Hi,
   We are running SRM 4.0 in an Extended Classic with R/3 5.0. We are having some MRP requesitions created from R/3 that came into SRM and the reviewer wanted to cancel the req's in SRM for some reason. So the req's are flaged as complete. But the completed req's are not getting cancelled in R/3. It used to work before but we recently did an SP12 upgrade to our SRM 4.0.
Can any body through some light?
Thanks
Kris

Hi ,
Thanks 4  ur replay,i have maintained Site attributes,please give me detail of site attributes like which attributes should i maintain ?please give me descriptive answer.

Similar Messages

  • Issue on Number Range for MRP Purchase Requisition

    Hi Gurus,
    Please help me on the issue explained below.
    We are already using SAP ECC 6.0 and SRM 5.0 and now we are implementing Plant Maintenance Module.As a result of this implementation ,we have created number of PR document types and assigned to unique number ranges in ECC. One of these document types has been maintained for MRP group for a material type in order to identify the MRP purchase requisitions created on the shortage of the materials for these material types.
    This functionality is working fine. MRP run for the materials is picking the appropriate PR document but number range of the document is not the same what was assigned to the linked document type.Some other number series is getting picked by system .
    There is setting under SPRO Consumption Based PlanningNumber RangesPurchase Requisitions
    Here, number range assignment is against plant. This is the same number range which is being taken by system on running MRP. But the desired number range is the one which has been linked to PR document type.
    If I change the number range above then number range for MRP PR in present system will get affected..
    Can you please advise me on above so that PR generated on MRP run should have appropriate number range?
    Thanks & Regards,
    Niti

    Hi,
    As per my understanding, what you have mentioned above is exactly the way SAP is designed. Its SAP Standard behaviour.
    But if you check your PR document type - no:range & the CBP no:range both will be same only since both refers to the same object.
    Please check the PR document type that you have assigned in the CBP & its no:ranges.
    Thanks & Regards,
    Ram

  • Is there a way to identify MRP requisitions transfered to SRM?

    Hello experts,
    We are using SRM 5.0 connected to an ECC 6.0 backend system, using ECS scenario.
    I have the following question:
    Is there a way to identify in SRM requisitions transtered from ECC that are created in R3 from an MRP process? Meaning like an indicator or a flag in a table in SRM?
    Thanks!
    Regards,
    Gilberto Gallardo

    Hi
    <u>Please go through the SAP OSS Notes below as well -></u>
    Note 451245 Framework conditions connection MRP <-> EBP
    Note 505030 Restrictions for the integration of external requirements
    Note 441892 Integrating external requirements
    Note 831348 Source List for Stock requirments and MRP list -wong results
    Note 528808 Incorrect item numbers during the update (add items)
    Note 540339 Purchase requisitions are transferred incorrectly
    Note 534419 Transfer of purchase requisitions into the procuremnt system
    Note 532293 Fulfillment: incorrect quantity for activities and limits
    Note 447516 Composite SAP note PlugIn Correction for External Requiremts
    Hope this will help.
    Regards
    - Atul

  • Hello, sent me the email canceling my account creative cloud, and I did not cancel the account, I do not understand the reason for the cancellation was because term option than 1 year and not yet completed.

    Hello, sent me the email canceling my account creative cloud, and I did not cancel the account, I do not understand the reason for the cancellation was because term option than 1 year and not yet completed.

    There is payment related issue, I have send you a personal message, please respond as requested.
    I shall raise a request to the digital river store from where it was purchased.
    I am from the Customer care Team.
    Regards
    Rajshree

  • I am creating Contractor request Requisition in iProcurement and it is completed approved still not viewable in Sourcing super user to create RFQ what is missing?

    I am creating Contractor request Requisition in iProcurement and it is completed approved still not viewable in Sourcing super user to create RFQ what is missing?
    is there any profile or set up i am missing?

    Thanks for quick reply
    Yes,
    But client do not want it to open through demand workbench
    instead contractor request requisition  should open in Sourcing super user and i should able to open through  document builder to make New RFQ
    Yogita

  • HI. I HAVE ALREADY MEMEBRSHIP for one app in creative cloud. I want to upgrade it to be complete membership . first I could not cancel my old one . second i pay for the second one, third i could not download the indesign cc ( which i need right now becaus

    HI. I HAVE ALREADY MEMEBRSHIP for one app in creative cloud. I want to upgrade it to be complete membership . first I could not cancel my old one . second i pay for the second one, third i could not download the indesign cc ( which i need right now because they ask for serial number) . I have already cs6 products. is that technical problem in adobe or what ?

    Log out of your Cloud account... Restart your computer... Log in to your paid Cloud account
    -Sign in help http://helpx.adobe.com/x-productkb/policy-pricing/account-password-sign-faq.html
    Cancel http://helpx.adobe.com/x-productkb/policy-pricing/return-cancel-or-change-order.html
    -or by telephone http://helpx.adobe.com/x-productkb/global/phone-support-orders.html
    Ask for serial number http://forums.adobe.com/thread/1234635 has a FAQ link

  • Open quantity remains open even when delivery and goods issue is completed

    Hi gurus,
    We have so many deliveries in system where open quantity  in outbound delivery document  shows the quantity as open even though the goods issue is completed and invoice has been created and accounting documents are also cleared.
    I am not getting why it is happening. can someone please advise or throw some light on this.
    Vice versa they are showing up in MRP run as requirements.
    Thanks in advance gurus,
    Kind regards,
    Gopio.

    Hi Amol,
    I think i got the correct one which is RVV05IVB, and i had selected the shipping due date index, but it did not clear the open quantity, still it remained as open quantity.
    And the message i got after running the report is pasted below.
    Reorganization of SD Document Indices
    Reorganization sales document indexes with the following selection criteria:
    I EQ 80015593
    Delivery due Index
    How does that open quantity gets updated, or is there any control that we can deactivate as these are showing up in MD04 as sales requirements.
    Thanks,
    Regards,
    Gopio.

  • I have installed the agent 10 or 15 times and one installation hasfailed, no error appeared during the installation but I am havinginconsistent issues with my ethernet card not working here and there. Werebooted and can log into Novell client but th

    I have installed the agent 10 or 15 times and one installation has failed, no error appeared during the installation but I am having inconsistent issues with my ethernet card not working here and there. We rebooted and can log into Novell client but the login prompt did not appear for ESM client or the icon was not in the systray. Everything seems to work, besides at times (a couple times today) it terminates his ethernet card/connection. I would re-image his computer but he has several applications and it would take several hours, so I am hoping someone has an idea to fix this issue. So I was trying to figure out why he did not get the prompt to login and why it's not in the systray and it appears to not have completed the install? I checked the add/remove programs, its not listed within their, I also checked the registry and found nothing for endpoint within their, but the files are within c:\program files\novell\zenworks endpoint security.
    I have also tried uninstalling it but that fails due to it "not being installed", and it will not reinstall over itself either.
    I did notice that stuninstdrv.exe is running in task manager. Any help would be great...
    Windows xp sp3
    ESM 3.5.154
    Thanks,
    Andy

    If you are searching the registry, check for the "Senforce" string. It should be at HKLM\Software\Senforce
    Try running the install program for the ZSC with the following command line:
    setup.exe /V"STUNINSTALL=1"
    If you've specified an uninstall password, try this one instead:
    setup.exe /V"STUNINSTALL=1 STUIP=password"" (please note the double quote at the end)
    Let me know if that helped you.
    Daniel
    >>>
    From: Andy_DeWees<[email protected] du>
    To:novell.support.zenworks.endpoint-security-management
    Date: 2/5/2009 12:52 PM
    Subject: I have installed the agent 10 or 15 times and one installation hasfailed, no error appeared during the installation but I am havinginconsistent issues with my ethernet card not working here and there. Werebooted and can log into Novell client but the login prompt did not appearfor ESM client or the icon was not in the systray. Everything seems towork, besides at times (a couple times today) it terminates his ethernetcard/connection. I would re-image his computer but he has severalapplications and
    I have installed the agent 10 or 15 times and one installation has failed, no error appeared during the installation but I am having inconsistent issues with my ethernet card not working here and there. We rebooted and can log into Novell client but the login prompt did not appear for ESM client or the icon was not in the systray. Everything seems to work, besides at times (a couple times today) it terminates his ethernet card/connection. I would re-image his computer but he has several applications and it would take several hours, so I am hoping someone has an idea to fix this issue. So I was trying to figure out why he did not get the prompt to login and why it's not in the systray and it appears to not have completed the install? I checked the add/remove programs, its not listed within their, I also checked the registry and found nothing for endpoint within their, but the files are within c:\program files\novell\zenworks endpoint security.
    I have also tried uninstalling it but that fails due to it "not being installed", and it will not reinstall over itself either.
    I did notice that stuninstdrv.exe is running in task manager. Any help would be great...
    Windows xp sp3
    ESM 3.5.154
    Thanks,
    Andy

  • Java.io.IOException: A complete message could not be read on socket

    Hell All , Am gettign this issue very frequently .. From my googling i see that this can be because weblgic server was not able to do an IO operation because of time out or may be because of Net work issue ..
              I would like to know how this can be fixed
              java.io.IOException: A complete message could not be read on socket: 'weblogic.servlet.internal.MuxableSocketHTTP@a7f309 - idle timeout: '30000' ms, socket timeout: '5000' ms', in the configured timeout period of '60' secs

    Hi All,
    Has anyone got any further information on this problem? I have several instances of the message
    ###<Dec 13, 2005 2:29:40 PM GMT> <Error> <socket> <finland> <serviceview> <ExecuteThread: '12' for queue: 'default'> <kernel identity> <> <000424> <I
    OException on socket: weblogic.socket.MuxableSocketDiscriminator@4a4b21 - number of bytes read: '0', buffer: 'null', fd: 23
    java.net.SocketException: Connection refused: Connection refused>
    java.net.SocketException: Connection refused: Connection refused
    at java.net.SocketInputStream.socketRead(Native Method)
    at java.net.SocketInputStream.read(Unknown Source)
    at weblogic.socket.PosixSocketMuxer.readBytesProblem(PosixSocketMuxer.java:898)
    at weblogic.socket.PosixSocketMuxer.deliverGoodNews(PosixSocketMuxer.java:782)
    at weblogic.socket.PosixSocketMuxer.processSockets(PosixSocketMuxer.java:708)
    at weblogic.socket.SocketReaderRequest.execute(SocketReaderRequest.java:23)
    at weblogic.kernel.ExecuteThread.execute(ExecuteThread.java:234)
    at weblogic.kernel.ExecuteThread.run(ExecuteThread.java:210)
    In my wl-domain.log. I have no idea how to solve this? I am running WebLogic 7 SP4 on HP-UX 11.11 with JDK 1.3.1.09.
    I note that the release notes for WL7 SP 6 release notes mention MuxableSocketDiscriminator. See link http://e-docs.bea.com/wls/docs70/notes/resolved2.html Is this the problem? Anyone else come accross this and solve it?
    Best Regards,
    Kevin.
    Any help much appreciated. Best Regards, Kevin.

  • COMPLETE BUTTON is not visible in OSA-HIGHER MANAGER WORKFLOW

    Hi
    Its pertaining to OSA, we have two level of appraisal Approval system. Employee-Manager and Higher Manager.
    The problem is when we send the Appraisal Document to Higher manager for completion of Document, the Complete button doesnt appear in BSP, but when i check the in URL that is being generated after the manager has CLOSED PART APPRAISAL in workflow inbox has COMPLETE button, i copied URL and generated the page but the COMPLETE button here is in Display mode. I am not able to close the document.
    I am not able to see the same button in PHAP_ADMIN too.
    The same thing working when i tested earlier, but now its not working.
    Please help.
    Thanks n regards
    Aadi

    Hi Aaditya,
    Goto transaction PHAP_CATALOG. Select the templtae for which you have created the document. Goto the tab "status flow" and check the button in the "in process" stage. if the complete button is not there then it will not reflect in the document.
    Choose the button as Complete and create again. The templte status has to be changed to cancel release. So delete the document to change the status.
    Hope this helps you.
    Regards,
    Subbu.

  • Link a MRP Purchase Requisition to a  Purchase Requisition Workflow

    Hello Gurus,
    I have a Purchase Requisition Workflow  already created.
    I want to create a MRP purchase requisition that start my workflow.
    How can I do that?
    Thanks in advance,

    Hello Charlie.
    Our release strategy hasn't classification. When we I create a MRP purchase requesition, the release stratagy is already assigned to that. however the worklow is not started.
    thanks

  • A User facing a issue of "Collaboration Folder is not created"

    Dear All,
    A user facing an issue of collaboration folder is not created even through they have created in the SRM Potal.
    Can anybody put some light on the issue as soon as possible.
    Thanks,
    Pranav

    Hi
    Please refer below URL.
    cFolder settings in SRM
    Thanks
    Karitkeya

  • Purchase Requisition Release strategy for MRP based Requisition

    Hello Gurus
    We want to set up the urchase Requisition Release strategy for MRP based Requisition ..Any can one Please share your experience about the impact down the road?
    Thanks
    Nick

    Hi,
    If you want include the MRP related PR in Release strategy.
    You need to include the field CEBANESTKZ-Creation Indicator (Purchase Requisition/Schedule Lines) in one of the characteristics which you create and include the characteristics value as per the field values like AReal time, BMRP, CConverted Planned order etc.. and include the charactristic in the Release Strategy will release group & release codes.
    So when ever the PR is created through MRP run then this creation indicator will update in the PR as per that release Strategy will trigger in the PR.
    there is one more option you need to create the separate document type as MRP PR then create document type as characteristics and include the values of all these document types and include in Release strategy.
    But it will  not pop up for direct PR from MRP run only trigger when planned order is converted to PR manually there you need to select this MRP document type then release strategy will trigger.
    I think first one is best suited.
    rgds
    Chidanand

  • Can NOT cancel/Reverse GI with a date before the actual GI date

    Hi
    can NOT cancel/Reverse GI with a date before the actual GI date, if i do the PGI in wrong date, then how should i do?
    thanks

    >
    jo jo wrote:
    > Hi
    >
    > can NOT cancel/Reverse GI with a date before the actual GI date, if i do the PGI in wrong date, then how should i do?
    > thanks
    Hi Jo Jo,
    I am not sure if i understand your problem correctly.
    As far as my understanding goes you are trying to reverse a GI on a date before Actual goods issue date.
    If you have PGId on a date before planned GI date the system will update that date into Actual GI date and not planned GI Date.
    For example if you planned GI date was 1st April 2008 and you did PGI on 28th April 2008 Actual GI date will become 28th April 2008.
    So if you try to reverse PGI before 28th April you wont be allowed to as you cannot reverse a goods issue that has not happened.
    Hope it helps.
    Post furthur if i had misunderstood your problem.
    Regards
    Abhishek

  • Issue with -ve safety stock not allowing items of smaller demand to be isue

    We have a material with  a safety stock value of 300 with only 119 available in inventory.  Looking at MD04 the available qty immediately goes negative (-181). We have requirement of 30 but was prevented by the system from ussing the material - no iventory available message.  The workaround, which is not acceptable, was to reduice the safety stock to zero, create the delivery and then re-instate the safety stock level back to 300.
    So the issue is that  material could not be issued to PrdOrds.  Is there a possibilty that we have some missing config / master data settings that are preventing the issuing of material when safety stock is factored in and available quantity is less than zero?

    From planning perspective, there are two options available for your scenario.
    You may try if the dynamic safety stock works for you. You may have to configure the minimum, maximum  and target stock levels. The system calculates the average daily requirements of the material and determines the proposals.
    If your business process demands only static ss, you can configure the % share of ss that can be used for smaller requirements. Check the config node Production >> MRP >> Planning >> MRP calculation >> Stocks >> Define SS availability. This way the smaller requirements would be considered for use from SS by planning. You will have to define the % share of SS that can be used by planning based on MRP groups.
    Edited by: Arun.CBE on Feb 17, 2012 9:25 AM

Maybe you are looking for

  • Create Free Good item with Action profile assigned to item category

    Hi, I want to create a free good for an item in a CRM sales order only during a certain period with an action ie if the main item is entered in a sales order during a certain period, a sub-item which is different from the main item should be created

  • Pc suite 6.86.9.0 error no available connection t...

    when i want to get to the 2nd step in the get connected wizard, an error window pops up saying "There is no available connection type and therefore a connection to phone cannot be established." however i do have 4 usb ports that work fine with other

  • Unable to access the Firewall through ASDM

                       Hi All, Thanks in advance , in my organisatin we are facing one issue with launching of ASDM in ASA 5520 , when wer are trying to access the Firewall through ASDM we are unable to access that , see the java error loggs below , yes

  • What is correct format to pass Today as created date parameter

    I have created TFS data set (as drill through report) which is displaying all bugs based on created date. Now, I want to pass date range as parameter from main report so drill through report displays data for the bugs created between given date range

  • Pre-configure of AQ Adapter example

    Hi all, Could anyone tell me if it is possible to run AQ Adapter example in Oracle Lite? Would you like to give me some steps? (For example, modify "oc4j-ra.xml" and restart BPEL) Any reply are welcome and thank you very much. Roy