Hi experts,
I am new in SAP PP
currently when run the MRP, it will generate planned orders and PR's. it will calculated planned order sub compoents requirement qty also.
but i want to change settings for once convert planned order to production order once release after only need to create sub compoent PR's and planned order
pls explain what change need to do?
Regards,
Elango
Hi
This is not possible,because planning and production order releasing is two different activity.When ur release production order thats mean ur giving green signal for manufacturing or start manufacturing and when ur release the production order ur work center or capacity is get booked against that production order. So at the time of production order release if u want to plan the child item then u have to procure ur child item then u have start manufacturing so complete time ur capacity is showing as loaded then ur not able plan for other production order.
Similar Messages
-
Preview and print a printout in production order release
Iu2019m using CO02 to release and save the production order. Currently u201Cbatch cardu201D printout is automatically printed in production order release. I want to change this to preview the printout before printout is send to the printer. Can someone tell me the configuration for this.
Hi
Pls refer this link
layout adjustement in production order- suitable to printout sheet
Print Preview of Production Order
layout adjustement in production order- suitable to printout sheet
Thanks
S.Murali -
Unique serial number during production order release for FG materials
Hi,
Actually our client is asking for serial number generation for each FG material during its production order release.
So that with this serial number he can track it in shop floor plus after dispatching to customer.
Here the scenario is Make To Order, this serial number will also be considered by SD during dispatch.
For serial number creation, I referred documents from SAP best practices(help.sap.com).
After this, now I am able to create serial number for specific material automatically.
Currently I am getting serial number with respect to material specific, i.e., serial number generating with respect to FG codes. Ex:- FG1 - 1, 2, 3, 4 and FG2 - 1, 2, 3, 4.
But as per my client requirement, they want serial number without material specific, i.e., common serial number for all FG codes.
Ex:- Sr No- 1-FG1, 2-FG1, 3-FG2, 4-FG1 - - - - according to production order releasing sequence.
Plz inform if any settings are to be made.
Thank you in advance.Hi Arman,
I Had got solution for how to track which FG is linked to which SFG sr no, just go through the below link it also gives how to use COIB transaction.
COIB transaction usage, how to track which FG is linked to which SFG sr no
But still I had not got solution for
how to assign common serial number for all FG codes automatically
Ex:- Sr No- 1 -> FG1,
2 -> FG1,
3 -> FG2,
4 -> FG1
- - - - according to production order releasing sequence.
Whether is it automatic serial number assignment is possible or not.
Plz inform if any settings are to be made.
Thank you in advance. -
Serial number during production order release
Hi,
Currently I am getting serial number with respect to material specific, i.e., serial number generating with respect to FG codes. Ex:- FG1 - 1, 2, 3, 4 and FG2 - 1, 2, 3, 4.
But as per my client requirement, they want serial number without material specific, i.e., common serial number for all FG codes.
Ex:- Sr No- 1-FG1, 2-FG1, 3-FG2, 4-FG1 - - according to production order releasing sequence.
Plz inform if any settings are to be made.
Thanks,
regards,
B C GudageriThanks Glenn Larson,
This is the first time for me for creating serial number for FG materials.
Actually our client is asking for serial number generation for each FG material during its production order release.
So that with this serial number he can track it in shop floor plus after dispatching to customer.
Here the scenario is Make To Order. So this serial number will also be considered by SD during dispatch.
For serial number creation, I referred documents from SAP best practices(help.sap.com).
After this, now I am able to create serial number for specific material types automatically.
But here the condition is client wants serial number should not be specific to material codes but should be common throughout the plant for all FG codes.
Ex:- Sr No- 1 for FG1,
2 for FG2,
3 for FG2,
4 for FG3
- according to production order releasing sequence.
Me dont know about Presort and IMB serial numbers.
Please tell me the appropriate approach I can make or any of links which I can refer.
Regards,
B C Gudageri -
Dear Experts
Good Afternoon
I have small query regarding production order release when ever i try to release a production order system give following message
System status WCRE is active (ACT 20030197 0010) and system status of work center is CRTD WCRE
I can't able to find the clue how to release the sale order
Kindy guide me
Valuable answer will be rewarded
Regards
Rajeev GargHi,
Pls. check for your Work Center Status in CR02 / CR03 -
> Extras -
> Administrative Data -
> Status.
Check whether it is locked or not. If work center is locked , unlock your work center from
Extras Menu--->Status--> Lock / Unlock.
Hope this may help you.
Regards,
Tejas -
Production order release with batch management
Dear All
Our company are going to use batch managment. But someone told us the production order cannot be released if the component with batch managment is missing (requirment is lower than stock). Is that true?Dear,
It depend upon the setting means if you want to automatic batch determination in production order for component then system will not allow to release if no batches are available.
This setting come from MRP 2 view batch entry if you keep it blank then system will allow you to release the order with missing batch quantity also.
Please try and come back if any issue.
Regards,
R.Brahmankar -
Error during Production Order release
Hi Experts,
When I am releasing one production order follwoing messege appearing.
Error during availability check for order xxxxx (see log)
co02>goto> logs--> release
Date 22000504 lies after the end of the valid factory calendar (please correct).
I have checked routing, pv, bom etc. availability check indicator 02 is alreadly maintained in mm03. Earlier we have confirmed several order of this material in the past, now suddenly this error is appearing.
Kindly help me to solve this problem.
Regards
GRHi,
Chk for following :
01. Timings in Routings/Factory calender
02. Chk for all components in order . It may be possible that one of component is having some MRP elelment dated beyond factory calender
03. Also chk all receipt /issue elements with dates .
Regards,
Milind. -
Production order release Material Availability check
Gurus,
I have a production problem where the order can be released when the component for the order is in a restricted status. This is not allowed by the batch search strategy.
<u>Here's Problem Description:</u>
When running on version 4.6C, I have a work order created. I release the work order successfully. However there is a component that has an invalid material/batch according to the batch search strategy The material availability check shows all components available.
However, I remove the batch and the batch can not be entered because it is not correct according to the batch search strategy. I try and release and the material is added to the missing parts list.
I change the component so that it can be used.
Put the batch number back in the order.
Save the order.
Change the component material/batch so that it is no longer valid.
The order will release and it shouldn't because the material/batch is not valid.
<u>I've looked at the following transactions and master data:</u>
OPL8 - Order Type - Dependent Parameters Overview for my plant and order type and the check batch box is checked.
MM03 - Material Master MRP 2 view for the component to get the availability check
OVZ2 - Availability check control
OPJK - Order Control to get the checking rule for order release
OPJJ - Availability check control details with availability check and the checking rule for order release - I did not see anything here that would influence the checking based on if the batch was entered or not.
I did double check the batch search strategy for production order - COB3. Everything looks OK there.
Does anyone have any other places to check? I must be missing something. I tried OSS - there weren't any notes that I could find.
Thank you!
MichelleHi,
Check in order control opjk for order type pp01
Batch assignment /release material
Release despite missing batches
no release if batches are missing
Regards,
nandha -
Stanging indicator change in control cycle after production order released
HI
We have MM PP interface active
i setup staging indicator 4 for one material via control cycle
Production order is created and released
now we would like to change staging indicator to 1 [pick parts]
how we reread control cycles data in production order
ThanksTry: CO02 > Functions > Read PP master data
-
Disable certain changes in sales order after production order release
We are in the MTO scenario and are also using variant configuration. The business requirement is that after a production order has been released (REL status) the preceding sales order item should be “locked” for certain changes. Such changes would include VC and some other fields (e.g. quantity and dates). Some minor changes like texts should still be allowed.
The best idea we could come up with is to put some validation in the sales order user exits, but there are some disadvantages. It seems kind of strange though that there would be no such functionality in standard SAP (e.g. some changes in the order can’t be made after a delivery has been created). Is there by chance anything in the configuration that we missed?
I found this old thread, but it still seems to require user exits. Unfortunately couldn't find anything specifically on the production order / SO integration.
Thank you!Hi Jelena,
Try in the userexit MV45AFZZ
(form userexit_field_modification)
Example:
select * from afpo where kdauf = vbap-vbeln
and kdpos = vbap-posnr.
if sy-subrc = 0.
select single * from aufk where aufnr = afpo-aufnr.
if aufk-loekz = ' '.
select single * from jest where objnr = aufk-objnr
and stat = 'I0002''
and inact = ' '.
if sy-subrc = 0.
screen-input = 0'.
endif.
endif
endif.
endselect.
.H.Terras -
User Exit at Production Order Release
Hello Everyone
Could anyone tell me if there is any particular User Exit at the Release of Production Order? I have seen the list but didnt find any appropriate one.
Reward points Guaranteed
Regards
ChandraHello,
Another workaround could be to create a user status 'released' (REL) that is set at 'order release' and removed at ' reread master data' is done (just like the system status REL).
Attach the ABAP code to the activation of the user exit.
Other advantage is that you have another field to select in COOIS(PI). We have created user statusses in order to replicate all primary system statuses (CRTD, REL, TECO, CLSD) in order to facilitate reporting. Via this way we have a column with only one status for filtering, sorting summarizing...
Regards,
Philip -
MRP Production Orders one for One
Hello All,
I have a case that when MRP creates an order for ITEM1 I need MRP to also create an order for the component requirement quantity of the order regardless of unrestricted stock.
Example
ITEM1 I have a production order for 5000 which has a component item ITEM2 to use 1000.
ITEM2 is a semi-finished good and requires a production for it to be make also.
I need MRP to create an planned order for ITEM2 for 1000 (even if I have 1000 in inventory ).
These order are always made together and left over inventory needs to be used for something else.
ThanksI found it by using the Special procurement 52 under the bom.
-
Hi,
Can somebody explain how to create an IDoc automatically whenever a Production Order is released or changes made to a released production order? Appreciate it.
Regards,
V M.Hi VM,
It would be helpful for the forum if you can put across the method by which you resolved the issue. We all can then refer to your solution if we face a similar requirement sometime in future.
Regards,
Vivek -
Production order release based on operation
Hi friends
How to release production order based on operations ?
pl help meHi
The real time scenario is to select release operation wise is:
If you are expecting any change in the subsequent operations after starting of production say first opration, you will opt for this .
I do not find any advantage if you release all operations at a time in mass processing. It is as goods as releasing at header level.
Normally in such cases one can opt for trigger points in which system will release successive oprations automatically when preceding operation is confirmed.
If you want manually release the operations you can select the operation which you want release & press release button in operation overview screen.
Hope it is clear now.
Regards
YMREDDY -
Deny production order release if component has no storage location
Hi,
when a production order is created, I want to deny the release if there is a component without a storage location.
I looked at the PPCO* user exits, but I haven't found a suitable one yet.
Could anyone help me?
Thanks,
MatthiasAny ideas?
Maybe you are looking for
-
How do I stop firefox from showing mobile content on my desktop
I was wondering if anyone could assist me with this problem. Firefox shows mobile content on my desktop (such as going to Yahoo Sports page) instead of desktop content on my desktop. I have tried clearing cookies and c ache, and that has not solved m
-
When I connect my I pod shuffle to USB it shows an error message - " I Tunes has deducted a problem with your audio configuration. Audio/Video playback may not operate properly" due to this problem whenever i connect earphone each and every earphone
-
[SOLVED] Graphical Interface doesn't start with Radeon HD 7670M
Hi everyone! I just bought a new laptop: Toshiba Satellite L855-14Z with a Radeon HD 7670M graphic chip. I installed Arch Linux and everything works fine except the graphical interface. I have tried 3 options and all result in strange log files: 1. K
-
DtReport structure and Alerts Settings from sender AS2 Reports adapter
Hi, I have imported DtReport for MDN's from SeeBurger AS2 adapter documentation as external definition into PI. However, in the mapping, when I select DtReport as source, I could see only the following structure: <?xml version="1.0" encoding="UTF-8"?
-
Error:Release outside field of responsibility
Dear All, Error:Release outside field of responsibility in Function module:BAPI_PO_RELEASE I given the Inputs: Purchase Order:xXXXXXXXX PO_REL_CODE: 01 Exceptions: X it showa the Error:Error:Release outside field of responsibility can any one help me