MRP list - components of subcontracting materials

Dear All,
Our practice is to deliver the components of F-Z3 materials to our subcontractors at once, independently from subcon. POs (all the components at once). So, we don't have stock of them at our plant (storage location) but at our suppliers.
This 'causes problems' when we use MD04 material list. F-Z3 components are marked with 'red', because F-Z3 material PldOrd-s generate requirements at our plant - there's no stock to cover them.
If these requirements were genereted at our subcontractors there would be no problem, because there's enough stock to cover them (the requirements).
How can this problem be handled? Which settings are necessary?
Thank you.

Hi Stephen,
Maybe my explanation wasn't clear enough, I'm trying to describe the problem more precisely.
The problem (if problem exists at all) is with the MRP list of components of F-Z3 materials (that are in the BOM of F-Z3 goods).
The MRP list of these components are 'devided' into two parts. One begins with 'Stock' and the other section begins with 'SubcSt'. The structure:
<b>Stock</b>
SubReq1
SubReq2
<b>SubcSt</b>
SubReq3
Generally, all of our components are in the WH of our suppliers, that's why 'SubcSt' is high, 'Stock' is near 0.
But MRP shows 'red light' because the purchase requisitions on F-Z3 level generate requirements like SuReq1 & SubReq2 - these are not covered (by 'Stock'~0).
But (if everything is OK) the stock level at suppliers ('SubcSt') is enough to cover all SubReq (123), but only SubReq generated by F-Z3 PO belong to this section.
So, MRP indicates a failure that doesn't exist (am I right?). How can we set SAP to consider the things described above?
Thanks for your help.
BR
Csaba

Similar Messages

  • Error msg in MRP list

    Hi SAP Guru's,
                 I am getting red light in MRP list (MD06) for my materials mentioning " For material 'X' 'A,0  day's supply is less than limiting value of 0,1-"
    what is wrong, what settings i need.
    Thanks & Regards,
    Karad D D

    IT<S  INDICATE SHORTAGE OF MATERIAL SUPPLY AS PER YOUR PRODUCTION REQUIRMENT.

  • Deleted materials shows in mrp list

    Hi,
    I have two requirement
    1. How can we remove all deleted materials from MRP list.
    The deleted material does not display in planning file entry.
    2. Is there any report to see the MRP LIST with Exception message (Not MD05,MD06, MD46)
    Please guide me
    Regards,
    Sanajy

    Hi,
    After you have marked a material for deletion you also need to take it out from planning (MRP type "ND").
    If a MRP list exists for such a material, you need to erase it specifically, since MRP will not do it automatically.
    Regards,
    Mario

  • How to ship back subcontracting materials from vendors to company .

    Hi
    Our client is delivering subcontracting materials  to vendors  using  ME2O transaction .
    She is asking me how can I  ship back materials  from vendors to company .
    Example :
    Shipped 236.C from  company  to vendor .
    Now we need to ship back 236.K from vendor  to  company .
    Could you  brief  me T codes to be used and entire process in step by step .
    Thanks In Advance

    hi jaya
    check whether these points will help you
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product.   In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    regards
    harish

  • Time stamp in MRP list after MRP Run

    Hi Gurus
    After running a MD01-MRP at scope of planning level, with processing key as NETCH, materials which had no planning file entry also were updated with the latest executed MRP run time stamp in MRP List MD05.
    Is it the standard behaviour? As per my understanding, the materials with no planning file relevant change is not included in the MRP run with processing key NETCH/NETPL. Then how does the time stamp be relevant for the latest MRP run while the material was never included in the mrp itself?
    Regards
    Deepak Prasanna S

    Dear Deepak,
    If my understanding is correct only if a mterial is included in the last MRP run(MD01/MDBT) then the time stamp gets included in the
    MRP list which can be checked and confirmed through MD05 and also the output of last MRP run.
    Once after the MRP run is completed the system deletes the corresponding planning file entries in the system.
    On completion of the planning run, the appropriate indicator is automatically deleted in the planning file:
    The system deletes the net change planning indicator and the net change planning horizon indicator for a regenerative planning
    run and a net change planning run.
    The system only deletes the net change planning horizon indicator for a net change planning run in the planning horizon.
    Check and revert back.
    Regards
    Mangalraj.S

  • Report RMMD07EX for collective MRP list

    Hi all
    I want to use the collective MRP list MD04 but by defining a range of plants and multiple MRP controllers at a time. SAP recommends using a report similar to RMMD07EX. This mimics MD07. Has anybody created a report for collective MRP list using MD04
    thanks

    How do you plan to switch from collective display to individual ? DO you plan to agregate some figures like stock for differents materials?
    Have you tried the LIS, with transactions like MCBZ? This is collective Stock/ Reqmts List !

  • MRP Date in MRP List

    Hello All,
    While accessing the MRP List (collective access MD06). There is a selection option for MRP Date. SAP Help tells that "Date: for example, all MRP lists that were created or processed within the last two weeks".
    But I could not understand what this means. Please clarify this.
    Regards
    Mahesh

    Hi
    It means that, the MRP list will be displayed only for those materials that were created in that time frame. There might be materials for which MRP is not run and processed within that time frame. they will not be displayed. This is one of the parameters for filtering the list.
    Hope this is clear and helpful. If so please reward
    Chandra

  • MRP Job not picking 'few materials'

    Hello,
    I am facing strange issue. We have been  running MRP daily job (since July09) for few MRP controllers.
    We have found that system is not selecting 'few materials'...
    One of the mateial ABC has not been selected since 29th Aug and other XYZ since 2nd of Sept...
    But User has converted the Planned order to PR on 2nd and 3rd Sept respectively....
    Whereas when I displays the results for MRP run (MD03)for these materials it does shows the PR.
    But MRP job does not picks these....
    Even I changed the 'processing indicator' 'ON' but it did not work.
    Please suggest any possible causes.
    kind regards,
    JPS

    Hello DB49,
    I did run MDAB then MDRE and then MRP run for MRP controller ;Material belongs to...
    But No results; MRP run did not pick the ABC material.
    Even I have set the 'display list' parameter during MRP run but it did not pick material in question....
    Any Idea, When I try to create planning file manually MD20.....
    And select any of the 'check box' it says "The material ABC has been marked for the MRP run"
    Please suggest...
    ======================MDAB=============================
    Number of set planning file entries:          0                              
    =======================MDRE===================
    Plng file entries for operational planning run:                       
    No. of deleted panning file entries:          0                                                                               
    Planning file entries for long-term planning:                                                                               
    Complete statistics:                                                  
    Plng file entries for operational planning run:                       
    No. of deleted or changed planning file entries:          0                                                                               
    Planning file entries for long-term planning:                         
    No. of deleted or changed planning file entries:          0                                                                               
    ==================MRP run for (MRP controller; Material belongs to)====================
    regards,
    JPS
    Edited by: Bhatti JPS on Sep 10, 2009 9:30 AM

  • Planning of subcontracting materials with scrap percentage

    Hi All,
    Need your help for below mention scenario,
    For planning, where my planning is start with subcontracting materials.
    To clarify more, strategy group is defined in subcontracting materials. Now when I entering Assembly scrap or Component scrap in material master or BOM, system is not considering this scrap percentage for planning.
    when i defining scrap percentage with procurement type, E (Inhouse Production) or X ( Both) system is considering scrap percentage. But for external like F or X with special procurement 30 (Subcontracting) its not considering the scrap percentage.
    Please suggest, how I can plan subcontracting materials with scrap percentage.
    Regards,
    Rajesh
    Edited by: Rajesh Sawant on Feb 18, 2009 4:54 AM

    Hi Jejesh,
    Thanx for reply.
    This scrap is required for subcontracting materials.
    Setting in material master,
    In MRP 1 and MRP 4 view- Define scrap as Assembly and Component scrap as per the requirement.
    Procurement key - F or X
    Special Procurement key - 30 (Subcontracting)
    Strategy group- 40 (Planning with final assy) in MRP 4 view.
    Bill of Material setting,
    Component scrap and Operation Scrap in Bill of material.
    Based on above master data, Plan Independent Requirement (PIR)  cration for above materials and MRP Run.
    Here after mrp run based on above setting, scrap percentage is not considered. Plz suggest the solution.
    Regds,
    Rajesh

  • Material determination for subcontracting materials

    Hi
    Where and how  material determination will happen for subcontracting materials ?
    thanks

    While creating the PO when you put the item category L it will search the BOM for the FG and its components, if BOM doesn't exists in the system for the FG then put the components in PO manually..
    To create the BOM for the FG go to T-code CS01 nad mantain the components for the FG  and save it  it will be copied to PO in ME21N in material tab by putting the item category L Subcontracing.
    You can do it in ME21N at item detail level in material tab...
    Here mantain the components  for the FG.
    Regards
    Sujoy
    Edited by: Sujoy on Apr 9, 2009 12:51 PM

  • How to see the unprocessed MRP list.

    Hi,
    We run the MRP through MDBT transaction. Then i don't know how many materials MRP run.
    From which transaction we can see the unprocessed MRP list.
    Pleas guide..

    Anil,
    I am not sure what you mean when you say 'Unprocessed MRP list'.
    MRP will usually produce a spoolfile.  The spoolfile contains a very high level statistics list, including a list, of materials planned, and what exception message groups they generated.
    SM37 > select your MRP job from the list of jobs (you can find the ones using programs RMMRP000 or RMMPS000).  Select the Spool icon. Select one of the displayed spoolfiles.  Display the spoolfile.
    If you wish to display all of the exception messages of the most recent run in detail, then you would normally use MD06.  Here you can elect to display only the exception message groups that are of interest to you.  From each detail item on the resulting list, you can branch to the appropriate MD05 screen.
    Rgds,
    DB49
    Edited by: Dogboy49 on Jun 1, 2010 9:58 AM

  • Image in item renderer issue for List Components

    Hello,
    I have an issue when I use an item renderer with an image in
    it. This happens when I do this with a List or TileList component
    that has enough items to create a scroll bar. What happens is the
    images load fine, then I scroll down and the other items and their
    images start appearing, but then the first and last images start
    loading the wrong image. I'll scroll back up and the first item now
    has a different image, and when I scroll back down, the last images
    changes too.
    Has anyone had this problem with image itemrenderers in List
    components?
    Thanks for any help.
    Brade

    The creationComplete event is called ONCE and that's it. But
    each time an itemRenderer is recycled it will have its data
    property reset with new a new record from the dataProvider. Thus
    overriding the set data function lets you inspect the data and do
    what you want with it.
    Data binding in MXML <mx:Image source="{data.image}" />
    is set up by the Flex compiler. When the data property is reset it
    will trigger the data binding notifications. The Flex
    compiler-generated code will intercept that and update the Image
    source property.
    If you use MXML, then use data binding. If you write your
    itemRenderer in ActionScript, override the set data
    function.

  • Report for MRP list(MD05/MD06)

    Hello,
    I am looking for a Report that can give me the details of the MRP list(MD05 or MD06).
    Basically I need the report to give me the following details.
    Material Number
    Material Description
    Date
    Opening Date
    Rec/Reqd qty
    MRP element
    If you see all these fields are coming from the MRP list(MD06)
    Is there a standard report or table that can give me this information.
    Let me know
    Thanks
    SAP Fans....

    Hi,
    Please check this link for the desired tables / structures:
    Re: Tables in MD04 list
    Regards,
    Csaba
    PS
    http://www.sap-topjobs.com/SAPTABLEREF%5B1%5D.doc
    Edited by: Csaba Szommer on Nov 17, 2008 5:07 PM

  • Report on MRP List

    Kindly suggest me if any standard report is available in which I can get the requirement of MRP ( Plant / Porg wise ) without considering the Open PO and stocks

    hi
    U can use MD04 or MD06  for reports on MRP list
    Vishal..

  • MRP list issue

    Hello,
    I am having issues when I run MD05 MRP list for a material. It gives me the below error.
    "No MRP list exists"
    This is a material just extended to a new plant with no stock. Is this issue because there is no stock for it and/or because its a newly extended material?
    Same material in a different plant does give me the MRP list view when I run MD05.
    let me know how it works.
    Thanks
    SAP Fans...

    Have you had an MRP run after the creation of this material?
    If not, then it is obvious that an old MRP run does not know anything about a material created after this event.