MRP FOR CBP MATERIALS- MRP TYPE 'VB', IN MD01

Dear PP Gurus,
My client wants to run MRP for consumption based planning materials (MRP type: VB), for there individual plants. For this I have suggested MD01 for planning in the perticuler plant by using the user exit available in the screen. But then also, after MRP run system is plannig all the materials which have MRP type PD as well as VB.
The user exit parameters are
User Exit Key: 002 (Consider MRP Controller for CBP)
User Exit Parameters : CBP
"CBP" is my MRP controller for materials which have MRP type 'VB'.
Pl suggest me what & where is the problem?
Thanks,
Regards,
Sachin Patil.

Dear,
It is possible through
User Exit: M61X000.
You need to maintain MRP group assign it to the VB type material then go ahead.
For details please refer this thread,
Re: mass MRP run
Regards,
R.Brahmankar

Similar Messages

  • MRP FOR MULTIPLE MATERIALS

    Dear cons
    For MRP we are using t-CODE- md62 for requirement demand.Then we have created a z- t-code which is a replica of t-code- MD02. In MD02 T-CODE one single material option is availble. so we chose one BDC of new t-code- ZMD02. In this Z-t-code it is possible to upload multiple material.But the problem is for each material the system is creating an individual Purchase requisition even though I have uploaded multiple materials, Our motto is to create  a single purchase requisition for these multiple material just like the t-code- ME51N where entering of multiple items .are available. So is there any standard T-code availble to create a single pur. requisition for multiple materials in one time.Any advice for other option.

    Hi Nirupama,
    In standard system we dont have any such facility/transaction to create a single PR for a bulk of material. Which ever T-codes are available to run MRP for multiple materials (ex:MD01), those give individual PR for each individual material. You may refer to SAP notes also for this.
    Regards,
    sachin

  • Dependent reqs for CBP materials

    Hi all,
    For consumption based planning (VB) material, in MD04, order released (OrdRes) for its parent material is displayed. Is it possible to show the planned orders too ?
    Regards,
    Yogesh

    Dear,
    For MRP type VB, dependent requirement (open prod order, dep planned order)will not pass from main material.
    Because this is reorder point planning, so while MRP run system plan for procurement if the stock qty falls below the reorder level.
    In MD04 you can see only P.R & P.O for VB type material.
    While running MRP for main material, VB type material will not plan.
    You have to run separately by MD01 or MD02.
    Regards,
    R.Brahmankar

  • Purchase Order is generated after MRP for Material with MRP Type ND

    Hi Everyone,
    Material type := HAWA
    My material procurement type = F i.e. External Procurement.
    MRP Type = ND in Production server , and VB in Quality
    Lot Size = EX
    Material Status :- 15 Pre-release both for Quality and production server
    The Material is bulk material and bulk material indicator is set.
    Purchasing View is also maintained for the same.
    Planning Strat = Z5 Company specific
    Special procurement key:- Z7 Company specific
    I am running MD02 with following parameters.
    Create Pur Req =1, PR
    Create MRP List = 1, MRP List
    Delivery Schedule = 3, Schedule Lines
    Planning Mode = 2 Re- Explode BOM & Routing
    Scheduling = 1
    Issue:
    After MRP run, system is  generating PR, Though with MRP type ND purchase requisition should not be generated.
    Observation:- Looks like there is inconsistency of material date in Quality and production server.
    When I tried to run the planning , The Error message was generated"Material status is set to pre- release.
    After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
    We havent been able to locate the root cause so far
    Please guide us
    Thanks in Advance,
    Ayaz
    Edited by: Ayaz Alam Khan on Feb 16, 2011 2:41 PM

    IF the material is ND, system won't Run MRP for the material
    Observation:- Looks like there is inconsistency of material date in Quality and production server.
    There is no link
    When I tried to run the planning , The Error message was generated"Material status is set to pre- release.After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
    system will read the X plant  material status or plant specific material status first and then only system will read MRP type

  • MRP for 2 materials

    Is it possible to run MRP for one material number and take into account inventory and orders that exist for a different material number?
    We have some parts that can be rebuilt (e.g. material abc123).  We're considering creating a new material number for the rebuilt version of the part (e.g. abc123R).  We want to run MRP for the abc123 material, and recognize the inventory and orders for both materials.
    Thanks in advance for your help.
    Regards,
    Dennis

    Hi Dennis,
    It is not posible to do as you want, because there is only one number material by physical part... you can not assing two number material by physical part...
    Best Regards,

  • MRP for BOM materials

    Hello,
    Actually , I have a finished good ( parent material) which is a BOM and  is made out of two raw material items ( child material).
    But,  I am unable to see any short term or long term requirements for this two raw material items in MD04 and MS05.
    Is their any special configuration need to be carried out for the requirements on the raw materials.
    Thanks

    Dear
    First Check MRP Values are maintain in Material Master or Not For your FG & Raw materials.
    Are you run the MRP for the FG Product?
    If yes than after requirement is Come in MD04.
    thanks
    Sam

  • How to Forecast and run MRP for consumed materials

    Hi Experts,
      I need help urgently on below business requirement.
    Objective: Forecast consumable materials (like Gas , Chemical) to produce Finish product
    Scenario:
    1.  We have Plant WF01  - to produce finish products, Sales related activities, SOP for sales forecast, and production planning
      Production BOM Like below
        Finish part (material used to make production, Sales, Shipment)
        RAW  (Component used to make Finish Product)
    2. We have other plats with in same company for  GS01 - for GAS related materials, CH01 - For Chemical Related material
          - Material under GS01, CH01 does not have BOM
          - Gas and chemical material used during production process to make finish product
    Question:
              - How Can I forecast(to procure from external), how much GAS/Chemical required to meet future demand from SOP
              - How can I link SOP to forecast GAS and Chemicals because we don't want to base on historic usage
              - Please share best practices if any

    Hi All ,
      Thank you for help. Understand we can use CBP for non BOM components planning.
    But SAP has standard forecasting models(based on historic/trend/Seasonal etc.).
    Can we define our own forecasting model to generate fore cast values.
    Ex:
    Based on history
          Com1 - requires 100PC in Mar and 150 in Apr
    But what we require is , We need to base on usage rate(to make finish product) and SOP forecast  to determine raw material forecast.
         i.e
              SOP: FinishGoods 1000pc in Mar and 2000PC in Apr
              based on SOP, I need raw material comp1  500PC in Mar and 1000PC in Apr
              formula: Lets say Usage rate for Raw Comp1 is 0.5PC to produce 1PC of finish goods
                   Forecast: 0.5PC  * 1000PC = 500PC
                                   0.5PC  * 2000PC = 1000PC
                                       Usage rate * Demand = Raw material forecast value
              usage rate and demand are dynamic and can change.
    Is there any way in SAP to determine forecast of components based on formula.
    Thank you.
    Rayudu

  • MRP for MRP type VB

    Hi,
    In order to run MRP for the materials related to consumption based planning (VB) in transaction MDBT / MD01 i have followed below link and activated user exit but when i run MRP, it is considering even MRP type PD. When we try to put break point in debug mode program is not considering this exit itself. Has anyone has implemented this exit? Let me know the correct procedure.
    http://scn.sap.com/docs/DOC-32041
    Regards / US

    Dear Uma good morning.
    I will have to agree with what Mariano is saying and i will take it a little bit further.
    Some time ago, in my company we were asked to implement an MRP solution where MRP should run with specific settings (different than what stands for all other materials) for only 2 MRP controllers. We followed the procedure Mariano describes but with one addition.
    At the lowest part of the MD01 screen, there are two boxes, User Exit Keys and User Exit Parameters. In the first box we entered the User Exit Key we created (using Mariano's procedure) and in the box User Exit Parameters we entered "IEQ(MRPcontroller1)/IEQ(MRPcontroller2). IEQ stands for "Include Equal". So, whenever MRP was running with this variant, it was running only for the materials that belong to these two specific controllers.
    Of course, you will have to also change your standard MRP variant, by writing to the User Exit Parameters box "EEQ(mrpcontroller1)/EEQ(mrpcontroller2). EEQ stands for "Exclude Equal. This way, your MRP when running on this second variant it will run only for the resto of the materials, excluding (not running again in other words) the materials of the first variant.
    You can find the document which describes the complete procedure here (it also describes the steps Mariano is talking about):
    How to run MRP for a specific MRP controller
    Best regards, 
    Nikos Giannopoulos

  • MRP for Service Order

    Hi Friends,
                                   My client want to run the MRP according to  Material Group and according to service order.What are the possible ways to run the MRP? How my problem can be resolved?Please reply...
    Regards,

    Hi Edit,
    The question is not to run MRP for Service materials, - to run MRP for the Materials in a Service Order.
    I have one service order in which I have raised requirement for 10 materials (eg. Raw materials).
    MRP can be run Plant wise or Material wise.If  I run Plant wise MRP, system will gather all the requirement that are required in the plant (including Sales order, Service order, Prod order etc..).
    If I run the MRP Material wise, system will gather the requirement of that material in all types of orders.
    But the requirement is to run the MRP only for a particular Service order (only for the materials and quantities required in the given Service order) and generate PR and PO for procurement. The material may also be required for another service order, sales order or prod order. MRP should not gather the requirement for other orders.
    Hope my explanation is clear. Prasanna, please post the correct scenario if there are any deviation in my understanding of your query.
    I am also Looking for the solution. If any one have idea please help us to solve the issue.
    Thanks,
    Babu.K

  • Purchase requisition after MRP for Semifinished & raw material

    Hello Gurus,
    Please guide me in following scenario :
    FERT - X ---> HALB (subcontracting) - Y ---> ROH - Z
    Requirement : X - 1000 , Y - 1000 & Z - 1000
    In this case, when I will take the MRP for X ,then MRP will generate PR for Y & Z.
    But in my case, client purchase the Z & sell it to vendor & then vendor will sell the Y to my client.  He wants the requirement of Y & Z both after MRP run of X .
    FERT - X ---> HALB (Purchase) - Y ---> ROH - Z
    What can I do to map this in SAP?
    Thanks & Regards,
    Sagar

    Hi Sagar,
    It can also be maped in following way. Please take your MM and FI Consultant with you.
    It could be map in following way:
    Create BoM for Z (FG) and add Y (SFG) & X (RM). Keep the procurement type for both as F. Use special procurement key as 30 for Y (SFG). Mark NOT RELEVANT TO COSTING indicator for X in BoM. Maintain MRP type = ND for X (RM).
    Now when you run MRP system will only create Dependant requirement for X (RM) and it will check stock of Y (SFG) as well. If stock of Y (SFG) is not available, Subcontracting PR will be generated for Y (SFG).
    MRP will not be accurate for X (RM) since it has got dependancy on Y (SFG) which is going to be subcontracted from some Vendor. You can look for Re-order point planning or you can adopt the way suggested by Satish or you can make a new Infostructure in MM which will be updated for consumption movements for X (RM) which later can be used to make its PR directly to Vendor.
    Regards,
    Shoyeb

  • MRP for Particular Material

    hi
    I need to run MRP for certain materials for certain period in background or foreground
    how to configure this????
    tks and regards
    pnts will be rewarded
    murali

    Hi,
    __MRP for certain materials:__
    For this you have work with MRP Area concept. Assign some parts to storage location ex: say MN01 and create MRP area MN01_01 in customizing and assign this storage location.
    Now run the MRP for this MRP area from MDBT/MD01 and plan those materials which are assign to this storage location. (storage loc assignment is from MM01...create with this sto loc).
    MRP for limited period: Scheudle the MRP job in background or in foreground from SM37 with the required period. The MRP will run only in between this selected period.
    Hope the answer will help u.
    regards
    Tajuddin

  • Collective Invoice Posting for Direct Materials

    Hi ,
    We have extended classic scenario with R/3 backend and we are posting Collective Invoices for multiple POs for direct materials ( order type ECDP).Invoices fail to transfer to backend.BD87 /WE02 log in R/3 indicates the following error -->Acct assgt 01 for order item 2200000070 00001 does not exist
    Message no. M8140
    Also ,if I try posting the invoices in R/3 using MIRO, there are no errors.
    Thanks,
    Gourang

    Several notes show up for M8140.
    316657, 615114, 506930 in the SRM area.
    493604, 810917 for BAPIs may also be relevant.
    334765 recommends creating a support message for further analysis.
    Kind Regards, Suresh.

  • One pr for multiple materials with line items while running mrp

    Hi SAP gurus,
                  I am config the system for MRP as per my client requerement.
                     We use CBP for different RAW materialsfor example they having a 10 materials for planning,were,
             MRP type is VB,
              LOT size is FX,with Different Reorder points and fix order quantity for all materials,
             My client whant run MRP for all these materials in single time that means they whant multiple item at single levels,
            i soles these requirement with the help of Product Group(sop) and its working but when we running md02 for product group all materials have planed and they give different purchase requistion numbers for all these materials but my client Wants single purchase requistion with line items for all these materials.
         Pls give me the solution for that requirement.
    thanks and Regards,
    abhi

    this is not the way SAPs MRP run works.
    Where is the benefit for this?
    the requisitions are not even split into header and item table, it is just one table EBAN, and either way you would get exact the same number of records in EBAN.

  • System creating procurement proposal for components having MRP type VB

    Hello All
             I am having a FG under which there are two raw materials ROH1 & ROH2, MRP type for FG & ROH1 is PD & lot size EX, MRP type for ROH2 is VB & lot size HB. When am running Single-Item-Multilevel MRP for FG (using txn MD02) system is creating purchase requisition for ROH2 as well which shall not be the case as its MRP type is VB (Manual Planning).
            Looking forward to your valuable inputs for resolving this issue.
    Regards,
    J K Tharwani

    Thanks for your inputs
             There is stock of ROH2 above the reorder point still the system is generating purchase requisition after I run the MRP for FG, I would like to inform you that I am running MRP of the FG against Customer independent requirement (Sales Order), am using strategy 50(MTO) for FG.
             I also checked the similar scenario with another FG but i kept strategy as 40(MTS) for it, & when am running the MRP against independent requirement of FG with 40 strategy am not getting any purchase requisition for ROH2 (having MRP type VB & lot size HB).
            Can you please make me understand this behaviour of the systtem. Again looking forward to your valuable inputs.
    Regards,
    J K Tharwani

  • Best MRP type and strategy to run MRP for component using PIR and forecast

    Hi Experts,
      I want to run MRP for Component parts. I need to run MRP based on Planned independent requirements and Forecast Data.
    Which is the best suited MRP type and strategy.
    Please help to share bestpractices if any. thank you.
    Rayudu

    Hi,
    is the components you are talking are Semi finished materials or Raw materials and Packing materials which are procured from vendors ???....
    It is not a good idea to maintain planning strategy for Components which are part of BOM...these materials are automatically planned when the header materials of these components are planned....
    If these components are not part of any BOM then you can try the option of using forecast based planning.. MRP type  VV and maintain the forecasting view in the material master
    You can also explore the option of consumption based planning like manual or automatic reorder point planning...
    Thanks
    Kumar