MRP run for header material with bom usage-3

Dear All,
We have header material with bom usage-3.We maintain the stock at child components only ,not at header
I have created the planned independent requirement for header material.I have created a sales order but sales order is not shown in md04.
What can be the further setting  I am missing for mrp run of above scenario.
with regards,
pradeep

Dear ,
Couple of checks points for you :
1.Check the material master Sales Org Veie-Item Categoery .As you have mentioned Item Categoery -TAQ which is not relevent for requirement planning throgh schedule line category -CT ( CT means there will not be any inventory or good movement and requirement will not be passed for MRP ) .Only CP -line item categoery does requirement passing through MRP and it will show u in MD04. So the summery is if you want to generate an MTO order for the same FG material , you should matian the Sales Line item categoery as MTO in sales Org View and it will pop up in VA01 whiel logging Sales Order .
Generally , TAQ item categoery are used in Project Billing or Delivery .ok  and they will not be having any availabilit check so it KP ( no check ) .
But for MTO order , you should have availablty chek 02/01 in MRP3 view and also MTO Sales Item categoery .
Based on the above information logg an sales order , release credit chek in VKM3, SAVE and check in MD04.
Create PIR in MD61 and Run MRP on the both cases .I have tested its working .but noit with TAQ item categoery ok
2.Why do you need to create Sales Order for dependent Item-Y because it will be in X-BOM item  ? Make sure that Y- should have Sales Item categoery in material master -MM02-Sales Org View as NORM item .If you really want to create sale sorder for this item , it should TAN or NORM .
3.Other PIR detail is fine .
Try and revert back
Regards
JH

Similar Messages

  • Costing run for a material with alternative BOM

    Hi Friends,
    My requirement is to have product costing for a material with 3 different BOMs, in CK11N i can change the alternative BOM number to have costing run for 3 differesnt boms, but in ck24 how to proceed, My client requirement is such that the standard price should be the average price of the costing run from 3 different boms, and they are not interested in manual price change in MR21
    Regards,
    Arun Kumar R V

    Hi Arun,
    You can have a Standard cost estimate based on only one of the alternative BOM and Routing. This alternative is selected based on the business ie., whichever alternative is generally used in production frequently. This will be the std cost and whenever you do the production using the other alternatives, the difference in cost will be captured as Variance.
    There is no option of having average or cost estimate for each alternative at the same time.
    There is absolutely no use in maintaining price in MR21 for an in house produced material, since during Prod Order process the planned costs will be arrived at based on the quantity structure of BOM & Route only.
    Thanks & Regards,
    Vijaya Bhaskar A
    Edited by: Vijaya Bhaskar A on Jan 7, 2009 8:57 AM

  • Error during MRP run for a Material : Calendar date

    Hello All,
    I am trying to run MRP for a material and it is not creating Purchase Requisition. It is giving an error that says  " 08/10/2003 date lies before start of factory calendar. (Please correct)"
    The MRP is set up in such a way that we have a special procurement key pointing to another plant. So we are expecting it to create a Purchase Requistion on that plant but it is not doing so.
    I am not expecting a change of dates in the calendar.
    Please let me know what the issue would be and where can I correct it.
    Thanks
    Regards
    SAP Fans...

    MRP will create a requisition in your plant to procure from the plant that is mentioned in the special procurement key.
    The second best solution is to maintain a calendar for this past old year 2003 in your system by using transaction SCAL.
    But why would you need a requisition for a time 6 years back? Ever thought about this?
    You must have a production order or sales order with a wrong delivery date or replenishment lead time in your system. Because of that the MRP run calculates an expected delivery date for the requisition item that far in the past.

  • Schedule lines are not coming after MRP run for HALB material

    Dear All,
    I am not getting schedule line after mrp run, inspite of all required setting only purchase requisitions are coming.
    Material type is HALB and involve a subcontracting process (30). For raw material I am getting the schedule line but in the case of HALB, it is not coming.
    Pls let me know if I am missing something and guide me further on this.
    Thanks & Regards
    Kundan Kumar

    Dear All,
    I am closing this thread. As the vendor mentioned in scheduling agreement is not a subcontracting vendor. Its a individual vendor.
    Thanks for all the reply.
    Thanks & Regards'
    Kundan Kumar

  • Muliple inspection plan for same material and same usage

    Hi,
    I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
    In standard SAP its not possible.Any user exits available for this..
    Regards,
    S.P.Selvathangam

    Dear Selvathangam Palanisamy ,
                                                       My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
    Either go to QA02 and then select it from the list of multiple plans.
    Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
    Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
    Thanks

  • In MRP Run for FERT, i want to eliminate 3rd level HALB and their BOM compo

    Hi All,
    Can you please guide me on this issue please.
    Regarding - In MRP Run for FERT, i want to eliminate 3rd level HALB and their BOM components for exploration and planning
    My scenario is:
    Level 1: FERT1
    Level 2: HALB1.1 + ROH1.1 + VERP1.1
    Level 3: HALB1.1.1 + ROH1.1.1
    Level 4: ROH 1.1.1.1 + ROH1.1.1.2
    While performing MRP run i dont want to include the material HALB1.1.1 (Level 3 component) and their corresponding BOM component (ROH 1.1.1.1 + ROH1.1.1.2)
    My constraint:
    The reason for this is HALB1.1.1 is being manufactured through REM profile with separate PIR and MRP run.
    But it is being consumed in FERT1 through intermediate semi-finished HALB1.1.  and it needs to include for Product costing.
    Note: All materials have been marked as PD - MRP type
    Would be a great help from you.
    Thanks and Regards
    Khadeer Ahmed

    Hi,
    If you put in FI forums then you will get reply immediatly.
    Anil

  • MRP run for MTO

    hi gurus
    I have a finished product and I have two level BOM for this and I maintained strategy group for the finished and semifinished as 20 and in MRP4 view in the field BOM explosion I have'nt maintained any indicator.When I run mrp in MD02 transaction two planned orders are getting generated for the same item one is for subreq for finished product and one is for sales order.
    Please clarify on this.
    thanks
    ravi

    Hi
    To generate Procurement proposal as per Strategy 20. System requires Sale order. See how many sale orders are there for Fert in MD04 .
    Do not use Strategy for Dependent requirements and otherwise if you pass PIR to this level. Always use strategy for header material.
    Regards
    J.Saravan

  • Sale Order MRP Run for All Order Line Items

    Greetings...
                     I have One Sales Order , in which i have ten different Line Items .
    Now I have to Run the MRP on basis of Created sales Order so that all Line items wi get consider insingle MRP Run on sales order base MRP Run.
    How to take MRP Run of One Sale Order for all Line Items.???
    In MD50 , we can have sales Order with Item..

    In MD50 you can give only one item at a time.
    Its a standard transaction meant to accomodate changes relevant for MRP after plant level MRP run  related to specific sales order Item.
    so either you need to do it multipal times by changing material or you need to go for MD02.
    Please explain bussiness case in detail why you want to restrict your MRP run for items in a specific sales order.
    Regards

  • MRP RUN for the more than one line item in sales order.

    Hi ,
    In the sales order nuber of line item are , i will have to take MRP RUN for selected line item .
    So plz suggest what development will require?
    Abhay
    Edited by: abhay patil on May 30, 2008 8:52 AM

    HI,
    U can write separate prog. Which will ask sales order no. and from to line item or multiple line item of sale order. Then in loop internally pass the each line item no to MD50 prog. Which will run in background.
    I will give u sample prog. Which I had created for running MRP for all the lines items of given sales order in one go.
    *& Report  ZPRG_PP_001
    REPORT  ZPRG_PP_001.
    tables vbak.
    data: begin of it_vbap occurs 1,
            vbeln  type    vbap-vbeln,
            posnr  type    vbap-posnr,
          end   of it_vbap.
    DATA: P_MODE   TYPE    C.
          Batchinputdata of single transaction
    DATA:   BDCDATA LIKE BDCDATA    OCCURS 0 WITH HEADER LINE.
    selection-screen begin of block b1 with frame title text-001.
      parameters :   p_vbeln  like  vbak-vbeln obligatory.
      selection-screen skip.
      parameters :   p_fore   radiobutton group mode,
                     p_back   radiobutton group mode default 'X'.
    selection-screen end   of block b1.
    at selection-screen.
    Check Sales Order
      if not p_vbeln is initial.
        select single * from vbak
          where vbeln eq p_vbeln.
        if sy-subrc <> 0.
          message e499(sy) with 'Invalid Sales Order no.' p_vbeln.
        endif.
      endif.
    start-of-selecTION.
    Get Sales order items
      select vbeln posnr from vbap
        into table it_vbap
        where vbeln eq p_vbeln.
    Set BDC mode
      if p_back eq 'X'.
        p_mode = 'E'.
      else.
        p_mode = 'A'.
      endif.
    Process MD50 BDC
      LOOP AT IT_VBAP.
        perform bdc_dynpro      using 'SAPMM61X' '0160'.
        perform bdc_field       using 'BDC_CURSOR'  'RM61X-TRMPL'.
        perform bdc_field       using 'BDC_OKCODE'  '/00'.
        perform bdc_field       using 'RM61X-KDAUF'  IT_VBAP-VBELN.
        perform bdc_field       using 'RM61X-KDPOS'  IT_VBAP-POSNR.
        perform bdc_field       using 'RM61X-BANER'  '1'.
        perform bdc_field       using 'RM61X-LIFKZ'  '3'.
        perform bdc_field       using 'RM61X-PLMOD'  '3'.
        perform bdc_field       using 'RM61X-TRMPL'  '1'.
        perform bdc_dynpro      using 'SAPMSSY0' '0120'.
        perform bdc_field       using 'BDC_OKCODE'   '=XBAC'.
        CALL TRANSACTION 'MD50' USING BDCDATA MODE P_MODE.
        CLEAR BDCDATA.
        REFRESH BDCDATA.
      ENDLOOP.
    end-of-selection.
           Start new screen                                              *
    FORM BDC_DYNPRO USING PROGRAM DYNPRO.
      CLEAR BDCDATA.
      BDCDATA-PROGRAM  = PROGRAM.
      BDCDATA-DYNPRO   = DYNPRO.
      BDCDATA-DYNBEGIN = 'X'.
      APPEND BDCDATA.
    ENDFORM.
           Insert field                                                  *
    FORM BDC_FIELD USING FNAM FVAL.
      CLEAR BDCDATA.
      BDCDATA-FNAM = FNAM.
      BDCDATA-FVAL = FVAL.
      APPEND BDCDATA.
    ENDFORM.
    Ajay P. Nikte

  • MRP RUN for increased qty of SODS PR for complete qty instead of increase

    While doing MRP RUN for increased qty of SO No line item 10 to 20,System is making PR for complete qty instead of increased qty.
    Sales order  - 0001
    Line item - 10 Qty - 10
    Line item - 20 Qty - 15
    MRP run against the sales order for line item 10 & 20 PR / PO raised for qty 10 & 15 respectively.
    After that qty has increased in sales order.Again we run MRP system generates totla no of PR insted of Increased qty .
    Sales order  - 0001
    Line item - 10 Qty - 10 + 5 = 15
    Line item - 20 Qty - 15 + 5 = 20
    Plz help

    There are few questons here:
    - when you increase the amount of the sales order item, is the newly added amount confirmed with the same date / schedule line? You can check the schedule lines for that SO item.
    - have the purchase requisitions, which were generated after the first MRP run (before the modification of the SO items), been modified manually (are they firmed?) / processed? In this case MRP cannot modify (delete) them (and create new ones)...
    - did you check the MRP control settings in material master
    Remark: even if you get several PRs, you can create one PO from them.

  • Revision number for Header material in Production order.

    I have maintained Revision number in material mster  for Header material in Production order and also for components.
    1)Revision number for Header material in Production order is not appearing in AFKO table against production order.
    2)Revision number for components in Production order is not appearing in RESB table against reservation.
    Any settings for that please guide.

    Hi,
    Revision number generation is using ECM only possible. Are you using the ECM with revision levels. Check this.
    Regards,
    V. Suresh

  • MRP Run for MTS & MTO..........................

    Dear Friends,
    Please explain me the following question.
    If a customer needs some 100 pieces of product, but we dont have the inventory to produce that.
    So we need to run the MRP.
    Here what is the output of the MRP in MTS and MTO.
    Thanks very much.

    Hi Arun
    Your Customer wants 100 quantity of material but you dont have in stock so you are gonna run MRP, below are the results.
    a) MTS Scenario - 100quantity of Planned Independent requirement to be created, run MRP MD02 for that material and you get planning orders, now convert the planned orders into Production order and for components do Goods issue to the production order and the operations do confirmations, then do Goods receipt and take the material into stock, now you can issue the material from stock to the sales order and your requirement is fullfilled.
    b) MTO Scenario - 100quantity of Sales order is created and run MRP using MD02 or MD50, you get the planned orders then convert the planned orders to Production order and do Goods issue of components to the Production order and confirmation of operations, now you do GR to sales order and the material is put in sales order stock, this stock can only be issued to that particular sales order you have planned.
    Hope the above clarifies...

  • GBB -VBR for Header Material

    Hi All,
    We have created a split valuated material with 2 valuation types . i have maintained the consumption accounts for the child materials but should i mainatain the consumption accounts for header material in obyc?

    It is not necessary.  The valuation class for the header level is not required, and it is not useful for sub-sequent functions.
    Flex Yang
    FI/CO, MM, SD Certified.
    Edited by: flex yang on Oct 4, 2009 1:41 PM

  • Creation of Material Master for a material with Material Type NLAG

    Hello Sirs,
         I have to create a material which will be consumed directly. I would use the
    material type NLAG (Non stock material). If I create a material with this material type, will it contain an Accounting view where in I can maintain the price of the
    material? If it contains an Accounting view, which type of Price control should be
    used (Moving average or Standard)? Further, can we maintain an info record for
    a material with material type NLAG?How the price updation happens?
    Regards
    Yoga

    Hi Madhu,
        Thanks for your reply. But, I have one more doubt. For non stock materials, we
    will specify the cost centre and G/L account at the time of creation of Purchase order. Then, do we have to specify the valuation class at the time of creation of
    Material Master since there is no automatic account determination?
    Regards
    Yoga

  • Line item for header material not updating in COEP table

    Hi all,
    from last few days, I found that   when I do confirmation and GR for process order, system is updating all line ( i.e. components, activity types) but line for header material that is finished goods  or semi finished goods is not updating in COEP table,  I have done GR for order and transferred stock from quality too.
    But still its not updating. What could be the reason for it .
    Thanks
    Vivek Varun

    Hi Krishnendu,
    Thanks for the reply ,  FI document is not getting generated.
    What could be the reason for it, as before it was working fine.
    Thanks
    Vivek Varun

Maybe you are looking for

  • Opening SWF Files in the Application window

    Hello Everyone, We have a problem in opening .swf files in our application. We had quick time movies(.mov) which we used to open and play inside the application window, using QuickTime Framework APIs in the code. Presently we had converted these quic

  • XI idoc to idoc scenerio

    Hi       my problem is that  i passed data from Source R3 sytem to XI.I am receiving XML message in XI.But XML massege is not passed to target R3 System. Suoure System Distribution Model Details: Sender:TESTBSYS2        (r3source) Receiver:IQXCLNT600

  • Can't Read My New Interactive Booklet

    I bought the new Matisyahu CD "Youth" yesterday and it came with an interactive booklet. I'd like to use the booklet but it comes up in the spot where the album art comes up and can't be enlarged unless i expand it but it's still tiny. Any idea how t

  • Can I use my 2010 AirPort Extreme as a range extender with a new AirPort Extreme?

    I want to use an existing AirPort Extreme (2010 model) with a new AirPort Extreme to extend the range and signal strength into a shop. They are different designations, one n and the other ac. Are they compatible. I need to know before I buy the new r

  • GBF en mode frequence list

    J'essai de générer un signal sinusoidal variant en fréquence. pour cela j'utilise l'exemple de national Instrument : NIFgen_sweep_generator.vi J'entre 1kHz pour la fréquence de départ et 1MHz pour la fréquence finale, pour les frequency steps j'entre