MRP Run to Monitor Subcontracting/Service Provider Stocks
Hi,
As per the businee requirement, we want to run the MRP based on the ROL / Max stock level for the Individual component of a BOM (Child items) and for each subcontractor we need to monitor the stocks (special stocks), i.e., whenever the vendor stocks goes below the ROL for these BOM components/Child items, system should raise a requirement to replenish for the Max stock level defined in the system.
Also, business requirement is like the components provided will be consumed by the subcontractor/service provider and in return we are not getting any finished component / material. So, the requirement generated from the MRP Run should be such that we can only issue the BOM compoenents to the Subcontractor / Service provider from the Plant.
Kindly suggest how can we map this type of a scenario in the SAP system.
Thanks & Regards,
Pavan
Edited by: Pavan_cnsmg on Jul 20, 2010 10:04 PM
Dear ,
Re-order level and Stock Monitoring at Sub Contracting level can be done the folloiwng set up :
1.Activate MRP Area -SPRO-MRP-Master Data-Define MRP Area
2.Convert Planning File Entery for MRP Area
3.Select Option -3-sub Contracting while creation of MRP area .
4.Maintain Re-order Level at Material master MRP1 view and MRP Type VB-For manual level /V1 -Automatica Re-oorder level .If it automatic then, maintain Forecasting View with relevent paraemtrs because to calcualte MAD,BAsic values and Re-Order Point through Individaul Forecast or Colletive Forecast -MP38
Follow the below link which is self explanatory for the same http://www.sap123.com/a/57/
Refer : Replenishment between Storage Location with MRP Planning
MRP Areas
only one MRP for multiple plant
Try and revert
Regards
JH
Similar Messages
-
To consider subcontract stock during mrp run
Dear all,
while mrp run it is not considering subcontractor stock .Is there any setting in spro so that it will consider subcontractor stock into consideration.
with regards
cp vijaya kumarDear,
Special stocks are not considered for MRP run. Subcontracting stock is a special stock(O), hence is not considered for MRP.
Hope clear to you.
Regards,
R.Brahmankar -
How to make MRP run based on Target Safety stock
Dear Experts,
For our MRP-planned materials with safety stock we would like MRP run to take into account target stock level defined for each month.
for example: we know the target stock level values will be for M1 = 1000, M2 = 0, M+3 = 5000 etc.
MRP should then propose orders to replenish up to the target stock level at the end of each month:
needs for current month = (target stock level defined for current month minus safety stock)
needs for M1 = (target stock level defined M1 minus safety stock)
needs for M2 = (target stock level defined for M2 minus safety stock)
etc
Do you know if there is any simple way to achieve this?
Thanks you!
ElynnDear Experts,
in my company, we are facing exactly the same issue, we would like the MRP to consider a target stock exaclty as described by Elynn. To be more clear, if we could reproduce the TDSS like in SNP in MRP, we'll be happy !.
We imagine already to manage the target stock level in APO DP and released into ECC6 as a different MRP element than Forecast. this target stock should not be considered as forecast neither consumed by any sales order. Only to force the MRP to generate planned orders to increase the final stock when needed. This is only an idea, we have nothing tested yet.
someone have an idea if there's a standard solution for make this ? I mean, why this fonctionality exist in SNP but not in MRP?
thanks for any help
Celia -
Repeated purchase req. in MRP run procudure
Dear SAP experts,
Here at my client site, i have one scenario of mrp run of consumables.They maintain safety stock in material master MRP view,
I am using MRP type PD.Now after MRP run,system creates purchase requisition as per safety stock qty,( consider initial stock
is zero) now when i convert Purchase requisition into purchase order. i refresh the MD04 list, as soon as i refresh i get the
purchase req. converted into PO item.Upto this point its ok. but during this refresh function i get repeated purchase requisition
of the same quantity as previous one..Why this is happening? any specific reason behind this? my logic is not getting clear.
please assist me to find exact reason..
Thanx in advance..
Regards,
RaviHI
If the initial stock is zero then system will generate the PR for the safety stock also and then for the Dependent requirement.
Check and revert
Regards
Anupam Sharma -
Generate Plan Order from MRP Run (MD51) by WBS Element
Dear All,
1. I have created sales order with assigment WBS element (VA01)
2. Then I created Routing & BOM for Material (CA01 & CS01)
3. Generate MRP Run (MD51)
The problem the generated mrp run doesnt consume planned order .. i have set the planning strategy 21 or 40, but still doesnt works.. is there any other parameter that i should configure..???
Help Me...
MamaRaraHello,
Hopefully, the following link can assist you.
- Re: After firming planned order, new planned order is generating in MRP run
- Basic Scheduling in MRP run
- Re: MRP run
- During MRP run unwanted plant and storage location include and exclude
- MRP run does not consider the common stock
Thanks & Regards
JP -
Consideration of stock of discontinued FG or trading material during MRP Run
There is an functionality of follow up material for component. I would like to know if there is any similar option available for finished goods or trading materials.
I am doing procurement planning for externally procured Trading materials. Now my previous material A is being replaced by material B. Therefore all the planned independent requirement is available in system only for B. But still there is some stock available for material A. How can it be considered during MRP run for material B.
Example,
Material A:
On Hand Stock = 100
Planned Independent Req. = 0
Material B:
On Hand Stock = 300
Planned Independent Req. = 1000
In this case if we run MRP for material B, how we ask system to plan Purchase Requisitions for 600 instead of 700 for material B, considering stock of material A.Hello
Please refer to the following SAP note:
43636 - Discontinued parts
This note provides a detailed explanation of the system standard design of the usage of discontinued parts with material requiremenst planning and the most common questions about this issue.
The following information is provided on this note regarding the PIRs:
2. Planned independent requirements and forecast requirements are not redirected.
Explanation: Planned independent requirements after the effective-out date are not redirected but are provided with an exception message in the MRP list stating that they cannot be included in the availability check. Planned independent requirements and forecast requirements are therefore displayed in the MRP list and in the stock/requirements list. However, they do not influence planning
BR
Caetano -
Subcontracting with external service / non-stock material
Hi,
I have a scenarion in subcontracting when i provided the components / raw materials to the in-house workshop (workshop treated as an internal vendor) and further more our workshop required some external services / non-stok material from third party... now how i will incured this service / non-stock material cost on finished product.
(PP moudule is not implemented on project)
Regards,
AliHi,
Please refer the following links ..it may help you...
Subcontracting service to a FERT material.
http://books.google.co.in/books?id=LDyarcerUu0C&pg=PA571&lpg=PA571&dq=Subcontractingwithexternalservice/non-stockmaterialinsap+mm&source=bl&ots=vj5kUO9dto&sig=vrlCpSZ0-V0BseN96Qw9rTVhsQ0&hl=en&ei=cJKRTs5_0MmsB6rrgIsB&sa=X&oi=book_result&ct=result&resnum=10&ved=0CG4Q6AEwCQ#v=onepage&q&f=false
Regards,
Udaya -
Consider Special stock in MRP run
Hi all,
Is it possible to consider the special stock (table MSLB) when I run MRP (MD01)?
The type os special stock is 'O'
Thank in advance,
Felipe Simionatto
Edited by: fsimionatto on Feb 8, 2012 8:09 PMSpecial stock cannot be included in the MRP run, either you have to make it unrestricted or implement a BAdI or userexit.
BAdI/Enhancement implementation may not be very reliable :
The following BAdi's are available for MRP related stuff
MD_ADD_COL_EZPS BAdI: Extra Columns for Evaluation PP-MRP Reqmnts P
MD_ADD_COL_OVERVIEW BAdI: Display of Additional Columns in the Material
MD_ADD_ELEMENTS
MD_ADD_ELEMENTS BAdI for Adding Additional Requirements/Receipts
MD_CHANGE_CALENDAR BAdI: Change Calendar for Range of Coverage Calcula
MD_CHANGE_MRP_DATA BAdI: Change Data when Importing MDPSX
MD_DISPLAY_ELEMENT BAdI for Changing Display of MRP Elements
MD_DISPLAY_ELEMENT
MD_EXPORT_TREE Order Report: Export Contents of the Order Tree
MD_EXT_SUP BAdI for Determining the Issuing Storage Location
MD_INTERACT_PLANNING BAdI for Deactivating Changeability of MRP Elements
MD_LAST_LOT_EXACT BAdI for Calculating Last Lot Exactly in Individual
MD_M61R_DELKZ_POPUP Definition: Display data for MRP element (MD04)
MD_M61R_EXT_REQS_TXT Definition: Supplement data of MRP element for ext.
MD_M61X_EXT_REQS_GET Definition of selection of external rqmts in FuGr M
MD_MODIFY_PRODVERS BAdI for Modifying Production Version
MD_MODIFY_SOURCE BAdI for Modifying Source Determination in MRP
MD_MRP_LIST BADI for further processing of MRP list
MD_MRP_PARAMETERS BAdI: Change Planning Parameters
MD_MRP_RUN_PARALLEL Add-Ins for parallel planning run of requirements p
MD_PIR_FLEX_CONS BAdI for flexible planned ind. req. consumption/red
MD_PLANNING_RESULT BADI for Issuing Planning Result
MD_PLANNING_SCENARIO BAdI for Maintenance of Add. Parameters in Planning
MD_PLDORD_BOMEX_CIF BAdI: Deactivation of BOM Forced Explosion in CIF
MD_PLDORD_CHANGE BAdI for Changing Planned Orders
MD_PLDORD_POST BAdI: Update of Planned Orders
MD_PLDORD_SCHEDULING BAdI: Schedule Planned Orders
MD_PLDORD_TIME_STAMP BADI for publishing time stamp problems
MD_PURREQ_CHANGE BADI for changing purchase requisitions
MD_PURREQ_POST BADI for updating purchase requisitions
MD_PURREQ_REL_STRAT BAdI for Deactivating Release Strategy for MRP Purc
MD_STOCK_TRANSFER BADI: Change the Requirement Date During Stock Tran
MD_SUBCONT_LOGIC BADI: Determine Subcontracting Logic
Available userexits for MD01.
LMDR2001 User exits restr. profiles of opt. pur.ord.-based load bldg
LMDZU001 User exits in additional planning
Edited by: Jeevan Sagar on Feb 8, 2012 2:30 PM -
How to make Open Sales Orders consider unallocated stocks in MRP run
Dear Experts,
Maerial BOM MATERIAL TYPE STRATEGY GROUP PLANNING STRATEGY DESCRIPTION
Req-DM Req-CU
3. TF180TK fert 20 KE make-to-order
2. TH300TK halb 20 KE make-to-order
1. TA300TK roh 10 LSF KSL make-to-stock
As listed above material in line no.1 is required to produce 2 and
2 is required to produce 3.
I have open open sales orders for material TF180TK(fert).
What settings do I need to effect, to make the System consider Stocks & Open Purchase Orders for material TA300TK (roh) which are not allocated to these Sales Orders , when MRP run is carried out at plant level using MD01?
RegardsDear Bisolaaina,
I Think by mistake this duplicate thread might have been created so pls close it
Regards
Madhu -
How to handle the our stock in logicistic service provide
Hi,
I have the scenio and how to config in SAP.Iam placing the PO to vendor, Vendor suply the raw material directly to our logistic service provider when ever we need we pull the stock ( consignment). The stock is in Service provide place.How to design in SAP WM.
1. I can create the Storage location and assign to WM and create new Storage type ( Service provide area) and store in the Bin
Pl advice
Kumarclosed
-
Stock Transfer Reservation in spite of Purchase Requisition in MRP run
Dear SAP gurus,
We are running MRP heuristic on the PP/DS and we have different results comparing our development and productive environments.
In our productive environment purchase requisitions are generated and in our development environment stock transfer reservations are generated as result of the MRP run.
Where can I check differences of configuration that would be causing this?
Thanks and BR
MauricioMauricio,
I guess I was not clear in my suggestion, I apologize. Differences in T001W between ERP dev and prod will not necessarily generate your problem, differences in sourcing within APO between APO dev and APO prod will generate the differences. I only mentioned the vendor number because a transportation lane can exist 'source plant > destination plant', but also you can have a transportation lane 'vendor of source plant > destination plant' which would also have an impact on the type of req created.
Easier to check the sourcing, //PWBSRC1, mentioned earlier. Your dev system should contain no objects that relate to Stock Transport orders. You can delete the STO sourcing records within that transaction, which will also delete the material assignment to the Transportation lane. Hopefully you will then get the default external supply proposal, which is normally a Purchase req.
Also check for presence of quota arrangements //SCC_TQ1. Delete any that unnecessarily refer to an STO object.
Best Regards,
DB49 -
How MRP Run exclude QI Stock Type of a Raw Material SLOC?
Dear all
Fact:
All of our raw materials must be subject to quarantinee upon GR. We have Storage Location of Raw Material: RMSL
In Material Master of that Raw Material
We are using the "SLOC of EP" (MRP View 2) to put the defaulted GR SLOC. And we also make use of the "Post to QI Stock" in View: Purchasing.
Upon GR:
During GR, the Raw Mat SLOC (RMSL) will be copied from "SLOC of EP" of the material master data, and it will be posted to the stock type "QI STOCK".
Problem:
However, when the MRP Controller run MRP, it will take the QI Stock Type of Raw Material SLOC into account.
Is there anyway we can exclude the QI Stock Type of Raw Material SLOC from MRP Run?
I have read from some threads to suggest to post it to the Quarantinee SLOC. We prefer not to create another Quarantinee SLOC (QISL) which will be filled in SLOC of EP and then after passing QC, we perform Transfer Posting from SLOC: QISL to SLOC: RMSL. We have a few Raw Material SLOCS and we do not want the Warehouse guy to get confused which Raw MAterial SLOC to choose upon GR. Rather, we prefer it to be defaulted in the "SLOC of EP" in the material master.
Please advise.
Edited by: Daimos on Jul 13, 2009 1:16 PMHi,
Generally MRP consider stock from all the storage location when run the MRP for Plant level for material.
However we can exclude the particular storage location from MRP Run, for those following settings to be done.
Go to MRP-2 View of material master and select the storage location to be excluded from MRP. (Press Shift +f1 ex .sloc2) As per your case it should be RMSL
In that MRP view go to Storage location MRP Tab.
And assign u201CSLoc MRP indicator = 1 (Storage location stock excluded from MRP)u201Dand save.
Now run the MRP, stock from sloc2 will not be considered to create-planned order.
Please try this and revert back.
Cheers,
Kumar.S -
STOCK OF FINISHED PRODUCT BY PIR NOT CONSIDERING WHILE TAKING MRP RUN
DEAR SAPGURUS,
I have finished product stock of 50 nos through planned independent requairement. now i am creating sales order for finished product but mrp run generate the planned order for finished product. I dont have planned order for finished product because material already have stock. what can i do please give solution.
thanks.
Regards
AtulHi Atul,
Please describe your problem better, it's not easy to understand...
Strategy 10 is net reqirement planning:
- SAP considers only PIRs as requirements, SOs are not considered
- SAP considers stock levels
- requirements should be LSF (check in MD04)
If you input sales order SAP won't create PldOrd for it. If you have stock and you want to create more to fulfil you SO, you have to input PIR accordingly and run MRP.
Please clarify your problem...in a way that we may understand it.
http://help.sap.com/saphelp_47x200/helpdata/en/60/9ea1536fbd11d191820000e8a5f6e6/frameset.htm
http://help.sap.com/saphelp_47x200/helpdata/en/e0/71bb199c9f11d191920000e8a5f6e6/frameset.htm
Thanks,
Csaba -
How to create STPR(Stock Trasnsfer Pruchase Req) in MRP Run
Hello PP Guru ,
I am running MRP in various branch-plant .I maintained Special Procurement Key 40 for all the material in branch-plant .Here we have one supply plant .We run MRP at Supply plant once all our other branches(plant) completes their MRP run .My requirement is
1.How to create STPR/STPO while running MRP at branches ? I did not find any option in MD01 to create STPR/STPO while executing MRP at plant level.Is there any configuration seting required?
2.How to create PR/PO in Supplying plant (Central plant) so that it will consider all the branches STPR/STPO and show List of PR in MD04 ?
Thanks and regards
JiaHi Jia,
Yes, there is some special setup for Stock Transport orders. There are some business decisions you must make first. Pls refer to [Stock transport orders|http://help.sap.com/saphelp_erp60_sp/helpdata/EN/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm] for basic functionality in helping you to make your decisions.
For configuration settings, refer to
[Purchasing IMG|http://help.sap.com/saphelp_46c/helpdata/en/32/72369adc56d11195100060b03c6b76/frameset.htm] then Purchase Order>Set up Stock Transport order.
and
[Purchasing IMG|http://help.sap.com/saphelp_46c/helpdata/en/32/72369adc56d11195100060b03c6b76/frameset.htm] then Purchase Requisition>Set up Stock transport Requisition.
These steps can be reached in IMG>MM>Purchasing>Purchase order>Set up Stock transport order, and
IMG>MM>Purchasing>Purchase Req>set up Stock transport requisition.
For question 2, there is no special setup. Once your STOs/STRs are properly set up, you will see new requirements in your central plant, which represent the un-fulfilled requirements from the branch plants. Assuming that you already have set up MRP in the central plant, MRP will create new proposals (pureqs or plndords) just as if all of these new requirements were new sales orders.
Rgds,
DB49 -
Exclude special stock (project) from MRP run
Hi,
Would need to exclude special stocks representing project stocks from MRP calculation. Could not seem to find a way to control this via config similar to options available for blocked and in-transit stocks. Is there an option to do this in config? Thanks...Hi,
You can exclude the stock by creating storage location MRP.
Create separate str location for project stock by MMSC.
In the material master of mrp 4 view, str location indicator - select Exclude str loc from mrp for new ie, project str loc.
Check your Plant & str location by checking Plant/ data view in material master whether you have excluded the correct str location which you have newly created.
When mrp run system exclude this str location.
Regards,
Dharma
Maybe you are looking for
-
Switches to Acrobat Reader 5 instead of '7'...
I have the Classic OS 9 also for older applications-it has the Acrobat Reader 5 application installed; the OS X 4.8 Tiger is set up with Acrobat 7...HOWEVER...for some reason when Acrobat engages it is using ONLY the '5' and not the '7' version(Class
-
Hi I am getting error in Extended Syntax Check which is displayed below. Object PROG Z_IUSERS_ACC has insufficient authorization to use objects FUNC FIMA_DAYS_AND_MONTHS_AND_YEARS from package FIMA Z_IUSERS_ACC in package Z_ABAP FIMA_DAYS_AND_MONTHS_
-
Photos Distorted When Exported to iWeb Slideshow
I'm using the button within iPhoto to export a photo album to iWeb and then publish it to a folder that I upload to my web site. Unfortunately, the photos are pixelated in slide show mode. If I click on the photo to get it out of the slide show scree
-
It seems like Apple is ignoring the Micro-FourThird System for more than one year now - even the Panasonic G1's RAW-Format, the first of all µFT-cameras isn't supporte bei Apple! This is quite scandalous because this system is so well-accepted by the
-
Database connection using JSWDK
hii all, I am a beginner in JSP.I have a win98 machine where i have installed Java Server pages Web Development Kit. I have installed jdk 1.1.3.My Aache Webserver and simple Jsp pages without database connection are running fine.Now when i am using r