MRP Dependent requirements - How to define

Hello.
If I set "1" in MRP Dependent requirements field the Depended Requirements are excluded, but also the Order reservations.
Can i somewhere set so that only depended requirements are excluded and not the rest?
Thanks in advance.
/Gherry Svantesson

Dear,
In the MRP dep.requirements field, you set the indicator to 1 so that dependent requirements (reservations) are not planned.
You do not set an indicator in the Cross-project field for the availability check. This means that only the individual segment (segment of the production lot) is checked during the availability check.
Thanks,

Similar Messages

  • MRP dependent requirements indicator

    Hi,
    Can anybody please let me know use of MRP dependent requirements indicator in MRP4 view?
    Regards,
    Samir Wadajkar

    Dear,
    You only use this indicator in connection with planning strategies for make-to-stock production, assembly planning. Note that the indicator Dependent requirements not relevant to MRP should only be used when, for  example, planned independent requirements exist for an assembly.
    EX... If you manufacture the chemical product say named ABC and you use water as component to manufacture it , and you dont want to plan the WATER quantity as it is used in bulk . So you can exclude the material water from the MRP run and only the Chemical product is planned and not the WATER.
    Edited by: Girishprasad Subhash Pawar on Jun 24, 2010 9:13 AM

  • MRP: how to segregate the planned orders by dependent requirements

    Hello SAP Guru's,
    I would like to know if this is possible to make the MRP work is this way:
    - generate global planned orders (by date) for several dependent requirements, for inhouse production;
    - AND generate individual planned orders for each dependent requirement, for external procurement;
    For the moment, it is grouping the quantities of all the dependent requirements to generate a unique planned order by date.
    But we would like to get separate planned orders for each dependent requirements that are externally procured.
    Do you think it is possible to do so? and if yes, how?
    Thanks in advance for your help on this subject.
    Regards,
    Rudy

    In MD04 the demand n supply that is seen is considered as plant segment. In some cases when you plan demand n supply for a given storage location separately it is called as SLoc segment, also if you're working with MRP areas then its called mrp area segment, likewise for project & sales order.
    In short it is just a way MRP would do its planning. In normal cases, the demand n supply is in plant segment, so in this segment the least resolution that you can work with is a day, so all demand on a given day is clubbed together and a supply proposal is made (depending on the lot size).
    If you want further split on a given day, then MRP needs some way to identify the difference & this is provided by the special stock segment such as project segment. To see how it works, if you're working with PS module, ask your PS colleague to create a demand for the material from different projects for a given day. Then in MD04 you will see each project demand show up in different segment & when you run MRP, you will see the results.
    I guess more than me writing quite a lot out here, a simple test at your end should help clarify... good luck

  • Dont want dependent requirement after MRP

    hi all
    I dont want dependent requirement after MRP?
    means A is a header material and B.C are the component
    after MRP run system should be created requirement of component item.
    so wht r setting  required?
    plz guide me

    Hi,
    First you ask how can you carry out settings not to get DepReq for your components than you say system should create requirements for your components.
    Please give a clearer picture of your situation and make your question more clearer.
    How do you procure your goods (if you do not use MRP)?
    If you do not want DepReq for your goods you can:
    - remove them from the BOM (use them as text item, use design BOM - I do not know your situatio)
    - you can set the MRP type in material master as 'ND' (not planned) (MM02 > MRP1)
    Please give more information.
    Thanks,
    Csaba

  • MRP Planned order generation for Order reservation excluding Dependent Requirements

    In our Project we have a requirement like for FG stage & SFG1 stage are M.T.O So after sales order are punched through  MD50 we have created Planned orders against sales orders,But dependent stages like SFG2 & SFG3 which are pure M.T.S so only Dependent requirements will get generated.Suppose for SFG1 i have partially converted planned order to Production order then for component SFG2 we get Partial Quantity as order reservation.Now requirement is if i run MRP for SFG2 system need to generate demand only for order reservation excluding Dependent requirements.Is there any possibility where we can generate demand only for order reservation.As system will create Planned order for SFG2=Dependent requirement + Order reservation

    Hi Uli,
    Suppose i have Sales order--100 kgs for FG
    B.O.M levels
    1.FG-----M.T.O
    2.SFG1---M.T.O
    3.SFG2---M.T.S
    4.SFG3---M.T.S
    5.ROH
    So if i run MRP via MD50 system would generate planned orders for FG & SFG1 level as they are M.T.O specific
    Now my requirement list would be
    FG-100kg planned order
    SFG1-100kg planned order
    SFG2-100kg dependent requirement.
    Now suppose i have partially converted SFG1 planned order to production order
    SFG1--100kg planned order to 30 kg production order
    Now my requirement list would be
    FG-100kg planned order
    SFG1-70kg planned order & 30 kg production order
    SFG2-70kg dependent requirement & 30kg order reservation.
    Here my requirement is if i run MRP for SFG2 in MD02 as these stage is M.T.S system should provide 30 kg planned order & if we see down the line it would be like
    Now my requirement list would be
    FG-100kg planned order
    SFG1-70kg planned order & 30 kg production order
    SFG2-30kg planned order & 70kg dependent requirement.
    SFG3-30kg planned order
    ROH-30kg Purchase req
    Client requirement is like these..

  • How to Find dependent requirements generated for a period

    Pegged Requirements for the PR's Generated after MRP Run

    Hi Archie,
    We can find out the list of dependent requirements from RESB table.
    We can pass the pegged requirements in RESB and fetch the dependent requirements and purchase requistions created for the same.
    The Planned orders within a particular period can be fetched through table PLAF and the same can be given in RESB and fetch dependent and purchase requisitions.
    If you feel my answer is clear and useful, kindly award me with points.
    Regards,
    Prashanth.

  • Rounding of Decimal for dependent requirement During MRP Run

    Hello Experts,
    I have the following scenario:
    We are currently enabling Characteristic Based Planning in our system.
    Our one component is selected when two characteristic values are met through object dependencies.
    Ex: Component A = Char A= '002' and Char B ='002'
    Now we have given the following Usage Probability for the two characteristic:
    Char A = 20%
    Char B = 15%
    And the total PIR quantity is 25 Pcs for Configurable Header.
    With the above usage probability and PIR Qty, We have a dependent requirement of 0.75 Ea
    ((20% X 15%) of 25 Pcs) = 3% of 25 Pcs = 0.75 Ea of the component
    Now during MRP Run I want to round the dependent Requiremnet to 1 Ea instead of 0.75 Ea.
    Any suggestion towards the solution will be appreciated.
    Regards,
    Vinod

    Hi Vivek,
    As mentioned we are using Characteristic Based Planning.
    The component is selected based on a Selection comdition which is as follows:
    Component 721290201000 = $PARENT.BCS_RL_LINE_LOADER = '002' and $PARENT.BCS_RL_WAFER_VENDOR ='002'
    When the above two conditions are met the component is selected.
    In Characteristic Based Planning we give percentages (Usage Probabality) to the characteristic values like:
    $PARENT.BCS_RL_LINE_LOADER/'002' =20%
    $PARENT.BCS_RL_WAFER_VENDOR/'002'= 30%
    For the Parent which is a KMAT Material we maintain the PIR say 40 Qty.
    Now the component qty is calculated as follows:
    721290201000 =(20% X 30%) of 40 Qty of parent
    721290201000 =(6%) of 40 Qty of parent
    721290201000 = 2.4 Qty of component is the dependent req.
    Now my requirent is to round the dependent requirenment to 3 during MRP Run. Please note that the purchase requisition got from the above dependent requirement is rounded to 3 qty.
    Now I want to round the dependent requirement.
    Regards,
    Vinod

  • How to define dependancy between sowtware comps in the SLD

    how to define dependancy between sowtware comps in the SLD,
    i have a software comp, in the IR, where i import all RFCs and IDOCs, so that they can be used across all software comps in the IR,
    since, IDOCs imported in one software comp, cant be used in another s/w comp,
    i need to create that dependancy..............................
    how can i mention the dependancy in the SLD....

    Hi,
    Please read the Rules OF Engagement,
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement&
    <i>
    Do not use words in capital letters and any of the words: urgent, quickly, burning, etc in your message. Especially not in the title! This just irritates and does not help you get to your goal. From our side, we definitely do not answer faster when we see these words.
    The same goes for such things as ??? or !!! in appends. In the English language one ? or ! is sufficient to terminate a sentence. </i>
    Answering you question, Say you have 2 SWCV's. SWCV A and B. All objects imported in SWCV A should be visible in B. In this case, go to SWCV B and in this, Go to the Dependency Tab , and Select SWCV A here as the dependent Component.
    In your IR, Clear SLD Cache and Reimport the 2  SWCV's into the IR and now you will see the Basis Objects in SWCV B. All the existing objects will not be affected as a result of this reimport into IR.
    Regards
    Bhavesh

  • Dependent requirements for Top level materials planned in MRP

    Hey Gurus,
    A top level material 20350 has a component 30397 and both of these materials are planned in APO.  We have another top level material 30399 (but this material is planned in MRP) and the component 30397 (is planned in APO) will the dependent requirements from material 30399 be populated in APO for material 30397?
    Sincerely,
    Kris

    Kris
    As Datta has mentioned the dependent demand will not reflect for the component material in APO. We had the same scenario as yours and this is what we did
    We modified the Planned order integration model filter criteria by adding custom logic in the BAdI CIF_INT_MODEL. The logic was to query the BOM tables in R/3 and find out all parents that have SNP relevant materials as components and include these parents in the list of materials for which planned orders are to be CIF'ed from R/3 . The BAdI will be invoked when you run the IM generation .
    You also have to CIF the BOM to APO . Once the PDS and planned orders are available in APO , the dependent demand will be created automatically. ( If you do not want to modify the BAdI then you can write a query and identify the parents and add them to the integration model manually)
    Thanks
    Saradha

  • MRP planning - dependent requirements

    Hi all
    I have an assembly A1 which has a component C1. The assembly can be procured from a vendor or can be produced using component C1. C1 is always procured. I am entering independent demand at A1 and C1. I do not want the dependent requirement from A1 to appear on C1. Is there a way I can stop the dependent requirements on C1.
    thanks a lot

    Hi John,
    Create a BOM Explosion Type in Customization, in which you flag the check box
    "Plng Off".
    Now you assign this Explosion Type in the Item Details screen of the component C1 in the BOM of A1.
    It will fulfill your requirement.
    Regards
    Krishna

  • How to Run MRP with requirement Plan Number

    Dear all,
    I am working for the process of MRP Run .But customer requirement is that "To Run the MRP with requirement Plan Number"
    If you are aware of this scenario ,please provide the solution.
    Thanksin Advance

    Go to MD61
    Select the Radio Button Rqt Plan Number
    Write the plan number eg. "test1"
    now you get the next screen
    Here you can enter the materials like
    first line Testmat1 -qty 100   150 ....
    2nd line Testmat2 -qty 150    100
    like that
    So the difference between MD61 with Material and Rqt Plan number is
    Material means we give requirement for only one material
    But for Requirment plan number , w.r.t one Rqt Plan number we can maintain requirement for multiple material
    same material with same period we can maintain requitement for Different Requirement Plan number
    This is reducing effort of client of data entry and for different sales Regions for the same material through "Rqt Plan No" they can differentiate the rqt
    MRP run run it for PLANT or multiple plant with Scope of Planning
    thanks
    Pl award points if useful
    K.Prabakaran

  • How to delete dependent requirement

    I need to delete dependent requirement but when tried to delete it by using change mode in MD04, I got message that planned order 0000**** does not exists.

    Hi,
    In MD04 screen, using material number and the plant you can view all the planned orders. From MD04 screen, u can celect the planned order by change mode and you can delete the planned order.
    Regards,
    V. Suresh

  • System considers dependant requirements lying outside planning horizon

    Hello Experts,
    Iam running the MRP for procurement. I have defined a planning horizon so that system will consider the requirements of that period. Iam using NETPL as my planning method in MRP. I wanted to create only purchase requisitions during this period so I selected 1 as my creation indicator as well.
    But the issue Iam facing is, system is not skipping the dependant requirements which is outside planning horizon. System skips only PIRs.
    For all the dependant requirements outside planning horizon, system creates planned orders and for those within plannning horizon system creates purchase requisition. Is there any settings to skip system considering dependant requirements outside planning horizon.??
    Thanks
    Prathib

    Hello
    I believe that there is a misunderstanding about what exactly is the planning horizon. Using a planning horizon does not means that the requirements outside the horizon will not be planned.
    The planning horizon represents a part of the planning area, where a planning file entry is made for the MRP processing key net change planning in the planning horizon (NETPL).
    In this kind of net change planning, only those materials that have undergone a change that is relevant to MRP within the planning horizon are included in the planning run. Such materials receive a net change planning indicator in the planning file.
    That means, if an MRP relevant change is made for a material within the planning horizon, the planning file entry NEPLT is set for this material.
    You can check in the SAP Help how the planning horizon works, see below:
    "You can also use a planning horizon to further limit the scope of the planning run. In "net change planning in the planning horizon", the system only plans materials that have undergone a change that is relevant to the planning run within the period which you defined as the planning horizon. The system sets the net change planning horizon indicator automatically for these materials."
    http://help.sap.com/erp2005_ehp_06/helpdata/EN/f4/7d274f44af11d182b40000
    e829fbfe/frameset.htm
    So, the planning horizon only define is the planning file will be marked as "net change planning".
    BR
    Caetano

  • NPROC:Dependent requirement not getting generated

    Hi Experts,
    We have an issue wherein we have Depedent requirement for a HALB material against FERT material requirement.But, the MD04 screen of HALB material doesn't show any Dependent requirement.
    Infact, the MD04 screen of the FERT material shows NROC in the MRP element data for the given period.
    NROC: It means that there are some errorneous components which were created by doing GR before a GI.
    I had tried executing MF47 transaction(which is COGI equivalanet in REM scenario) for clearing the errorneous components.But, i got the error as "Deficit of BA Unrestricted use". So,it means that it shall use my current stock for post processing the error componenets, which ideally shouldn't been the case as the stock was already consumed.
    Then, i found out that the BOM of FERT was not maintained.
    So,just wanna know that coz BOM of FERT is not maintained & the HALB needs to be defined as a component in the BOM of FERT in this case?
    or any other solution is there so that Depedent requirement for the HALB material reflects in MD04 screen.
    What we want: The recurring NPROC requirement which is coming for the year 2009, 2010 should permanently vanish from MD04 screen.
    Thanks,
    Rishi
    Edited by: Rishi. N. Khanduri on Jan 28, 2010 3:08 PM

    Harendra,
    Are you using "NETPL" as processing key for MD02? After 3 or 4 days is the dependent requirment getting created automatically or is it after MRP run again?
    Please provide more details,
    Regards,
    Prasobh

  • Planning of Dependent Requirements for BOM Components in Make to Order scen

    Hi Friends - I want to execute a full cycle Make to Stock Scenario with Materials planning using MRP.
    The scenario will include BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    To execute this I have done the following
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - NORM, and General Item Category group as NORM
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6. Now created a standard sales order for the product.
    7. Executed the MD50 for the Sales Order Item.
    Now where do I find the BOM components for this material in the Sales Order?
    After executing the planning Run MD50 I am only getting the requirements for Product only. I can't see any dependent requirements for the BOM components.
    How do I make sure that the BOM components are also planned while the product is planned?
    I have checked the component Stock Requirement List - there are no requirements generated from the Sales Order Product BOM.
    Pls help me on this. How to do this so that the raw material components are also planned?
    Thanks
    Purnendu

    Hi Dhaval, Sandeep, Ashok - Thanks a lot for your replies.
    I have checked the Planned Order Created through Planning Run.
    If I click on the Components Tab I am getting following message
    No material components were determined
    Message no. 61027
    Diagnosis
    Until now, no BOM explosion has been carried out or no BOM has been created for this material yet.
    Procedure
    Either explode the bill of material for this material, or
    create the components manually by processing the planned order in change mode.
    If I try to explode the BOM through Header Menu - Edit> Explode BOM
    I am getting the same message.
    If I click on the Bill of Material Tab - I am getting the same above messge.
    Ashok - I have tried both the Selection Method -
    Nil - Selection by Order Quant.
    1 - Selection by Explosion Date
    But with no effect.
    Waiting for your advice.
    Thanks and warm regards
    Purnendu