MRS 700 planning board alternative working schedule

Hi MRS-colleagues,
There is a button in the planning board "alternative working schedule. If I highlight one resource, Ican define an alternative working schedule for this resource, based on a period HR-subtype and daily working schedule.
My question is, if you assign this alternative working schedule to a resource, then the display and calculation of the availibility will be changed for the respective period. A business case for this could be, that you have to schedule more work to a technician than his availibility allows. The benefit compared to a attendance time allocation is, that you can create a daily work schdule and assign it for a period instead of creating attendances manually. Is that correct?
Do you have guuys have some practical cases, where this functionality is used? Are there any "bad consequences" of the usage and can I just use it permanently and then remove the "transfer availiblity" tag from the HR Transfer report?
BR
Olaf

Hi,
As you said the purpose of alernative workschedule and the HR report are same. There are no impacts if you use this button. Apart from the actual workschedule if you want to assign some more work to a technician you can do through this. This will not greyed out the planningboard for that period. on the top of availability in the gantt chart, it will be appear as a bar to identify the type of work you has assigned.
Regards
Satish

Similar Messages

  • MRS (Multi Resource Scheduling) - Manager Planning Board

    My understanding of the MRS Manager Planning Board is that it will only display those orders that have operations that have been assigned to a resource.  If true, this would mean that the Manager Planning Board would be of little value to an organzation that is only using MRS to schedule to a work center because there would be no demand that had been assigned to a resource.  It would only start to be of some value once the organization began to assign demands to resources.  Is this correct? Or, do you see other value in the Manager Planning Board for an organization that is only scheduling to a work center?
    I've also found that when I run the Manager Planning Board that the resources are displayed, however, I have to hit "refresh" in the Planning Board to get the orders/operations (demand) to display.
    Mark
    Edited by: Mark Scott on Aug 18, 2009 1:15 PM

    Hi Mark,
    As you already figured out correctly that the Manager planning board displays the resources (in display mode). It displays all the information about the resource: Its availability and assignments. since assignments are displayed, obviously the (related) demands are also displayed.
    If the fine grained planning ( planning at resource level ) does not happen, then obviously it does not make sense to use the manager planning board transaction.
    PS: As the name suggests this transaction is for managers who are not authorized to change anything but only for display. So they will see the resource availability and assignments in this transaction.
    Regards
    Varun

  • MRS (Multi Resource Scheduling) - Show operation status in Planning Board

    Because the current MRS thread is some long and complicated I chose to move this question into a seperate thread:
    Initial question:
    Like many companies, it is not unusual at my customer for their Planners to create orders with multiple operations, particularly since many orders require different crafts to perform the work. When the Planning Board is launched and Planners lok at work scheduled for the past week they want to be able to see at a glance which operations have been completed and which operations, perhaps from the same order, have not and may need to be rescheduled. Their preference is to select "final confirmation" when using transaction IW41 and thereby set the operation system status to CNF when the work on an operation has been completed. They then want to somehow use this CNF operation status to drive something visual in the graphical Demand layout display and Resource layout display to enable the Planner to see at a glance that the operation has been completed. I've tried several approaches with configuration of abstract statuses and the user interface profile without success. My customer's interest in being able to see the completion status of an operation in the MRS Planning Board makes a lot of sense to me. I'm hoping someone can help me with a technique for modifying the Planning Board so that it displays the completion status of an operation in a visual way.
    Response from Varun Verma:
    Hi Mark,
    The problem at your customers end is nothing new.
    What you can do ( many other customers have done it in similar way ) is:
    1) you integrate the status CNF into MRS.
    Check the customizing: Basic Settings -> Assign ERP Objects -> Status
    2) configure in MRS that for status CNF, the assignments and demands (only in item work list or Hotlist) is colored to GREEN (or any other color)
    Check customizing: Set Up Scheduler Workplace -> Workplace Profiles -> Define User Interface Profiles
    Thus the users will know visually, that the green colored assignments are already completed.
    By the way, in your work list you can also filter the demands based on their status
    Regards
    Varun.
    Followup question:
    Varun,
    Thanks for the response.  I thought I had tried this but perhaps it's because in the UI profile I had not entered something in both the status groups for assignments and the status groups for demands.  I have a bit more testing to do but it appears that the demand status now gets updated from the operation status of PCNF (linked to abstract status WORK_START) and CNF (linked to abstract status WORK_STOP).  I also get a red bar (C4) for PCNF and a green bar (C1) for CNF.  Do you have a better status group I should be using in place of C1 and C4?  Status groups C1 and C4 give me a bar but it doesn't look like the demand bar with a outline and alphanumeric description of the demand, it's just a colored bar.
    I know the work list can be filtered based on their MRS "planning" status, however, it doesn't appear to permit filtering by the status of the operation unless I add the operation status as an additional field in the worklist.  Is there something I'm missing here?  And even if it did, my customer wants to be able to see the CNF status indication in the Demand layout and schedule using the work centers so the worklist is not being shown like it is in the Resource layout.
    Mark
    Edited by: Mark Scott on Aug 10, 2009 3:35 PM

    Hi Mark,
    Well I assumed that you have confirmations integration active !! But I guess not because you say that the status is not integrated always.
    What you need to do:
    1) I assume you have SP05 or later.
    2) Implement the user exit: CONFPM05. In the implementation of this exit you need to call FM: /MRSS/RSG_PM_ORDER_CONFIRM
    3) Go to customizing: Basic Settings --> Assign ERP Objects --> Status
      -- Here, define an abstract status (MRS Status) for confirmed and partially confirmed
      -- map it to R3 status CNF and PCNF.
    After this, whenever you enter confirmation for PM order from transaction IW41, the status will be integrated.
    Now you can use the MRS statuses defined in step 3 to configure the colors.
    Implementing the user exit CONFPM05 might require some technical input. But it is easy. Just a few double clicks and copy paste.
    Contact an ABAP developer for the same.
    This should solve your issue.
    Regards
    Varun

  • MRS (Multi Resource Scheduling) - Displaying Planning Board

    I've gotten the MRS planning board to function the way I want it in my sandbox, for example, when I run /MRSS/PLBOTIME the all the resources show up that are in the planning node the resource planner is assigned to and all subordinate resource nodes.  Also, the demand shows up.  I thought life was good.  I've now moved to my development box and configured the system the same as sandbox (to the best of my knowledge). 
    Now when I run /MRSS/PLBOTIME:
    1.  I get a popup window telling me that there are several valid resource planning nodes and requiring me to select one.
    2.  While the resources show up the demand does not.
    Now when I run /MRSS/PLBOSRV:
    1.  The demands I selected show up but none of the resources do.
    As I mentioned above, to the best of my knowledge, the MRS configuration is the same between the two boxes (e.g.,  work center types properly assigned, resource planning nodes and evaluation paths as delivered, user interface profiles, /MRSS/SGE_PN_MNT, etc.).  I can't figure out why the popup window is now showing up asking me to select a resource plannng node and, more importantly, why in one case the resources show up but not the demand and in the other the demand shows up but not the resources.  The only way I can now get both demand and resources to show up in the planning board is by running /MRSS/PLBOORGSRV.
    Mark
    Edited by: Mark Scott on Aug 13, 2009 8:58 AM

    Thanks for the response:
    /MRSS/PLBOTIME -->
    1.  What I had seen before in two other systems is that the org.units that are associated with me as the Resource Planner would show up, as well as all other subordinate org.units, both resources and demands.  In this system what I see is that the demands associated with  subordinate org.units are not showing up, only the resources.  I went into another system I have access to in order to confirm what I had been seeing.
    2.  Also, when launching the Planning Board using this transaction in other systems I had never seen a window pop up telling me there were "several valid resource planning nodes" and asking me to pick an org.unit from the list, it always just gave me the org.unit I was associated with plus any subordinate ones.  (We upgraded to SP06 last night and this morning this window didn't pop up, instead it gave me the resources and demand for the org.unit I am the Resource Planner for, as well as those for subordinate org.units....weird.)
    /MRSS/PLBOSRV --> Logical as you described is what I expected, however, what I was seeing was that the resources associated with the demands were not showing up.  After a closer look what appears to be happening is that the selected demands are being brought into the Planning Board but no resources unless the resource has previously been assigned to the demand.  In other words, resources associated with the work centers used in the operations (and their linked org.units) are not showing up in this Planning Board, they only show up if they had previously been assigned to a demand.  I can, of course, manually bring in resources once I'm in this Planning Board.  Is this what you meant?
    /MRSS/PLBOORD --> I followed your logic of "if I am responsible for the parent org.unit then I am responsible for the lower org.units also".  However, the logic escapes me as to why this only applies to resources and not demand.  Regardless, as long as I know that's how it works then I can deal with it.
    Mark
    Edited by: Mark Scott on Aug 18, 2009 9:57 AM
    Edited by: Mark Scott on Aug 18, 2009 6:18 PM
    Edited by: Mark Scott on Aug 18, 2009 6:25 PM

  • MRS - Resources and demands are not visible in the Planning Board

    Hi Friends - I am working on the the MRSS 610. We have installed it on the our ECC 6.0 as an add-on. We have configured the system as per the configuration guide.
    But when I am accessing Manageru2019s Planning Board -  /MRSS/PLBOMGR , using the Organization unit, I am getting Notification saying that the resources assigned to the Organization unit are not available in the MRS.
    "Resource 00000000010000000000000000000000 not yet created in the WFM Core"
    The details of the Error message
    "Resource 00000000010000000000000000000000 not yet created in the WFM Core
    Message no. /MRSS/SGE034
    Diagnosis
    Resource 00000000010000000000000000000000 has not yet been created in MRS.
    System Response
    No assignments have been created for resource 00000000010000000000000000000000, even though, according to the organizational model, this resource is to be taken into consideration in the planning board.
    Procedure
    Contact technical support.
    Procedure for System Administration
    Create the resource in question in MRS."
    I have run the Report
    /MRSS/HCM_RPTWFMIF : Transfers the HR data (availability times, qualifications and the resources itself) into the MRS Basis
    But even after that I am not getting the resources in the planning board.
    Also I am not able to view the Demands from PM/CS orders.
    I have created PM Orders and
    Assigned Work centres to the operations and
    assigned the Resources to the Operations.
    The HR assignment to the work center is also done.
    I have tried T Code   /MRSS/PLBOSRV - Enter the MRS planning board using a specified order
    to pull the order demand. But it is not working
    Its giving following message
    1004280 is not a valid demand
    Message no. /MRSS/SGU139
    Diagnosis
    The order does not exist in MRS.
    This may be because:
    The order number has an invalid format.
    The order does not exist.
    The order is not relevant for planning and has therefore not been transferred to MRS.
    The order has been deleted from MRS.
    Pls help me on this.
    Thanks in advance and warm regards
    Purnendu

    Hi Anil/Saurabh - Thanks a lot for your replies.
    I have checked the MRS configuration as per your suggestion.
    It looks fine as per the configuration guide. I have done the PM/CS integration for Orders as demand.
    But the Demands are not visible on the Planning Board.
    I have checked in the debugging mode what is causing the problem - It looks like
    "The Database Table: /mrss/d_dem_h  needs entry"
    But there are no entries in this table.
    I could not find any Customizing transactions or Application transactions for maintaining this table. This is an Application Table for Master and Transaction Data and its Display and Maintenance allowed with Restriction.
    I could not also find any transaction for transferring Demand from ECC(R/3) to MRS.
    How do I maintain entries in this table?
    How do I transfer Demand from ECC to MRS?
    Saurabh - I have also been not able to transfer HR Resources from ECC to MRS.
    We don't have WFM Core installed in our instance. But MRS should work fine without WFM. MRS Basis should take care of it.
    To transfer Employee resources i have run the Program " /MRSS/HCM_RPTWFMIF". But when I execute the transaction with the selection parameters system shows that it is processing (Clock at the bottom Status bar) but it does not shows any result or status.
    So I am not sure whether it is executing the program properly.
    Pls help me resolve these issues.
    Thanks and warm regards
    Purnendu

  • Scheduling comparision in Gantt Chart- Project planning board

    Hi All,
    I Need to use the "Scheduling comparision" in Project planning board gantt chart. This is to compare the original status of activities before and after scheduling.
    But the "Scheduling comparision" button in the PPB does'nt seem to work.
    ( I am selecting the activity and then pressing the button for"display original status" )
    How do I use this functionality?
    Thanks in advance.

    Hi Potluri Srinivas ,
    After some tests, I still donot get, how does this functionalties work either.
    I assume, it is linked with the setting in 'option' -> 'planning board' -> 'diagramm area' -> 'orginal schedule'.  But I donot know, how the two things linked directly.
    If you find it out, please post it.
    Thanks and  regards,
    Zhenbo

  • Resources en Planning Board - MRS 900

    Hello
    I wanted to see if anyone can help me I'm configuring MRS 900 I have problems displaying resources from / MRSS / PLBOORG the system allows me to see the demands with its operations, ran the report to transfer the HR resources MRS who ran without problems however despite this the resource can not be viewed in the planner, I have no alerts or anything to guide me to know what could be the problem.
    Sap my account was given access to objects which recommended configuration guide MRS 700 and did not get one for the 900 version.
    If someone could guide me I would appreciate it very much.
    Regards
    Damy...

    Hi Savas
    Thanks for answering a question when you refer to Basics Settings - Define Resource Planning and evaluation paths of nodes SPRO here if I have a question I have found that in some cases these pathways are not created in the system, in some cases have achieved create them but not as create such DISPOORG.
    The other thing that is happening to me is that the demands on the scheduler is bringing the operations are duplicated but have no idea why this happens.
    The documents that I mention in the OSS is the master guide.
    From already thank you very much for the help.
    regards
    Damy

  • DEtailed scheduling planning board - scalling of objects in the charts

    Hi,
    I am wandering if there is a possibility of changing the scale in the graphical planning board in APO PPDS, eg. in the resource chart. in the way that I could change the scale just for a certain period of time or one object.
    for example:
    the planning period choosen is 10.09.14 to 01.10.14., scale unit is hour, but the duration of some orders or operations is less than a minute. Woud it be possible to somehow change the scale just for 1 day or 1 hour within the shown period? zooming in does not help as then I cannot see the other lines that I need to look at when scheduling that specific order or operation.
    thank's for any helpful hint!
    br,
    Wojtek

    Hi Mike,
    thank you for responding to my query.
    I know the functionality with the right-click. this unfortunately does not help as the whole time frame is stretched-out => they cannot seen some objects, while the planners would like to strech-out only part of the shown period.
    I also checked the possibility of changing the scale down to seconds cause some operations have a duration of less than a minute (timescale editor = double left-click on the scale). But the production is still unhappy. They have seen in some software such a possibility and wish the same in the graphical planning board. they want to see just part of the time frame in another scale so that the objects outside the scale remain in the same time unit but the objects within the considered time frame would be displayed in another time unit.
    In the resource chart if you right-click an operation you can select the option shrink/stretch operation => I am not sure if there is sth wrong with my connection but most of the time when I click this option nothing happens. Just a couple of times while clicking on the same operation I manged to get a pop up "change operation duration" where you can define in % the new duration. but have to choose a new duration between "min and max duration" that are in this pop up zero => so I cannot change anything and have no clue where this zeros for min and max come from and in the end if that might solve my problem.
    br,
    Wojtek

  • MRS: PRT Tool Resource does not appear in Planning Board

    Hi Experts,
    I am trying to perform tool assignment but somehow the tool resource does not appear in the planning board.  I have the following set up:
    - Tool created as both material and Equipment (category P)
    - Equipment assigned to work center linked to Org Unit
    - Order with operations created with PRT assigned
    What I am seeing in the planning board:
    - I can see the operation with the linked PRT
    - I can see the HR resource under the same work center Org Unit
    - However, I cannot see the Tool resource.
    Am I missing somethng here?  Any kind of pointers would be greatly appreciated.
    Thank you in advance,
    Jk

    Thank you for your response, Varun.
    I do have the equipment work center set to be the same as the operation work center.  Also, when I try to add the PRT manually in the planning board, I get 2 error messages:
    "Resource  is not available"
    "Selected equipment 0 is invalid"
    Have you encountered this before?
    Thank and Regards,
    jk

  • How to get the personnel plan work schedule

    Hi,
    I write a report ,need get the personnel plan work schedule of the input month.
    for example:
    at input screen : I input : 2007-01  and pernr:10000001;
    I hope get the plan work schedule days (rusult :25 work days)of  the  person 10000001  at  January 2007 .
    Now I find some HR TM functions ,such as :
    HR_PERSONAL_WORK_SCHEDULE
    HR_PERSONAL_WORK_SCHEDULE_PNP
    but I don't know how to test , I had try many times ,but not get what I want . so I want to know if have any other function can make me get what I want .

    Hi Olivia,
    tables: ptpsp.
    parameters:
    pernr type pa0001-pernr,
    begda type pa0001-begda,
    endda type pa0001-endda.
    data:
    i_ptpsp type table of ptpsp.
    <b>CALL FUNCTION 'HR_PERSONAL_WORK_SCHEDULE'</b>
           EXPORTING
               <b> PERNR             = PERNR
                BEGDA             = BEGDA
                ENDDA             = ENDDA</b>
              KUG               =
              REFRESH           = 'X'
              WORKING_HOURS     = 'X'
              SWITCH_ACTIV      =
              MODIFY_ENTRIES    = 'X'
              I0001_I0007_ERROR = '0'
         IMPORTING
              WARNING_OCCURED   =
           TABLES
              I0000             =
              I0001             =
              I0002             =
              I0007             =
              I0049             =
              I2001             =
              I2002             =
              I2003             =
      <b>          PERWS             = I_PTPSP</b>
         EXCEPTIONS
              ERROR_OCCURED     = 1
              ABORT_OCCURED     = 2
              OTHERS            = 3
      IF SY-SUBRC <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
            WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
    table <b>I_PTPSP</b> is having all the data u needed..

  • Project Scheduling in Planning Board

    Dear Experts,
    When I am scheduling the project (all wbse and network) through planning board, after clicking the schedule icon a pop-up window is coming and in the pop-up window it is written Select set of dates .
    Any idea why this pop-up is coming.
    How can I remove poping-up of Select Set of Dates Window.
    Thanking you.
    Best Regards,
    Abdul.

    Dear Mr. Virendra Pal,
    Thank you very much for the detailed reply.
    I have removed the tick for forcast date and actual date from set of dates view button on the planning board, and kept tick only for basic dates and earliets dates, Now the pop-up window is not coming, when I am clicking schedule icon.
    Thanking you.
    Best Regards,
    Abdul.

  • Planned working time changed and we need to change work schedule for multip

    Hi All
    I have 2 senarios on time mgmt
    1.We have a transfer absence quota where this can be used in day off but it count day offs.It has to show the Calendar days and absence days equal.I am not getting this when i tried 
    I have a scenario that company management wants to cahnge the planned work timings due to whether for multiple work schedules which already exsist and running.How we can change these new timings and can generate work schedule in single shot/config change?
    Can any one through light on these two?
    Thanks in advance

    Any body plz give me a clue.
    Final Out put should be
    "Finally check the Abs Days and Calendar days are diff, but  the requirement is both should be same."

  • Time Specification Button in Planning board for MRS

    Is it possible to remove the time specification in the planning board for MRS?  I have disabled all the time type but we want to remove the time specification button?

    The clients wanted to remove it but if it not possible then there is nothing I can do ..
    Since we are the top of MRS, Do you know what the "Time Allocation from HR cannot be changed" mean and how do I get rid of it?

  • Mapping of Planned Working Time to Work Schedule

    Hi ,
    I have the following query.
    For a partiular employee 'abc' , i check his planned working time from 'IT 0007' .
    From the planned working time how can i get the work schedule in coding , ie for an employee in IT 0007 how do i write a code to read his work schedule ?
    Can anyone please tell me from where is the work schedule mapped to the employee number? (ie which table or field)
    Thanks,
    Rohit

    Hi Rohit,
    The relavant code would be:
    tables : PA0007.
    select SCHKZ from pa0007 where pernr EQ lv_pernr (and the begda and endda constraint) into lv_wrksch .
    This is I think what you would want. Also the master table for work schedules is T508A, but the mapping for pernr and work schedule is done in IT0007.
    Hope this helps.
    Vivek
    PS: Plese <b>reward points </b>if useful.

  • Collective work confiramtion in Planning board

    Hi all
    i want to collective confirmation of  activities in Plnning board. in planning board i wl enter %duration one by one against each activity.
    regards

    Hi,
    The collective confirmation is not available in PPB.  You can use CN27.
    But if you want to do it thru PPB, then----
    In PPB---> Edit >Select-> Activities
    Then GOTO---> Confirm Activities
    Here you can enter %duration one by one against each activity.
    Regards,