MRP run for sub contracting plant
Hi all,
Please let me know if this scenario is possible:-
I have two plant A and B. A is manufacturing plant and B is sub contracting plant. For one FG I plant there is demand of 100. After MRP run planned order is created for 100 for FG. For raw material purchase requisition for 50 is created and delivering plant will be B.
In md04 for plant A I can see pur req for 50 and for plant B in md04 I can see 50 as stock requirement.
Now use wants that if MRP is run for plant B, it should generate planed order against stock requirement.
Strategy 11 we are using.
Please let me if it is possible
Regards,
D.Dutta
Hi ,
Cross plant planning is possible ( like Plant A & B) , no need to run MRP in two plants separately . but you need to the follow the following config .
1) Define special procurment key ( Spro> MRP> Master data --> Define spl procurement key)
You can copy standard key 40 , ( you have to defined supply plant and recving plant)
2) Identify the Materials which are to be cross plant planning and go to material master MRP 2 view and assign Speial procuremnt key
3) run MRP for FG in Plant A and down level MRP for RM/PM/SFG will be generated in plant B.
I hope this will help your requirement .
Thanks
sekhar
Similar Messages
-
BOM Explosion in MRP runs for sub-contracting PO
Hello Experts,
We have sub- contracting Purchase order in business scenario.
Subcontracting PO is required to be considered as demand for MRP. As I have checked PO is showing in MD04, after MRP run using transaction code
MD02 subcontracting BOM not exploding.
Sub contacting PO raised on “X” procurement type material, PR is required on BOM item “F” Procurement type
Please suggest what all special setting is required as master data & configuration data.
Thanks in advance!!!Hi,
In the header or parent material (the material that is being produced bu your subcontractor) you have to maintain the following data:
Procurement type = F
Special Proc Type = 30
MRP Type = PD
Lot Size, Minimum Lot Size, Rounding Value: Enter what is convinient for your business.
Be sure you have a BOM (CS01)
Create a Production version indicating the BOM (C223)
Enter Selection Method 3 in the MRP4 view of the material master
Create an Info Record (type Subcontracting).. (ME11)
Create a Source List (ME01)
Run the MRP and check MD04
Kind Regards,
Mariano -
Only one MRP run for diffrent companies plants
Hi PP expert,
my bizness scenario is . there 2 companies code one company code has 2 plant and another comp has 3 plant..only one product is assembling in all plant. suppose finish material X is producing in all company plants
but finish material X have component K and L, L is manufacturing in only one plant and supply to all company plant
my client want to produce material component "L" for all plants for his monthly requirement with MRP run.
component L is semi finish material and its is component of X
but i am not under standing how will get requirement from same company plants and other company plants. for Monthly MRP run
Kindly suggest me how will take requirement from others companies plants for MRP run...
kindly suggest me step by step
Regards
AqueelDear Friend,
Only one MRP Run i.e. the Total MRP Run is possible at different plants but all must be under same company code.
in your case ,plants are under different comp.codes , so it s quite difficult.
Here I have to check the posiibility of using the special procurement key to tranfer the material between plants assigned to different comapny codes. The particular Keys are ..
40--Stock transfer (proc.from alter.plant); 70 -- Withdrawal from alternative plant or 80----Production in alternative plant*
If it is possible , then you can use this option of Special Procurement key.
Otherwise you can use Plant to plant transfer movements like 647 to transfer beween plants against the Purchase order.
Regards,
Edited by: Girishprasad Subhash Pawar on Jun 28, 2010 12:26 PM
Edited by: Girishprasad Subhash Pawar on Jun 28, 2010 12:30 PM -
Run time error while reconcillation for sub contracting challan
Hi,
Gurus please solve this issue ,
When i am trying to reconcillation for sub contracting challan against the GR DOC number.When we are assing the quantity for challan and save at that time i am getting abap dumpAnalyse in ST22
U may take abaper help -
Sale Order MRP Run for All Order Line Items
Greetings...
I have One Sales Order , in which i have ten different Line Items .
Now I have to Run the MRP on basis of Created sales Order so that all Line items wi get consider insingle MRP Run on sales order base MRP Run.
How to take MRP Run of One Sale Order for all Line Items.???
In MD50 , we can have sales Order with Item..In MD50 you can give only one item at a time.
Its a standard transaction meant to accomodate changes relevant for MRP after plant level MRP run related to specific sales order Item.
so either you need to do it multipal times by changing material or you need to go for MD02.
Please explain bussiness case in detail why you want to restrict your MRP run for items in a specific sales order.
Regards -
Error during creation of Purchase Order for Sub-Contract
Hi
i am creating PO for Sub-contract, to check whether it copied the components or not, when i clicked components in material data tab: it says u201CMRP parameters for plant XXXX have not been maintained.
Please guys help me out in this matter. Thanks in advance.
Regards,
KrishnaPlease post in the relevant forum.
-
Restriction for sub contract PO creation
Dear expert,
We are having discrete manufacturing process,
Some assemblies are manufactured using production orders as well as Sub contract PO.
We are using split valuation.
Now our requirement is suppose one assembly has been assigned to Subcontract purchase order, then the system should not allow the creation of production order for that assembly.
How to map this scenerio?
Thanks in advance,
K. SubhashHi Shankar,
I have not tried in one company code, any way you can try this with creating another plant as subcontracting vendor & process in the same way how you process for sub contracting.
1) Create plant as sub-contracting vendor
2) create po with item category L
3) send components
4) receive materials.
but since it is within a company code check for legality involved with FI, you can customize special transaction key for this may be with movement types since it is within a company code, that is the reason i asked you is it within a co.code
Regards
Rang -
541 & 543 Mvt for Sub Contract Process with Split Valuation
Hi all,
We have activated SPLIT VALUATION for sub contracting in ECC 6.0
We have clasified into 3 Valuation Catergories as New,Repaired & Faulty.
The logic & naming convention of the materials are
New Material : C1
Repaired : C2
Faulty : C3
The details are as.....a faulty material can be converted into Repaired by the external Vendors,for which we raise a PO and do MB1B with 541 mvt type with ref to this PO.
The Acing Entries are
PK GL Code Material Value
99 117000 C3 10
89 117000 C2 100
93 600530 90
While in process the GR w.r.t the above mentioned PO ,we are getting 6 accounting entries (which is delivered by Stand SAP) they are as
PK GL Code Descrip Value
89 117000 Stock 100
96 117400 GR/IR 150
91 600530 Sub Cont 100
86 600863 Sub Service 150
99 117000 Stock 100
81 600530 Sub Cont 100
Can any please explain me how the system calculates the above Accounting Entry.
We are confused why the system calculates ( entries) for the 91,81,86 Posting Key.
I have uderstood that PK 89 for goods inward, 96 is for GR/IR clr, 99 is for reversal of 541 mvt type.
Other 3 entries i have the confusion ........
Can anyone please guide me and explain in detail how ,why andfrom where the system is calculating the entries.
Hope that you will help me in this regards
Take Care
God Bless
Regards
Praveen.
Edited by: Praveen Singh on Sep 16, 2008 8:07 PMGo to OMWB and click on simulation and here enter you mateirla number, plant and Mtype 101
Then click on account assignment
you will see all the entries
Posting Lines Text VlGCd AGC VCl PK Acct D PK Acct Cr
Gain/loss from revaluation -e- -e- -e- 83 440700 93 440700
Inventory posting -e- -e- TRA1 89 130000 99 130000
Incidental costs of external a -e- -e- -e- 86 460820 96 460820
External activity -e- -e- TRA1 86 460960 96 460960
Change in stock account -e- -e- TRA1 81 460820 91 460820
Purchase offsetting account -e- -e- -e- 40 --Missing- 50 --Missing-
Purchase account -e- -e- -e- 40 --Missing- 50 --Missing-
Materials management exch.rate -e- -e- -e- 40 440600 50 440600
Cost (price) differences -e- TRA1 83 440000 93 440005
GR/IR clearing account -e- -e- TRA1 86 210005 96 210005
Inventory posting -e- -e- TRA1 89 130000 -
How to find out the link for the tables for sub contract PO
Dear All,
How to find out the link for the tables for sub contract PO, I am looking for the fields Material, Unit, Batch no., quantity.
Please provide the solution for the Table related to ABAP.
Thanks,
V.V.Hi,
Make use of the table EKKO, EKPO...
For subcontract please select the option in EKPO-PSTYP.
Regards
GK. -
Inbound delivery for Sub-Contracting Scheduling Agreement
Hi All,
I am working on inbound delivery creation --> PGR for sub-assembly (Semi-finished product) which we receive from sub-contracting vendor through scheduling agreement. At time of PGR, it should do MVT#101 for sub-assembly and 543-O for raw components.
I already created JIT/FRC releases and did PGI (MVT # 541-O) for raw components. Now I am manually creating inbound delivery (VL31n) to post PGR. When I am doing PGR with VL60, I am getting below error.
Any help or suggestion please ?
As observation, I have seen that in inbound delivery I am only seeing sub-assembly (semi-finished) product. I am not able see "SC Component" tab which I have seen on other environment (ECC 6.0 with EHP4). Is it related to system limitation where we can't do PGR for sub-contracting ?
Thanks.Hi AKPT,
Sorry if i miss understood but note 352243 says to refer note: 338119
"In the current release, it is not possible to process the components to be cleared when you post the goods receipt for the inbound delivery. (See Notes 338119, 197864 and 199703 also).
However when you implement these corrections, the error log is also displayed for the subitems to be cleared and further processing can be carried as described in Note 338119."
When I refer note : 338119, there is no correction. Am I missing anything ?
Again my issue is I am not able to perform Post Goods Receipt. Even after doing PGR, if system do 543 for raw component, I am fine.
Thanks.
Regards,
Ravi -
Swap between two different item categories in sales orders for sub-contracting
Dear gurus,
my requirement is to have the ability to swap between two different item categories for sales orders for sub-contracting.
This should be controlled by a combination of the material and a value maintained the Usage field in the Customer Material Info Record (for example by entering a ‘V’). A combination of Sales Doc Type, Item Cat Group and Usage should result in the creation of a purchase requisition.
In the event that a process order is required instead of a purchase requisition (i.e. the product is to be manufactured in-house instead of sub-contracted) the user must have the ability to change the Item Category within the sales order to produce a process order.
The user would just change the item category within the sales order, and the system would automatically remove the purchase requisition assigned to the SO, and create a process order and assign it to the SO.
Can you suggest any possible solution?
Thank you in advance.Hi Majlo,
In my system, I checked. First created sales order with third party line item and then changed item category to normal item category.
Till Purchase order not created, I can change Item category of my sales order line item.
In this case SAP inform by log and once save delete purchase requisition of that line item .
For this you need to assign another item category as an manual item category in SPRO Item category assignment.
After this user can manually change item category to other one manually, if PO do not exist.
Please let me know if your query is different.
Regards -
MRP RUN for the more than one line item in sales order.
Hi ,
In the sales order nuber of line item are , i will have to take MRP RUN for selected line item .
So plz suggest what development will require?
Abhay
Edited by: abhay patil on May 30, 2008 8:52 AMHI,
U can write separate prog. Which will ask sales order no. and from to line item or multiple line item of sale order. Then in loop internally pass the each line item no to MD50 prog. Which will run in background.
I will give u sample prog. Which I had created for running MRP for all the lines items of given sales order in one go.
*& Report ZPRG_PP_001
REPORT ZPRG_PP_001.
tables vbak.
data: begin of it_vbap occurs 1,
vbeln type vbap-vbeln,
posnr type vbap-posnr,
end of it_vbap.
DATA: P_MODE TYPE C.
Batchinputdata of single transaction
DATA: BDCDATA LIKE BDCDATA OCCURS 0 WITH HEADER LINE.
selection-screen begin of block b1 with frame title text-001.
parameters : p_vbeln like vbak-vbeln obligatory.
selection-screen skip.
parameters : p_fore radiobutton group mode,
p_back radiobutton group mode default 'X'.
selection-screen end of block b1.
at selection-screen.
Check Sales Order
if not p_vbeln is initial.
select single * from vbak
where vbeln eq p_vbeln.
if sy-subrc <> 0.
message e499(sy) with 'Invalid Sales Order no.' p_vbeln.
endif.
endif.
start-of-selecTION.
Get Sales order items
select vbeln posnr from vbap
into table it_vbap
where vbeln eq p_vbeln.
Set BDC mode
if p_back eq 'X'.
p_mode = 'E'.
else.
p_mode = 'A'.
endif.
Process MD50 BDC
LOOP AT IT_VBAP.
perform bdc_dynpro using 'SAPMM61X' '0160'.
perform bdc_field using 'BDC_CURSOR' 'RM61X-TRMPL'.
perform bdc_field using 'BDC_OKCODE' '/00'.
perform bdc_field using 'RM61X-KDAUF' IT_VBAP-VBELN.
perform bdc_field using 'RM61X-KDPOS' IT_VBAP-POSNR.
perform bdc_field using 'RM61X-BANER' '1'.
perform bdc_field using 'RM61X-LIFKZ' '3'.
perform bdc_field using 'RM61X-PLMOD' '3'.
perform bdc_field using 'RM61X-TRMPL' '1'.
perform bdc_dynpro using 'SAPMSSY0' '0120'.
perform bdc_field using 'BDC_OKCODE' '=XBAC'.
CALL TRANSACTION 'MD50' USING BDCDATA MODE P_MODE.
CLEAR BDCDATA.
REFRESH BDCDATA.
ENDLOOP.
end-of-selection.
Start new screen *
FORM BDC_DYNPRO USING PROGRAM DYNPRO.
CLEAR BDCDATA.
BDCDATA-PROGRAM = PROGRAM.
BDCDATA-DYNPRO = DYNPRO.
BDCDATA-DYNBEGIN = 'X'.
APPEND BDCDATA.
ENDFORM.
Insert field *
FORM BDC_FIELD USING FNAM FVAL.
CLEAR BDCDATA.
BDCDATA-FNAM = FNAM.
BDCDATA-FVAL = FVAL.
APPEND BDCDATA.
ENDFORM.
Ajay P. Nikte -
Error in GR for Sub-Contract PO
Hi,
When i carry out GR for Sub-Contract PO, system showing below message
Programming error: data already aggregated
Message no. AG223
Diagnosis
The material data for the document is already available in aggregated form in the internal tables. This means that it is not possible to call DELTA_MANAGEMENT for this document.Are you using CATT or eCATT ?
If yes, This may raise error message AG223
Please read attached note 304122.
Transaction MIGO does not support CATT, which is based on CALL TRANSACTION / batch-input techniques.
Instead, use for example BAPI_GOODSMVT_CREATE or CALL FUNCTION 'MIGO_DIALOG' (see function documentation in SE37).
Hope this helps,
Cheers!
Plauto -
In MRP Run for FERT, i want to eliminate 3rd level HALB and their BOM compo
Hi All,
Can you please guide me on this issue please.
Regarding - In MRP Run for FERT, i want to eliminate 3rd level HALB and their BOM components for exploration and planning
My scenario is:
Level 1: FERT1
Level 2: HALB1.1 + ROH1.1 + VERP1.1
Level 3: HALB1.1.1 + ROH1.1.1
Level 4: ROH 1.1.1.1 + ROH1.1.1.2
While performing MRP run i dont want to include the material HALB1.1.1 (Level 3 component) and their corresponding BOM component (ROH 1.1.1.1 + ROH1.1.1.2)
My constraint:
The reason for this is HALB1.1.1 is being manufactured through REM profile with separate PIR and MRP run.
But it is being consumed in FERT1 through intermediate semi-finished HALB1.1. and it needs to include for Product costing.
Note: All materials have been marked as PD - MRP type
Would be a great help from you.
Thanks and Regards
Khadeer AhmedHi,
If you put in FI forums then you will get reply immediatly.
Anil -
Batch determination for Sub Contracting Purchase orders
Hi
I want to allocate automatic batch number while creating the Sub Contracting Purchase order (item cat: L).
System should dynamically allot the batch, no manual process.
This automatic batch number allocation should be work for sub contracting PO's not all Purchase orders.
Please suggest the process.
ThanksHi SUNIL,
I haven't done such thing so I'm nut sure whether it works what I'm writing, but according to the manual is it possible to assign automatic batch creation to movement types.
As I understood in SPRO you can:
1. Set the internal batch assignment:
Logistic General > Batch Management > Butch Number Assignment > Activate IBNA
2. Define the creation for the movement type you want:
Logistic General > Batch Management > Creation of New Batches > Define Batch Creation for Goods Movements
But I think you can't make difference between 'normal' MVT 101 and 'L' MVT 101. Isn't it possible to create a new MVT for subcon-GR?
In this case maybe you could realize your idea.
But defining a new MVT just because of thi might be troublesome...
Maybe you can find better solution.
http://help.sap.com/saphelp_46c/helpdata/en/25/283c3f4f7811d18a150000e816ae6e/frameset.htm
BR
Csaba
Maybe you are looking for
-
WiSM, unable to see Interface after adding.
We have an up and running WiSM, for about 9 months. It resides in a 6509 chassis. I needed to add a new interface for another subnet (previous one was getting over ran, and we have a new project) I went through the process of adding the interface.
-
Macbook Pro screen blacks out keys stay lit
The gist of it is in the subject Pretty much without warning, does not have a preference for type of application being ran, the screen will completely black out. If sound is being play it either stops or begins to skip. The keys stay lit. The only wa
-
Itunes 10.1 will not launch
have removed and reinstalled don't help keeps giving an error saying not properly installed was working a few days ago . don't know what to do any help?
-
Change iPhone to iPod: won't restore/sync
I have an iPhone 3G that no longer has phone service, but otherwise worked perfectly fine. Took it to AT&T store and they wiped it clean and told me to Restore and then sync. I have restored 3 times, but the iPhone continues to show only an arrow in
-
Condition record for JMOQ condition
Hi , I have maintain a condition record for Condition type JMOQ (BED SET off , Amount) at tax code level .......but in Purchase Order , if I attach same tax code , system is showing