MRP for FG not looking at Raw Material

HI all,
I'm running MRP for finished goods material against my production plan (created in MD61).   The material has a BOM component but when I run MRP for the FG its not looking at BOM component to consider raw material) availability and thus proposing dates solely based on the Production Plan and not any other requirements.  
It simple creates the planned orders based on the production plan entered into MD61.  The dates for the planned orders don't take into consideration that on the suggested Production date there is not enough raw material to actual produce the product.   
The Production plan does drive requirements to purchase the raw material but the dates are not neccessarily correct to get product to the warehouse on time for production run.   
FG set up:
RP Type:                                PD - MRP
Lot Size:                                 EX u2013 Lot-for-lot Order Quantity
Safety Stock:                         125  - EA
Availability Check:                   02 u2013 Individual Requirements
Procurement Type:                   E - In-House Production
In-house Production:                 1 - days
Planning Strategy:                   10 u2013 Make-to-stock production
BOM / Raw Material set up:
RP Type:                                PD - MRP
Lot Size:                                 EX u2013 Lot-for-lot Order Quantity
Availability Check:                   02 u2013 Individual Requirements
Procurement Type:                    F - External Purchased
Pland Del Time:                         3 - days
GR Process time                       1 - days
Planning Strategy:                   40 u2013 Planning with Final Assembly
How do I get the MRP for the FG to not only create the planned orders from the production plan but also take into consideration raw material availability?   Thanks for your help!!

VC,
I need to the PlndOrd date for FG to take into consideration raw material availability...otherwise it's pretty useless to the site.
  I guess you are unfamiliar with the workings of standard MRP.  MRP in ECC as delivered by SAP will not support this requirement.
There are a couple of assemble to order strategies that may be suitable for you, if all of your RM materials exist in the FGs BOM.  Strat 81 and 82, which are intimately linked to the Sales order ATP check.  These strategies are not compatible with FGs forecasts.
http://help.sap.com/erp2005_ehp_06/helpdata/EN/41/19206a45fd11d188ff0000e8322f96/frameset.htm
In SAP ERP, MRP just does not check the availability of components during the MRP run.  The Net Requirements calculation of a component part (which is the closest concept within MRP to an Availability check) takes place ONLY after all parent parts are completely planned, and all parent part planned orders have been already been generated and saved.  In effect, when MRP is running, information is neither gathered nor considered as to what the planning situation will be for the components.
APO has several solutions that, depending upon the detailed requirements, might provide a solution.  A common one is to first run an MRP type heuristic, to create planned orders for all the shortages, and subsequently run a 'Bottom-up' scheduling heuristic to bring supply and demand dates into alignment, based upon pegging information.  ERP does not have this functionality.
Of course, SAP ERP is infinitely modifiable.  If you have enough time and money, you can write custom code that will torture ERP into filling any Business Requirement.
Best Regards & Good Luck,
DB49

Similar Messages

  • How to create production order for multiple items having common raw materia

    Dear all,
    We are running a sheet metal fabrication company at Vadodara Gujrat.
    Please guide us how to create single production order for multiple items using single raw material??
    For example, We want to produce baby shirt(item code AAA001), shirt with full sleeve(item code AAA002), shirt with half sleeve(item code AAA003),shirt slim fit (item code AAA004),shirt loose fit(item code AAA005) from single raw material say(item code XXX001).
    Right now we have to create 5 production order to produce above 5 items of single sales order  in SAP B1 though it is made from single raw material which is foolishness and time consuming too. (Please also note that to produce any finfish good item, raw material required for that item may vary every time in our process.)
    Kindly guide us how to solve the problem.
    Thanks.
    RUPESH  +91-9227744273
    WEB : www.gorasia.co.in

    Hi Rupesh Gorashiya,
    This is possible through MRP for that you have to put Sales Order first and Run MRP Wizard
    MRP Wizard Put Multi Production Order as per Item Taking in Sales Order just click it on and execute.
    Thanks,
    Srujal Patel

  • Reg. WIP Charges not added with Raw material cost

    Dear Sir
    In BOM Header material SEMIFINISHED(CUTPCS)  is attached and component material FABRIC -Raw material is attached,and then in MIGO using 261 Mvt type we are issuing fabric against production order,next using 101 Mvt type receiving CUTPCS now the cutting charge is not added with FABRIC only FABRIC cost is coming during Goods receipt.  this is our serious problem.
    Please help me.
    Thanks
    Rajakumar.K

    Not answered

  • BOM Creation for different FG from 1 Raw material

    Hi Experts,
    In my company I have 1 scenario where Sheet is a Raw material. After doing operations in 1 sheet (RM) 10 Finished Product are produced.
    So please can anybody help me to create BOM for FG as from 1 same Sheet (RM) 10 different Fgs are produced.
    Regards,
    Uttam

    Uttam,
    Do you always produce 10 different FG's from single raw material sheet? or it is just a possibility to  use same raw material in different FG's.
    You can maintain independ BOM with sheet materiila as a compoenent . hope you have exact measure of qty you need in each BOM.
    If all the FG's are produced together then go with co-products.
    Regards,
    Santosh Sarda

  • Where we enter raw material reservation qnty for planned order in monthwise

    sir,
    as per client requirement in every month raw material reservation quantity fixed for planned order in monthwise.
    in sap Where we entere raw material reservation   for planned order in month wise nov, dec, jan and whre its show.
    is it possible after mrp run.can we check that raw material reserve stock in mmbe for planned order.
    pl guide me step by step

    Dear Prakash,
    1) in MMBE, you cannot see Reserved qty against plan order ( it is not a confirmed receipt )
    2) the reserved qty which is shown in MMBE is against production order
    3) only after converting plan order to production order ( Header material )
    4) dependent requirements will convert into reservations
    Regards
    kumar

  • Raw material cost not coming KE30 profitability report

    Dear Gurus,
    We have two material type for our finished product for one material type without having cost release for current period we can't release the billing document for accounts but in other material type we can release the billing document for account without releasing the cost for current period.
    This occurs with problem that in KE30 we are not receiving the raw material cost & administration cost. Please suggest what should I do to correct this?
    Thanks in advance.

    Hi,
    I already assigned costing key to material type (FERT,HALB) but bifurcation of COGM not flow to CO-PA.
    In T.code KEPR
    1.All F/V i maintained as 3 is it ok or i need to maintain it 1 or 2.
    2.In T.code KE4J
    Record type = F i maintained for FERT,HALB category materials & assigned in Costing key
    Earlier before release i assigned in T.code ke4i
    Condition type             Value fields
    VPRS                          Stock value
    Then some value flow to copa
    After i release i removed stock value from ke30 report and added material cost ,sub contracting cost,material overhead but no value flown CO-PA.
    Pl check
    Regards,
    Debashis

  • Raw material not using for production

    Dears
    I have a raw material which will be a line item for different FERT
    But some particular FERT i don't want to this raw material is use for costing and planning and consumption
    Please tell me how we can map this
    I try  in BOM Item status we can select not relevent for costing as well as in material master can be select asP D ,But the problem is that in some FERT i will use this raw material for costing as well as planing ,consumption etc...
    Any hints please...
    Abu Fathima

    Bulk material is normally included in the BOM for information purpose. It normally has not impact on planning, costing, consumption. Materials like grease, washers etc are used as bulk. For what you asked in your first post, bulk material concept suits the best.
    You need to remember that if you set bulk material indicator in BOM (it is set in BOM only if in certain fert materials you don't want that component material to be planned costed and consumed) or material master ( for all Ferts), it will not get copied to component overview of production (meaning, you cannot see it in production order, but you can see it in BOM).
    But you can make it appear in production order by changing the setting Excl. Bulk Material in BOM explosion in OPPQ  and/or OPPR. In this case when you create production order it will appear in the component overview and it will also appear in the order reservation but... movement allowed field will be blank , meaning you cannot post good consumption for the bulk material even if it appears in component overview. So it is not visible in MD04 or MD05.
    Another thing to note is there is a third place you can set bulk indicator, you can set any material as bulk in component overview in CO02, it will not be planned, costed or consumed.
    You do not control those things with item catagory in BOM
    For R&D, the normal procedure is creating an Engineering BOM (Usage 2). But if you want to use production BOM's for R&D also, you need to go to OS20 and for BOM Usage 1 (for Prodution), change + to .(period)  and now go to CS02 and uncheck production relevant for the items you want to not to be considered for production (planning and consumption) and uncheck costing. Then check Engineering/Design Relevant. This should fulfill your need and also looks politically correct because you're just not bulking it out.
    Edited by: Jeevan Sagar on Feb 24, 2012 12:54 AM
    Edited by: Jeevan Sagar on Feb 24, 2012 12:59 AM

  • Purchase requisition after MRP for Semifinished & raw material

    Hello Gurus,
    Please guide me in following scenario :
    FERT - X ---> HALB (subcontracting) - Y ---> ROH - Z
    Requirement : X - 1000 , Y - 1000 & Z - 1000
    In this case, when I will take the MRP for X ,then MRP will generate PR for Y & Z.
    But in my case, client purchase the Z & sell it to vendor & then vendor will sell the Y to my client.  He wants the requirement of Y & Z both after MRP run of X .
    FERT - X ---> HALB (Purchase) - Y ---> ROH - Z
    What can I do to map this in SAP?
    Thanks & Regards,
    Sagar

    Hi Sagar,
    It can also be maped in following way. Please take your MM and FI Consultant with you.
    It could be map in following way:
    Create BoM for Z (FG) and add Y (SFG) & X (RM). Keep the procurement type for both as F. Use special procurement key as 30 for Y (SFG). Mark NOT RELEVANT TO COSTING indicator for X in BoM. Maintain MRP type = ND for X (RM).
    Now when you run MRP system will only create Dependant requirement for X (RM) and it will check stock of Y (SFG) as well. If stock of Y (SFG) is not available, Subcontracting PR will be generated for Y (SFG).
    MRP will not be accurate for X (RM) since it has got dependancy on Y (SFG) which is going to be subcontracted from some Vendor. You can look for Re-order point planning or you can adopt the way suggested by Satish or you can make a new Infostructure in MM which will be updated for consumption movements for X (RM) which later can be used to make its PR directly to Vendor.
    Regards,
    Shoyeb

  • GR based IV Indicator do not appear in PO for Raw material

    Dear All,
    I am creating a PO for material with cost center . Vendor is maintained with GR based IV and ERS Indicators.
    If a non valuated material (i.e. with quantity update and without value update)  is used in PO , I am able to  see  Tick for GR based IV indicator.
    But in the same PO when Raw material( quantity update & value update ) is used , Tick for GR based IV indicator disappears although it is there in Vendor Master.
    Please provide your valuable advice/solution.
    Thanking you in anticipation
    Regards,
    Vishwas

    Hello,
    Check GR based IV tick in Purchase inforecord for Pur. Org., material and vendor combination.
    Regards,
    Shailesh

  • Purchase Order is generated after MRP for Material with MRP Type ND

    Hi Everyone,
    Material type := HAWA
    My material procurement type = F i.e. External Procurement.
    MRP Type = ND in Production server , and VB in Quality
    Lot Size = EX
    Material Status :- 15 Pre-release both for Quality and production server
    The Material is bulk material and bulk material indicator is set.
    Purchasing View is also maintained for the same.
    Planning Strat = Z5 Company specific
    Special procurement key:- Z7 Company specific
    I am running MD02 with following parameters.
    Create Pur Req =1, PR
    Create MRP List = 1, MRP List
    Delivery Schedule = 3, Schedule Lines
    Planning Mode = 2 Re- Explode BOM & Routing
    Scheduling = 1
    Issue:
    After MRP run, system is  generating PR, Though with MRP type ND purchase requisition should not be generated.
    Observation:- Looks like there is inconsistency of material date in Quality and production server.
    When I tried to run the planning , The Error message was generated"Material status is set to pre- release.
    After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
    We havent been able to locate the root cause so far
    Please guide us
    Thanks in Advance,
    Ayaz
    Edited by: Ayaz Alam Khan on Feb 16, 2011 2:41 PM

    IF the material is ND, system won't Run MRP for the material
    Observation:- Looks like there is inconsistency of material date in Quality and production server.
    There is no link
    When I tried to run the planning , The Error message was generated"Material status is set to pre- release.After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
    system will read the X plant  material status or plant specific material status first and then only system will read MRP type

  • List of process order for particular raw material

    Dear PP Gurus,
    Suppose we have one raw material said - X and this is used to create finished product A, B, C an D.
    Now I would like to know, In particular period how many process order is created for raw material X?
    Ex. for one month only 2 process order usind raw material X are created. 1(finished product - A and 2 (finished product- B)
    I tried COOISPI but not getting success.
    Through MB51 I can get report of process order against which material is issued. (261 is done)
    But my basic req. is to know the process order created.
    I am from MM side so no much more idea in PP area.As working for SAP support we have to look little bit in PP ara.
    Thanks all
    Rajan

    Hi Rajan,
    You can use COOISPI and select Documented Goods Movement and give the Basic Start date range as you want and execute.
    You can use filters in Movement types and get your desired result. 261 is for Goods issue of the components and 101 is for Goods Receipt of the header material.
    Hope it clears your doubts.
    Regards
    Suri

  • How MRP Run exclude QI Stock Type of a Raw Material SLOC?

    Dear all
    Fact:
    All of our raw materials must be subject to quarantinee upon GR. We have Storage Location of Raw Material: RMSL
    In Material Master of that Raw Material
    We are using the "SLOC of EP" (MRP View 2) to put the defaulted GR SLOC. And we also make use of the "Post to QI Stock" in View: Purchasing.
    Upon GR:
    During GR, the Raw Mat SLOC (RMSL) will be copied from "SLOC of EP" of the material master data, and it will be posted to the stock type "QI STOCK".
    Problem:
    However, when the MRP Controller run MRP, it will take the QI Stock Type of Raw Material SLOC into account.
    Is there anyway we can exclude the QI Stock Type of Raw Material SLOC from MRP Run?
    I have read from some threads to suggest to post it to the Quarantinee SLOC. We prefer not to create another Quarantinee SLOC (QISL) which will be filled in SLOC of EP and then after passing QC, we perform Transfer Posting from SLOC: QISL to SLOC: RMSL. We have a few Raw Material SLOCS and we do not want the Warehouse guy to get confused which Raw MAterial SLOC to choose upon GR. Rather, we prefer it to be defaulted in the "SLOC of EP" in the material master.
    Please advise.
    Edited by: Daimos on Jul 13, 2009 1:16 PM

    Hi,
    Generally MRP consider stock from all the storage location when run the MRP for Plant level for material.
    However we can exclude the particular storage location from MRP Run, for those following settings to be done.
    Go to MRP-2 View of material master and select the storage location to be excluded from MRP. (Press Shift +f1 ex .sloc2) As per your case it should be RMSL
    In that MRP view go to Storage location MRP Tab.
    And assign u201CSLoc MRP indicator = 1 (Storage location stock excluded from MRP)u201Dand save.
    Now run the MRP, stock from sloc2 will not be considered to create-planned order.
    Please try this and revert back.
    Cheers,
    Kumar.S

  • PP module: I reversed my settlement but now raw material does not appear

    Hi all,
    I did a small mistake in setting up MRP for finished goods therefore my amount came different. I got the message to see the log but as i could not locate the log and went ahead and completed the settlement.
    Then I found out the mistake and correted the same. But I had already made settlement, therefore I reversed my settlement.
    Now when I am doing>>> Logistics u21D2 Production u21D2 MRP u21D2 Planning u21D2 Single Item, Multi-Level....I can see only finished goods and raw material disappeared. Therefore I can not proceed and do my settlement.
    can somebody help me on this?
    regards,
    Supriya
    Edited by: Supriya Naik on Mar 3, 2011 10:19 AM

    To be precise...thats how my PP module is.......I need to do SD module but can not proceed because of this mess up...but it is making me learn a lot!!
    I would really appreciate your help.
    regards,
    Supriya
    Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Materials Management u21D2 Consumption-Based Planning u21D2 Plant Parameters u21D2 Carry Out Overall Maintenance of Plant Parameters
    Activate MRP:  Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Materials Management u21D2 Consumption-Based Planning u21D2 Planning u21D2 Activate Material Requirements Planning
    Create production sch profile: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Shop Floor Control u21D2 Master Data u21D2 Define production scheduling profile
    Create prodn scheduler: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Shop Floor Control u21D2 Master Data u21D2 Define production scheduler
    Control parameter for MRP: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Material Requirements Planning u21D2 Plant Parameters u21D2 Carry Out Overall Maintenance of Plant Parameters
    Assign availability check to order type: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Shop Floor Control u21D2 Operations u21D2 Availability Check u21D2 Define Checking Control
    Define control perameters: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Shop Floor Control u21D2 Operations u21D2 Scheduling u21D2 Define Scheduling Parameters for Production Orders
    define control parameters- Order Type: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Shop Floor Control u21D2 Master Data u21D2 Order u21D2 Define order type-dependent parameters
    create confirmaton parameters: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Shop Floor Control u21D2 Operations u21D2 Confirmation u21D2 Define Confirmation Parameters
    define valuation of goods received: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Shop Floor Control u21D2 Integration u21D2 Define Valuation of Goods Received
    MMR1- Created material
    MMH1- MRP view fo trading goods
    MMF1- MRP view for finished oods
    MD02- Run MRP
    CS01- Create BOM
    KL01- Create activity type labor
    KP26- set activity prices
    Work Center person responsible: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Basic Data u21D2 Work Center u21D2 General Data u21D2 Determine person responsible
    Create work center location: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Enterprise Structure u21D2 Definition u21D2 Logistics u2013 General u21D2 Define Location
    create work center controll keys: Tools u21D2 Customizing u21D2 IMG u21D2 Edit Project u21D2
    Production u21D2 Basic Data u21D2 Work Center u21D2 Routing Data u21D2 Define control key
    CR11- Create activity
    CR01-work center for finished goods
    CA01- created routing for finished product
    case
    MD02- Run MRP (got error- error calculating costs- see log....but wrongly saved)
    MD04- conversion planned order to production order
    MB1A- Gods Issue- 261- consumption for order from warehouse
    CO15- completion confirmation of production
    MB31-Goods receipt
    KO88-Settle Cost of production order

  • MRP Not Running on Subcontracting Material

    Hi All,
    I have done the following :-
    Created a SUBCON Component with all the correct views, procurement type 30 etc.
    Created a RAW Material again with all the correct views.
    Created a BOM for the Above.
    Created Subcont PIR for SUBCON Material
    Created Standard PIR for RAW Materal.
    Sourcelist for both.
    When I create a PO ME21N i can see the BOM explosion etc so Subcon works fine.
    The problem is if i want to maintian safety stocks for the SUBCON Component and run MRP it doesn't generate any Planned Orders/Purchase Reqs?
    Why is that?
    If i maintain safety stock for the RAW Material and run MRP it generates me reqs which is correct but why doesnt it do the same for SUBCON Material?
    Thanks

    Hi,
    Issue Resolved,
    I removed forward consumption and backwards consumption and MRP is working now.
    Forward and backward consumption has nothing to do with safety stock level. MRP will plan with your safety stock even if you write values in those fields.
    Forward and backward consumption comes into picture when you want to set the system how SOs should consume PIRs.
    So, I do not think you fully described your original situation since merely setting forwar/backward consumption periods to zero cannot solve this issue as per my best knowledge. I've tested the same and those fields have no effect on how MRP considers safety stock.
    BR
    Csaba

  • MRP for imported material

    hi
    i am THENNARASU, PP consultant.  in our case client is impoting some raw material that  is very costlier and lead time also high ( 90days). for that type of material how to plan, whether we can use MRP... i need some clarification

    Hi Thennarasu,
    The business process should be decided first, SAP is just a tool to support it.
    The use of MRP doesn't depend on the lead time or on the value of the goods.
    Generally, high stock levels are not desired for goods of high value - e.g. JIT was invented to solve that problem (other question is that JIT process places a burden on the supplier...).
    Because your lead time is very long some safety stock should be kept from that material even though the value is high...
    Sometimes, customers force their suppliers to keep stock at their location that is owned by the supplier. The supplier have to keep the stock between certain (dynamic or statics) stock levels. This is the combination of consignment and VMI - that might be unfair since the supplier have additional costs.
    Safety stoc can also be kept at the cost of the customer.
    Sometimes, the supplier builds a samll plant near the customer and this way, relocating its production (or part of it), tries to solve this kind of situation.
    In my opinion, you should consider the use of some kind of safety stock, since the long leadtime might jeopirdize the production if something goes wrong.
    But of course, w/o knowing anything about your business process these are just general ideas.
    Regards,
    Csaba
    Edited by: Csaba Szommer on Nov 13, 2008 2:27 PM
    Edited by: Csaba Szommer on Nov 13, 2008 2:27 PM

Maybe you are looking for

  • Multiple Heading in ALV Grid

    Hello , I have a requirement to display Multiple heading in ALV Grid, I am using the Class 'cl_gui_alv_grid'. please let me know if you have Any suggestions. Ex: |                 Divison                     |      Sub D:1 Sub D: 2 Sub D: 3     Like

  • Log & Transfer

    I am having trouble with log and transfer. the camera I use is a Cannon HF10. When I log & Transfer all my clips appear in the log screen, but when I transfer to que I get an ! in a red box and the clip won't transfer.Never had this before. Can someo

  • Business Objects XI 3.0 connecting to domains from different forest

    Hi All, Does anyone know if BOE XI 3.0 support AD authenication with multiple AD domains which reside in different forrests? I found other post which mention we are now supporting it in XI 3.0 SP1 but I couldn't find any document on it. Thanks, Bobby

  • BI Content Browser - Infocube 0BCTCBC01 obsolete?

    Hi, I wanted to get an overview of object relationships with BI Content Browser. In the BI Content documentation, there is an infocube for this 0BCTCBC01. However, when I try to activate this, the following description is written for the InfoCube : "

  • Problem changing Document Type in tx. COMM_PCAT_ADM

    Hi experts, In tx. COMM_PCAT_ADM, in a catalog area, i double click on Item overview, then i click on Item Documents from Item Details. There I can see all the folders with their images in case they have any. I have to change the document type in the