MRP RUN- KIT BOM explosion not working

We setup one layer BOM’s for our maintenance KITs as parent material and components as child material.  For  example KIT is TS10000-K1 and components are TS10001, TS10002 etc setup as next layer with in the BOM. Both KITS and components are defined as material types ERSA (Spare parts). These one layers BOMs are setup as production BOMs and expected to create purchase requisitions for KITS and components by exploding BOMs during MRP runs. We use purchase requisitions and convert them into POs to procure both KITS and components. We DO NOT USE Panned orders and Production orders. 
The safety stocks / reorder point are considered as demand for KITS and components as we do not have any external demand for KITS and components.  
MRP run is creating purchase requisitions automatically for both KITS and components as per safety stocks and reorder point defined in MRP Views of Material Master. This is working as expected.  
The issue is: KIT BOM’s are not exploding to generate purchase requisitions for the dependent components of KIT BOM. Please suggest the way to resolve this issue. 
Split valuation: Also we plan to use split valued KITS with both new and refurbished. So we need BOM explosion for split valued KITS
also (after the 1st issue is resolved).   
I verified the following items to make sure the required configuration and data setup is defined correctly.
1) Planning file activated Plant - OMDU 
2) Executed MRP run with Total Planning - MDBT and MD02 (single item, multiple levels)
3) BOM explosion for MRP activated- OS23 
4) MRP type in MRP1 view- PD and VB (I tried both separately but BOM is not exploding).
5) Procurement type “F” (MRP 2 view) and lot size “EX”  
6) Planning strategy in MRP 3 view (tested w/o planning strategy and with strategies 10 and 40. But BOM is not exploded)
7) BOM status and usage (status is active and usage is for production-CS02 and OS20)  
8) BOM Validity date (Valid) 
9) BOM structure in CS12 (BOM is exploding in CS11) 
10) Availability check  
11) Selection of BON ID to have BOM usage indicator assign (OS31).
12) No alternate BOMs or production versions or work scheduling view are used.
Please review the above 2 issues and suggest any workable solution. Thanks in advance!
NOTE: I extensively used MRP with multi-level BOM explosion in my earlier projects without any issue. However the above issue is a  bit strange  why one layer BOM is not exploded in this case. 
Regards
Srini  

Hi
Thanks for your response. I reviewed all SAP notes and none of them are applicable to my scenario.
1808396 - BOM changes not considered by MRP: I have not changed BOMs.
1781324 - MD11: Valid BOM alternative is not found. We do not have alternative BOMs.
1791009 - No BOM explosion after changing production version: We am not using production versions.
Our Material KITS are PM spare assemblies set up as BOMs and consists of individual spare parts as components. We are creating purchase requisitions and not planned orders. We are not using PP functionality/Production orders.
MRP is generating purchase requisitions for KITS and components as per ROP and safety stocks. In other words it is working as expected.  The issue is BOMs which are parent assemblies are not exploding to the next lower level components.
Please note that I am not getting any error messages when MRP is executed.
Regards
Srini.

Similar Messages

  • MRP run without bom explosion

    Dear All,
    Can it possible to run mrp without bom explosion against demand management & demand program for 78 weeks its mid-long term?
    BOM is not considered by client,so it possible to run mrp without bom?
    Regards
    Gajjen

    Hi,
    You Can run MRP with out BOM explosion
    Option 1: In MRP 4- Set  MRP dependent requirement - 1
    or
    Option 2: Make the BOM status to 2 In active.
    or
    Option 3:
    IF you want BOM for Other purpose such as costing, Then
    Create a New BOM status as per your requirement in OS23,  Remove the  check mark of MRP  Explosion .and assign to the BOM status to respective bom
    Regards,
    Sundaresan
    Edited by: Sundaresan . E. V on Aug 26, 2010 5:03 PM

  • Material in two plants, I run MRP with the BOM is not found in prod plant

    Hi all,
    I have plant 1020 material 12345
    Plant 1020 is the production plant for material 12345
    The material 12345 exists in plant 1070.
    The material 12345 in plant 1070 has no MRP.
    Plant 1020 material 12345 config in MM03
    MRP1 --> MRP Type = PD
    MRP1 --> MRP Controller = G03
    MRP3 --> Planning material = PLAN_1020_GR03
    MRP3 --> Planning plant = 1020
    Plant 1070 material 12345 config in MM03
    MRP1 --> MRP Type = P3
    MRP1 --> MRP Controller = 017
    MRP3 --> Planning material = empty
    MRP3 --> Planning plant = empty
    The BOM in cs11 for plant 1020 material 12345
    has 3 components
    Comp#1
    Comp#2
    Comp#3
    The Dependency is code
    TABLE TB_1020_SUPERBOM (PP_nuance_interne = $ROOT.PP_nuance_interne,
    PP_dim_billette_bom = $ROOT.PP_dim_billette_bom,
    PP_CODE_LONG_BILL = $ROOT.PP_CODE_LONG_BILL,
    pp_component_bom =$self.pp_component_bom).
    The dependency is not found because it is looking for it in the plant 1070 and not the plant 1020.
    When the MRP runs for a Delivery type stock transfer order I get
    CONFIG_1020_BILLET <---- This is the BOM item component field in CS11 in the Basic data tab
    Comp#2
    Comp#3
    instead of
    Comp#1
    Comp#2
    Comp#3
    When I run MRP for the same material, if there's no
    "Delivery based on Stock transfert orders" the MRP associates the correct components
    Hope this explains m'I situation.
    Regards!
    Curtis

    Hi,
    If you want a reply in one line, it would be SAP R/3 does not supoort this feature.
    You will have to go for APO module.
    There are few things which can be done in R/3 side, as in maintaining a scope for MRP run in OM0E, maintaining special procurement key etc etc, but all these will not do any check of stock in another plant & can only help in a very limited way if all any for your specific need.
    But SAP R/3 provides a cross plant evaluation via MD48 to know the stock & demands at all plants, this can help only for evaluation purpose.
    Hope it clarifies.
    Regards,
    Vivek

  • Multi Level BOm is not working in SAP afs

    Hi Experts,
             I am facing issue in MRP.For multi level bom's ,Requirements is not getting generates.Is there any settings is there to active multi level bom for afs materials.
    please suggest solution
    Thanks and Regards,
    Deepika.

    Hello Deepika,
    As we know AFS materials are planned at SKU level (Grid and stock categories)  you can use AFS MRP (/N/AFS/MD02) only.
    Please refer OSS note Note 981747 - FAQ - AFS Production Planning
    Question 5 Made-To-Order Planning -Multi-Level (MD50) does not work for AFS Materials and Sales Orders containing AFS materials.
    Answer: Made to Order Multi level planning functionality was never enhanced for AFS and hence transaction MD50 is not supported.
    Steps are as,
    1. Create a MTO/PTO sales order for an AFS material.
    2. Run AFS MRP using transaction code /AFS/MD02.
    3. Convert the planned order to production order.
    Best Regards,
    R.Brahmankar

  • For  MTO scenario,multi level bom is not working sap afs pp

    Hi Experts,
                  We are implementing MTO scenario for our client. I have maintained  strategy group for FERT is 40 and strategy group for HALB and ROH are 20.
                   For single level BOM , requirements is not getting generates properly.
                  I would like to know What are all the settings is required to create AFS BOM.(single and multi level)
                   Please suggest me.
    Thanks & Regards,
    Deepika.

    Hello Deepika,
    As we know AFS materials are planned at SKU level (Grid and stock categories)  you can use AFS MRP (/N/AFS/MD02) only.
    Please refer OSS note Note 981747 - FAQ - AFS Production Planning
    Question 5 Made-To-Order Planning -Multi-Level (MD50) does not work for AFS Materials and Sales Orders containing AFS materials.
    Answer: Made to Order Multi level planning functionality was never enhanced for AFS and hence transaction MD50 is not supported.
    Steps are as,
    1. Create a MTO/PTO sales order for an AFS material.
    2. Run AFS MRP using transaction code /AFS/MD02.
    3. Convert the planned order to production order.
    Best Regards,
    R.Brahmankar

  • BOM explosion not done for externally procured item.

    Hi Experts,
    We have done MRP run for finish goods which is creating planned orders for HALB material, but it is not further exploding the BOM of HALB material, so  we are not getting any planned order/pur requisition for ROH. Plz help me out asap.

    Hi,
    When you run MRP for an externally procured item say - HALB , proposals will be generated say-planned order for ext proc for that item and the BOM will not be exploded further.

  • Windows update cannot run because service is not working.

    Thinkpad E545, Windows 7 (64 bit) Professional.  When I attempt to run Windows Update I get the message "Windows update cannot currently check for updates because the service is not working."  Microsoft Fix-It does not help.  I found a YouTube posted by Richard Lloyd and followed the steps:  the Windows Update service is running, the Background service is running.  Several web sources including Microsoft point to an Intel RST driver.  I downloaded this driver g1io15ww.exe and ran the file, but still no joy.  A solution would be welcome, and Happy Thanksgiving.  --  Alan

    Hello and welcome,
    Your laptop is AMD-based (IIRC) so an Intel driver isn't going to help.
    If the update issue is caused by the AHCI driver incorrectly reporting physical sector size (that's what those IRST reports are about) it might be fixed by installing the correct  AHCI driver for your laptop:
    http://support.lenovo.com/us/en/products/laptops-and-netbooks/thinkpad-edge-laptops/thinkpad-edge-e5...
    There are other reasons for Win update failures, so this isn't a sure thing. Worth a try, maybe. I've personally only seen this issue with Intel hardware.
    Z.
    The large print: please read the Community Participation Rules before posting. Include as much information as possible: model, machine type, operating system, and a descriptive subject line. Do not include personal information: serial number, telephone number, email address, etc.  The fine print: I do not work for, nor do I speak for Lenovo. Unsolicited private messages will be ignored. ... GeezBlog
    English Community   Deutsche Community   Comunidad en Español   Русскоязычное Сообщество

  • MRP Run error " Schedule Lines not generating properly"

    Hi Folks,
    I am facing a typical issue with MRP Run.
    Every time when I am running the MRP for a particular material I have made settings such that Schedule lines to be generated by maintaining the Source list and MRP relevancy as 2 in source list. Also I have fixed the vendor. Now my problem is I am getting Schedule lines for first run and Combination of Purchase requests and Schedule lines or only PRs for the next MRP run.. This is keep on repeating in such as way that the planning is shifting as said above for subsequent MRP Run.
    Note that the initial settings during MD02 remain same for all run.
    I want only schedule lines to be generated but not PR.
    Pls advise and provide input where the wrong might be.
    Quick responce would be appreciated.
    Regards
    Shash

    Dear shash,
    Check with What are the MRP control Parameters values which you are using for the MRP run.
    In MD02, For Deleivery schedules run with value 3 - That's -  Schedule lines.
    The other options are     1  No schedule lines
                                       2  Schedule lines in the opening period.
    check with this & revert back.
    Regards
    Mangalraj.S

  • Videos run by flash player not working on IE and chrome

    First, upgraded new adobe flash player, videos did not work so I deleted it and downloaded the flash player again.
    Also videos were not running, Repeated downloading and unistalling 7 times.
    I checked add-ons and enabled shockwave, disabled active X filtering,
    deleted flash player folder in Adobe and Macromedia folder...
    How can I make the videos run?

    Please try the troubleshooting steps in this FAQ:
    How do I troubleshoot and report problems with Flash Player Video?

  • BOM explosion not done because there is no free item number anymore

    Hello,
    I have a problem with BOM explosion when creating a sales order.
    All the following actions are done with VA01 :
    -  I enter a material (main item 10) with a rejection reason, so the BOM explosion is not done :OK.
    - Then  I add the same material (main item 20) without rejection code, so the BOM explosion is done, it means sub items 21, 22., ...,31,32 are determined:OK
    - Finally, I remove the rejection code on item 10, the problem is that there is no place anymore to do the BOM explosion because I have 12 sub items (10 +12 = 22 and it is not possible as I have already an item 20).
    I have a popup with message V1-142 (There are not enough item numbers free for a structure explosion).
    I know that it is possible to change the increment with VOV8, but my customer want to keep this one: 10 by 10 for main item and 1 by 1 for sub item.
    He told me that he think that there is a user exit in order to put the remaining sub items at the end of the sales order like this
    10 main item A
    11 sub item 1 (A)
    12 sub item 2 (A)
    19 sub item 9 (A)
    20 second main item (B)
    21 sub item 1 (B)
    22 sub item 2 (B)
    32 sub item 12 (B)
    33 sub item 10 (A)
    34 sub item 11 (A)
    35 sub item 12 (A)
    Maybe it's a strange idea, but could you please tell me what are the different possibilities to manage sub items when there is no place to put them :
    - put a higher increment in VOV8? Ok but my customer don't agree
    - other solutions?
    Thanks.

    Hello,
    Did you ever find a solution for this? The notes mentioned in the earlier post dont appear to be relevent for 6.0.
    I have a similar issue when dealing with Cross Sell items. When it tries to insert the additional items I get the V1142 message, then the items are copied at the end of the list but the higher level item reference is incorrect for the cross sell items.
    I do not want to change the increments but it appears to be the only option.
    Any ideas are appreciated.

  • ODS, Inventory cube, and WM- Trying to run a report but not working! Help

    Hi Gurus,
    Hope somebody can help me here....
    I have an Inventory Cube and an ODS on Material Plant and another on Warehouse Management. For my reports I need fields from three of them so I created a Multi Provider by using these. But I have only Material and Plant as common in three of them, which is used in defining the Multi Provider. Along with these I have used some more characteristics which are not common. So now when I run a query on this MP, I am getting a display wherein the common characteristics get the values that are correct but for uncommon chars the values for the kfs from other data targets become blank and an additional row comes too.
    For example, I have kfs like Blocked stock in the cube and in one of the ODS I have kfs like standard price. So, in the query for the char material group which comes from the ODS there are no values for Blocked stock, I mean I can see a row wherein there is a value for Blocked stock and a blank for Standard Price,  in the additional row there is a blank for Blocked stock and a value for Standard price. This is the case with all the other kfs of different info providers.
    Is it because they are not common in all the info providers? Is there anyway to solve this? RRI will not work as I need the KFs from both the info providers.
    I am stuck now with this problem, so any guidence would be a BIG help.
    Thanks

    Is it because they are not common in all the info providers?
    -->Yes
    Is there anyway to solve this?
    --> Yes and no. If there is a join condition between the ODSs that you can use to get the fields on the same row, you can do an infoset.
    --> To achieve something like an outer join, you can create RKF for your base KFs, and restrict them on uncommon chars with 'constant selection'. This may not work in all cases. Search for a blog by Prakash Darzi on 'Constant selection' to understand this.
    If logically there doesn't exist a relation (try to visualise how you will derive your output row if you were given these two in a file or spreadsheet - is there a logical link to connect the two sets of data?) you cannot expect the results that you look for.

  • BOM Explosion not seen

    Dear Experts,
    My Equipment BOMs and FL BOMs are not seen in the structure view when gone through IH01 (All relevant check boxes ticked in)
    Whereas, these are visible when I go through IL03 --> Structure.
    May kindly share the knowledge to troubleshoot.
    Regards
    Jogeswara Rao

    Dear Friends,
    I have found the problem.
    This is happening because the date value in the Valid From field of IH01 is 31.12.9999.
    This I have set to Dynamic Date Calculation with Current Date Name of variable. (In the Variant Configuration)
    Now the current date is defaulted in this field and the BOMs are appearing.
    Regards
    Jogeswara Rao

  • "Build Application/settings/Advanced/Run after installation" is not working LV70

    Hi !
    Look at thread
    http://forums.ni.com/ni/board/message?board.id=170&message.id=129269
    Seems like "Run executable after installation" is not workin at all (LV70, W2K).
    I' been try all,
    - run directly *.BAT file
    - i great exe file what' s runn *.BAT file.
    If i run directly "CmdPrompt3.exe" (attachment , source) it's working but not
    with when i run "setup.exe" ?
    What is wrong ?
    What means "wait until done" ?
    BR
    -HeVi-
    Attachments:
    CommandPromt3.vi ‏23 KB

    Hi HeVi,
    I'm not sure that I completely understand what your issue is. Are you
    trying to launch a BAT-file after the installation of an application?
    In that case, I will recommend you to refer to the following
    KnowledgeBase:
    Running a Batch File Automatically After an Installation to Access Installed Files
    If the methods in this KB doesn't work, please let me know.
    Have fun!
    PS: I wish it was only 25 degrees celsius here - it's currently around the 40 degrees celsius in Austin...
    Message Edited by Philip C. on 07-08-2005 02:42 AM
    - Philip Courtois, Thinkbot Solutions

  • Odd Run As issue with Windows 8.1 - Run As domain administrator not working

    I'm having an odd issue on a Windows 8.1 laptop. I log in with my standard account, but want to open things like group policy management with my special separate domain admin account. so I press shift, right click, run as a different user - fill in my username
    and password and get an access denied message. I verified I was using the right account info, verified UAC was turned off. I can run it as my non-domain admin account but of course I don't have access to everything. In the event viewer, I'm getting these messages:
    Application log:
    svchost (1648) SRUJet: An attempt to open the file "C:\Windows\system32\SRU\SRU.log" for read / write access failed with system error 5 (0x00000005): "Access is denied. ".  The open file operation will fail with error -1032 (0xfffffbf8).
    This and a few other similar messages show up in the application log, over and over again.
    Also the Application log has a couple of these, showing up only when I try to open as the domain admin account:
    Windows detected your registry file is still in use by other applications or services. The file will be unloaded now. The applications or services that hold your registry file may not function properly afterwards. No user action is required. 
    DETAIL -
    1 user registry handles leaked from \Registry\User\S-1-5-21-1856965257-1504725669-3833077565-143885_Classes:
    Process 1072 (\Device\HarddiskVolume1\Windows\System32\svchost.exe) has opened key \REGISTRY\USER\S-1-5-21-1856965257-1504725669-3833077565-143885_CLASSES
    Any help would be greatly appreciated.  I'm at a complete loss.
    As a quick edit - I also am not out of space on the hard drive, I have many gigs on my partition left.

    Hi,
    This issue may occur if you do not have the appropriate permissions assigned to the folder.
    Please make sure you have the sufficient permission to access the folder:
    logon with that domain admin account to check if you could access that file.
    If it works fine, logon with that domain standard user account do it again.
    In addition, why didn't you run as administrator directly(don't use
    Run as different user)?
    Karen Hu
    TechNet Community Support

  • Sales BOM is not working for one Distribution Channel

    HI Gurus
    In VA01, Line item, for material A Sales BOM is working ( Bom exploded ) for one distribution channel but not for other distribution channel.
    Material A is defined already for other distribution channel ( for which sales bom).
    Sales BOM ( CS01) is also define.
    Regards\Adnan

    this is solved by myself. Component ( child ) material was not defined for that Distribution channel.

Maybe you are looking for

  • Exchange 2010 Auto-Mapping not removing mailbox from Outlook

    I am having an issue that others seem to have as well.  When I give Full Access to another mailbox, auto-mapping brings it in to the users Outlook 2010 client.  However, when I remove that users access to the shared mailbox it doesn't remove the mail

  • Import status in stms

    Hi, When i do an import in the PRD system the status doesn´t change from running to finished. The imports finished because the changes are in the programs that i´m changing but the status doesn´t changes. How can i fix this problem? Thanks Saludos /

  • Toshiba Startup

    Hi again. after being hit with the devil system tool virus. and being able to beat it. im looking to speed my system boot up time abit. im wanting to know how to disable the auto start on toshiba programs that came with the laptop but i dont want to

  • Is there a point to Safari?

    Genuine question not meant to "inflame" passions. Made the switch to Mac about a year ago (still running XP PC for work). Have been using Firefox on PC and now on Mac. I occasionally have started up Safari, but for the life of me cannot see any upsid

  • Where is MY OLD SOFTWARE

    Why cant I use the software 8.1.2 version after I am having issues with 8.1.3 update. I HATE YOU APPLE! I have tried to revert back to the version that came with my ipad, really APPLE? LET ME USE 8.1.2