MRP not considering STO as demand

Hi,
When I run MRP, it is not considering the Storage location STO (SLOC to SLOC) as the demand.
here is the scenario in detial.
Material 1, MRP1 : MRP type V1 Reorder point 10, MRP 4 MRP indicator, SP proc key 20, Reorder point 50, Repl qty 25
STO created for 30. MRP run. ORD DS as -30 and available qty as 20. At this stage I expected a Pur req because the stock fell below reorder point
Material 2, MRP1 : MRP type PD Reorder point 0, MRP 4 MRP indicator, SP proc key 20, Reorder point 50, Repl qty 25
Same thing observed in this case also.
Bottom line STO (SLOC to SLOC) it is not considering as demand.
Please let me know the options that I have and what i am missing.
Thanks
Srini

The problem is solved.
I have made a change to the MRP type.
In the config, Under Additional requirements  in Reorder point Planning, I have selected all the check boxes. For the current requirement, Order Reservation and Release Ord stock transfer are sufficient.
After transporting the values, It worked as expected. It considered, STO as well as reservations as demand.
PS: Initially it did not work after the transport. I went into the Material in the change mode and touched and saved it. It is working fine
Thanks
Srini

Similar Messages

  • MRP not considering Process orders

    Hello Gurus,
           My pl.ind.req is 100 and I run MRP , system creates planned order for 100. When I convert this process order, the available qty in MD04 is blank. Then When I run MRP again, its creating new planned order for 100. I am thinking its every basic setting somewhere. Please help
    Atul

    Hello,
       I resolved the issue, immediately after I posted yesterday. The issue was that on the Goods receipt tab in process orders, "Goods Receipt, Non Valuated" was checked and "Goods Receipt" wasn't. Once I checked that everything was OK. Since the GR from process order was marked as Non-valuated, MRP was not considering it. I think this is a finance setting. Will take it up with the finance guys. Thanks
    Atul
    Edited by: Atul Katti on Feb 11, 2012 5:06 PM

  • MRP Not considering Safety stock

    Hello
    We have settings as 1000 for safety stock . if the stock went below 1000 , MRP is not pulling the stock for the confirmation of the Production order. we checked the safety stock indicator in the Availability check for the Prod order confirmation . What ever the stock are available ( only unrestricted stock we want to consider for the availability check )
    Any suggestion please.
    Thanks
    JJ

    Hi,
    When your stock level goes below the Safety stock, then MRP will trigger a planned order to maintain the planned order. In your availability scope of check, if you checked the safety stock, the system will allow to consume the safety stock by posting the goods issue, if the tick is not there, it will not post the goods issue, saying insufficient stock is there.
    regards,
    V. Suresh

  • MRP not considering open purchase orders when planning for open sales order

    Dear Experts,
        1.I have open sales orders as well as planned Independent requirements for finished goods for the current month. Also I have open puchase orders for raw materials which is part of the Bill of material of the finished goods for the current month.
    Please what do i need to do to make MRP consider my open purchase orders when the system is planning for the open sales orders.
    2 what tcode can I use to delete all purchase reuisitions in the sytem

    There was no response to these questions so i had to close it to make space for another

  • Open Purchase Orders not considered as requirement for MRP Run

    Hi ,
    We are facing a issue of Open Purchase orders not appeared in Stock requirements list and also it is not considered as requirement for MRP Run against reservation.
    As aresult for a reservation demand of 10 units we are ending with Open POs 10 units and a additional planned order 10 units.
    Material Type : ERSA
    MRP Type : PD (or VB)
    Lot size : EX (  HB if MRP Type is VB)
    Could you please throw some light to correct our settings to MRP to consider Open POs?
    Saravanan

    Can you check to see if there is a re-order point set up for this materia? That could be causing the problem too.

  • MRP is not considering material availability dates for sorting customer ord

    Hello Experts,
    MRP is not considering material availability dates for sorting customer order/ sales order in sequence (thatu2019s is oldest from newest in order) in MD04.
    Please suggest.
    Thanks,
    Om

    Om,
    No.  Aside from my obvious desire to preserve my privacy, it would be a disservice to the other forum members.  No-one else but you and I would understand your problem, and no-one else but you would be able to benefit from any solutions. 
    There are dozens of free public portals suitable for posting pictures on the internet.  I suggest that you use one.
    Best Regards,
    DB49

  • STOCK OF FINISHED PRODUCT BY PIR NOT CONSIDERING WHILE TAKING MRP RUN

    DEAR SAPGURUS,
           I have finished product stock of 50 nos through planned independent requairement. now i am creating sales order for finished product but mrp run generate the planned order for finished product. I dont have planned order for finished product because material already have stock. what can i do please give solution.
    thanks.
    Regards
    Atul

    Hi Atul,
    Please describe your problem better, it's not easy to understand...
    Strategy 10 is net reqirement planning:
    - SAP considers only PIRs as requirements, SOs are not considered
    - SAP considers stock levels
    - requirements should be LSF (check in MD04)
    If you input sales order SAP won't create PldOrd for it. If you have stock and you want to create more to fulfil you SO, you have to input PIR accordingly and run MRP.
    Please clarify your problem...in a way that we may understand it.
    http://help.sap.com/saphelp_47x200/helpdata/en/60/9ea1536fbd11d191820000e8a5f6e6/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/e0/71bb199c9f11d191920000e8a5f6e6/frameset.htm
    Thanks,
    Csaba

  • Demand Not considered by Heuristics

    Hello ,
                   I have a customer and plant , i have maintained stock at plant and have manually entered a forecast of 10 quantity by going to change mode in rrp3 . Now when i run heuristics it is not even identifying this demand . But when i do CTM demand simulation it is picking this demand . why is heuristics not considering it .
    Regards,
    Nick

    Hi Nick,
    Are using any custom planning book or standard planning book snp94?
    OK whatever it is, do you see the forecast quantity appear in the total demand key figure? I believe you do as CTM is planning for this demand.
    So, heuristic should also plan for this demand. As per your comment.. "Now when i run heuristics it is not even identifying this demand . " Why do you think so? that Heuristic is not picking this demand? I mean you do see the demand in the total demand key figure in your planning book, right? And you are running heuristic interactively. Does the logs shows 'total no. of demand' as 'zero'?
    If so you need to check your fore cast horizon. If your forecast falls within this period then it wont be considered as a part of the total demand. (But, again you said that CTM did plan for this forecast/demand).
    Anyway check the t-lane for this product for the plant/dc/customer. There should be a valid t-lane. Then re-initialize your planning area and run the LC consistency check.
    Now take your planning run (CTM/Heuristic).
    Please do update us your findings.
    Thanks,
    Satyajit

  • Sales Order is not consider for MRP in MRP Type PD and Strategy 40

    Sales Order quantity is not consider for net requirement calculating in MRP.
    My MRP Type is PD and Strategy 40.
    Also in MD04 Sales order is not appearing.

    Dear,
    Requirements to MD04 will flow based on the settings you maintain in OVZ9 for the combination of "Availability Check" and "Checking Rule". Here whatever fields you choose under the tab "In/outward movements", that will be considered.
    It may be because of Requirement type Missing at schedule line category level . In MD04 requirement are pass on Either Individually or collectively . In Case of Individual each schedule line create one entry in MD04 ( Stock Requirement list)
    So check the materail master for checking group is maintain or not?
    Please refer this thread also,
    Re: Sale order not reflecting in MD04
    After that run MRP again and check the result.
    Regards,
    R.Brahmankar

  • PR/PO generate by MRP not calculate factory calendar

    hi,
    if PR/PO generate by MRP did not consider factory calendar, possible?
    pls advice? thanks

    Hi,
    Your possible checks should be:
    1) Whether material has proper MRP type
    2) whether there is enough demand
    3) whether the stock available is less than the demand
    4) Whether planning parameters are set properly
    5) Whether external procurement is setup for material master
    6) Whether planning file entry took place
    so many but a few listed on possibilities of failure to get PReqs out of MRP run...
    Regards

  • GATP: How to consider SNP Deployment demand (EG) into ATP check ?

    Hello experts,
    we have a location 1000 where we run GATP. This location serves customers directly (via normal SalesOrders) and serves other locations like a DC via STOs. Serving other location is done (in a nutshell) using SNP which creates SNP STOs and afterwards we run Deployment to push out avialable stock. We would like to consider the so called "SNP Deployment Requisitions" (EG - "Deployment: Release for stk transf. req") as demand which the GATP product availability check should take into account. By this we would like to make sure "serving other locations" from locaiton 1000 is accounted for while performing ATP check for the Sales Orders in location 1000.
    Problem: ATP category EG has been added to the ATP customizing (check control in SPRO) - but these SNP Deployment Reqs do not have a "confirmed qty" looking into RRP3 / ATP tab - only a required qty. THis means these elements are not considered while doing an ATp check although the demand categorty is in scope of the ATP check. I checked the cumulation rules - we are using 3 (consider req qty during create, consider conf qty during chg) - but this doesn't help even with the other rules we have there.
    I wonder if there is a way to tell the system to consider the ATP cat. EG as demand correctly - even without a confirmed qty. Or, does somebody known how to generate/make SNP deployment reqs  "with conf qty" (I checkded SNP deployment heuristicsdocumentation and SAP help etc. - without any result).
    Regards
    Thomas

    Hi Elanie/Thomas,
    We have similar issue where we are trying to confirm deployment demand in supplying location to reserve HUB demand over customer orders.
    I tried the setting mentioned by Thomas but ended up getting the same error as Elania " No orders selected by filter setting"
    "performing an GATP-BOP run on SNP Deployment PReqs does only require to setup a respective BOP "filter type" as follows:
    --> add ATP cat "EG" while maintaining the filter type in tcode S_AP9_75000212
    --> use the filter type in your /SAPAPO/BOP run
    Be sure that you select orders / run your BOP in thesupplying location (where SNP deployment orders are of ATP cat = EG)."
    Please let me know if you have any work around or solution for this .
    Thank you,
    Sai

  • ISO consideration for calculation of MRP per Safetystock adds more demand

    Hi Planning experts,
    Internal Sales order consideration for aggregate demand which uses for Safetystock calculation based on MRP Planned percentage safety stock adds more demand in the warehouse.
    We have ASCP Plan where X1 warehouse procures material from X2 Inventory organization through ISO created from Plan, after transfer Planned order releases from X2 and We have Safety stock calculated based on MRP percentage method in individual warehouses.
    Since ISO considered for aggregated demand to safety stock, and acts as a individual demand for Plan adds of more demand to the plan and recommending additional Planned order supplies by ASCP engine.
    Procurement rule: X2 --->X1through ISO recommended by Plan
    Steps to Reproduce :
    Goto ISCP Responsibility > Advanced Supply CHain Planner >Workbench > Open Plan > query PWB data for X1 warehouse for any item which is procuring from X2 org for ex:Item: Y1 , verify the safety stock for this item in X1 and verify the ISO created from X2 through early Planned order releases from Plan, so there is additional demand equals to ISO qty observed, where ISO qty not required to be considered for aggregated demand used for MRP Planned percentage safety stock calculation for item:Y1.
    Need to exclude ISO qty for MRP Planned safety stock calculation, please let us know how to exclude ISO for safety stock calculation, so additional supply will not be recommended by ASCP.
    Please let me know, if u have any idea how to crack this issue.
    Regards,
    Kumar
    Edited by: user9093449 on Mar 2, 2010 3:14 PM

    -->What is the shortcut to change location type in APO?
    Report /SAPAPO/CHECK_LOCATION_TYPE can be used to change location type (say from 1001 to 1002 or vice-versa)
    can you check if this works - cos i think you need to use/SAPAPO/CHANGE_LOCTYPE
    --> Can SAP APO be used as a stand-alone solution?
    *of course, as a stand-alone planning solution it can be !!
    and the connected executed system, which need not be ECC, is to give a well rounded solution
    there are organizations that have APO alone and integrate to other execution systems, and there are companies that have implemented APO first and R3 later. there are companies that just need planning and dont have to execute it (transport planning and demand planning)*
    -->How to copy a Process Chain?
    To copy a process chain to another process chain, goto the Process Chain you want to copy and then type copy in the tool tar
    also... if you dropdown on the toolbad under process chain you have a copy option... but this looks cool

  • System is not considering Planned Delivery time

    Dear Gurus,
    As iam planning for the month of January and running the MRP,schedulelines are getting generated but system is not condering Planned Delivery time maintained in the material master ie. 7days.Following is the example:
    I have a FERT-X with a component A-1PC in its BOM and its planned delvery time from vendor is 7 Days.If iam running the MRP on 13/12/2010 for FERT-X  100 PCS for January1,2011 then the schedule lines are getting generated for for component A is on 01/01/2011.But PDT is maintianed in material master is 7 days and same has been maintianed in vendor inforecord.But system is not considering it.
    Kindly help to resolve the issue.
    With Regards.

    I have one ROH which has two different vendors.
    Two scheduling Agreemnt with target qty 100000 kg each.
    Two different Vendor info record with Min. order qty maintained.V1-1000Kg,V2-6000Kg.
    One source list with two vendors and with respective scheduling agreement.
    Quota arrangement is there in which SOB is maintiained 50:50.
    I hv the requirement of 3084 kg of ROH.
    I run the MRP and two diiferent schedule lines are getting generated with 50:50 qty as mentioned in Quota arrangement.
    Not considering the minimum order qty maintiained in vendor info record.
    The above process is correct
    Only One doubt In Quota Arrangement?
    IS two schedule line is created after MRP run?
    Generally System will  select a vendor Whose Quota value is less
    quota rating   = quota base quantity + quota-allocated quantity/ quota
    Edited by: Sundaresan . E. V on Dec 14, 2010 3:26 PM

  • Is there a possibility should not consider available quantity at time of MR

    Sir,
    Is there a possibility should not consider available quantity at time of MRP planning?
    Example:
    Available stock: 100
    Planning stock: 100 (MD61)
    Schedule line to be generate: 100 Qty (Exclude the available quantity at time of MRP planning)
    regards,
    sampath

    Dear Sampath/Raj,
    1) Move the stock to particular storage location for which you don't want to be consider by MRP
    2) Now go to OMIR t-code, input value as 1 for that particular storage location
    3) Go to MMSC, input value as 1 for that particular storage location
    4) Go to MRP - 4 view Down you can find field Storage location input value as 1
    5) Now run MRP, system will not consider stock of that particular storage location
    Regards
    Madhu

  • Query on MRP to consider vendor holidays

    Dear All,
    In my industry MRP creates the purchase requisition for the raw material. These materials are procured from different vendors. The vendor has some holidays during the upcoming christmas and we would like MRP to take these holidays into account and propose the "Release Date" of the MRP Purchase requisitions. How should it be made possible.
    For eg. a PR for material A has a planned date = 02.01.2012, GR processing time of this material is 5 days. Hence Delivery date of PR = 27.12.2011. Planned delivery date of the item is 5 days, hence the release date of the PR is 19.11.2011. This is the current setup. However the vendor which supplies this material is closed from 20.11.2011 to 23.11.2011. Hence we want MRP to consider this 3 days holiday and propose the release date of PR as 16.11.2011. Can anyone let me know how this could be made possible.
    Thanks in advance.

    Hi
    I have tried using planning calendar.However i could see that on using a planning calendar only the planning date and/or the delivery date falls as per the interval in the planning calendar but not the release date Also i could see that the planning calendar is usefull for grouping our requirements (using suitable lot size), and fixing the delvery date as, as per the planning calendar, but not the release date....Hence i believe planning calendar cannot be of use for my above requirement.
    regards

Maybe you are looking for

  • How to delete playlists on Apple TV

    I syncd a handful of songs with my Apple TV. But it is showing all my albums as if they were on the Apple TV. How to I get the albums to show for just the music that is on Apple TV?

  • IPod Classic 120GB freezes, won't add more songs

    Hi Guys! I was wondering if anyone can help me, I've been reading through some posts and it seems some people may have the same problem as me. A friend of mine kept my iPod plugged in and was transferring all my music onto her Macbook pro, and I'm no

  • Word to PDF conversion does not retain left margin (for thesis submission to a university)

    Hi everyone, I've searched through the more recent margin issues posts and haven't found anything that exactly matches my problem.  I'm currently trying to convert my thesis from Word to a PDF (I'm using Word 2003 in Windows XP and Adobe Acrobat 8 Pr

  • Cisco agent desktop has encountered a problem and needs to close error

    A Remote Hotline user is experiencing crashes with her desktop agent.  After logging into the program it generated the error message "The Cisco Agent Desktop has encountered a problem and needs to close" I have removed the agent from add remove progr

  • How to Refresh or TaskFlow from pageFragment button?

    Hello im using Jdev 11.1.1.3.0, and i have a task flow with a managed bean with pageFlow scope, this managed bean defines a lot of parameters for my page framents that are on my task flow. I need a custom on this bean to programatically refresh the t