MRP Mix Ind for Pl. Strategy 40 & 70

Hi Gurus,
I'm working on a requirement in which some MTS products can flow in the following 2 ways:
1. Stand alone in SO that will consume PIRs.
2. Dep. req. (Product as child of configurable KMAT) in SO consume PIRs (thise PIRs are generated by LTP).
For that my understanding is that Ican use planning strategy 40 for point 1 and 70 for point 2. My doubt rather than if it would work is regarding MRP Mix indicator that has to be set as 1 for st. 70, but it will affect 40 (consumption). Is that correct? is there a way to use both strategies?
Thanks in advances.

Dear Christopher,
I have not understood your requirements completely,but in standard SAP PIR's generated for LTP/by
LTP will be for an inactive version,which will create simulated planned order's. These PIR's will remain in
the system which will not be consumed and the simulated planned order's cannot be
executed/converted to production order or process order.
Also in my understanding generally 2 planning strategy is combined where the product is produced in
both Make to Stock and Make to Order and in your case both these strategies 40 and 70 falls under
Make to Stock.
Check and come back with your further queries.
Regards
Mangalraj.S

Similar Messages

  • MRP exception handling for planning strategy 52

    Hi All,
            How to handing MRP exception in Mass? For example, header material having two sub assembly and 3 raw materials in it's BOM. As per planning strategy 52, we maintain PIR for finished part, if we run MRP planning will be generated with respect to Planned Independent Requirement(PIR). Now, the problem is the higher/upper level material planing date is lower than low level material, It means Semi finished material(SF2) planning date is for example ( 15 june 2014) at the same time another lower level semi finished material (SF1) planning date is (18 june 2014). In this case without completing SF1, we can't produce SF2 because SF1 is an component of SF2. In the same way, system will propose the planning info for all raw material/semi finished. How we will handle this exception in mass since we using more materials in shop floor.Hence, it's really hard to planner to adjust the planing date for each and every material wise. How to handle/adjust this MRP exception? How to make system to calculate dependent materials availability to calculate next level material's planning date (start,end)? We understand that we have to maintain proper master information like in-house production days, planned delivery date, Gr processing date etc., to get planning information. Apart from that how we handle or to get without this kind of exceptional message? Please suggest
    Thanks

    AKS,
    There is absolutely nothing wrong with having exception messages.  Expecting to be able to perform some mass transaction that will magically make all messages "go away" is unreasonable.  In any real life business, there will be new exception messages with every MRP run - sometimes thousands of them.
    These messages indicate that there is something the matter with the plan; but they don't really tell you what is the best way to fix the plan.  There may not be an easy way to fix this plan, it may actually require having your planners examine each PIR, trace down the BOM, and determine what is the best solution for that PIR.  Once you have decided what is wrong with your plan, then ask me what mass changes are available to fix THAT problem.
    Now, to your question.  If you want all the dates to line up, then allow dates in the past. Although this solution doesn't give you results that are any more realistic than your current solution, you will eliminate most of the exception message 10's; and, if all your master data is correct, most of the supply and demand dates should line up.  The messages will be replaced with a boatload of "new, and start date in the past" or similar.  You can allow MRP to create procurement proposals with start dates in the past by changing the appropriate settings in OPPQ and/or OPPR.  Also affected by scheduling parameters found in OPU5 and OPU3.
    This is a business decision.  Some planners prefer not to allow dates in the past.  Others just the opposite.  You (or the client, if you are a consultant) have to decide which is best for your company.
    Best Regards,
    DB49

  • Mixed MRP indicator 1 for PIR consumption of STO

    I am aware that Mixed MRP indicator is used in planning strategies 70, 11 and 74.
    could some one please help me understand the rationale behind using mixed mrp indicator 1 for consuming PIR by Stock transfer documents using BADI MD_PIR_FLEX_CONS
    http://wiki.sdn.sap.com/wiki/display/ERPLO/PIRconsumptionwithStockTransport+Documents

    Question is
    what is the technical reason behind using mixed mrp setting in material master for consuming pir with STO using badi dm_pir_flex_cons. I do not see how they are related??

  • Bin capactiy for SUT strategy

    Hi experts,
    My question is How system calculate the capacity for putaway for SUT strategy and we are not maintaining any capcity in bin master data.
    Scenario:
    We are using SUT strategy and I  have divided my bin into two sections A and B and some bins I have divided like 10 also.
    Now I have added storage bin type to storage bin and for that bin type I have assigned possible SUTS.
    I have allowed mixed storage A(allow homogenious SUT) and addition to existing stock.
    In material master I have mentioned like 10 E1 and 20 E2 as LE quantity.Now in one storage bin I kept only 5 E1 and after that I
    want to put 15 E1. Then how system behaves here, for eg. if system put that 15 in another bin then how what about the free
    space in bin and how system select the storage bin section.
    Your help is greatly appriciated
    Thank
    Raghu

    Hello,
    Not sure if I understand the question but:
    System simply picks the lowest bin and selects next lowest bin after bin is ocupied by single SU.
    I don't think bin selection by open capacity (after SU is moved into it) is standard SAP.
    In my opinion if you need the remaining space filled the moves will need to be done manualy.
    If any one reads this and knows better please post to correct me.

  • Creating Planned orders and Requisitions for a particular MRP controller and for all the others only Requisition is to be created.

    Hi Experts,
    Currently we run Program 'RMMRP000' as a batch job to create Planned orders and requisitions.
    The client wants that Planned orders and Requisitions should be created for a particular MRP controller and for all the others only Requisition is to be created.
    I implemented Exit 'EXIT_SAPMM61X_001' in the following manner by passing MRP controller to user_key.
      IF mt61d-dispo <> user_key.
        no_planning = 'X'.
      ENDIF.
    But as you can see that this will not meet my client requirement.
    If any of you has worked on similar requirement / if any one knows that this is achievable or not,
    please share your inputs.

    Moved from SAP ERP Sales and Distribution (SAP SD) to ABAP Development
    G. Lakshmipathi

  • Video mix mixer mixing software for Mac

    I need to mix text slides (jpg) with live video before it is recorded or sent to Ustream. I need a video mixing software for Mac.

    I don't have a lot of experience with it, but I would suggest you take a look at BoinxTV.
    http://boinx.com/boinxtv/overview/

  • Addn to stock flag for putaway strategy not working

    Hi
    It seems that the flag “Addn to stock” for putaway strategy “ “  in the storage type 103 configuration is not working fine as the quantities of the same material with the same batch sent to the same stype 103, and destination bin are not being added. So by running stock report in WM we see several lines with partial quantities instead of only one line with the total quantity in place. Do anybody know how can that be solved? Or what can be the route cause of the issue? Is there any OSS known applicable to fix the problem?
    Thx for your help
    Alba

    Hi Guys
    Unfortunately I do not think that you will get an answer now. Either your question is not simple or we do not know.
    So in the interest of keeping the Forum tidy and easier to surf through could you please close your thread and wither try one of the other forums or try another post. I do not think that mosy people will bother to look this far back anymore.
    Sorry I cannot help as I would if I could.
    Regards
    Frenchy.

  • U0093Addn to stocku0094 for putaway strategy u0093 u0093  in storage type not working

    Hi
    It seems that the flag “Addn to stock” for putaway strategy “ “  in the storage type 103 configuration is not working fine as the quantities of the same material with the same batch sent to the same stype 103, and destination bin are not being added. So by running stock report in WM we see several lines with partial quantities instead of only one line with the total quantity in place. Do anybody know how can that be solved? Or what can be the route cause of the issue? Is there any OSS known applicable to fix the problem?
    Thx for your help

    Hi Alba,
    Please check the WM views in MM.
    I've checked:
    (SAP help pushing F1 when the cursor is set on this thick box)
    <i>Indicator: Allow addition to existing stock
    Indicator determining whether a material with particular characteristics may be added to existing stock of the same material with the same characteristics in one storage bin.
    Dependencies
    If the storage type control table does not allow additions to existing stock for this storage type, the indicator set in the material master record is ineffective.</i>
    +
    (SAP help)
    http://help.sap.com/saphelp_46c/helpdata/en/c6/f8449d4afa11d182b90000e829fbfe/frameset.htm
    I think you have to set this indicator!
    BR
    Csbaa

  • BAPI for release strategy

    Hi Guys
    I need know one bapi for release strategy.
    Anybody can help me?
    Thanks Comunitty.

    Hi Ronaldo,
    Could you be more specific? Do you need to Release a PR, or you need to read/check the strategy or what?
    If you need to release a PR, check this ones (and others in FuGr MEWF):
    BAPI_REQUISITION_RELEASE       Release Purchase Requisition Item by Item
    BAPI_REQUISITION_RELEASE_GEN   Release Entire Purchase Requisition
    Cheers,
    Custodio

  • Can MRP be done for multiple plants in Single Run?

    Can MRP be done for (MRP Areas) for many plants, many storage locations and many
    subcontractors in a single run?

    hello
    u can perform mrp run at mrp area level which could be different then plant.
    thx
    dilip sadh

  • Mass update of mixing ratios for new fiscal

    Hello All,
    Is there any way to update mixing ratios for a new fiscal in a mass manner? What would be the best way to do a mass update? Thanks.
    Regards,
    SB

    Hi
    There is a catch in it... The screen delivered by SAP for CK94 has a problem... If you have more than 6 Proc Alternatives, even LSMW wont help...
    LSMW can help only if you have upto 6 proc alt.. if more than that, you have to do it manually....
    I debugged the Std program with my ABAPer for whole long day.. What we discovered was that SAP hos not given the PAGE DOWN option, usually given in all the screens.... So, no BAPI/BADI/LSMW can help of Proc Alt > 6
    br, Ajay M

  • Subitems for manual strategy are not supported

    Hi Experts,
    Need help from you,
    While configuring material substitution reasons  with inputs substititution strategy as A(Substitute products or display for selection) and in the outcome i am trying to use A (Substution Products are displayed as subitems), system throughing error message "subitems for manual strategy are not supported".
    My requirement is like this - In sales order i enter material, system should pop up with substitutions and after selecting the substitute material, i would like to have the sub item for the original mateiral along with the substitute material.
    I know it is supporting automatic substitution strategy, but i need for manual substitution strategy.
    - Prem

    Hi,
    maintain Stragegy "A" and  then u need to  keep Outcome as "  "( Blank:-Item will be replaced) :-
    Becasue,Strategy Determines Alternate of material Ex:- for X Mat Repalce with Y. where as Outcome control :-
    product selection should replace the original entry or whether it should be recorded as a subitem.Both will not be possible one at time.

  • EXIT_SAPLEBND_002 -- user exit for release strategy

    Hi,
    This is regarding help on user exit for release strategy, ref: note no. 365604, however after going through all the config part given in the given note we activate the fm in cmod.... but after activating the release tab goes off from  me29n.
    That is after you activate in cmod and then if u create po and go to me29n the relese tab is not there.
    if u deactivate and create po and then relese the release tab in me29 would appear.
    All we are trying is that the po in me29n should be open to release again if we change the delivery date. However what coding and how is still a second step , first is as soon as the exit is active the tab goes off.
    New to user exit . plz help.

    Hi Again,
    I guess I have solved the issue temporarily, however Am not sure if this is the best which cld be doen to the issue.
    I didnt make any new characteristics in ct04, for the delivery dats since i didn't want to restrict the delivery date. All I did i yje coding below in the exit :
      DATA wa_eket TYPE LINE OF mmpur_beket.
      DATA wa_eket1 TYPE LINE OF mmpur_beket.
      data: c type i.
       data: p type i.
      break1.
      break2.
      e_cekko   = i_cekko.
    loop at it_beket into wa_eket . " for comparing previous and the current del date
      e_cekko-usrc1 = wa_eket-eindt.
      SELECT SINGLE * FROM eket INTO wa_eket1 WHERE ebeln = wa_eket-ebeln
      AND ebelp = wa_eket-ebelp.
      if wa_eket1-eindt <> wa_eket-eindt.
      import c from memory id 'CID'.
      c = c + 1.
      clear p.
      p = c mod 2.
      if p is not initial.             " adding 0.01 to the characteristic value for p.o amt.
      e_cekko-GNETW = e_cekko-GNETW + '0.01'.
      else.
      e_cekko-GNETW = e_cekko-GNETW - '0.01'.
      export c to memory id 'CID'.
      endif.
      endif.
      endloop.
    The logic I tried using is since the relese gets reset incase of p.o amnt and hence indirectly po amnt so i changed the value of p.o value by 0.01 incase of change in delivery date. cekok-gnetw doesnt reflect anywhere in the p.o as amnt, I guess its for defing range for relese stragey's amont in ct04 characteristics.
    However anything better incase u know plz let me know, or do u think this can cause any problems later....new to exits.
    Rgds,
    Anu.

  • Work flow for release strategy for PO & PR

    Hi Gurus
    Can anybody explain workflow for release strategy for PO and PR
    Thanks in advance.
    Atul Kulkarni

    Hi,
    First you set your all required configuration fro release strategy(Class,Char,Rel.Group,Release Strategy ,Release Indicator )
    For Work flow settings,You have to do follwoing configuration:
    MM - purchasing - purchase order - release procedure - Define Release Procedure for Purchase Orders - Work flow - Enter release code, group, user ID, object type as user.
    Creation of work flow object,activation of workflow and other related settings will be done by Techinical  work flow consulant.
    Thanks,
    AMIT

  • Is Stereo Mix available for the Satellite L300?

    Hi,
    I have been looking far and wide to see if I can find out how to get stereo mix for the L300 and I can't seem to find anything for it.
    Is Stereo Mix available for the satellite L300?
    Can I get it and if I can how?

    Take a look here:
    +Not possible to record sound from Internet+
    http://aps2.toshiba-tro.de/kb0/TSB8A02HA0000R01.htm
    At the end of this document you will find this:
    +The Conexant Audio Device does not support "Stereomix" device.+
    +This is specification of the Conexant hardware+.
    If you have Realtek sound chip then the Stereo Mix is supported!!

Maybe you are looking for