area allows you to have specific control over the staging and procurement of important parts produced in-house and purchased parts for each shop floor area. You can, however, also plan the provision of components for the individual subcontractors.
    MRP areas of the storage location or subcontractor type are only suitable for:
    components that are planned and produced for stock
    finished products that are planned and produced for stock. By assigning a storage location in a sales order or by entering an MRP area when creating the planned independent requirements, you can define whether a material is planned in the plant MRP area or in the MRP area of the storage location.
    Finished products and important assemblies intended for make-to-order or engineer-to-order production are always planned in the plant MRP area.
    The planning run takes into account the planning with MRP areas as follows:
    If you do not enter a separate scope of planning, the system plans the whole plant, that is, all MRP areas in the plant, during the total planning run. If you want to carry out a total planning run for a particular MRP area only, you must specify the required MRP area in the scope of planning.
    During single-item, multi-level planning, the system plans the selected material in the MRP area entered. In addition, the system takes into account planning file entries from other MRP areas, for example, if the material is to be procured using stock transfer.
    During single-item, single-level planning, the system plans the selected material in the MRP area entered only.
    Structure
    You define the MRP areas in Customizing for MRP. You can thereby assign the following to an MRP area:
    one or more storage locations (example: you want to carry out planning for a particular assembly line and therefore assign a production storage location to the MRP area)
    a subcontractor.
    You assign the various MRP areas to the materials in the material master. For this, you create an MRP area segment for a material for every MRP area, in which it is used. In this MRP area segment, you can define MRP parameters such as, for example, the lot size or MRP type. This allows you to plan the material differently in the MRP area from how you plan it in the plant MRP area.
    MRP with MRP areas for the material is not activated until the material has been assigned to an MRP area. If you have not assigned a material to an MRP area, that is, you have not created an MRP area segment in the material master, the material will continue to be planned in the plant MRP area only. If you have assigned an MRP area to it, the system can plan it in the plant MRP area and in the assigned MRP area.
    Integration
    You can carry out material requirements planning for MRP areas using all MRP procedures and all lot-sizing procedures.
    You can also carry out an independent material forecast for MRP areas using your own parameters.
    The material consumption values are updated separately for each MRP area.
    A separate ATP check is carried out for each MRP area.
    If several storage locations belong to an MRP area, the system can also carry out a check at two levels, that is, at storage location level and at MRP area level.
    Example: Subcontractor
    You can also carry out planning for components to be provided in subcontracting using an MRP area by defining an MRP area for every subcontractor and assigning the components to be provided to the MRP area of the subcontractor. You therefore plan the requirements to be provided for these components for one subcontractor separately from all other requirements (see Planning for Components to be Provided in Subcontracting).
    Depending on the requirements situation, the system creates either stock transfer reservations from the plant to the stock of material provided of the subcontractor or it creates purchase requisitions within subcontracting/third-party order processing, according to the special procurement key settings.
    Implementing MRP Areas
    Implementation Options
    The main reason for you to implement MRP areas is if you would like to plan materials, which are required in different shop floor areas, storage locations or by subcontractors, separately from one another.
    As soon as you have activated materials requirements planning with MRP areas, this type of MRP is active at client level, that is, MRP will be carried out in this way in all plants.
    Material requirements planning with MRP areas cannot be reversed.
    Process Flow
    You can implement material requirements planning with MRP areas in three steps:
    You convert the existing planning file entries at plant level to planning file entries at MRP area level.
    During the conversion, the system creates a plant MRP area for every plant as a background job. This, however, will not affect your planning. The processes in material requirements planning and the planning results remain unaffected.
    The conversion is also useful even if you do not work with MRP areas, but still have to plan for several plants, as the new planning file improves system performance during the planning run.
    You activate MRP with MRP areas in Customizing for MRP. This causes the MRP area field to appear in the applications of MRP and in related areas. When you enter the plant number, the system automatically fills the field with the number of the plant MRP area. The number of the plant MRP area is the same as the plant number.
    This does not affect the planning run as the plant MRP area still corresponds to the present plant.
    You define an MRP area, for example, for a storage location. You then assign the materials that are to be planned for this storage location, by creating an MRP area segment in the material master.
    Materials requirement planning for this storage location is then carried out separately. The storage location stock is no longer included in the available stock of the plant MRP area. The receipt and issue elements of this storage location (MRP area) are also not taken into account in the plant MRP area. They are only taken into account in the MRP area of the storage location.
    If you have already worked with storage location MRP the system still carries out storage location MRP even after the activation of MRP areas. You need to decide in principle whether you want to continue using storage location MRP or whether you want to create MRP areas for the storage locations that are planned separately. It is not possible to simultaneously plan a material using storage location MRP and an MRP area for the same storage location.
    If you decide to use MRP areas, you should then try to convert all storage locations that are planned separately to MRP areas in one step. Before you assign the material to an MRP area, you must remove the MRP indicator, which is located in the material master at the storage location organizational level (view MRP 4) in the screen area Storage location MRP.
    Even if you have defined MRP areas in Customizing, the system plans the materials in the plant MRP area until you assign the MRP areas to the materials.
    Only the assignment of one or more MRP areas to a material, by creating MRP area segments in the material master, actually cause changes in the material requirements planning.
    Hope this helps.
    Regards,
    Tejas