MRP Controller with SO and STO

Can anybody suggest me,
1. In the process of SO, which will be the MRP Controller: maintain with supplying Plant in Material Master Record  or reciving plant?
2. In the process of STO, which will be the MRP Controller: maintain with supplying Plant in Material Master Record or reciving plant?

Hi,
MRP Controller who got ownership to run MRP. Based on demand and then requirement, MRP run by an individual (MRP Controller) to keep maximum possibility for available of materials/goods.
But always keep Delivering Plant as production plant in Sales org-1 view in material master and copy material from production plant to all other plants for business to run.
Regards,
Biju K

Similar Messages

  • Mrp controller with description in two languages

    Hi gurus
    how can we create MRP controller  with description of Controller in two languages out of which one would be englidh .
    awaiting reply

    Hi,
    Please try following.
    For English there is no issue.
    For another language which you want, log in that language (FR/DE etc)and in customisation give which discription you want.If it is available to you or ask user what description he want and paste it.
    This is technically not correct but most of the times system not convert properly, at that time we can follow this process.
    This is also usefull when some times user wants same description (which is in EN)in the other language.

  • Using a midi controller with Amplitube and Logic 9

    Hi all
    I'm stuck as helll at the moment can someone please help???
    I'm trying to use my Line 6 x3 live as a MIDI controller for amplitube (whilst this is being used as a VST plug-in) for Logic 9.
    Heres my setup.
    Line6 x3live connected by USB and midi IN and OUT to a Focusrite Saffire USB - connected by USB to my IMAC (27 inch standard spec) and running this on logic 9 with Amplitube as a VST.
    If any one can provide a step by step guide i'd be bloody grateful.
    Thanks

    Unfortunately there is no way to use the remaining knobs, sliders and buttons on your Axiom. My work around was to buy the Korg NanoKontrol. It is a cheap controller with knobs, buttons, sliders and transport controls that integrates perfectly with GB. There is a little plugin on the Korg site to DL and install to use with GB so you don't need to use the garageremote with your axiom.
    Cheers.

  • MRP areas and MRP controller..

    In a plant if there are some 100 x materials and 100 y materials..
    The requirement is when the 100x materials are planned ,The 100 y materials should not be planned(i e 100 y materials should not be considered in planning). How to map this in MRP.
    I have heard that using MRP controllers or MRP areas this can be achieved.But I don know how?
    If anybody cud help me in how to proceed this?

    HI
    This can be achieved through the user exit in MD01 based on MRP controller assing different MRP controller for X and Y material and with the help of ABAP you can use exit in MD01 and run mrp  with that  exit in MD01
    sorry the user exit which is used in my scenario which is  same as of yours is M61X0001 as Suggeste by Mr Mangalraj
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Nov 26, 2009 11:15 AM
    Edited by: anupam sharma on Nov 26, 2009 11:17 AM

  • MC.9 report is showing -ve value when MRP controller selected

    Hi Expert,
    I'm confuse about the -ve value in MC.9. If i run by using Plant as the selection parameter for month 02.2010, then sorted by valuatted stock value(ascending), it will not show me the -ve value for all materials. But if i run the report by using Plant and MRP controller as the selection parameters,then sorted by valuated stock value(ascending), it shows me the -ve value. why?
    Please explain.
    Thanks

    hi jurgen,
    i still not clear. I try to run the report for material A and mrp controller  001. I got the -ve value. But when i run the material without mrp controller, it shows 0. no -ve value. i check in MM03,changes history for the material. MRP controller has been changed few times but the latest is 160. What am i confusing is, what is the relation between MRP controller with the report? What is the function of the report actually? Isn't it suppose to give the same data either i put the MRP controller or not when running the report?
    Thanks

  • Change MRP Controller Description

    Hi,
    We have maintained Same MRP Controller with Description for all 100 Plants.
    Now we want to change Description of these MRP Controller for all 100 Plants.
    Is there any way to change in One go or we need to manually change one by one?
    Thanks & Regards
    ND

    Hi Nitin Desai,     
    Well there is a way:
    GO TO OMD0 t-code select all the plants and then on the top of the screen you can see SELECTION click it select BY CONTENTS then select MRP CONTROLLER NAME OR MRP CONTROLLER.
    Then a pop window will appear give the data then bottom press CHOOSE then you can do it easily OK.
    I hope it helps you.
    Regards,
    Madhu.G

  • MApping of MRP Controller in SCM

    Hi Friends,
       I am a bit unsure of integration of MRP Controller between ECC and APO.
    My understanding is that the MRP Controller field in automatically populated into the SNP or any other Planner field in APO when the material is integrated. We need the user exit EXIT_/SAPAPO/SAPLCIF_PROD_001 to populate the value into the Extras field .
    Is my understanding correct ? or do we need the user exit to populate the MRP controller into APO ?
    Thanks in advance for your replies !
    Regards,
    Ranjini.

    Hi Ranjini.
    There is something else you need to be careful of here.
    In ECC, MRP Controllers are configured at the plant level, whereas in APO planners are configured globally.
    This can lead to the situation where you are trying to map many to one.
    For example, MRP Controller '001' in Plant X = Traded Goods but MRP Controller '001' in Plant Y = Manufactured Goods. You would only be able to create 1 '001' planner in APO.
    This would mean that you have to create an APO planner for each MRP Controller/Location combination, meaning you couldn't use the same numbering convention as the MRP Controllers.
    Hope this helps.
    M

  • Inventory report for the selection of requisitioner and MRP controller

    Hello Experts,
                           Can someone please help me with a standard  Inventory report in which we can give input thr requistioner and MRP controller
    regards,
    YK

    Hi,
    You will get the requisition no. from EKKO (provided PO has been created otherwise you won't get any record). Find out PO & item no. for the requisition item. Then you can check EKBE table whether GR has been posted or not. If GR has not been posted then there won't be entry in EKBE for that PO & item.
    Regards,
    Rakesh

  • Purchase requisition with MRP controller

    Hi everybody, I need support because I have to control during purchase requisition to block users with specific MRP controller.
    I mean, user A only have permission to create purchase requisition with MRP controller Z and user B only have permission to create purchase requisition with MRP controller Y.
    Thanks for all the ASAP cooperation.
    Regards.

    Hi Mitra,
    You will find your answer here.
    MRP controller for PR document type
    Do let me know if it helped, as I might have to explore this option for an upcoming requirement.
    Thanks
    Shailesh

  • Mass update for production and planned order MRP controller

    Hi Gurus,
    It's anyway possible to mass update MRP controller for Production orders and  Planned orders. If any please provide me step by step process.
    Thanks,
    B.Deethya.

    I feel You have changed the MRP controller in Material master and want to incorporate same in production order & plan order.
    For Planned order Run MRP with delete and recreate mode, system will create a new plan order with MRP controller in Material master
    For production order, Mass change is not possible, create a simple BDC or LSMW, And change the MRP controller

  • Creating Planned orders and Requisitions for a particular MRP controller and for all the others only Requisition is to be created.

    Hi Experts,
    Currently we run Program 'RMMRP000' as a batch job to create Planned orders and requisitions.
    The client wants that Planned orders and Requisitions should be created for a particular MRP controller and for all the others only Requisition is to be created.
    I implemented Exit 'EXIT_SAPMM61X_001' in the following manner by passing MRP controller to user_key.
      IF mt61d-dispo <> user_key.
        no_planning = 'X'.
      ENDIF.
    But as you can see that this will not meet my client requirement.
    If any of you has worked on similar requirement / if any one knows that this is achievable or not,
    please share your inputs.

    Moved from SAP ERP Sales and Distribution (SAP SD) to ABAP Development
    G. Lakshmipathi

  • STO with WM with shipping and transportation process

    Hi ,
    Can anyone explain the process STO with WM with shipping and transportation?. What are all the config needs to be done for shipping and transportation?
    Regards,
    abi

    <STO with shipping>
    [1]
    Please set shipping data for the receiving plant and supplying plant.
    img -> mm -> purchasing -> PO -> set up stock transfer order -> define shipping data for plant.
    receiving plant <> ship to party
    supplying plant <> sales area.
    [2]
    Please assign delivery type and checking rule.
    img -> mm -> purchasing -> PO -> set up stock transfer order -> assign delivery type and checking rule.
    [3]
    Maintain shipping point determination:
    [4]
    Maintain and assign confirmation control key (if you are using two step STO and want to post GR via inbound delivery).
    This is the same as normal PO.
    ==========================================================
    WM and transportation.
    This is basically the same as normail WM and transportation.
    Once outbound delivery (replenishment delivery) is created, the process is the same as normal outbound delivery.

  • Issue in Intracompany STO with Delivery and Billing

    Dear Experts,
                          In Intra Company STO with Delivery and Billing, pls help to map this scenario:
    During PGI Supplying plant stock a/c credited. and debited to some interim a/c.
    During GR at receiving plant this interim a/c credited against the receiving plant stock a/c.
    This issue mainly arose b'cause in ordinary cases during PGI itself the stock a/c value updated, even when the goods r in Stock in transit.
    Thanks and regards
    sBk

    Hi,
    During Intra company Stock trasfer below acc. entries happen:
    at the time of PGI 
    movement type (641)
    Stock A/c receiving plant : debit (BSX +)
    Stock A/c issuing plant : credit (BSX -)
    But at the time of receiving goods (GR) at receing plant:
    only impact the inventory entries. No accounting entries.
    SAM

  • STO with delivery and Billing

    HI,
    STO with delivery and Billing
    Material is valuated in MAP
    When doing PGI system picks the MAP of the issuing batch and this is what SAP provided
    Nw we need to transfer(PGI) @ the purchase price of the material in the supplying plant
    How to configure that
    Do we have any control on the price during PGI
    How can i use the help of ABAP ers for this
    sapmmlearner

    Hi,
    If material is not maintained for batch, then system picks MAP during PGI as it is having price control 'V'.
    To get desired result, you have to go for batch valuation. ACtivate valuation category for your plant.
    Maintain 'X' in accounting 1 view in material master.
    Valuation type is nothing but your batch number. During PGI, you can select batch as per valuation.
    Regards,
    Piyush

  • STO with shipping and with billing, in PGI- Error Msgs- VL-608 & VL-609

    Hi..
    I have generated outbound delivery in STO  with shipping and with billing process.
    But, in PGI Quantity not picked and when i click PGI two error msgs came with message class-VL and message numbers 608 and 609.
    VL - 608 - Delivery has not yet been putway/picked (completely)
    VL - 609 - Delivery has not yet been completely processed in WM.
    I think this is related to Warehouse settings.
    Please help me in issuiging goods.
    Thank You.
    Govind.

    your issuing storage location is warehouse managed. hence you need a transport order to move the materials from the stroage bins to the interim storage type 916 for goods issue.
    Such TO is created with LT03 and need to be confirmed with LT12.  Then the status changes to picked. And subsequently you can post goods issue.

Maybe you are looking for

  • Japanese charcters displaying as "?" on a JSP page

    Hi My database is UTF-8. I am loading some japaneese data using sql*loader and using Java.IO mechanism(Reader classes). Both ways it is storing the data on database in proper(Japanese) format. If I print it on dos-prompt then same Japanese characters

  • ACS with patch L 6 and Name column issue

    Has anyone experienced the following? My customer has used the migrate tool to migrate users from the ACS 4.2 to 5.3. He has also applied the patch level 6. However under the Identity Groups listed names (the Name column)- from some - to half of the

  • Urgent : Query on Non cumulative cube

    Dear BI Experts, I have a non cumulative cube to help me report Stock Balance. It has stock entries from Jan till June,2006. When I query on the cube to report the balance as of Current Period (July,2006) it doesnot return anything. What I expected i

  • Automating program

    Hi! I need help. I have to create a java program that initialise a crystal object, run it and save the report to some where. I should then schedule the java program as a service in windows admin setup to run every day.