MRP Exception message :- 40- coverage not provided by master plan

HI ,
I have  a sales order & i run the MRP & after MRp run , the rpoduction order generate  for the componant material , the systemeis nshowing me the exception message   40- coverage not provided by master plan .
I have checked the stockes for the all componant material , there is no stock  for the componant material ?
Please help me out in this
Piyush

Dear,
Please refer OSS notes 550441 question no 06 for Exp message 40 Coverage not provided by master plan.
Exception message '40' resulted from the calculation of the ATP quantity in Transaction MD04.The calculation of this ATP quantity is not provided anymore in Transaction MD04  since it was not an "actual" ATP quantity as in Transaction CO09, but it was calculated according to a separate logic which did not take into account certain relevant parameters.Branching to the ATP quantities now leads to Transaction CO09 which considers all MRP elements, checking rule and scope of check.This instrument should be used now, here the previous exception message '40' is equivalent to a negative, cumulated ATP quantity.In Transaction MD04 exception messages '10' and '30' from the rescheduling check can also be used to determine receipt elements that are not covered.
Regards,
R.Brahmankar

Similar Messages

  • Coverage not provided by master plan - EXCEPTION MESSAGE 40

    Dear All,
    I am continuously getting the message - Coverage not provided by master plan - EXCEPTION MESSAGE 40 - after MRP run for the materials at 2nd level of BOM and no planned orders are getting created.
    I tried in all different ways reffering to different forums, but unable to resolve the issue.
    How to overcome this issue.
    Regards,
    Pavan

    Dear Mario,
    Thanks for your reply.
    Here requirements for production are coming from WBS from Project.
    We made changes in the dates in WBS and run MRP, Now system is able to run without any errors.
    Regards,
    Pavan

  • MD50 , getting exception "Coverage not provided by Master Plan"

    Dear Sir,
    We have mate-to-order scenario and MRP run was made using MD50 against a Sale-Order .
    After the MRP run , we are getting an exception in MD04 for a Material which is a Bought-out Material . The exception is "Coverage not provided by Master Plan" .
    The detail about the Material  (X) having exception is as below :
    The requirement for the Material X as per BOM is 15 nos . We have 10 numbers quantity for Material X available in own Stock . The Material X has Individual/Collective Indicator set as 2 in MRP view .
    After the MRP run under MD04 , for Material X following information appear :
    Date            MRP Element    MRP Element Data     Rec./Reqd Qty       Available Qty
    20.06.2008   Stock                                                                             10
    24.06.2008   DepReq            1300-100                    15-                        5-
    As a logical  for the balance 5 qty , Planned Order of 5 nos qty must be generated . But no Planned Order has been generated . In MD04 view , the Item has exception "Coverage not provided by Master Plan" .
    We request , to kindly guide us as what is the reason for the mentioned exception and how to resolve it . Why it has not generated Planned Order for 5 nos qty .
    Regards
    B Mittal

    can you please speicify the what is the MRP type used for materials X, the material for which requirement is not generated in the planning run?

  • Coverage not provided by master plan

    Hello all,
    When I run MD02, planned orders are generated but no purchase requisition is generated. The error is : "Coverage not provided by master plan".
    What can I do to sort out this error?
    Thanks in advance.

    Dear,
    Please go through the links which will give idea about your issue.
    Where as Coverage not provided by master plant is an exception message which details situation as : "Coverage not provided by master plan Excess stock planned based on the "Range of Coverage" profile. Coverage profiles should not be in use. Remove the "Range Of Coverage Profile" from the MRP view of the Material Master and run MRP manually. Contact the HelpDesk for assistance if unable to resolve error".
    http://www.sap-img.com/production/mrp-not-creating-purchase-requisition.htm
    http://help.sap.com/saphelp_45b/helpdata/en/f4/7d32bb44af11d182b40000e829fbfe/frameset.htm
    Regards,
    Syed Hussain.

  • MRP exception message 64 and planning strategy group 52

    Hi Gurus,
    I have done extensive search online in the forum to find the route cause why we are getting MRP exception message 64 for a specific material in one of our plants. This exception message does not occur for the same materials which is also produced in another plant.
    I was just wondering whether the planning strategy group of 52 in MRP 3 view would have any effect on the frequent occurrence of exception message 64. I know that the 64 message occurs when the routing time is higher than the in house production time. If that's the case where to look for in routing to correct this, apart from this do we need to look at work centers and other details. I'm not a  PP person but still was curious to know see if i could take a shot at it.
    Also the MRP settings that we follow in the plant where this problem does not occur is NETCH, Create PR - 2, Schedule lines - 3, create MRP list - 1, Planning mode - 3, scheduling -2
    in the plant where the 64 message occurs quite often is Netch, Create PR -2, Schedule lines - 3, create MRP list - 1, planning mode - 1, Schdeduliing - 1
    I was  thinking do MRP settings and planning strategy group would have any impact on why we are getting the 64 wexception message
    Because of this 63 exception message, the downstream components are getting wrong signals.
    Thanks
    Ravi

    Hello Ravi
    Generallt, exception message "64 - Production finish after order finish" is triggered when the order start date is in the past and system automatically changes to forward scheduling to calculate the finish date.
    Note 1913017 explains how the order basic date is calculated and adjusted in case of forward scheduling, however, you are using strategy 52 and this is a very special scenario, whever VP planned orders are generated.
    The VP planned orders will always be adjusted to the requirements date even if the requirements date is in the past. This is a special feature in the planning segment, since these orders are only kind of 'virtual' planned orders. These orders only have to provide the demand requirements for the components in time.
    Therefore, there is a relationship between strategy 52 (VP planned order) and the exception message observed.
    BR
    Caetano

  • Working with MRP Exception Message

    Hi Team,
    In MD04, i am getting exception messages like below.
    20 - Cancel the Process
    15 - Postpone the process
    10 - Bring Process Forward
    I have already read the SDN postings and also the below link.
    What is rescheduling and how does it work - ERP Manufacturing (PP) - SCN Wiki
    But question is, Instead of MRP raises this exception message like "10 - Bring Process forward". This exception message proposes new start date for the planned order.
    Q1: Instead of raises this as exception message, during MRP run, the planned order start date can be directly modified by the system know?
    Q2: On daily basis, How to act on this MD04 exception messages? How the MRP Controller should act on this exception messages? Should the planner need to modify the planned order dates manually as proposed by the exception message?
    Q3: Do w have any mass transaction to act on this exception message?
    Thanks

    But question is, Instead of MRP raises this exception message like "10 - Bring Process forward". This exception message proposes new start date for the planned order.
    Exception message '10' is raised to 'firmed' receipts - not planned receipts. MRP cannot change the firmed receipts (exception - roll-forward periods), hence adjustment in case of this message is out of the question. Rest assured, the planning run does adjust the receipt as much as possible.
    Q1: Instead of raises this as exception message, during MRP run, the planned order start date can be directly modified by the system know?
    Have you seen exception message '10' to a planned order which is not fixed/firmed? System adjusts when possible.
    Q2: On daily basis, How to act on this MD04 exception messages? How the MRP Controller should act on this exception messages? Should the planner need to modify the planned order dates manually as proposed by the exception message?
    This may involve many manual decision from the planners and should not be automated. You can help out a planner through reports, but the decision should not be taken automatically.
    If you find it interesting you can go through responses from Dogboy 49 and myself in the threads shared below:
    Handling of MRP Exception Message
    md04 exception
    Q3: Do w have any mass transaction to act on this exception message?
    No, you may think of developing something using BAPI_MATERIAL_STOCK_REQ_LIST or  MD_STOCK_REQUIREMENTS_LIST_API function modules and providing hyperlinks to the users so that they can directly be inside the corresponding change transaction according to the MRP element.
    However, 10, 20 and 15 all of these three exception messages come due to rescheduling for the firmed receipt elements. In MD07 you can get a collective overview of number of these messages in the exception group 07 (standard).
    Best Regards.
    Rajen

  • New MRP Exception Message

    I would like to create a new MRP Exception Message for the following:
    A new MRP Exception Message is to be displayed when MRP runs, if the MRP element (PR or PO) Qty differs from the Material Master Minimum Lot size Qty.
    Can you tell me:
    If this is possible?
    How to go about doing it?
    I checked the forum and found some older posts saying this is not possible, we are on Version 4.7c and I want to know if SAP have changed this for our version or newer releases.
    Thanks,
    Dave

    HI David,
    Just for your info, if in case you already know it then apologies for repeating it. But the MRP program which is provided by SAP is a very powerful tool, all we need to ensure is the data is maintained properly.
    So if you maintain the proper lot sizing procedure, mrp type etc, system will manage the rest.
    In this specific case, if you maintain min. lot size, then system will plan based on that, so even if your need is less than the min lot size, system will create proposals for the min lot size, so there is no need for any exception message for this.
    Hope the above was helpful.
    Regards,
    Vivek

  • MRP Exception Message 26: Excess stock in individual segment

    We would like to modify the logic relating to MRP Exception Message 26: Excess stock in individual segment to allow for a material-specific tolerance threshold, within which no exception would be generated.  An alternate approach might be to deactivate  message 26 and create a new custom exception that accomplishes the same thing.
    The reason is that we fabricate and procure a large number of materials in a Make-To-Order environment, with some planned scrap at multiple levels of sub-assembly.  The result is that we often have small residual quantities of components & sub-assemblies in sales order stock when the project is complete.  Some of these may be useful on future projects so we want them to remain in stock, but we donu2019t want them to continually generate exception messages that distract our planners from the exceptions that truly need attention.
    I have tried setting up a storage location that is excluded from MRP, and this works only if the material is in General Stock, but not if it is in Sales Order Stock.
    If anyone knows of a way to either set up an allowed tolerance, or exclude a sales order segment from MRP, please let me know.

    DB49,
    I have previously suggested just what you have indicated (ie. to move the parts back to unrestricted geneeral use stock).  My company's objection is that the materials were either produced or procured for that original sales order and that the costs for these materials are in that sales order as well.  Using a 411E transfer posting will not only move the stock, but also the cost (as if we are buying it back from the sales order).  Since there is no guarantee that we will be able to sell it again, our accounting department will not allow us to do this.
    So the bottom line is:
    We do want to retain visibility to these stocks.
    We don't want the cost for these stocks back on our books
    If the opportunity presents itself, we want to move them to any future sales order for the same material.
    We don't want the hundreds of exception messages for "excess stock in individual segment"
    However we do want to see this message for actively planning sales orders that may have too much stock
    There may be no way to get this, but that is the goal.

  • MRP Exception messages difference

    Hi PP Gurus
    I need to understand the exact difference between few exception messages
    MRP Exception message 6 - Start date of supply proposal is in past
    MRP Exception message 7 - Finish date of supply proposal is in past
    Query : Does it means that if start date is in past & finish date is in future , then only EM6 will appear .If both are in past , then EM7 will appear ???
    MRP Exception message 10 - This is meant for Rescheduling IN i.e. if the supply proposal finish date is later than reqt date
    MRP Exception message 15 - This is meant for Rescheduling OUT in i.e. if the supply proposal finish date is eariler than reqt date
    MRP Exception message 30 - Plan process according to schedule i.e. pull or push the supply proposal as per reqd date
    It looks to me that
    EM30 is same as EM10 & EM15 since the former also suggests to pull or push as the latter two does .Then what is the exact  difference between these
    rgds
    sandeep

    1- I'm not sure, but could be.
    2- Difference between 10, 15 and 30 is that 10 and 15 are for firmed elements (like production order or purchase order); 30 is for planned order (or other NOT FIRMED element) that cannot be properly planned because of LT problems.

  • Regrouping of MRP exception messages

    Hi Gurus,
    Can anybody please help me with this issue. The business has requested to regroup the exception messages arising in MD04/MD06. Currently there are 8 selection groups into which all the MRP exception messages are put in. The business wants to move some messages in to different selection groups. Can anybody please let me know what are the implications of doing this? The reason the business has asked for this is that they feel that there are so many unused selection groups and they want to organize the messages as per the title/name. for example Reschedule in (message no 10) and reschedule out (message no 15), they want to separate these into two groups. Once group called expedite which will contain message 10 and anothet group called deexpedite which will contain message 15. sinmilarly for other messages. Please throw some light on this. Help is greatly appreciated.
    Thanks
    Anusha

    Dear,
    There is no the implications of doing this but note that most of exception message functionallity is hard-coded in MRP.
    OMD3 and OM0L are the places you can make the possible changes.
    Or you need to go for develpment with MD_STOCK_REQUIREMENTS_LIST_API
    Use the BAPI_MATERIAL_MRP_LIST where AUSSL Exception message key. You will get all details
    Regards,
    R.Brahmankar

  • MRP exception message

    Hi,
    How to  interpret the MRP exception messages in MD06?
    1.what is the meaning of Stock days supply field showing 999,9-  (meaning of 999,9-)
    2.what is the meaning of 1st receipt day supply & 2nd RDS
    3.Exception message group 3 showing the value 19 (In message group 3 there is no 19)
    Can you please elaborate the each one in detail?
    Thanks and Regards,
    Vairavan

    Hi,
    The main difference would be what you consider as available for the calculation. You can configure in OMIL.
    Regards,
    Vivek
    Pasting SAP help, which explains it quite clearly:
    The receipt days' supply indicates how many days a material will last. The system takes current plant stock and specific, predefined receipts into account when calculating the receipt days' supply.
    You can define two receipt days' supplies.This enables you to instruct the system to take the less binding receipt elements into account for the first receipt days' supply, and to take only the binding receipt elements (such as production orders and shipping notifications) into account for the second days' supply.
    Additionally, in Customizing for MRP, you can use the safety stock indicator to define whether the number of days refers to the safety stock or the actual physical stock.
    If the number of days is based on the safety stock, which is set in the standard settings, the system calculates the number of days until the stock level falls below the safety stock level. If the number of days is based on the physical stock level, the system calculates the number of days until the stock level falls below 0.
    Material with critical ranges of coverage are indicated by red traffic lights in the MRP list and the stock/requirements list. You can define how many days are considered to be critical.

  • MRP exception message configuration in SPRO

    Hi all,
    Please advise where we can do configuration settings of exception message in SPRO.

    Please check the first link of my post. Path and usefull info is mentioned there:
    MRP exception message:
    spro -> pp -> mrp -> evaluation -> exception messages -> define & group exception messages.
    Define and Group Exception Messages
    In this step, you define the following parameters for exception messages:
    Whether exception messages are displayed for particular exception situations
    If a particular exception message is not relevant to your company, select the field No exception message. In the planning run, this exception message is then no longer created for this situation.
    The priority in which exception messages are to be displayed
    If several exception messages exist for one MRP element, you can assign priorities to determine which exception message is to be displayed in the MRP evaluations. The system always displays the exception message with the highest priority directly in the list. The exception message selected with the next highest priority can be displayed in the list by accessing the additional data.
    You enter the priority of the exception messages in the field entitled Excep.mssge priority.
    You can see the sequence of priorities by selecting the possible entries pushbutton on the input field. Thus, you can gain an overview of the previous sequence of the exception messages. The exception messages with the higher number also has higher priority.
    How exception messages are grouped to exception groups
    For the collective display of the MRP list and the stock/requirements list, as well as for all material lists created as a result of the single-item, multi-level planning run, exception messages are grouped into exception groups. In the standard system, a grouping exists that you can change, if necessary, in the field entitled Selection group. You can adapt the long text of the exception group in the step Check Exception Group Texts.
    Depending on which exception messages MRP lists are created
    In the initial screen of the planning run as well as in in the MRP group, you can define that the system is only to create an MRP list if certain exceptional situations exist (creation indicator "Create MRP list - depending on exception messages"). The exception messages that lead to the creation of the MRP list are selected in the field entitled Create MRP list.
    Actions
    1. Define whether the exception message is set.
    2. Define the priority of the exception message.
    3. If necessary, change the exception groups.
    4. If necessary, select the exception for the creation of the MRP lists depending on the exception messages.
    Edited by: Afshad Irani on Jun 3, 2010 4:27 PM

  • View & Action Cross Plant MRP Exception Messages

    We have a centralised storage facility and we have chosen to control all of the conversion of Planned Orders to Requsitions and then on to Stock Transfer Orders from the Supplying Plant. However we do not currently have the ability to view and action MRP Exception Messages from the Ordering Plants.
    We use MD06 to action the Supplying Site MRP Exceptions but this can only look at one Plant at a time.
    Does anyone know a way of viewing and actioning MRP Messages across multiple Plants?

    Hi,
    pls try below selection method in TCode MD06
    then you will get exception message list of materails only within plant (don't enter MRP controller, enter only plant)
    MD06 --> Plant --> Tab Restrict Selection --> Exception Groups --> select all group ( check box tick 1 to 8 ) --> then Excute
    it will solve your problem
    Regards,
    Sankaran

  • User exit/BAdI to manipulate display (MRP) Exception messages

    Dear,
    I wonder if there is a user exit/BAdI or implicit enhancement with which I can manipulate the display (or not) of (MRP) Exception messages in MD04/MD07.
    In customizing of the Exception messages (table V458A) there is the indicator No exception message (V485A-ASNOT) but if this indicator is ticked, the Exception message is never displayed;
    My client wants this message only not to be displayed in case the Material is of a certain Material group.
    In all other cases, the Exception message should be displayed.
    Thanks for any clues!
    Kind regards,
    Bart

    Hi Bart
    There is no exit or BAdI to manipulate exception messages in MRP. See the following note:
    1697703
    MD04/MD05: Change or create new exception messages
    You can find a list of the most relevant BAdIs available for MRP on the following document:
    BAdIs for MRP
    BR
    Caetano

  • Exchange 2010 Free busy not working from remote site to main site "exception message is: Could not find a base address"

    Hi all , I have an exchange 2010 SP 2 environment with 2 sites , the remote site FL free busy has NEVER worked and I get this error on the remote site , is this related ?
    thanks 
    Log Name:      Application
    Source:        System.ServiceModel 3.0.0.0
    Date:         :
    Event ID:      3
    Task Category: WebHost
    Level:         Error
    Keywords:      Classic
    User:          SYSTEM
    Computer:      FL-CAS1.WOMBAT.LOCAL
    free bust works from WITHIN the remote (FL ) site , but NEVER to the main (WASH) site , it has Never worked ,I am thing that this error is related
    thanks I have no idea how to fix 
    Description:
    WebHost failed to process a request.
    Sender Information: System.ServiceModel.ServiceHostingEnvironment+HostingManager/17256489
    Exception: System.ServiceModel.ServiceActivationException:
    The service '/EWS/exchange.asmx' cannot be activated due to an exception during compilation.  The exception message is: Could not find a base address that matches scheme http for the endpoint with binding CustomBinding. Registered base address schemes
    are [https].. ---> System.InvalidOperationException:
    Could not find a base address that matches scheme http for the endpoint with binding
    ++++

    Hi 
    This issue could be with corruption in  Autodiscover and web services virtual directory 
    Replace Web.config file for Autodiscover and web services virtual directory from the other working site
    Delete and Recreate  Autodiscover and web services virtual directory 
    Do this only  on the affected site 
    Remember to mark as helpful if you find my contribution useful or as an answer if it does answer your question.That will encourage me - and others - to take time out to help you Check out my latest blog posts on http://exchangequery.com Thanks Sathish
    (MVP)

Maybe you are looking for

  • Help needed for IPC configuration error

    hi all, I have installed IPC according to installation guide, RFC's are working perfectly. IPC_COM_SESSION_BEGIN gives a value. Still i get the following error while checking  the ipc monitor n runnin the test. Testing IPC standard installation. This

  • How to copy and paste manual menu with hyperlinks from one page to another?

    Copy paste does not duplicate hyperlinks.  Neither does putting it in the library. Both erases links.  This is a general menu that will be on every page of the site, do I really have to hyperlink all 40 buttons in accordion menu again? There has to b

  • Yet again help re speed problem

    First todays stats ADSL line status at 1359 on 01/04/11 Connection Information Line state Connected Connection time 0 days, 00:00:19 Downstream 1,151 Kbps Upstream 888 Kbps ADSL Settings VPI/VCI 0/38 Type PPPoA Modulation G.992.5 Annex A Latency type

  • Service method  of servlet  is called repetitively as response time is more

    Problem: when we try to retrieve data for a particular input, then the retrieve query takes longer time which is as expected i.e more than five minutes as our data ware house is large and the where clause is very complex. After 5 mins what happens is

  • VA02 - maintain settlement rules

    Hi folks, I am trying to maintain a settlement rule within the Sales Order without the user going to the Item Level. I want to inherit the WBS element from the Header VBAK and on the save of the document automatically create the settlement rule. I ha