MRP run by excluding storage location

Dear PP experts,
I have excluded storage location e.g. storage location 0001 from MRP in OMIR and also maintained the same in MRP 4 view in material master. As far as MRP run is considered system is ignoring the stock and giving the results.
But now we are facing the problem in quantity confirmation in sale order in transaction code CO06. The stock is existing in storage location 0001and is not confirmed for any other sale order.
We need to exclude the storage location in MRP but it should allow stock determination in sale order.
Pl. let me know how this can be achieved.
Thanks in advance,
Regards,
Prashant

Dear Prasobh,
Thanks for the reply. There is no storage location mentioned in the sale order. I tried confirming the sale order by activating the No storage location check box, still it does not confirm the quantity. If we keep the check box "Check without RLT" blank then the sale order quantity gets confirmed. But the problem here is that it confirms quantity greater than what is available in stock i.e. if we enter any quantity it is confirmed.
I would like to ask one more question. The sale order confirms quantity available as per the ATP logic. When we have excluded the storage location from MRP the quantity is seen at storage location level and not at Plant level and hence it is not proposed in cummulative ATP quantity. Should the quantity be available in cummulative ATP quantity. If yes, how can be get that quantity in cummulative ATP quantity?
Is there any impact of MRP area? as we have MRP area activated. Within this Plant we have one MRP area at storage location level and the other MRP area as Plant excluding this storage location.
Regards,
Prashant

Similar Messages

  • MRP run without one storage location

    Dear All,
    My client's requirement is they need to run MRP on plant level without considering one storage location stock
    e.g if a material is having stock of 10 in unrestricted with storage location 1104. Now when mrp is run for 100 quantity planned order is created for 90 only planning strategy is 40....they want the MRP should not consider the stock in storage location 1104.....how this can be made possibe?
    Please Suggest...
    Regards,
    Pawan Shetty

    Dear all,
    Pl. help me which user exit implemented  for MRP RUN without Storage location ,b'coz. from slandered setting we are not able to  do the same
    Regards
    Sandeep

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • MRP4 view exclude storage location & material provided by vendor/customer..

    Hi
    Could anyone please tell me in MRP4 view for a material,where is the option so that i can exclude or include the storage location stock from MRP?
    and also in which T code i should indicate the material is provided by vendor/material provided by customer?In CS01wher's this option?
    Please help me
    Thanks & regards
    Raj

    Hi Karthik,
    MRP area is nothing to do with storage locations settings in MRP4 view. If you want to activate MRP area and use the MRP run at MRP area level then you have to customized MRP area either at storage location level or sub-contractor level (in MRP master data settings )... then you need to assign this MRP1 view of the material and with valid MRP type.  Now when you run the MRP then planning will be carried out at this MRP area for this part.
    With storage location indicators in MRP4 view (must enter with putting the stoarge location values from MM02/MM03) you can exclude the stock of this storage location (indicator 1) in the palnning run or you can plan seperately with indicator2 with using re-order level. Here no need of MRP area.
    If helps rewards points.
    Regards
    TAJUDDIN

  • MRP Run in an excluded Storage Location

    Hello all. I have this situation.
    I have material X with two storage locations: SL01 and SL02. Storage location SL01 has 15 pieces and SL02 has 5 pieces. In MD04, I can see a total of 20 pieces under the "Stock" MRP Element.
    Material X also has five Order Reservations (OrdRes), for 5 pieces each. These Order Reservations are assigned to Storage Location SL02, because stock is procured from there.
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    I tried deactivating SL02 in Material Master MRP4 for material X, but then the MRP Run doesn't generate any proposals because my reservations are in SL02, and it's deactivated. Even if my Availability Check is set not to look at "storage location", if I the requirement is in SL02, it won't propose anything.
    Is there any other solution to my problem? How can I have the system ignore the stock in SL02, but still propose those 5 pieces I'm missing in SL01?

    I have material X with two storage locations: SL01 and SL02. Storage location SL01 has 15 pieces and SL02 has 5 pieces. In MD04, I can see a total of 20 pieces under the "Stock" MRP Element.
    Material X also has five Order Reservations (OrdRes), for 5 pieces each. These Order Reservations are assigned to Storage Location SL02, because stock is procured from there.
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    Sorry, but your logic is not clear to me...
    your stock:
    5 pcs (SL02) + 15 (SL01) = 20 pcs
    your requirements
    5 x 5 pcs (SL02) = 25 pcs
    Procurment proposal (w/o excluding SLoc):
    20 pcs (stock) - 25 pcs (requirements) = -5 pcs > procurement proposal 5 pcs
    You are saying:
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    So, you can see MRP will give a procurement proposal of 5 pcs without any SLoc exclusion...
    Please clarify your requirement / business process. Why don't you want to consider the stock in Sloc2? What is your process?
    You can see that you cannot exclude a SLoc with Sloc MRP and still consider the requirements relevant to that SLoc (unless you use reorder point planning in that SLoc).
    Thanks,
    Csaba

  • Exclude storage locations from the MRP run

    Hi all,
    Is it possible to exclude stock of specific storage location from the MRP run?
    Thanks for your help
    Thomas

    Hi,
    2 things,
    1. In OMIR for the storage location set that this location is excluded from MRP run (if am right the value to be maintained is 1)
    2. In MM02 go to MRP-4 view of the material master, specify plant & the storage location which you want to exclude & in the field SLoc MRP indicator specify that this is excluded for MRP run (if am right the indicator is 1).
    The step 1 ensures that all materials which are extended to this storage location will by default have the value 1. And step 2 ensures the materials already having this storage location view are excluded from MRP run.
    Regards,
    Vivek

  • To exclude Storage location frm MRP run

    Hi Friend s
    In my secnario MRP should not consider the storage location  stock planning
    i using stratgey 11 gross req planning ,
    and  (SPRO), In MRP  -define storage location MRP  per Plant , i set the indicator 1 i.e storage location stock excluded frm MRP
    But still i mrp considers  stoge location stk .
    is there any setting ?
    Regards
    Sandeep

    Sandeep,
    For strategy "11" system automatically will not consider storage location stocks, so no need to define that in SPRO>MRP->Planning-->Sloc MRP/Plant as told by you.
    Couple of checks....i would suggest.
    1. Check whether you have maintained "2" - Mixed MRP indicator in MRP3 view.
    2. Check whether the PIR you have created is having requirement type "BSF".
    Regards,
    Prasobh

  • Need to exclude storage location from MRP.

    Hi Gurus,
    Is there an option to exclude a specified storage location from MRP at configuration level. But not at material level as in MRP4 view.
    We have excluded the stoarge location in config OMIR, however the system considers that stock if the same is not excluded in MRP4 of that material.
    Now, the problem is every time i need to go to the material master of every material  i have to excude from MRP, which is very time consuming..!
    Please advise me is there any option in point of view of Storage Location,  just simply  define the storage location to be excluded from MRP run.
    Thanks in advance.
    Naveen.

    Dear,
    Yes you can do it though OMIR or MMSC 1-Storage location stock excluded from MRP.
    Also check this link for more details,
    Exclude purchase order on storage location from MRP
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on May 25, 2009 12:22 PM

  • Exclude storage location from Availability check

    Hi,
    We have to exclude 4 storage location out of 46 storage locations from availability check in sales order processing.
    Please advice how to do it.
    We can not use MRP area and MRP Groups to control this because of certain reasons. 
    Regards,
    Avnish

    Please check this..
    spro...material management....consumption based planneng....planning...define storage location MRP...
    Here give plant name and enter...
    Against every storage location you ll have indicators for excluding,including the stock....
    hope this clarifies..
    For material availablity check in production order,
    1. you need to delete the storage loation in OX09 (it is possible If no stock)
    2. Or you need to transfer post the materials to a storage location xxxx which you can name as Blocked storage location...
    F Y I....In OVZ9  you can exclude all the storage locations which is not your reequirement..
    katrthick
    Edited by: karthick PP on Mar 26, 2009 12:40 PM

  • Exclude storage location during batch determination

    Dear SAP Gurus,
          My client senario is PP-PI. We are using batch determination in process order. Suppose my raw material is 'A'. It is present in ST1-100 qty, ST2-200 qty and ST3-150 qty. Now during batch determination i want to consider only ST1 and ST2 in determination and don't want to include ST3 in determination. But during determination system consider all 3 locations. So how can i exclude ST3 from batch determination.
    What things i have to do for this. Please help me out.
    Thanks and Regards,
    Harish Gunjatay.

    Hi,
    Sol 1:
    U can create Storage location as one Characteristic and while determining the batch, you can play with this characeteristic. Just this logic strikes my mind. See the posibility. And by "Reference Characteristic" concept if u can establish automatic updation of this characteristic, it will be superb.
    Sol 2:
    In Bactch Information Cockpit I think u can filter the storage location out. Try this also.
    Kiran.

  • QM exclude storage location from QM

    Dear All,
    is it possible in some way to exclude a storage location from QM in a plant managed with QM.
    The case is this:
    We have the material AAA with QM active for good receipt.
    -If the material arrive in st. location 10 we want have stock in Q status.
    -If the material arrive in st. location 20 we want have stock in Free status.
    St location 10 and 20 belong to same plant.
    If it is not possible, do you have some suggestion to solve this case (u.exit?)?
    Thanks in advance. Best regards.

    Tanks,
    but finally we have used another u.exit, EXIT_SAPLQAAT_002.
    This one is called directly in the MIGO and allow to deactivate QM setting X in the parameter NO_INSPECTION.
    Best Regards.
    Alby

  • Mrp run should exclude intercompany delivery shedule(PO)

    Dear,
    I have scenario ,
    THere are two company codes in which there are two different plants,one is manufacturing & ANOTHER IS Trading plant
    They are putting inter company PO for sale of material between these two plants.
    I am using planning strategy 10 make to stock production.
    So my problem is that when i run mrp in manufacturing plant system should not consider inter company PO
    SO THAT no planned will generated against that delivery schedule.
    can you tell me  how to do it
    Rewards points for useful answer
    Regards
    vidyasagar

    Dear,
    My requirement is that i am selling goods from manufaturing plant to trading plant and from trading plant is sold to customer,so when trading plant raising intercompany po on manufacturing plant it should not consider in mrp run so that my manufaturing plant planning should not change.
    because when i run mrp in manufacturing plant by putting plan in md61 system generating planned order for planned qty as well as for intercompany po,i want to generate planned order only for planned qty put in md61.it is make to stock 10 strategy
    regards,
    vidyasagar

  • During MRP run unwanted plant and storage location include and exclude

    Hi There,
    During MRP run how to include and exclude the unwanted plant and storage location pls let me know the required configuration settings.
    Thanks in advance.

    HI,
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run :-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards
    KK

  • MRP Relevance for Storage Location

    All SAP Gurus,
    In SPRO where we need to maintain MRP Relevance for Storage Location?
    Regards,

    Dear,
    Check transaction OMIR - Storage location - MRP relevance.
    In detail:
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run follow the steps:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards,
    Syed Hussain.
    Edited by: Syed Hussain on Sep 20, 2008 12:51 PM

  • RLM MRP execution at storage location

    Hello Friends,
    Need help - I am configuring RLM with MRP - need help with below:
    Requirement: I need to run MRP at the main storage location first (requirement is from Plant Maint order), followed by another MRP run at secondary storage locations. I want to deplete stock in the main storage location before using up stock at secondary storage locations.
    This is not for re-order point planning (VB) for both storage locations, I know that I can plan MRP separately at storage location levels, but that only works with re-order point replenishment.
    Is MRP area configuration my only option?
    If possible I want to avoid MRP area configuration - I hear once it is configured we can revert back!

    Hi Joe,
    As per your client requirement, you need to run MRP at Main storage location, and want to avoid performing at storage location, here you can define the supply chain derivation via plant Mainteniance order by using using item category and transport requistion in RLM Configuration. you have option to select the order type order type item category  ( ), item category change rule ...( newer change item category) & direct prourement type ( SAP Std ).
    Yes MRP Area is the only option, the MRP first as plant level is the option, check in setting ie Step-3 Supply process derivation via plant ( supply type PD).
    The parameters for the RLM Supply Process are a combination of the following:
    · Material requirements planning (MRP) type at the requesting plant or storage location (the plant making the request for materials)
    · MRP type at the supplying plant or storage location (the plant or storage location supplying the material)
    · Special procurement type at the demanding plant or storage location.
    For more information pls check this link..
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_oil472/helpdata/en/83/496c3a411aab70e10000000a114084/frameset.htm
    BR
    Satish

Maybe you are looking for

  • Unknown devices on Windows 8.1 on HP ENVY TouchSmart 15-j078ca

    Hi, my HP ENVY TouchSmart 15-j078ca is showing 5 device errors under other devices.  I will copy the hardware id for the 5 devices and if someone could tell me where I can download the device drivers for these 5 devices that would be greatly apprecia

  • I can't print from network computer while in bootcamp

    Although I can see the network printer while in Windows 7 on bootcamp, I can't get it to print.  I am trying to print reports from Quicken 2012.  Any ideas?  

  • How to view code of Macromedia Flash Player 7.0 application

    Hi, frnds i have Macromedia Flash Player 7.0 Application file. I want to view the source code for it. how? it's very urgent for me. What is the software i've to use to view it. Company: Macromedia, Inc. File Version: 7,0,14,0 Inernal Name: Macromedia

  • Photoshop Album Starter Edition 1.0

    I've already downloaded Edition 3.0, but it doesn't have the same features as Edition 1.0. Can anyone tell me how to go about downloading Edition 1.0? I'm trying to get the 3D features and the newer editions do not have them.

  • ISE 12.3 crashing on 'file open'

    Running ISE 12.3 64-bit navigator on WinVista x64. With a project already open, I try to open an existing Verilog source file which is not 'in the project'. The file browser opens, then seems to hang (turns pale, a la windows "not responding"), then