MRP Generating Purchase Reqs for Materials Needed in 2013

Hi, all.  We're running MRP and it's generating a massive amount of purchase requisitions (18,310 to be exact).
The following is a typical part setup:
Lot size = EX
Planned delivery time = 5 days
GR processing time = 2 days
Individual/collective requirements = 1
MRP profile = BTO
We have one existing sales order with a delivery date in 2014.
With a lead time of roughly a week, why is MRP generating purchase requisitions out into 2013 for this material??
Thanks!
Sarah

Sarah,
MRP Profile doesn't mean much to us, they are all created individually during each implementation, and they are all different.  However, I will guess that BTO is some type of Make-to-order profile.
You mention 18K of PRs.  Are these all being created in a single run, or is it possible that they may have been accumulating for a while?   To find out, run MRP, but using the parameter for Planning mode 'Delete and Recreate planning data'.  It will delete all the unfirmed PRs and then regenerate new ones based on the current situation.  I will assume for the moment that all these 'future' PRs are unfirmed, please let me know if they are not.
Since it appears to be a MTO environment (if not, let me know) then you should be able to see in the planning segment which requirement (sales order) is driving the purchase reqs.  Depending on your MRP type, this could give you understanding of why MRP is proposing so many PRs.
One thing that will generate a large number of purch reqs is an unrealistic value in Maximum Lot size (MRP1 page of material master).  For instance, for a requirement of 1000 widgets, and a max lot size of , say, 2, it would generate 500 PRs for 2 widgets each.
If my suggestions don't help you, please specify MRP Type, Lot Size, max lot size, rounding value, Safety stock, reorder point, Strategy group,   From these values we can begin to understand your problem a little better.
Rgds,
DB49

Similar Messages

  • Purchase req. for activity/element  cannot be generated

    Hi:
    I want to creat a new external activity,but the Purchase req. for activity/element cannot be generated. The Messagr No. is CN705.
    I checked the network activity,I fount that the"Reservation/ Purchase Requisition" be setted option 2 ( From Release). I want this should be with option 3 (immediately).
    I have checked network profile , the option 3 (immediately) is setted.
    Is there any other place where we set this setting. Please share your valuable opinion.
    Best Regards.

    Hi,
    If it is appearing in display mode only (It must be made to "display" only in SPRO at Field settings for Network) then it is not possible for the users to change it in the operative project. If you have made the changes in the Network profile for Pur.reqn. after the Project / NWA is created and released then  create a fresh  Network /activity and check.
    Regards,
    Bala.

  • Problem in MRP generated purchase requisition.

    Hi Friends,
    We have run MRP via MD02 transaction for one material.
    MRP generated purchase requisition created.
    In that MRP generated purchase requisition, under item level in the status tab we are getting below field values is like below.
    Processing status : No edited
    Block ID: Blocked by requester.
    Due to above values we are not able to convert this MRP PR to PO.
    Could you please let us know is there any master setting is cause of this?
    Thanks in advance.
    Regards
    Jegen Mohan

    Hi Friends,
    After debugging MRP programme, we came to know that there is BADI implemented to block the MRP PR's intially and then z programme called for adding secondary materials/services to that MRP PR's.
    After addition of secondary materials/services to MRP PR's,  Status will be unblock automatically then save the PR.
    This is my client specific scenario.
    Thanks & Regards
    Mohan.

  • MRP - Single Purchase requisition for multiple Items

    Hi
    We have recently introduced MRP module in SAP .In some specific scaeanrios , we want to create a single Purchase Requisition for multiple items .Standard SAP generate different Purchase requisition for each item
    Is there any way out

    Sandeep,
    This topic has been covered numerous times in this forum and in the MM forum.  You evidently have not used the search feature.  There are thousands of posts in these forums, and the search function will be very helpful for you in future questions.
    To answer your question, No, nothing is available to make standard SAP MRP create Purchase requisitions for multiple items.
    Most companies address this issue during the conversion of Purchase Requisitions to Purchase orders.  During this process, you can add many items to a single purchase order.
    Rgds,
    DB49

  • Document type selection for MRP generated Purchase Requisition

    Hi,
    when I  run MRP ,for externlal procurement items system is creating Purchase Requisition with Document type NB.How to make system to take different Document type automatically with MRP.
    Thanks and Regards
    Raghavendra Pai

    Dear,
    Go to SPRO-Materials Management--Purchasing Purchase RequisitionDefine Document types
    Copy the NB and create and New Document type
    You can default the document type from the MRP group.
    Customizing is done in OPPZ transaction.
    Once you have entered the MRP group to your material master MRP view, then next MRP run will create the requistions using the document types maintained to the MRP group.
    Please refer the OSS Notes- 46919 and this thread,
    Purchase req doc type in MRP
    Regards,
    R.Brahmankar

  • Document type for MRP generated Purchase Requisition selection

    Hi,
    when I  run MRP ,for externlal procurement items system is creating Purchase Requisition with Document type NB.How to make system to take different Document type automatically with MRP.
    Thanks and Regards
    Raghavendra Pai

    Dear,
    Follow below steps to fullfill your requirements:
    1) Go to Tcode OMDT.
    2) Click on MRP group
    3) In front of your plant  maintain your  doc.type purchase requisitions for standard purchase ord which you want to generate at the time of MRP --PR generation.
    4) Go to Tcode MM02---maintain MRP group  same as above parameter in MRP-1 view .
    Now run MRP..it will pick the defaulted Document type for PR generation via MRP.
    Regards
    Utsav

  • Purchase req. for STO -in Third Party Sales order .

    Hi gurus,
    Is it possible if i create a sales order a purchase requisition should be genarated. the normal third party PR we can not convert in to STO and   account assignment  catagory "M" is coming in PR but  in case  of STO Pur req. that is not require.
    So is it possible ? if yes can any one plz tell me.
    Rajendra

    hi
    charlie
    this purchase req genarartion will be controlled by Schedule line catagory so
    I am trying to copy Sceduline catatogory CS as ZS in this i want item category as ' 7' ( Stock transfer) and pur req as "UB" but it is giving error as
    "Entry B UB does not exist in T161 (check entry)"
    Rajendra

  • Need to generate a CSR for a new Lync 2013 Edge server

    I am upgrading my Lync 2010 Edge to 2013. Part of the process is exporting all the certificates on the 2010, some public, and eventually importing them into my 2013 Edge. I have a problem with one certificate that was generated by our internal CA for the
    2010 server itself named servername.domain.local. Since my new Edge will be renamed to the same name as the old Edge, I was planning on exporting this certificate but the private key can't be exported. The option is grayed out.
    I need to therefore figure out how to get a certificate on my new Edge. No Lync software has been installed yet. What is the best way to generate a CSR so I can manually create a certificate on my internal CA. Since I don't have access to the internal CA
    from the DMZ, I need to do it this way. I am thinking maybe the MMC but maybe Windows PowerShell? Once I get the CSR generated, I will figure out how to create a certificate on my internal CA.
    I know I can do it during the Lync install but I wanted to have it ready on the server when installing.

    The option is most likely grayed out, because the private key was not marked as exportable.
    Now, you can either request the certificate by using the Deployment Tool and requesting the certificates, selecting offline and then manually copying the CSR to your Internal CA (and the certificate back)
    Or you can use Powershell and do a Request-CsCertificate (see here: http://technet.microsoft.com/en-us/library/gg425723.aspx)
    Try something like this: Request-CsCertificate -New -Type Internal -ComputerFqdn "lyncedge.domain.com" -FriendlyName "Internal Edge"
    -Template jcila -PrivateKeyExportable $True -DomainName "edge.domain.com" -Output C:\path\test.req​
    If this helped you please click "Vote As Helpful" if it answered your question please click "Mark As Answer"
    Georg Thomas | Lync MVP
    Blog www.lynced.com.au | Twitter
    @georgathomas
    Lync Edge Port Check (Beta)
    This forum post is my own opinion and does not necessarily reflect the opinion or view of Microsoft, its employees, or other MVPs.

  • Generating Purchase Req. / Purchase Ord. from Maintenance Notification

    Hi all,
    Is there any way we can create a purchase requisition(PR) or purchase order(PO) from a Maintenance Notification? I know we can create PR/PO from Maintenance Order but our client doesn't want to take that route.
    To add more info, the piece of equipment for which the notification will be raised, is created with a link to a material in MM (Serial Data tab in equipment master). We also have a vendor partner attached to the equipment as well as notification. We need to generate PR/PO from the maintenance notification which is raised for this piece of equipment.
    Any help / pointers / suggestions are welcome.

    Thanks Pete
    Is there one, or many PRs to a single notification
    There needs to be only one PR for a single notification. The notification pertains to only one piece of equipment, and once the PR -> PO -> GR cycle is completed, the notification will be closed. Next time, if the equipment fails, a new maintenance notification will be created. So, yes, there will be only one PR for a maintenance notification.
    How will you handle missing data e.g. vendor, material, etc
    The material no. for that particular piece of equipment is maintained in the equipment master (material field in the Serial number view). Also, we maintain vendor number under partners for the equipment master data. We should be able to use these while creating PR from notification. At least that's what is our initial thought. Please correct me on this.
    What will be the account assignment for the PR
    I'm not sure about this one though, I'll confirm with the MM consultant and update this reply.
    Will the notification user-status be update on PO creation, GR, IR, etc
    Yes, thanks for bringing this up. The client intends to use this functionality to check the availability of the equipment. So, not only the notification's user status should update based on PO status, but also the piece of equipment's user status should also get updated when the notification is closed and the piece of equipment is available.
    Will the notification be referenced in the PR/PO
    Not exactly, but there should be a report available which will list all the PRs / POs raised for maintenance of a particular piece of equipment. So, if notification is linked to PR/PO, we may  be able to generate this report easily. Again, correct me if I'm wrong on this.
    Do you want to limit who can create the PRs
    Well, if we are talking about auto-creation from notification, then only the person releasing the Notification will be able to generate PR indirectly. If it is manual creation, then yes, we will need to restrict this authority to limited people.
    Please let me know if these responses help you understand my requirement and give any other possible solution.

  • Purchase Req For STO -In Third Party Scenario

    Hi gurus,
    Is it possible if i create a sales order a purchase requisition should be genarated. the normal third party PR we can not convert in to STO and account assignment catagory "M" is coming in PR but in case of STO Pur req. that is not require.
    So is it possible ? if yes can any one plz tell me.
    Rajendra

    Hi
    Use the following user exit to pass your required account assignment category to purchase requisition at the time of sales order creation.
    USEREXIT_MOVE_FIELD_TO_ME_REQ (include MV45AFZB)
    With this user exit you can include additional fields for the following fields:
    o     EBAN (purchase requisition)
    o     EBKN (purchase requisition-account assignment)

  • MRP planning Purchase REQ per fixed lot size

    Folks,
    I have materials which have MRP type PD with fixed lot size of 20 pieces. Safety stock = 200 pieces. MRP run results in 10 preqs of 20 pieces each. I would like to have 1 Preq of 200 pieces. How can this be achieved?
    Regards,
    MdZ

    Hi,
    This is because of Lot size "FX" you maintained as 20.
    For FX lot size system will divide the total qty as per the fixed lot qty & throw that much of PR for that stock.
    So Safety stock = 200, FX =20 so PR will be 200/20 = 10 PRs
    If you want 1 PR for your safety stock, then change the Lot size to "EX" then system will throw 1 PR for 200 qty as per your Safety stock
    rgds
    gsc

  • Purchasing Rig for CS4 Need advice for GPU and RAM

    I am a purchaser that has been assigned the task of buying a new machine to run Premier Pro (CS4 suite was purchased).
    I will be buying a HP xw9400 but require a graphics card. What line of cards will Preimer take advantage of?
    Does Premier need a great graphics card?
    Will 4gb of ram be enough?

    I hear you loud and clear! Anyone eager to snap up those old Pinnacle cards rusting away in my basement?
    This is not benchmarked but a review of an HP xw6600 by Videomaker Magazine claims "and we could render a clip for YouTube (as H.264) in about double real time." Without the CX but with a pair of Xeon E5450's. Whereas the CX promises real time rendering.
    I work with HDV and I think I will possibly look at CS4 with a $400 nVidia Quadro FX and native (CS4) video acceleration. And live with whatever performance I get.
    CS3 encoding to MPEG2-DVD with four cores versus 8 cores on my system with my new PPBM3 benchmark is disappointing. The reason is that my testing has shown that for a good disk configuration with my 8-core system running at standard speed the MPEG2-DVD encode time is 75 seconds, disabling 4 cores the processing time only goes to 80 seconds in my I hear you loud and clear! Anyone eager to snap up those old Pinnacle cards rusting away in my basement?
    This is not benchmarked but a review of an HP xw6600 by Videomaker Magazine claims "and we could render a clip for YouTube (as H.264) in about double real time." Without the CX but with a pair of Xeon E5450's. Whereas the CX promises real time rendering.
    I work with HDV and I think I will possibly look at CS4 with a $400 nVidia Quadro FX and native (CS4) video acceleration. And live with whatever performance I get.
    CS3 encoding to MPEG2-DVD with four cores versus 8 cores on my system with my new PPBM3 benchmark is disappointing. The reason is that my testing has shown that for a good disk configuration with my 8-core system running at standard speed the MPEG2-DVD encode time is 75 seconds, disabling 4 cores the processing time only goes to 80 seconds
    Premiere Pro PPBM+v3 unpublished data
    . Let us all hope that things Improve in CS4!

  • Purchase Req for third party items on SO-where are required fields defined?

    I have that issue where when a third party item is entered on a sales order, it goes on credit hold and when you release it, it tries to create a purch req but can't because of the required field - Val Price is not automatically filled in. I thought I could make the field not required by going to config and under purch
    requistion>Define Screen layout at Doc level and changed the price and
    unit option to optional instead of required but it still treats it like
    a required entry. That config change only affected that field if creating a purch req from scratch, didn't affect if creating one from sales order third party item.
    Thanks for any input!

    Hi Mike,
    Please contact to sd consultant regarding that.
    Regards,
    Anil

  • Req for moderators: Need FTP write access to websp...

    My step-father has a website hosted at http://www.btinternet.com/~philip.martin8/ A few days ago, I FTPed into the webspace to make some changes. I uploaded the new files and the old ones got over-written, but the new ones did not get uploaded. Going to the website now just shows an empty directory listing.
    Could a moderator possibly give his FTP account (philip.martin8) write access to that directory? The website is used for our family business, so it's quite important to us.
    Thanks very much.

    maryrosecook wrote:
    My step-father has a website hosted at http://www.btinternet.com/~philip.martin8/ A few days ago, I FTPed into the webspace to make some changes. I uploaded the new files and the old ones got over-written, but the new ones did not get uploaded. Going to the website now just shows an empty directory listing.
    Could a moderator possibly give his FTP account (philip.martin8) write access to that directory? The website is used for our family business, so it's quite important to us.
    Thanks very much.
    Hi. Welcome to the forums.
    May I ask if your step father is still a BTinternet user ? The usual reason files get removed from the website when uploading is due to the account being a "basic" only one, after say a person has ceased their service.
    A basic only account has no webspace allowance, however if the account was previously a "normal" one, then that's why it had space. If the webspace was untouched, it would still function - however any changes, as you've seen, will delete them.
    You can check is the account is a basic only one by going to my shortcuts options 12b, and logging in using your step father's email address as the Yahoo! ID and the associated password. Look under Product to see what it says.
    http://www.andyweb.co.uk/shortcuts
    http://www.andyweb.co.uk/pictures

  • Purchase Req. Document type during MRP Run

    Dear All,
    My reqmt. is that whenever I take MRP run of external procured items, System should generate Purchase
    Req. for a particular Document type let say ZPE.as I want to control the no. range.
    One thing I fopund was control through OPPR(MRP Group Settings).I have assigned the relevant MRP gp. to materials also,but still after MRP run,system picks up std.(NB) Doc. type for Purchase Req.
    Kindly advise whether Iam missing some settings.

    if you want sytem to create our own type, u can create assigning MRP Group for your material.
    Goto OPPR , Assign your PR Docuemnt type in under "stnd pur order" coloum in External Procurement option in OPPR for your plant/MRP group Combination.
    i hope u already  have created ZPE Pur requsition   doc type
    Regards
    pradeep

Maybe you are looking for

  • Cannot install InDesign on my MAC book pro

    New to Mac, so when I put in the cd, the Adobe folder appearson my desktop, I click on it and select install Adobe InDesign, it opens FTP Client Ultimate to install and of course says cannot install, wrong program.. So I tell it to use Automator, it

  • Using Main-Class attribute in a MNF

    What filepath do you specify to get it to read the .class file? I keep getting NoClassDefExceptions. I am not adding .class to the end of the file in the Manifest, so it's not that.

  • One step procedure for STO without delivery

    Hi, I need a help. I've configured the STO one step procedure (document type, supplying plant and receiving plant) but it does not working. When i use movement type 351 it does not automatically transfer the stock to the receiving plant. Could anyone

  • I have no "File - Edit - History - Bookmarks tool bar at the top of my screen and can't figure out how to get it!

    new desktop, new user of Windows 7. Made Firefox my browser as always, with Yahoo as my home page. There is no tool bar at the top of my screen that says "File - Edit -- History __ etc the way I have always had! I can't figure out how to get this, an

  • Embedde SQL Examples

    Hello, i installed the 11.1 Database for 32 bit windows on my system. I want to use the embedded sql interface. I am missing the examples for visual Studio, the description in the documentation is for the old Studio (6.0) and i am not getting it to w