Hi all,
Pls can anyone tell me the TCODE to display all Purchase Requisition generated by MRP LIST.
Hi
You need to use ME5A report with dynamic selection. In dynamic selection (it will appear next to variant button) you need to choose creation indicator. Give creeation indicator as "B" which material requirement planning. and execute the report.
Regards
Antony
Similar Messages
-
Issue on Number Range for MRP Purchase Requisition
Hi Gurus,
Please help me on the issue explained below.
We are already using SAP ECC 6.0 and SRM 5.0 and now we are implementing Plant Maintenance Module.As a result of this implementation ,we have created number of PR document types and assigned to unique number ranges in ECC. One of these document types has been maintained for MRP group for a material type in order to identify the MRP purchase requisitions created on the shortage of the materials for these material types.
This functionality is working fine. MRP run for the materials is picking the appropriate PR document but number range of the document is not the same what was assigned to the linked document type.Some other number series is getting picked by system .
There is setting under SPRO Consumption Based PlanningNumber RangesPurchase Requisitions
Here, number range assignment is against plant. This is the same number range which is being taken by system on running MRP. But the desired number range is the one which has been linked to PR document type.
If I change the number range above then number range for MRP PR in present system will get affected..
Can you please advise me on above so that PR generated on MRP run should have appropriate number range?
Thanks & Regards,
NitiHi,
As per my understanding, what you have mentioned above is exactly the way SAP is designed. Its SAP Standard behaviour.
But if you check your PR document type - no:range & the CBP no:range both will be same only since both refers to the same object.
Please check the PR document type that you have assigned in the CBP & its no:ranges.
Thanks & Regards,
Ram -
Link a MRP Purchase Requisition to a Purchase Requisition Workflow
Hello Gurus,
I have a Purchase Requisition Workflow already created.
I want to create a MRP purchase requisition that start my workflow.
How can I do that?
Thanks in advance,Hello Charlie.
Our release strategy hasn't classification. When we I create a MRP purchase requesition, the release stratagy is already assigned to that. however the worklow is not started.
thanks -
MRP Purchase requisition not generating to Max stock
Hello Gurus,
We have implemented consumption based planning. Purhcase requisitions are automatically created based on the stock reaching reorder point.
MRP type used is VB
Lot Size used is HB
Min lot size is 1
Max lot size is 11
Rounding value is 1
MRP is run using program RMMRP000 setup as a batch job.
But the problem is purchase requisition is generated only for 1 quantity. There is no stock available in the plant and there are no open purchase requisitions or purchase orders for the item.
So please let me know what is missing that the lot size HB is not generating PR for max stock.
Thanks,
NarayanYesterday you wrote Max lot size is 11 today Max lot size is 0
What shall I believe now?
The calculation of quantity in reorder point planning is described in
Reorder Point Planning Procedure - MRP Procedures - SAP Library -
Query for MRP Purchase Requisition
Hi Gurus,
Currently system is creating Purchase requisition for BOM Material, which I don't want system should create PR for this material.
I know MRP type ND but i need someother ways to stop it
Appricate your response
Thanks
SastryHi,
You can try the following option-
1) Tcode - MM02-> MRP1 view - > Plant sp-matl status - 01 ( Blocked for procment/whse)
2) Tcode - MM02-> MRP2 view - > Procurement type - Blank(No procurement)
Sudarshan -
Diferent Number Range to Purchase Requisition
Hi Everybody:
I 've 2 kind of Purchase Requisition, one to Subcontracting [ZNB] and the another one to Import [ZNBI] and I've 2 number range for each one, as well I've the same kind to my Purchase Oder.
When i'm in TCode MD04 and get a Planned Order I want to convert this into a Purchase Requisition, but how can I get that the Planned Order become in a Subcontracting Purchase Order and the another Planned Order to Import get the same, each one in their respective number range and kind of Purchase Requisition.
Please help me w this, I'll be appreciate.
Regards
OPHi Omar,
IN Tx: OPPZ you can define for the MRP Group which type of document you create for each type of PR
SPO = doc.type purchase requisitions for standard purchase ord
SC = MRP: Document type purchase requisition for subcontracting
ST = MRP: purchase requisition for stock transfer - document type
Then you have to assign the MRP Group to the material, so when you create a PR for a Material which has special procurement (Subcontracting) the system will create a PR for SC.
Let me know if it is Ok.
Kind regards,
Federico -
Creation of Purchase Requisition with MRP - MD02
Hello,
I have created a sales order using one material with MRP. When I run MRP-transaction MD02 for this material, a purchase requisition is created.
What we want is to block the creation of the purchase requisition when the sales order has delivery block (code 02). I have been trying to use this enhancements; setting break-points in all function modules, but when running MD02 is does not stop there:
MEREQ001 Customers' Own Data in Purchase Requisi
LMDR2001 User exits restr. profiles of opt. pur.ord.-based load bldg
LMDZU001 User exits in additional planning
M61X0001 User exits PP-MRP materials planning
M61X0002 User Exits PP-MRP Material Requirements Planning Evaluation
Do you know a way to do this or also change data in the purchase requisition created with MD02?
Thanks and regards.Dear ,
Are you very particualr to process the Sales Order demand when there is a delivery block ?
To restrict that one you can do the following steps :
1.Goto Sales Order -VA02-Select the line item -Double Click -Select the Schedule line tab -Set Sechedule line item categoery as CN instead of CP.If it is CP then it will processed through MRP
2.Change the pricining date and make credit block for sales Order and do not release though VKM3 so it will not be tearted through MRP run to have PR geneartion
Hope this is clear
regards
JH -
Creation of SDEB's instead of Purchase requisitions while running Plant MRP
Hi Gurus,
we noticed that after the weekend run of MRP that the system has produced SDEB''s rather than Purchase requisitions. When we run individual MRP for a part then a purchase requisition is created and if run an MRP total region requisitions are not created. Can you please explain why this is happneing as it is affecting the ordering of goods for producton.
thank you,
Naveen.Thank you.
-
Purchase requisitions are not created for Component by MRP
Hi,
I have created planned orders for assy. When I run the MRP the purchase requisitions are not created by MRP for the components. If I check the planned order the components tab is showing all the raw materials list as per the BOM. The master data tab shows the BOM,Routing,Production version etc. But when I run the MRP the components planned orders/purchase requisitions are not created. There is no stocks available for the components in the plant, still the purchase requisition are not created by MRP.
I have tried in both transactions MD01 and MD02.
I could notice one thing. Supoose if I enter 31.12.2009 is the order finish date, the system creates exception mesage 10- Rescheduling in with proposed date 01.12.2009. Why the system is propsoing rescheduling in with date 01.12.2009 which past date.
Please sugest.
thanks and regards
MurugesanHi,
I am using MRP type PD for assy and components. There is no planned orders for assy.
If I run MD02 the planned orders created for assy and purchase requisition are created for raw materials. But if I run MRP in MD01 neither the planned orders nor the purchase requisitions created.
I tried the Control keys NETCH,NEUPL but still the planned order and purchase requisitions are not created if I run using MD01.
Please suggest.
thanks and regards
Murugesan -
MRP creating additional purchase requisitions for the existing sales order
Hi,
We have scenario where we switch materials from POD material to ARP material. POD material is just like make to procurement which creates purchase requisition and purchase order upon saving the sales order. ARP (Auto replenishment) material creates purchase requisition based on sales order and re-order point while running MRP.
When the material is POD title, it created purchase requisition and purchase order (example: 4500000110) while saving the sales order (example: 1000000010) for the quantity 10. After some time this material is switched to ARP and it has open sales order (1000000010) and purchase order (4500000110).
We have special MRP run for ARP materials based on MRP type, which creates purchase requisition.. What is happening is when we run MRP; it is creating new purchase requisition for the old sales order (1000000010) for the quantity 10. But old sales order (1000000010) is already having purchase order (4500000110) to fulfill. So we donu2019t want to create new purchase requisition for the old sales orders. It should create purchase requisition only for new sales orders.
Please advise
Thanks in advance
SrinivasMangesh,
If the components are Inhouse production then you can think of using collective orders by assigning special procurement key 52. If raw material exists then your requirement cannot be met..as i think your scenario is of assembly processing. The idea of assembly processing is that component materials will always be available and only assembly will be done based on Sale Order.
Regards,
Prasobh -
BADI/User exit for Purchase Requisition from MRP
I am looking for a BADI or any enhancement when a purchase requisition is created or modified from MRP .ie. MD50 transaction. Can anyone help ?
THanks in advance.Hello Shareen
Have you had a look at package <b>MD03 </b>(contains transaction MD50). It contains lots of BAdIs. Perhaps the following ones may be useful:
MD_PLDORD_CHANGE (BAdI for Changing Planned Orders)
MD_PURREQ_CHANGE (BADI for changing purchase requisitions)
However, I should mention that I have not found anything when I checked the <i>Where-Used-List</i> for these BAdIs (on ECC 5.0).
Regards
Uwe -
Creating purchase requisitions instead of planned orders after MRP run in MDBT
When running regenerative planning in MDBT for plant with following details ,The system has to provides planned orders for the materials .
Processing key:NEUPL
Create Purchase requisition :3
Schedule lines:3
Create MRP list:1
Planning Mode:1
Scheduling :1
But sometimes it provides purchase requisitions for certain materials.The problem happens for different materials at different times.
I checked the material master and found that procurement type is external procurement.Business need to create planned order for the materials and then want to convert it to purchase requisition.
MRP group is assigned to the materials but no creation indicator maintained for the MRP group.
Please tell me why this run creates purchase requisitions suddenly and in the next run it disappears?Hello
Maybe someonelse is running MRP in another transaction, such as MD02, with a different parameter. Check on transaction MD05 when was the last MRP execution and the user that ran it.
Also check if there is any active implementation of BAdI MD_MRP_PARAMETERS.
If you don't have a cretion indicator, maybe it would be useful to set it for your MRP group, with the parameter 3, in order to make sure that planned orders will be created.
BR
Caetano -
Automatic Purchase Requisition Creation in MRP run
Hi,
1. I create a Sales Order for quantity 20 of main material MAT which has two sub-components - COMP1 and COMP2. The plant in which this sales order is being created does not have any stock quantitiy of the material or its sub-components. For quantity 20 of the main material, quantities required of the sub-components are 40 and 60 respectively.
2. I run MRP using transaction MD03 for the sub-components. This created purchase requisitions for the sub-components automatically. But, I see that the system creates only one purchase requisition of quantity 40 for COMP1 but two purchase requisitions for COMP2 each having quantity 60.
Can you please tell me why is the system creating two purchase requisitions for COMP2?
Thank you,
Helpful answers will be immediately rewarded!Hi Janakiraman,
I compared the parameters - Safety stock, Lotsize, Maximum Lot Size, Reorder point - between the two components but found all the values to be same.
The only difference I found in the parameter values was...
For COMP2 (the one for which 2 PRs were generated) 'Special Procurement' field was blank
For COMP1 this field had the value 4A which means "STO from X101 plant"
Do you have any idea what could be the reason?
Thank you. -
MRP is not generating purchase requisitions consistently for MRP type VB
Issue: When executing consumption based MRP in ECC 6.0 using the following parameters; purchase requisitions are not created for all material with stocks below max stock levels. In other words requisitions are created incase of some materials and requisitions are not created for others.
u2022 MRP type VB ( manual reorder point) with reorder point qty
u2022 Lot size HB with Max stock level
u2022 Procurement type F (external procurement).
Additional info: Some of these materials are batch managed and results are inconsistence whether it is batch managed or not.
Regards
SaiI checked that and planning file entry is created.
Example 1: MRP is not working.
MRP type = VB
Lot size =HB
Procurement type= F
Material # = 1200045
Reorder point =30
Max stock level = 300
Available qty = 139
No PRs are existing before MRP.
MRP is expected to create PR for qty 161 (300-139= 161)
Example 2 : MRP is working.
MRP type = VB
Lot size =HB
Procurement type= F
Material # = 1200052
Reorder point =100
Max stock level = 1000
Available qty = 87
MRP created PR qty of 913 and results are as expected.
MRP is expected to create PR for qty 161 (1000-87= 913
NOTE: I am directly creating Purchase requisitions by selecting creation Purchase Requisitions Indicator =1 during MD01/MD02 trxs . Not creating any planned orders. -
Stock Transfer Reservation in spite of Purchase Requisition in MRP run
Dear SAP gurus,
We are running MRP heuristic on the PP/DS and we have different results comparing our development and productive environments.
In our productive environment purchase requisitions are generated and in our development environment stock transfer reservations are generated as result of the MRP run.
Where can I check differences of configuration that would be causing this?
Thanks and BR
MauricioMauricio,
I guess I was not clear in my suggestion, I apologize. Differences in T001W between ERP dev and prod will not necessarily generate your problem, differences in sourcing within APO between APO dev and APO prod will generate the differences. I only mentioned the vendor number because a transportation lane can exist 'source plant > destination plant', but also you can have a transportation lane 'vendor of source plant > destination plant' which would also have an impact on the type of req created.
Easier to check the sourcing, //PWBSRC1, mentioned earlier. Your dev system should contain no objects that relate to Stock Transport orders. You can delete the STO sourcing records within that transaction, which will also delete the material assignment to the Transportation lane. Hopefully you will then get the default external supply proposal, which is normally a Purchase req.
Also check for presence of quota arrangements //SCC_TQ1. Delete any that unnecessarily refer to an STO object.
Best Regards,
DB49
Maybe you are looking for
-
When decoding PCM data from an MP3 from position 0 and in one go there is obviously no problem. However, when I try to seek to a certain position for reading some samples, no matter what I do, the seeking is never accurate and consequently, the produ
-
Is Oracle client 10g or 11g for Windows 2008 R2 (6.1) available yet?
I have not been able to locate this. If this has not been released, does anyone know when? I have tried the Windows 2008 64 bit 11gR1 (11.1.0.7.0) client on a Windows 2008 R2 with no success. Thanks.
-
Jfmerge:Invalid printer Type (98) when generating a pdf output.
I am receiving "Invalid Printer Type (98)" error message when i call jfmerge from my servlet to generate a pdf output. Any idea? Thx, Anupam
-
Hi I am trapped in an update loop. My iPhone 4.0 is only on v4.2.1 (8C148) and when I put it in iTunes to update it doesn't work. It now says it's "unable to contactr the iPhone software update server because you are not connected to the Internet". T
-
got a new adobe id and password, trying to download a lib book to my nook, adobe digital ed won't open, why not? JLW