MRP Not Running on Subcontracting Material

Hi All,
I have done the following :-
Created a SUBCON Component with all the correct views, procurement type 30 etc.
Created a RAW Material again with all the correct views.
Created a BOM for the Above.
Created Subcont PIR for SUBCON Material
Created Standard PIR for RAW Materal.
Sourcelist for both.
When I create a PO ME21N i can see the BOM explosion etc so Subcon works fine.
The problem is if i want to maintian safety stocks for the SUBCON Component and run MRP it doesn't generate any Planned Orders/Purchase Reqs?
Why is that?
If i maintain safety stock for the RAW Material and run MRP it generates me reqs which is correct but why doesnt it do the same for SUBCON Material?
Thanks

Hi,
Issue Resolved,
I removed forward consumption and backwards consumption and MRP is working now.
Forward and backward consumption has nothing to do with safety stock level. MRP will plan with your safety stock even if you write values in those fields.
Forward and backward consumption comes into picture when you want to set the system how SOs should consume PIRs.
So, I do not think you fully described your original situation since merely setting forwar/backward consumption periods to zero cannot solve this issue as per my best knowledge. I've tested the same and those fields have no effect on how MRP considers safety stock.
BR
Csaba

Similar Messages

  • MRP not running with MD01

    Hi Gurus,
    My client has a problem, MRP is running OK with MD02 and MD03 tansactions but no materials are planned when MRP is run through MD01at plant level.
    Can anybody throw some light what could be the problem?
    There is no error message either.
    Thanks in advance
    Shailesh

    Dear PP and QM
    I think there is a misunderstanding
    The reason why the materials are getting planned via MD02/MD03 is because here you are forcefully running the MRP for the material,System wont look for the planning file entry where as when run through MD01 system will check for planning file entry
    Just though to explain the reason behind such behavious, there is no intention to prove you wrong
    Shailesh
    Proceed as suggested by other expert,Even i feel that planning entry might be missing
    I'm not sure how the materials were uploaded in the system,if it is via BDC then you normally one setting is there(update planning file) if it is not done then planning file entry will not get created ,we have to create it manually
    Hope this helps !!
    Thanks
    SVP

  • MRP not running - Issue with Planning File

    Hi
    In MD06 - MRP List, I see MRP list last generated on 5/30/2008. There is a production order
    with requirements date of 3/27/2008 which has been met but is still showing up on the MRP List.
    The goods issue for the production order was posted on 7/30/2008. The goods receipt for the purchase order of material is posted on 5/6/2008
    IN the stock requirements screen (Transaction: MD04), there is no entry except the following:
    8/29/2008 Stock     Available Qty = 0
    There is no entry in the planning file for this material. We run MRP automatically in the night using MD01 and this is not cleraring up the MD06 - MRP list.
    Why was not the planning file entry generated?
    How do i resolve this issue?
    Please help.
    Ketan

    Hi,
    It is perfectly ok for not having the planning file entry for this Material.
    Create a PIR for this Material now, and acheck whether system will creates the planning File entry or not..
    Inspite of having the Demand for the Material, when there is no planning file entry is a problem..
    But, every time there will not be a Planning file file entry, unless there is a change with reference to the Planning..
    Regards,
    Siva

  • MRP not Run

    Dear All,
    We have created material BOM using CS01 in AFS.Then We go to MD02 (AFS-MRP-Single item planning).That time no items coluld be run.the result shows NO MRP list found.Pls give the solution for this.
    Regards,
    Devi.G

    Dear Deepa,
    first of all You cannot Run MRP in MD02 for AFS materials
    AFS has provided an additional t-code - /AFS/MD02
    u can run MRP in the above said t-code
    have u activated MRP for ur plant in OMDU or not
    Plz check & revert back
    Regards
    kumar
    Edited by: kumar kumar on Jul 8, 2009 3:18 PM

  • Subcontracting Material MRP.

    Hi friends,
    Here is my issue,
    We have a material 'A' which is a subcontracting material and its subrequired material is 'B'.
    when we run MRP (MD04) for the material 'A', here it generating the PR's as required. but when we run
    the same for material 'B' it is generating the Planned orders (pldOrd). but this material is not in-house
    produced one..
    Why it is generating the pldOrd for the material B
    Please explain why it is happening and how it should be corrected.
    Regards,
    Mohan.

    Hi,
    Check the below settings
    1. For Matrl A Ensure the MRP2 , Procurement key is F and spl.proc.key is 30
    2.For Matrl B ensure the MRP2 has the Proc key F if you are buying this product externally
    Hope you would have maintained BOM as Matrl A header and Matrl B as lower material
    3. If you need PR to be generated, Put MRP relevant indicator as '1' in source list by giving proper vendor
    4. If you need Sch lines to be created,enter the Sch.agrmnt # in the source list and give MRP relevant
    5.Run the MRP for Matrl A in MD03,give the below MRP Control Parameters
               Processing Key NETCH
               Create Pur req    1
               Delivery Sch       3
               Create MRP       1
               Planning mode   3
               Scheduling         2
    6.By this MRP run,the lower level material also will get run automatically.
    7. If not,run MD02 with the above MRP control parameters 1,3,1,3,2

  • Moving average price of subcontracted material not picked for Cost estimation

    Hi Experts
    I have the below scenario:
    Finshed Product A has components B, C.
    C is a subcontacted material and it has its own BOM with components D & E.
    We are maintaining moving average price for the subcontracted material C, (because the subcontracter is adding X & Y in addtion to the components D and E, which are sent from us).
    In the mateial maste of C, Procurement type is F and Spl. procurement type 30 are maintained.
    When i do costing for the Finished product A, moving average price of C is not picked up (where as system calculates the std cost for C by adding the values of D & E and purchase info record price).
    Is there any way to Calculate Price of A by using the mvg avg price of C.
    I maintained the below valuation variant settings.
    If i remove the spl. procurement type 30 in the material master of C, it picks up the mvg. avg price. but it affects the MRP planning of  items D & E.
    Please advice.
    Thanks in advance.
    Regards
    Bala

    Hi Big choi
    Thanks for your response.
    I understand.
    1. if we maintain spl. procureent key 30, system calculates standard cost based on raw material and service charges.
    2. If we don't maintain spl. proc key, it considers the material as purchased and picks the mvg avg price from material.
    But, is there any way to pick the moving avg price from material master eventhough i maintained the spl. procurement type 30?
    Thanks
    Bala

  • MRP for FG not looking at Raw Material

    HI all,
    I'm running MRP for finished goods material against my production plan (created in MD61).   The material has a BOM component but when I run MRP for the FG its not looking at BOM component to consider raw material) availability and thus proposing dates solely based on the Production Plan and not any other requirements.  
    It simple creates the planned orders based on the production plan entered into MD61.  The dates for the planned orders don't take into consideration that on the suggested Production date there is not enough raw material to actual produce the product.   
    The Production plan does drive requirements to purchase the raw material but the dates are not neccessarily correct to get product to the warehouse on time for production run.   
    FG set up:
    RP Type:                                PD - MRP
    Lot Size:                                 EX u2013 Lot-for-lot Order Quantity
    Safety Stock:                         125  - EA
    Availability Check:                   02 u2013 Individual Requirements
    Procurement Type:                   E - In-House Production
    In-house Production:                 1 - days
    Planning Strategy:                   10 u2013 Make-to-stock production
    BOM / Raw Material set up:
    RP Type:                                PD - MRP
    Lot Size:                                 EX u2013 Lot-for-lot Order Quantity
    Availability Check:                   02 u2013 Individual Requirements
    Procurement Type:                    F - External Purchased
    Pland Del Time:                         3 - days
    GR Process time                       1 - days
    Planning Strategy:                   40 u2013 Planning with Final Assembly
    How do I get the MRP for the FG to not only create the planned orders from the production plan but also take into consideration raw material availability?   Thanks for your help!!

    VC,
    I need to the PlndOrd date for FG to take into consideration raw material availability...otherwise it's pretty useless to the site.
      I guess you are unfamiliar with the workings of standard MRP.  MRP in ECC as delivered by SAP will not support this requirement.
    There are a couple of assemble to order strategies that may be suitable for you, if all of your RM materials exist in the FGs BOM.  Strat 81 and 82, which are intimately linked to the Sales order ATP check.  These strategies are not compatible with FGs forecasts.
    http://help.sap.com/erp2005_ehp_06/helpdata/EN/41/19206a45fd11d188ff0000e8322f96/frameset.htm
    In SAP ERP, MRP just does not check the availability of components during the MRP run.  The Net Requirements calculation of a component part (which is the closest concept within MRP to an Availability check) takes place ONLY after all parent parts are completely planned, and all parent part planned orders have been already been generated and saved.  In effect, when MRP is running, information is neither gathered nor considered as to what the planning situation will be for the components.
    APO has several solutions that, depending upon the detailed requirements, might provide a solution.  A common one is to first run an MRP type heuristic, to create planned orders for all the shortages, and subsequently run a 'Bottom-up' scheduling heuristic to bring supply and demand dates into alignment, based upon pegging information.  ERP does not have this functionality.
    Of course, SAP ERP is infinitely modifiable.  If you have enough time and money, you can write custom code that will torture ERP into filling any Business Requirement.
    Best Regards & Good Luck,
    DB49

  • Not running MRP but has Purch Req with Sales Order as pegged reqmnt in AFS

    Hello Gurus!
    MRP run is activated in the Plant but we do not run MRP (no MRP batch job nor manual MRP). However, there are materials that have Purch Reqs with creation indicator as MRP showing pegged reqmnt from Sales Order even if Item category is the same.
    My initial check shows that those materials with issue has MRP Indicator as BLANK(Multi-level, transaction dependent MRP) and those that do not generate Purch Req from SOs has N(No transaction-dependent MRP). However, transaction dependent MRP is not activated.
    Can you provide areas where I should check/other probable cause of this?
    Your valuable insights is deeply appreciated. Thanks!

    Hello?
    I just want to update how this was resolved.
    I found out that MRP Indicator field in AFS MRP view for the materials with MRP generated Purch Reqs is maintained as BLANK(Multi-level, transaction dependent MRP) in AFS MRP view instead of N(No transaction-dependent MRP) but there is no transaction group maintained. So MRP run is triggered whenevert there is MRP relevant transactions performed.

  • MRP is running daily but not in MDBT

    Dear Guru,
    In my system, MRP is running daily but I am not able to find out in MDBT. Is there any othe way for automatic mrp run? Please reply.
    Thanks in advance.....
    Regards,
    Raj.

    Hi,
    2 things you can do:
    1. Ask your system admin or basis consultant
    2. Go to SM37, specify
    for Job name & user name. Set the job status as finished, specify the date interval say today until a week ago & in the Abap program specify RMMRP000 & execute. The output will list all MRP jobs defined & this should clarify.
    Regards,
    Vivek

  • MRP is running in MD03 and not in MD03

    Hi all
    The MRP is running well in our MD03 T code, but same time we cant do the same in MD01. Let me have the reason.
    Basically we have the user exit parameters is implemented, this is running well in our other plant. There is no authorisation message about this. Totally we are searching for scrap

    Thenna,
    MDAB will indeed create new Planning file entries en masse.
    In addition, it is always a good idea to periodically run MDRE to repair any inconsistancies in the planning file.
    Some companies run these two programs in batch regularly, say every week or so.
    Rgds,
    DB49

  • MRP planning run

    Hi experts,
                 During MRP run for  a material ,  open PO quantity is not considered   If  delivery date mentioned in that open PO exceeds 110 days from planning date(MRP run date). If it is less , it considers open PO quantity.  
                 What could be the reason for it? Pls help me out.
    Thanks in advance,
    Rgds,
    jay

    The Planning Horizon entry for your plant must be 110 or more. Check it out in OMI8. Click on the 'Maintain' button after entering ur plant, click on 'Planning Horizon' to see the entry.
    For open PO qty to be considered, try running MRP run with processing key as 'NETCH' in MD02 or whichever t-code u use this doesn't take planning horizon into account.
    Amit G

  • MRP run details(date and time when MRP was run)

    Hello,
    I need time stamps of all MRP/MPS run for a particular material. Please let me know relevant T.code/FM/BADI.

    Dear
    One more way to find this is using Transection Code AUT10.
    Here you can find not only Last MRP date but some other useful data also like user, date ,time and so many.
    Try it by using T.Code like MD01, MD02, MD40 etc.
    Or goto se16-SAP Table MDKP-Here you will get MRP run details
    Hope this helps
    Regards
    JH

  • Palnning entry not generated for the material

    Hi,
      We RUN the MRP with MD01, but for for some material the PR are not generated,  with MD01 I checked the palnning file with MD21 there is no entery for that material but when we RUN single level MRP with MD03 for that material it creates the PR so what can be the problem as for some material the PR are not generated with MD01 but it generates with MD03  all MRP data is proper in material master.
    regards,
    zafar

    Hi,
    Generally the planning file contains a list of all materials which has a valid MRP type in material master and relevant to the planning run. As soon as a material master record is created with valid MRP type, it will be automatically included in the planning file. You can find it in transaction code MD21.Whenever system find MRP relevant transactions i.e Stock updation,Receipt,Issues etc it will be included automatically in Planning file with appropriate indicator(NETPL,NETCH etc.).
    Only in some exceptional cases, it is necessary to make an entry in the planning file manually.For an example after run MRP ,that material relevant Indicator will be removed. But still if you want to force it for next MRP run,you can include it manually..
    And Please also check in material master entries properly maintained or not.
    Kuber

  • QMASTER hints 4 usual trouble (QM NOT running/CLUSTEREd nodes/Networks etc

    All, I just posted this with some hints & workaround with very common issues people have on this forum and keep asking concerning the use of APPLE QMASTER with FCP, SHAKE, COMPRESSOR and MOTION. I've had many over the last 2 years and see them coming up frequently.
    Perhaps these symptoms are fixed in FCS2 at MAY 2007 (now). However if not here's some ROTS that i used for FCP to compressor via QMASTER cluster for example. NO special order but might help someone get around the stuff with QMASTER V2.3, FCP V5.1.4, compressor.app V2.3
    I saw the latest QMASTER UI and usage at NAB2007 and it looked a little more solid with some "EASY SETUP" stuff. I hope it has been reworked underneath.. I guess I will know soon if it has.
    For most FCP/COMPRESSOR, SHAKE. MOTION and COMPRESSOR:
    • provide access from ALL nodes to ALL the source and target objects (files) on their VOLUMES. Simply MOUNT those volumes through the APPLE file system (via NFS) using +k (cmd+k) or finder/go/connect to server. OR using an SSAFS such as XSAN™ where the file systems are all shared over FC not the network. YOu will notice the CPU's going very busy for a small while. THhis is the APPLE FILE SYSTEM task,,, I guess it's doing 'spotlight stuff". This goes away after a few minutes.
    • set the COMPRESSOR preferences for "CLUSTER OPTIONS" to "Never copy source to Cluster". This means that all nodes can access your source and target objects (files) over NFS (as above). Failure to to this means LENGTHY times to COPY material back an forth, in some cases undermining the pleasure gained from initially using clustering (reduced job times)
    • DONT mix the PHYSICAL or LOGICAL networks in your local cluster. I dont know why but I could never get this to work. Physical mean stick with eother ETHERNET or FIREWIRE or your other (airport etc whic will be generally way to slow and useless), Logical measn leepin all nodes on the SAME subnet. You can do this siply by setting theis up in the system preferences/QMASTER/advanced tab under "Use Network Interfaces". In my currnet QUAd I set this to use BUILT IN ETHERNET1 and in the MPBDC's I set this to their BUILTIN ETHERNET.
    • LOGICAL NETWORKS (Subnet): simply HARDCODE an IP address on the ETHERNET (for eample) for your cluster nodes andthe service controller. FOr eample 3.1.1.x .... it will all connect fine.
    • Physical Networks: As above (1) DONT MIX firewire (IPoFW) and Ethernet(IPoE). (2) if more than extra service node USE A HUB or SWITCH. I went and bought a 10 port GbE HUB for about $HK400 (€40) and it worked fine. I was NEVER able to get a stable system of QMASTER mixing FW and ETHERNET. (3) fwiw using IP of FW caused me a LOAD of DISK errors and timouts (I/O errors) on thosse DISKs that were FW400 (al gone now) but it showed this was not stable overall
    • for the cluster controller node MAKE SURE you set the CLUSTER STORAGE (system preferences/QMASTER/shared cluster storage) for the CLUSTER CONTROLLER NODE IS ON A SHARED volume (See above). This seems essential for SHAKE to work. (if not check the Qmaster errors in the console.app [see below] ). IF you have an SSAFS like XSAN™ then just add this cluster storage on a share file path. NOte that QMASTER does not permit the cluster storage to be on a NETWORK NODE for some reason. So in short just MOUNT the volume where the SHARED CLUSTER file is maintained for the CLUSTER controller.
    • FCP - avoid EXPORT to COMPRESSOR from the TIMELINE - it never seems to work properly (see later). Instead EXPORT FROM SEQUENCE in the BROWSER - consistent results
    • FCP - "media missing " messages on EXPORT to COMPRESSOR.. seems a defect in FCP 5.1 when you EXPORT using a sequence that is NOT in the "root" or primary trry in the FCP PROJECT BROWSER. Simply if you have browser/bin A contains(Bin B (contains Bin C (contains sequence X))) this will FAIL (wont work) for "EXPORT TO COMPRESSOR" if you use EXPORT to COMPRESSOR in a FCP browser PANE that is separately OPEN. To get around this, simply OPEN/EXPOSE the triangles/trees in the BROWSER PANE for the PROJECT and select the SEQUENCE you want and "EXPORT to COMPRESSOR" from there. This has been documented in a few places in this forum I think.
    • FCP -> COMPRESSOR -> .M2V (for DVDSP3): some things here. EXPORTING from an FCP SEQUENCE with CHAPTER MARKERS to an MPEG2 .M2V encoding USING A CLUSTER causes errors in the placement of the chapter makers when it is imported to DVDSP3. In fact CONSISTENTLY, ALL the chapter markers are all PLACED AT THE END of the TRACK in DVD SP# - somewhat useless. This seems to happen ALSO when the source is an FCP reference movie, although inconsistent. A simple work around if you have the machines is TRUN OF SEGMENTING in the COMPRESSOR ENCODER inspector. let each .M2V transcode run on the same service node. FOr the jobs at hand just set up a CLUSTER and controller for each machine and then SELECT the cluster (myclusterA, hisclusterb, herclusterc) for each transcode job.. anyway for me.. the time spent resolving all this I could have TRANSCODED all this on my QUAD and it would all have ben done by sooner! (LOL)
    • CONSOLE logs: IF QMASTER fails, I would suggest your fist port of diagnosis should be /Library/Logs/Qmaster in there you will see (on the controller node) compressor.log, jobcontroller.com.apple.qmaster.cluster.admin.log, and lots of others including service controller.com.apple.qmaster.executorX.log (for each cpu/core and node) andd qmasterca.log. All these are worth a look and for me helped me solve 90% of my qmaster errors and failures.
    • MOTION 3 - fwiw.. EXPORT USING COMPRESSOR to a CLUSTER seems to fail EVERY TIME.. seems MOTION is writing stuff out to a /var/spool/qmaster
    TROUBLESHOOTING QMASTER: IF QMASTER seems buggered up (hosed), then follow these steps PRIOR to restarting you machines.
    go read the TROUBLE SHOOTING in the published APPLE docs for COMPRESSOR, SHAKE and "SET UP FOR DISTRIBUTED PROCESSING" and serach these forums CAREFULLY.. the answer is usually there somewhere.
    ELSE THEN,, try these steps....
    You'll feel that QMASTER is in trouble when you
    • see that the QMASTER ICON at the top of the screen says 'NO SERVICES" even though that node is started and
    • that the APPLE QMASTER ADMINSTRATOR is VERY SLOW after an 'APPLY" (like minutes with SPINNING BEACHBALL) or it WONT LET YOU DELETE a cluster or you see 'undefined' nodes in your cluster (meaning that one was shut down or had a network failure)..... all this means it's going to get worse and worse. SO DONT submit any more work to QAMSTER... best count you gains and follow this list next.
    (a) in COMPRESSOR.app / RESET BACKGROUND PROCESSES (its under the COMPRESSOR name list box) see if things get kick started but you will lose all the work that has been done up to that point for COMPRESSOR.app
    b) if no OK, then on EACH node in that cluster, STOP the QMASTER (system preferences/QMASTER/setup [set 0 minutes in the prompt and OK). Then when STOPPED, RESET the shared services my licking OPTION+CLICK on the "START" button to reveal the "RESET SERVICES". Then click "START" on each node to start the services. This has the actin of REMOVING or in the case where the CLUSTER CONTROLLER node is "RESET" f terminating the cluster that's under its control. IF so Simply go to APPLE QMASTER ADMINISTRATOR and REDFINE it. Go restart you cluster.
    c) if step (b) is no help, consult the QMASTER logs in /Library/Logs/Qmaster (using the cosole.app) for any FILE MISSING or FILE not found or FILE ERROR . Look carefully for the NODENAME (the machine_name.local) where the error may have occured. Sometimes it's very chatty. Others it is not. ALso look in the BATCH MONITOR OUTPUT for errors messages. Often these are NEVER written (or I cant find them) in the /var/logs... try and resolve any issues you can see (mostly VOLUME or FILE path issues from my experience)
    (d) if still no joy then - try removing all the 'dead' cluster files from /var/tmp/qmaster , /var/sppol/qmaster and also the file directory that you specified above for the controller to share the clustering. FOR shake issues, go do the same (note also where the shake shared cluster file path is - it can be also specified in the RENDER FILEOUT nodes prompt).
    e) if all this WONT help you, its time to get the BIG hammer out. Simply, STOP all nodes of not stopped. (if status/mode is "STOPPING" then it [QMASTER] is truly buggered). DISMOUNT the network volumes you had mounted. and RESTART ALL YOUR NODES. Tis has the affect of RESTARTING all the QMASTERD tasks. YEs sure you can go in and SUDO restart them but it is dodgy at best because they never seem to terminate cleanly (Kill -9 etc) or FORCE QUIT.... is what one ends up doing and then STILL having to restart.
    f) after restart perform steps from (B) again and it will be usually (but not always) right after that
    LAstly - here's some posts I have made that may help others for QMASTER 2.3 .. and not for the NEW QMASTER as at MAy 2007...
    Topic "qmasterd not running" - how this happened and what we did to fix it. - http://discussions.apple.com/message.jspa?messageID=4168064#4168064
    Topic: IP over Firewire AND Ethernet connected cluster? http://discussions.apple.com/message.jspa?messageID=4171772#4171772
    LAstly spend some DEDICATED time to using OBJECTIVE keywords to search the FINAL CUT PRO, SHAKE, COMPRESSOR , MOTION and QMASTER forums
    hope thats helps.
    G5 QUAD 8GB ram w/3.5TB + 2 x 15in MBPCore   Mac OS X (10.4.9)   FCS1, SHAKE 4.1

    Warwick,
    Thanks for joining the forum and for doing all this work and posting your results for our benefit.
    As FCP2 arrives in our shop, we will try once again to make sense of it and to see if we can boost our efficiencies in rendering big projects and getting Compressor to embrace five or six idle Macs.
    Nonetheless, I am still in "Major Disbelief Mode" that Apple has done so little to make this software actually useful.
    bogiesan

  • Error while running the object MATERIAL in T.Code R3AS

    Hi All,
    When I running the oject Material in T.code R3AS, I am getting the following error. Please suggest how to resolve.
         001     The following Errors/Warnings occured. Do you want to continue?
         002     MATERIAL: No active entry in Table SMOFSUBTAB. Read OSS note 339787
         003     MATERIAL: No active entry in Table SMOFSUBTAB. Read OSS note 339787
         004     MATERIAL: Object will not be loaded.
    Thanks & Regards
    SATYA

    HI,
    Go through this link..
    No active entry in Table SMOFSUBTAB. Read OSS note 339787
    Hope it could be helpful..
    Thanks
    prasad.s