MS Project Professional 2010 Re-installation

Hi MS Technical Support,
I have had my computer re-booted and subsequently lost MS Project from it.  Unfortunately this particular computer does not have a CD drive, and so it is not as simple as inserting the disk and re-installing it.
I have contacted the MS phone line, where they sent me an invitation to download it and register my product key.  I submitted the product key, and the response back was that 'the product key provided represents a product which is not available for free
download'.
All I need is for the product to be re-installed back on to this particular computer so that I can use it once again.  How do I proceed from here?
Thanks, Ryan

You could start from the
eval center and call MS support in case your product key is still not woking.
Hope this helps,
Guillaume Rouyre, MBA, MVP, P-Seller |

Similar Messages

  • Activating Project Professional 2010 after a crash

    hi there:-
    I am looking to reactivate/reinstall Project Professional 2010 after a crash. I have a product activation code having downloaded the software online (no disks). What do I need to do?
    Much obliged
    Tom

    Tom,
    It should be pretty straightforward. I assume you saved a copy of the .img file you downloaded to a location that was safe from your crash. Without that you're probably out of luck.
    Just re-install from the .img file and when the installation gets to the part for activation, go ahead and activate it.
    Hope this helps.
    John

  • Project Professional 2010 and pwa hangs when opening a linked project from PWA on Project Server 2010

    When I open a linked project in Project Professional 2010 from PWA, Project Professional 2010 hangs with the "Links Between Projects ..." dialog box open.  Unable to move or close the dialog box.  Unable to move or close Project Professional
    2010.  The PWA tab on internet explorere is frozen and unable to access although other tabs in IE are accessible.  End up having to reboot to close down project or force the process to end.  I suspect a hidden dialog box is the culprit maybe
    the scheduling conflict dialog box but am unable to access or switch and cannot confirm that there is another dialog box.
    Has anybody else experienced this problem?
    Thanks,
    Julie

    I have seen it hang when trying to open a project schedule even with no external links.
    Project 2013 Pro, Link to schedule is on a PWA on a Project 2007 server.
    If Project 2013 is open before clicking on the link, there is a long delay and the project schedule opens up in the web tab where the link was selected. If Project 2013 is not open, it just hangs and has to be shut down via the task manager.
    No idea why. I can create a link to the shared volume and that works OK. But if I actually try to open MS Project by clicking on the link to a .mpp file it never opens in MS Project.
    Mike

  • Project Professional 2010 Not Publishing to Project Server 2010

    I am having trouble publishing a project from Project Professional 2010 to the Project Server 2010 (PWA). What I am trying to publish is a master project which is contains many enterprise projects as subprojects. When I press publish, it prompts me
    to save and if I click yes then it goes through and saves all the subporjects and then just stops there and doesn't publish the changes to the master project. If I press publish and click no to the save prompt then it gives me the status "sychronizing
    data to server" for around 15 seconds and then just does nothing after the sychonization finishes.
    It usually should be giving a "publishing job done 0%" or "publishing job completed" when it publishes, but it gives nothing like that. I also check the project through the PWA and it has not updated yet, but when I open it for editing in the client it has
    everything updated and up to date, meaning that the save is working properly and just not the publishing.
    All my subprojects are able to publish correctly, it's just this master project that is not working.
    Does anyone know why this is happening? Is the publishing process timing out for some reason? Or is it something else?
    Please help.
    EDIT: The progress notification at the bottom of Project Professional just stops at "save completed sucessfully" whenever I try to publish

    To check the queue, navigate to Server Settings > Manage Queue and view the jobs that are present. If there is an error when publishing you should see it in the queue.
    Alex Burton
    www.epmsource.com |
    Twitter
    Project Server TechCenter |
    Project Developer Center |
    Project Server Help | Project Product Page

  • Dropdowns and many buttons disabled in PWA 2007 after Microsoft Project Professional 2010 has been installed

    Hi Team,
    I have Microsoft Project professional 2007 installed and also using PWA for 2007.
    I recently installed Microsoft Project Professional 2010, and since the time i installed 2010 all the button in PWA 2007 have been disabled.
    1. I could not select a project from "Project Center"
    2. I could not select resources from "Manage Resources"
    3. I could not select dropdowns in the project properties even if the project is selected.
    ALl the other team members are able to use both without any issues.
    I also uninstalled IE8 browser and re-installed, that didn't help.
    I could use PWA normally after 2010 is uninstalled.
    Please suggest a solution for this.

    Try running a repair on Project Professional 2007. You always have to do this after installing a newer version of project. Always run a repair on the previous version. What's happening is that PWA is not seeing 2007 on your machine because 2010 overwrote
    some of the shared objects.
    Gary Chefetz, MCITP, MCP, MVP msProjectExperts
    Project and Project ServerFAQs
    Project Server Help BLOG

  • Project Professional 2010 download

    Help!! I need a download link for Project Professional 2010 I have a license for 2010 and I still have the cd. I want to install it on my new sleekbook - which has no cd drive 
    (I was referred to you by @ project on twitter)

    Help!! I need a download link for Project Professional 2010 I have a license for 2010 and I still have the cd. I want to install it on my new sleekbook - which has no cd drive 
    (I was referred to you by @ project on twitter)
    http://social.technet.microsoft.com/Forums/projectserver/en-US/e29ce911-f774-4d8c-8c02-8dcc6b9ba2b4/how-do-i-download-a-free-trial-of-microsoft-project-for-windows-xp?forum=projectprofessional2010general

  • Copy/Paste Resources in Project Professional 2010

    I have a Project Server 2010 environment running SP2 and patched to April 2014. I use Project Professional 2010 patched up to same level. I am trying to copy/paste resources from one project to another, but the popup states that the resource is not found
    in the enterprise resource pool, do I want to add as a local resource.  The project from which I am copying the resources are in the enterprise pool.  Both projects are in the server.  Why can't I do this?

    Tom --
    The bigger question is why you are not adding resources to your enterprise projects using the Build Team dialog.  That is the approach I would recommend.  I believe that if you do the copy and paste of resources from one enterprise project to another,
    then the project in which you paste the resources treats the pasted resources as local resources until you first save the project.  Then the software should display a dialog indicating that a local resource has the same name as an enterprise resource,
    and ask you if you want to replace the local resource with the enterprise resource.  Is that the behavior you are seeing?  Either way, I would still recommend you use the Build Team dialog rather than copying and pasting enterprise resources.
    Hope this helps.
    Dale A. Howard [MVP]

  • MS Project Professional 2010 - Unable to open Project Plan from the Server.

    Dear Folks,
    Since morning we have been facing an issue with MS Project Professional 2010. When we try to open project plan, it takes time and then show nothing on the screen, project gets checked out to you as well but nothing comes on MS Project Professional Screen.
    Strange thing, when busy mouse cursor gets released MS Project Professional show "Disconnected from the Server" message with white icon instead of globe one at the bottom of MS Project Professional and disappear after few seconds.
    We are able to open small plans but the plans having 4000 lines is not able to open, Project Professional show busy status when we give it a try.
    Everything seems fine to me .. Project Server connection .. queue jobs .. no issues.
    What could be the possible problem and how to resolve this issue?
    Many thanks in advance.
    Best Regards

    Hi Mohsin,
    Is it happening for all users or just some of them? Is it happening for all projects? Have you tried on a different machine?
    First I'd suggest to try accessing the project plan through PWA to identify wheither it is a network issue or an application issue.
    Then check the Project Pro account to ensure that the connection settings to Project Server are correct. You could also try to remove the Project Server account in Project Pro and create it again.
    Finally, ensure that the PWA URL is added to IE trusted sites.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Unable to connect Project Professional 2010 to Project online (PWA Cloud)..

    Greetings!
    we are getting  following error when connecting a Project Professional 2010 - local desktop thick client to a PWA (Project online) cloud environment. I have an admin access to the system..
    <detail><errinfo><general><class name="ActiveCacheUnsupportedProjectProfessionalVersion"><error id="12015" name="ActiveCacheUnsupportedProjectProfessionalVersion"
    uid="7babc462-4923-e411-890f-00155dc21b2c" version="14.0.4751.1000"/></class></general></errinfo></detail>
    Can someone please help? Unfortunately, I am new to the Project online setup..
    Best Regards...
    stct

    Hello,
    Unfortunately Project Professional 2010 will not connect to Project Online / Project Server 2013. You will need to use Project Professional 2013 to connect to Project Online / Project Server 2013. Project Pro 2010 will only connect to Project Server 2010.
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Do I *really* need a Service Connection Point in AD to complete a Project Server 2010 SP2 installation?

    Hi all,
    I have installed Project Server 2010 SP2 and run psconfig.exe
    PSCONFIG is failing because it cannot set up a Service Connection Point in AD. I've checked in AD and the contains 'Microsoft SharePoint Products' does not exist. All the resolutions I can find suggest adding the container into AD.
    The issue I have is that I have no control of the AD, and adding containers will take lengthily negotiation.
    Is there any way of completing the installation and getting my site back without adding the container into AD?
    Thanks in advance.

    other solutions
    1) check timer service see if it is running
    http://www.jonthenerd.com/2011/06/30/sharepoint-2010-sp1-upgrade-error-unable-to-create-a-service-connection-point-in-the-current-active-directory-domain/
    2) check UAC (and the rest of the technet answers - some are listed below)
    http://social.technet.microsoft.com/Forums/en-US/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/psconfig-fails-failed-to-upgrade-sharepoint-products
    3) My workaround:I
    run once again the command „PSConfig.exe -cmd upgrade -inplace b2b -force -cmd applicationcontent -install -cmd installfeatures“  in
    the “Bin” Folder as an administrator console session.In the moment I saw the staus “Configurationtask 5 of 6 is executed”
    I start to run the command “net start SPTraceV4 & net start SPWriterV4 & net start SPAdminV4 & net start SPSearch4 & net start SPTimerV4” in a parallel administrator console session and after that the configuration task finished successfully.
    http://social.technet.microsoft.com/Forums/en-US/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/psconfig-fails-failed-to-upgrade-sharepoint-products
    4) Try running the psconfig.exe command a second time
    5) had the same issue and called Microsoft support.  Here is the fix:
    Stop the "SharePoint 2010 Timer" service
    Delete ONLY the xml files from C:\ProgramData\Microsoft\SharePoint\Config\216f8013-b78b-4e5b-8631-3a5f4c7277e8
    Note: Do NOT delete the cache.ini file in this folder
    Edit cache.ini and change to "1"
    Start "SharePoint
    2010 Timer" service
    Run psconfig again:  PSConfig.exe -cmd upgrade -inplace b2b -wait -force
    6) Initially I tried http://support.microsoft.com/kb/2009272 but
    it did not help (I re-implemented later).
    I re-registered the DLL’s as perhttp://social.technet.microsoft.com/Forums/da/winservergen/thread/b4bd0deb-45d0-4661-8c50-a2b45db41103 from
    NareshD.  I do not believe this is necessary unless there is a corruption in the system but I am noting here just
    in case.
    I tried to run The PSConfig but it was failing:  I
    had to do the following in order to make it finish successfully:
    (from same page at http://social.technet.microsoft.com/Forums/en-US/smallbusinessserver/thread/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/)
    On the migrated SBS2011 PSCDiagnostic Log I found no entry to detect or start the services SPWriterServiceInstance and SPTimerServiceInstance.
    I run once again the command „PSConfig.exe -cmd upgrade -inplace b2b -force -cmd applicationcontent
    -install -cmd installfeatures“ in the “Bin” Folder as an administrator console session.
    In
    the moment I saw the status “Configuration task 5 of 6 is executed” I
    start to run the command “net start SPTraceV4 & net start SPWriterV4 & net start SPAdminV4 & net start SPSearch4 & net start SPTimerV4” in a
    parallel administrator console session and after that, the configuration task finished successfully.  (I
    just opened another cmd window and copy/paste the sequence below when I saw the status “Configuration Task x of y” on the screen:
    net start SPTraceV4 
    net start SPWriterV4 
    net start SPAdminV4 
    net start SPSearch4 
    net start SPTimerV4
    -Note SPSearch4 is disabled in our system…
    Very awkward but it worked…
    I implemented http://support.microsoft.com/kb/2009272 again.
    Backup started working with no errors.

  • MS Project Professional 2010 - Tasks and Formatting Lost

    I am using MS Project to manage the SRM Program.  This Program has over a thousand tasks and over a hundred milestones.  As we complete tasks and milestones I am formatting the backgrounds differently for ease of use.  I am shading tasks grey
    and milestones yellow/green.
    MS Project keeps removing my formatting.  Literally, I will shade a hundred tasks grey and then MS Project will remove my formatting without prompting me.
    This is getting frustrating as I have to keep insertting formatting.  How do I fix this?
    Is this something a Service Pack might fix or am I doing something wrong in the way I am selecting stuff?

    Hi,
    I'd suggest to install the latest SP of MS Project Std 2010. Then if it is not working, I'd suggest to repair it from the control panel.
    Finally your file might be corrupted. In order to repair it, save your file as an XML file (change the output format from the "save as" dialog box), close Project, open again Project, open your XML file with the wisard and save it back as an MPP file.
    If you are willing to dig into this issue, send me your file at guillaumeDOTrouyreATgcosiDOTcom (replace caps).
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • MS Project Professional 2010 - Configuration Failure - There is not enough memory to complete the operation

    Windows 7 64, MS Office Pro 2010 installed add working - 4 gig of memory 500 gig +  of free disk space.  I  get the below results when trying to start project the first time.  
    Tried usual admin rights stuff and turning off norton and firewall.  Same results after re-install, restart,
    repair, you know all the usual.
     Note I borrowed the steps below from another thread that was never answered. 
    http://answers.microsoft.com/en-us/office/forum/office_2010-project/ms-project-crash-after-configuring/e6c67a84-5749-4b19-8cbd-562189d9785c
    1. Microsoft Project Professionnal 2010 popup: Configuration Progress splash screen with progress bar and yellow wave at bottom.
    2. Microsoft Office Project MUI (English) 2010 popup: Please wait while Windows configures Microsoft Office Project MUI (English) 2010, then disappears.
    3. Microsoft Project 2010 logo popup with green wave at bottom.
    4. Steps 1-3 repeated 3 times.
    5. Microsoft Project popup: There is not enough memory to complete the operation.  To free up available memory, close programs, projects, or windows you aren't using, and try again.

    I located a solution, finally!  It was solved back in 2007. It is NOT a memory issue nor a conflict with other software as most of the forum advisers suggest. It is a pure MICROSOFT problem with Registry permissions. And as they provide no solution
    (as of 2014 yes 7 years) one has to use a registry hacking tool to take command  of the registry. The solution that worked perfectly for me is located here :
     http://www.techtalkz.com/microsoft-office/157044-unable-install-project-standard-2007-a.html
    Full thanks to David Chatfield for finding the answer back in July of 2007!

  • How to remove over allocated resource in project professional 2010

    I'm new to MPP 2010, as I have admin access got some problem with one project. The project has reached finish date(august 2013) and the remaining work is zero, but still the task is not getting complete because of constraint "The task has resource assigned
    which is over allocated".  since the resources have submitted time sheet i'm not sure if I make any changes in MPP now it  will affect the data in the Reports.
    Please can anyone suggest on this.

    Hi Chaishashi,
    The fact that the resource is overallocated should not stop the task being completed.  What is the %complete and the %work complete on the task?  Are you able to share a screen shot of your issue?
    Ben Howard [MVP] | web |
    blog | book |
    P2O

  • MS Project Professional 2010

    Is there a way to create a dynamic vertical gridline in the Gantt Chart view?  I would like to keep a vertical gridline in the Gantt Chart to mark 2 weeks in advance of the current date.

    Hi,
    As John said, there is no such a feature to do that easily in MS Project 2010. You can just display the current date, status date, project start and finish dates. Moreover they are not dynamics. So you might for example use the status date (in case you don't
    use it for tracking) but you'll have to update it manually.
    Another way would be to create a task bar style based on start1/finish1 and flag1 and create a formula for finish1 like [current date]+10. Then create a "current date + 10 days" task with the flag1 set to yes. Finally attach a vertical
    line (drawing in the format tab) to the finish date to the given task, referenced by the ID.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Project professional 2010: Physical % Complete field does not roll-up to the summary tasks

    Hi,
    I have a project plan which I need to set the physical % complete fields of it in order to use it for earned value over time report. I have assigned costed resources to come of the tasks, set all project task's earned value method to physical % complete,
    and finally set a baseline. However, the physical % complete still does not get calculated for the summary tasks! It is always zero! 
    I have created another project with only 3 tasks and 3 resources, did the same as above, and was able to get calculated values for the physical % complete.
    I followed the same procedure in both projects. In one I was able to get the physical % complete value of the summary tasks while it was always zero in the other! What may be the problem? 
    Regards,
    George 

    Hi Julie,
    This is what I am seeing as necessary to make Physical % complete roll up to the summary level task.
    BEFORE tasks are entered, set the "Default Task Earned Value method" to Physical % complete. File > Options, Advanced.  This will set both the summary and detail tasks to that method.
    Add tasks
    Add resources with costs.
    Assign resources to tasks.
    Baseline the file
    Take a look at the Tracking table and enter progress in the Physical % complete field for subtasks. The value should roll up.
    Sadly I don't know of anyway to force the change after the tasks have been added.  You can certainly add the Earned Value Method field to a task view to confirm all is set - but I have never been able to switch mid-flight and get it to work correctly.
    I did, however, just try an experiment.  I created a file that did not work correctly - Physical % complete was not rolling up.  I inserted it into a blank project that had the option set correctly without linking.  After a bit of tweaking
    (outdenting all tasks to be able to delete the "extra summary task", saving a baseline), it now appears to be working correctly.
    I hope this helps.

Maybe you are looking for

  • Two new SCs in the same track - with dependencies

    Hello Guys, We are going to create an NWDI track with two new Software Components. 1. SC for Services (let us call it SC-A) 2. SC for UI Content (let us call it SC-B) These are going to be brand new SCs created in SLD and imported into one NWDI track

  • GR document Number ranges

    Hi,   I want to Maintain MM ( GR Document ) number ranges for the fiscal year 2010 - 2011 . Can we do it ? Wats the procedure ? Regards Rajesh

  • How to ceate simple SCM application for Hardware shopee in oracle 10g forms

    Hi all, I want to create a simple SCM application for hardware shopee. I want to know all idea behind it, want to clear all concepts,required tables, etc

  • Updated to V12 phone got into restart loop

    I have just updated to the v12 on my N97. the phone boots up ok, I see lots of things starts to run and then when it is about time to go to lightsoff mode the phone restarts. I updated this phone on a very busy schedule. I do not have time to reinsta

  • Checking portal roles in WebDynpro

    Hi, I want to make some role checking in my WD and depending on the role I want to create the WD dynamically. I know how I can check the roles and also how to generate the WD dynamically, but I don't know where to do it. In which method should I do t