MRP Data changed

Hi Experts,
We have decrease MRP level in most of IC items and following transaction may be happen after run fresh MRP.
If material stock exists more than reorder level, existing PR will be auto deleted by system where PO is not created and released.
If material stock is not exists and Open PO also not exist than Open PR qty will be reduce as per latest maximum qty.
If no Open PR/PO exists than new PR will be created for Maximum stock level.
Is there any other changes in current sap configuration please letme know.
Regards,
Hanuman.

Hi,
If stock is excess then the decided reorder point and still Open PR is there then system will not delete those PR during next MRP but system will saw Exception massage 20 in MD04 (Cancel Process - Which means PR is no longer required and required to be cancel).So you can cancel that one.
Regards,
Dhaval
Edited by: Dhaval Choksi on Jan 21, 2009 11:12 AM

Similar Messages

  • Schedule lines should not change 3 weeks time from MRP date

    Hi
    Is there any specific customisation required to get following results in case of schedule lines.
    1) MRP should not change/adjust the already send delivery schedule lines  which are lying within 3 weeks time from MRP date
    2) System should not allow to book the GRN unless the messages / print out has been generated from the system in case of scheduling agreement.
    Thanking you
    Shantakumar
    09944009752

    Hi,
    There are 2 possibilities:
         1. use MRP fixing using planning time fences, this is done by putting the relevant settings in the MRP1 view of the material master
         2. use the firming options of the scheduling agreement, these are set per material number that is entered in the scheduling agreement.
    The GR can only be posted for schedule lines that have been processed aka output generated.
    Regards,

  • Costing error while change mrp data in material master

    Hi dears,
    This is Rem process. when i try to change the material master MRP data ex. ( mrp type M1 to M0)
    system not allow to change and show the error as
    Product cost collector 000000750122 is still active (assigned to PrCtr 50601-025)
    i need to change the mrp data in mm02 and i donot want to do delete the pcc .
    any process to carryover
    thanks
    Edited by: raj on May 24, 2010 12:22 PM

    Hi,
    MRP is mainly configured for a material so that tere would not be any need for manual checking of the stock so as to create a PR. 
    The parameters which you have specified for a particular material like reorder point and lot size will help in planning for a particular material.
    If you need only Qty of two (Less) then  there s no need of configuring a MRP for that material
    And lot size is also decided basing on certain other factors like
    1) Lead time
    2) Transportation costs involved in procuring the material etc
    So ifyou want to generate PR for a qty of 100 then you need ot change the lot size
    I hope this gives you clarity
    Thanks & Regards
    Pavan

  • Costing error while change the mrp data

    Hi dears,
    This is Rem process. when i try to change the material master MRP data ex. ( mrp type M1 to M0)
    system not allow to change and show the error as
    Product cost collector 000000750122 is still active (assigned to PrCtr 50601-025)
    pls give some hints to clear
    Any program is there to change the MRP data for the material master in production server directly
    thanks

    Dear ,
    Did you try MASS or MM70 Transction ?
    If you do not want to go for Deletion flag of PCC  , you need to settle the REM qty  .You need to do product cost for semi finished product and finsihed product in KKF6N and after that you have to do mark and release in CK24N .For standard cat Estimate create std Cost estimation(CK11n)  and std cost Estimation Mark & release(CK24) .
    1.Backflush (confirmation) the Planned order - MFBF. Results planned order will Reduced and GR,GI, activity cost will be posted. U need not convert the planned order to production order, Confirmation for planned order only.
    2.To see Backflushed documents MF12
    3.Then Goto KKF6n to see the Manufaturing cost.
    4.Over head calculation - (Co42)
    5. Variance calculation (KKS6)
    6.Settlement(KK87)
    Try and revert back
    Regards
    JH

  • Sales Order availability checks + date changes in POs v Proc Orders

    Am getting into a knot about availability checks.
    I have a MTO process. All my materials have the same planning strategy (MRP3) but are either inhouse manufactured/external (MRP2)
    1. I create a sales order for a subcontracted material so MRP creates a Purchase Requisition which I convert to a Purchase Order..
    OR
    2. I create a sales order for a manufactured material so MRP creates a planned order which I convert to a Process Order
    Let say I have a delivery date in the sales order of September 20th for both scenarios above.
    1. For the subcontract PO, my delivery date is confirmed by the vendor as October 10th so I change the delivery date in the PO. If I run the availabilty check in the sales order, the sales order delivery date changes from September 20th to October 10th.
    Perfect.
    BUT
    2. For the manufactured products, if I change the process order to have a Finish Date of October 10th due to a busy production line, when I go into my sales order and run the availability check, it still comes back with September 20th, i.e. ignores the date on the Process order. Why isn't it updating to October 10th?
    My ATP check is set up to include Production/Process Orders. any suggestions as to what I'm doing wrong?
    Many thanks.

    Hi Shiva
    Here are my availability check settings in OVZG
    All "Stocks" checkboxes are unticked except for "W/O Subcontracting".
    All "In/outward movements" checkboxes are ticked.
    X "check all planned orders"
    X "Take all production orders into account"
    X "Check releases for stock transport orders and requisitions".
    o.

  • STO  rel order dates changes

    Hi,
    In MD04 Stock Requirements for two plants 0011 and 0012. Plant 0012 has a Stock Transport Purchase Order STO001/10 where it is buying from the sending plant of 0011 and an arrival date of 09/21/07.  Plant 0011 has the demand side of the Stock Transport Purchase “RelOrd” saying it needs to Ship on 09/10/07(so it gets to plant 0012 by 9/21/07.
    Next, I run transaction VL10B to create a delivery in plant 0011 so I can get ready to ship the goods. 
    Now, when I look at Stock Requirements in the shipping plant (0011) you will note that the delivery say the shipping date of 9/20/07.  The delivery date changes to the date of the receiving plant Stock Transport Order i.e 9/20/07. In plant 0012 the PO will show date 9/21/07 because it has 1 day goods receipt time in the material master.
    <b>The MRP element RelOrd date changes when the delivery is created before doing PGI why the date changes in MD04???</b>
    Thanks,
    Suresh

    Suresh,
    Please Refr OSS Note-25444.
    This deals with the inconsistencies with MD04 & Actual Placed  orders.
    REWARD IF U FINDS THIS AS USEFUL...
    Regds
    MM

  • Extracting MRP Data by GR date instead of AV date

    For reporting purposes I  have a requirement to extract the MRP data by GR date, not the default AV date. I have looked at all the FM's and the BAPI's I could find and cannot seem to get the data as required.  I see that in MD04 you can change your user setting to default to GR date, so I assumed that there is a similar configuration or FM parameter that can do the same.  So far I have not found a solutoin. Short of writing a custom ABAP that mimics the MD04 GR button for every plant/material I'm  hoping someone has a better suggestion.

    For reporting purposes I  have a requirement to extract the MRP data by GR date, not the default AV date. I have looked at all the FM's and the BAPI's I could find and cannot seem to get the data as required.  I see that in MD04 you can change your user setting to default to GR date, so I assumed that there is a similar configuration or FM parameter that can do the same.  So far I have not found a solutoin. Short of writing a custom ABAP that mimics the MD04 GR button for every plant/material I'm  hoping someone has a better suggestion.

  • MRP Relevant changes

    HI,
          After MRP run, there are so many <b>MRP relavent changes</b> happening, Any one can list out what are those?
    Thanx in advance
    Regards
    Mnsr

    Hi,
    Looks like an Interview question? Any how some of the example,
    1. Creation/Changes in reservation
    2. Any Order creation
    3. Goods Issue
    4. Goods reciept
    5. BOM Changes
    6. Changes in date and quantity of individual element
    7. Changes in demand element
    8. Changes in MRP type, Lot Size Procedure, Procurement type.
    9. Changes in supply element.
    This is not all... but it just gives you an Idea,
    Hope this helps....Reward your points,
    Regards,
    Prasobh

  • MD01  rel order dates changes

    Hi,
    In MD04 Stock Requirements for two plants 0011 and 0012. Plant 0012 has a Stock Transport Purchase Order STO001/10 where it is buying from the sending plant of 0011 and an arrival date of 09/21/07.  Plant 0011 has the demand side of the Stock Transport Purchase “RelOrd” saying it needs to Ship on 09/10/07(so it gets to plant 0012 by 9/21/07.
    Next, I run transaction VL10B to create a delivery in plant 0011 so I can get ready to ship the goods. 
    Now, when I look at Stock Requirements in the shipping plant (0011) you will note that the delivery say the shipping date of 9/20/07.  The delivery date changes to the date of the receiving plant Stock Transport Order i.e 9/20/07. In plant 0012 the PO will show date 9/21/07 because it has 1 day goods receipt time in the material master.
    <b>The MRP element RelOrd date changes when the delivery is created before doing PGI why the date changes in MD04???</b>
    Thanks,
    Suresh

    I found this thread, but unfortunatelly is not finished..
    My scenario is the same as the described here.
    req.date in receiving DistCenter = 20.11.20007
    req.date in delivering Plant = 19.11.2007 (because of the PlndDelTime=1)
    but when I create the delivery, the delivery date in the plant = 20.11.2007 instead of 19.11.2007.
    What should I change to have the delivery date=19.11.2007
    Best Regards
    -Italo

  • Can not see the option Execution with Data Change in the infoprovider?

    Hi team,
    i am using query designer 3.x, when i go into my bex brodcaster settings and schedule my report
    i can not see the option "Execution with Data Change in the infoprovider",
    i can only see 2 options
    Direct scheduling in background process
    create new scheduling
    periodic,
    is there any setting which i would be able to see the option "Execution with Data Change in the infoprovider"?
    kindly assist

    Hi Blusky ,
    check the below given link.
    http://help.sap.com/saphelp_nw04/Helpdata/EN/ec/0d0e405c538f5ce10000000a155106/frameset.htm
    Regards,
    Rohit Garg

  • How can I recover from a Botched BATCH DATE CHANGE in iPhoto?

    Botched Batch Date Change iPhoto08
    Short Story: Intending to change the date for one photo I managed to change the dates for all 8,525 images in my iPhoto08 library to the SAME DATE!! I found that the original creation dates were saved in the in the Modified field that appears in the Photo Info Window / File metadata subsection. I would like some help figuring out how to set the Date Created to this File Modified Date that appears in the Photo Info Window.
    GORY DETAILS:
    I used iPhoto08/ Photos menu / BATCH CHANGE... /“Set DATE to 20100723 1:20:54 PM” with “Modify original files” checked. iPhoto changed all 8,525 images to the same date.
    I now realize I should have used Photos menu / Adjust Date and Time ... But the damage was already done. Unfortunately there was no Edit menu / Undo for this operation. ALL 8,525 images have the same date. I checked in the the iPhoto Information sidebar--same date all images.
    Next, as a test, I dragged an image to the desktop and opened it in Graphic Converter7.0.3. The same date “20100723 1:20:54 PM” appeared in the Image Browser List /”Date Created”, “Date Modified”, “Date Captured” metadata fields.
    The following appeared in the Graphic Converter
    Image Preview sidebar (subWindow) going left to right
    Image menu/button
    Date and Time: Friday, July 23, 2010 1:20:54 PM PT
    Exif menu/button
    File date and time: 2010:07:23 13:20:54
    Date and time of original data generation: 2010:07:23 13:20:54
    Unknown tag (36868): 2010:07:23 13:20:54 <- significant?
    ExifTool menu/button
    ExifTool Version Number:8.40
    Warning: [minor] Suspicious MakerNotes offset for tag 0x9001
    ----System----
    File Modification Date/Time: 2010:07:23 13:20:54-07:00
    ----IFDO----
    Modify Date: 2010:07:23 13:20:54
    ----ExifIFD----
    Date/Time Original: 2010:07:23 13:20:54
    Create Date: 2010:07:23 13:20:54
    <<<<<<OH MY GOD >>>>>> the BATCH CHANGE / SET DATE not only RESET the date for EVERY IMAGE in my library, it also changed the date metadata EVERYWHERE inside each individual image file.
    Actually it's my Mom and Dad's iPhoto library containing all the kids and grand kids pictures, family trips, important events, everything. There is no backup. I feel as if I have tipped over a file cabinet containing all our photos. Our “date and event” organized 8,525 image iPhoto library was now as useful as a giant shoebox. On second thought, a shoe box full of real photo prints would be more useful than my iPhoto library because the prints would have the print date stamped on them.
    At this point feeling desperate I closed my eyes and said a quick prayer to Saint Rita - Patron Saint of the Impossible.
    I returned to iPhoto .................and noticed the Show Photo Info MENU item in the Photo Menu.
    I selected it.
    And Low and behold,
    in the Photo Info WINDOW,
    under the Meta data File SUBSECTION, the correct photo creation date appeared -->" Modified: 20071002 05:46:07 PM" I checked different photos ... They all had different FILE MODIFIED dates. These dates were/are the old creation dates! My prayers were answered: THANK YOU SAINT RITA!
    But now I am really stumped! This File Modified Date seems to be some kind of external metadata that is indexed or keyed to each image. How is this metadata stored in the iPhoto library? How can I access this File Modified date? I now turn to you GREAT iPhoto WIZARDS. Pray tell, how can I set the “Creation Date to the file Modified Date” that appears in the Photo Info Window as a (scriptable?) batch process.
    I am on my knees for this one...please help. we have iphoto11 but afraid to upgrade to it. until i know more i don't want to loose this Modified Date metadata.

    thanks for the quick response...
    no simple solution because no backup to restore from
    iPhoto seems to be using file metadata as some sort of index key in the
    Photo Info Window. open up the iphoto library package and take a look at
    the .xml file -- ModDate is used everywhere. hoping to export this data and merge/join it to
    each image.
    still trying to figure it out.
    thanks,
    Tom

  • Open Transactions in ECC for Master Data changes in MDM

    Hi All,
    I have a basic Design question on how to handle the impact of Data changes in MDM for any open transactions with that Master object. For eg if we have a Material set up in MDM and in ECC and there are open Purchase Orders for that Material, now if the Base Unit of Measure is changed in MDM and gets harmonized to ECC(After Workflow approval of the Change) how will it impact the PO attached to the material . Can we do any configuration in ECC that will restrict any Open PO s not to take the new changed value and any new POs taking up the new Base Unit of Measure , or can we set up an alert/notification that will trigger for a PO whenever any Master Data is changed and the PO takes the new changed value on the fly . What will be the best approach from a solution point of view .
    Thanks ,
    Prabuddha

    Hi Prabuddha,
    In ECC if a change happens to a master data not all the changes are reflected automatically in the open documents like open PO or open Sales order. Some fields values have to be redetermined for eg: "pricing procedure", some of them needs to be changed manually for eg: "Description". Moreover specific to your eg of Base unit of measure, this is a sensitive field and has lot of impact on the process so there for changing such fields it is necessary to close all the open documents against the Master data record in consideration. This fact is regardless whether the change happens through an IDoc or directly by MM02/XK02/XD02
    Prabudha, Please revert if you have further questions.
    Best Regards
    P T Manoj
    Edited by: PT MANOJ on Sep 2, 2011 10:25 PM

  • Address data changed after invoice is created

    Hi,
    I've a problem to solve and it's related with data changed after invoice is created.
    The scenario is the follow:
    1º - create a complete and standard sales process - order => delivery => invoice, with the standard partner scheme and without edit the address data, for any kind of partner
    2ª after the invoice is created, I change the address data on Client Master Data, for the same client that I've used on previous process
    3º I'll go to the VF03 transaction and take a look at the partner data on header level. Here I can see that the changes on the Client Master Data ar updated to the invoice document wich is already created and printed when I maked the changes
    I think that could be a program error because, once the documento is created, you only can change texts and accounts if this document is not yet created.
    And, I can't edit this kind of data on invoice creation because it must be done at order level.
    So I don't understand why it happen, but it happen on more than one client.
    I'll hope that anyone can help me to solve this issue.
    Kind regards,
    Nuno Rodrigues

    Hi Nuno,
    the adresses of all Clients are stored in table adrc. If there are no changes in the order, the system takes the standard adress of the client. That is made for not having an extra adress for each order.
    If you change the adress - the system will create a new adressnumber ( 999........ - see in VBPA ).
    If you have different adressnumbers in your orders, you are not able th collect several orders into one delivery note - for the adressnumber ist normally a split-criteria.
    Ich you will have an extra Adress for each Order, change the adress - for example by an user exit.
    But if you have different adressnumbers - the delivery and the invoice will split the different orders - if you dont do something against in an user-exit.
    Hans

  • No Data Change event generated for a XControl in a Type Def.

    Hello,
    Maybe I am missing something but the Data Change event of a XControl is not called when the XControl is used in a Type Def. or Strictly Type Def. (see the attached file).
    There may be some logics behind it but it eludes me. Any idea of why or any idea of a workaround still keeping the Type Def. ?
    Best Regards.
    Julian
    Windows XP SP2 & Windows Vista 64 - LV 8.5 & LV 8.5.1
    Attachments:
    XControl No Data Change event.zip ‏45 KB

    Hi TWGomez,
    Thank you for addressing this issue. It must be a XControl because it carries many implemented functions/methods (though there is none in the provided example).
    Also consider that the provided non-working example is in fact a reduction of my actual problem (in a 1000-VI large application) to the smallest relevant elements. In fact I use a  typedef of a mix of a lot of different XControls and normal controls, some of them being typedef, strictly typedef or normal controls and other XControls of XControls (of XControls...) in a object oriented like approach...
    Hi Prashant,
    I use a typedef to propagate its modifications automatically everywhere it is used in the application (a lot of places). As you imply a XControl would do the same, though one would like to construct a simple typedef when no additional functionality is wanted.
    The remark "XControl=typedef+block diagram" is actually very neat (never thought of it that way) because it provides a workaround by transforming every typedef into a XControl. Thanks very much, I will explore this solution.
    One issue remains: All normal controls update their displayed value when inserted into a typedef but not XControls. Data change event is not triggered. I known that XControls have some limitations (no array of XControls) but I would say, like TWGomez, that this is a “bug” considering the expected functionality.

  • How to schedule the webi report based on data changes in the report data

    Hello,
    I want  to schedule a webi report based on data change in a column in the report.
    The scenario is something like below:
    1. If a data of a particular column changes from 2 to 3 than I would like to schedule this report and sent it to users mail box.
    I know how to apply alerts or schedule a report or data tracking for capturing changes in the report but I dont know how to schedule the report only for data changes.
    Anybody done this before.
    Thanks
    Gaurav

    Hi,
    May be these links can help you:
    http://devnet.magicsoftware.com/en/library?book=en/iBOLT/&page=SAP_R_3_Master_Data_Distribution_Defining_Change_Pointers.htm
    SEM-BCS: Load from data stream schedule
    Attribute Change Run