MTO & MTS scenario

Hi,
I am having a requirement where my final product ius MTO and input products are MTS..
PPM is defined at all levels, when a Sales Order is created for the final product and I take a CTM run Order segment is created for that order and corressponding Planned Orders are created at subsequent levels which are assigned to the same order segment eventhough the input material is MTS.
I just wanted to know in this scenario can we generate Planned Order for MTS material which will not be assigned to any order segment and which can be pegged to any MTO Sales Order for the final finished component.
I am using CTM for planning.
Thanks & Regards,
Sanjog Mishrikotkar

Hi Sanjog,
Please refer to SAP thread [Sales Order on 1 product and Need to consume Forecast on another product|Re: Sales Order on 1 product and Need to consume Forecast on another product] .
here forecast product is MTS and Sales order product is MTO.
You can map a planning material scenario to achieve this.
Regards,
Digambar

Similar Messages

  • FOR MTO & MTS scenario when the Production order shows the Sysy status DLV?

    Hi ALL,
    In the MTO & MTS  scenario when the Production order system status become DLV ?
    Regards
    Satish

    Hi Satish,
    For both the planning strategies (MTO/MTS)..
    The status of the production order becomes DLV ,
    when you do GR for the order with 101 movement type.
    (OR) 
    At the time of final confirmation if automatic goods receipt is activated.
    Regards,
    Anil

  • GATP in MTO/MTS scenario

    We have an ongoing implementation for a paper industry using GATP. Ours is basically a make-to-order(MTO) scenario. But we have some stocks (from order cancellation, rejects, etc) which we move to unrestricted stock category (that is without account assignment). So our planning strategy group contains MTO(primary) and MTS (secondary) strategy. We use reqmnt classes 046 and 049 respectively.
    Reqmnt types are KEK and KSVS respectively. When we create a sales order we default the reqmnt type to KSVS so we can do a GATP check for unrestricted stock. We use basic availability check, rules-based check, and CTP.
    We need solutions for the following:
    1. When we do the GATP check it always reduces the required quantity from the available unrestricted stock quantity. In some situations, we don't want to consider the stock even if it matches most of customer requirements (for plethora of reasons). Is there a way to do confirmation bypassing the stock and trigger CTP for the entire required quantity.
    Example:  Unrestricted stock qty available=100, required qty=200. Instead of producing 100, is there a way to tell the system to produce 200(since we don't want to take the available stock).
    2. When we do only the basic availability check (without activating RBA), in the GATP screen when we click on the delivery proposal button, it takes us to the sales order screen and we are able to see the confirmed quantity in the schedule line. In this case when we click the check instruction button in the GATP overview screen, it shows check mode 049 and business event A as expected. But when we also activate RBA and do a GATP check from the sales order it shows the substitution list with buttons for delivery proposal. If we click on a button for delivery proposal where it shows a confirmed quantity, it doesn't show any confirmed quantity in the delivery proposal screen. Also, when we click on the check instructions for one of the substituted rows, it shows check mode 046 and business event A.
    Why we are not able to do a confirmation in this case? Are we missing any setting in R/3.
    We are using ECC 6.0 and SCM 5.0
    Thanks,
    Ramesh

    Tilman,
    Well, it can be executed...but the results are inconsistent. RBA GATP will in some limited circumstances give deceptively reasonable results for MTO, especially with CTP.  However, it is not a comprehensive solution as pointed out by Sanjeev.  The problem lies in the subitems created in ECC.  Each subitem is account assigned to the sales order item or subitem in MTO (although it is not yet clear to me that YOUR 'MTO' orders are so configured).  When performing an atp, and during Backorder Processing, when you perform the product check, the first thing the check does is to delete any subitem and all unfirmed supply elements in APO and then run RBA GATP.  Now, the account assignment is no longer relevant for the subitem, but is changed to being relevant to the ITEM.  Product check can no longer find any firmed supply elements (such as stock, or production orders, or Purchase orders), and will either deconfirm, go to lead time, or create another planned order, depending on your settings.  This is unsatisfactory.
    You also mention seeing Business Event 'A' in your scope of check.  This is typically 'not-account-assigned'.  AE is usually used for Sales order account assigned checking.  This is hard coded in SD and sent to APO during the ATP check (well, it was before ECC6, I haven't worked much on this rev yet).  If you are not getting Business Event 'AE' or 'A-something' when you do a 'scope of check', then you are only checking generic stock.
    You didn't mention the strategies you are using, but KEK/046 sounds quite a bit like strat 25.  Anyhow, whichever it is, the strategy configuration in ECC should have 'Acct assign cat' set to 'E", if you want MTO.  If you are actually creating MTO requirements, I would be surprised that you didn't receive an error during your ATP check, without also having 'AE' configured in SCM under "maintain check control" and also under 'Maintain Check instructions".
    Rgds,
    DB49

  • Reg. Accounting Revenues for MTO & MTS in SAP PP

    Hi all,
      I am having few doubts in Costing aspects of SAP PP.
    What is Accounting revenues for MTO & MTS scenario how its to be defined.Please explain?
    What are the Costing impacts of SAP PP.How the Costing of a Product in the production aspects to be addressed.What are the prerequistes for that.Please provide me help materials with detailed examples.
    Thanks in advance,
    M.Badrinarain.

    Dear Badri,
    Plz refer the below link, this is current thread of CO Forum, Reply by Mr. Mangalraj
    [Product Costing;
    Regards
    kumar
    Edited by: kumar kumar on Nov 9, 2009 11:07 AM

  • Re: MTS to MTO+MTS

    Dear Expert,
           we are currenlty using MTS scenario & now plannig for MTO + MTS scenario. For fert level we will do MTO & Semifinish, raw material level will do MTS scenario.
    can any one tell how to map this scenario/any configuration changes ?
    which plannig strategies are need to be used in material master?
    i have tested with Planning stratgies 20 but it is not generating accounting document, so please help me.
    Regards,
    Ishwar J

    Dear Ishwar,
    1.First check whether planning strategy 50 will be suitable your business requirement,here PIR's will be entered at FERT
    material level and all the planned orders for the dependent requirements can be converted and produced and kept in stock ,but
    for the final product alone only after recieving a sales order its planned order can be converted into production order.
    The system generates a planned order which is convertable.
    2.In this case if this not suitable check with planning strategy 40.
    3.If this is not suitable means create a strategy group by combining one make to stock and one make to order planning strategy
    and check the output.
    Regards
    Mangalraj.S

  • Component material to be used for both MTO and MTS scenario

    Hello All,
    What is the setting required at IMG or at Master data level, in order to use the component for both MTO and MTS scenario.
    Detail description of problem:
    In the system already MTS process is exist. And now business wants MTO scenario, in order to have sales order specific stock.
    So i have made the necessary configuration in requirement class (special stock - E in account assignment field) and the basic requirement is working fine. Meaning when i create prodcution order manually using transaction CO08 with reference to sales order i am able to create it. And no problem in executing GR for the prodcution order. Also noticed that after GR the stock is under the salesorder created.
    But the problem is when i try to do the goods issue for the component to the prodcution order, system is expecting sales order specific stock for components too.
    But business wants to use components from unrestricted stock as of Make to stock scenario.
    Please guide me how to achieve this? This is critical to business so expecing quick recommendations from experts.
    Best Regards,
    Krish

    HI
    For  your component if you dont set indi/collective requirement indicator as 2 collective reqmt MRP 4 view then only system will not allow you to use r special stock E  for sales order
    if you want to make all stock avaliable and PR and PO not sales order wise then maintain above indicator as 2 in MRP4 view.
    Regards
    Anupam Sharma

  • Material Issue for both MTO & MTS

    Dear Guru's
    I have to do REM Backflush for a MTO scenario.
    The corresponding raw material are available in stock which was not purchased over a period of  time.
    When I try to do post with correction the system is not allowing me to do the posting, the system is giving error as sales order item is not available.
    Can anyone help me consumming the raw material available in the stock .
    Is there any settings to be done to consume the material which is available in the stock for bothe MTO & MTS.
    Kindly do the needful.
    Helping hands will be appreciated with good points.
    Thanks & Regards,
    Arul.

    Hi Arul
    Please check the below in your DEV server.
    If you put the Individual/coll indicator to 2 in MRP 4 view in material master the raw materials can be taken from unrestricted use stock while back flushing.
    Or
    IN MB1B you can use mvmt type 412E to convert unrestricted use stock to sales order stock.
    SO u can do the backflushing after the conversion.
    Cheers
    JOJI

  • HI All --MTO-MTS-ETO

    Hi All
    can any one explain
    What  is the procedure of MTO , MTS & ETO
    Explain

    Hi Prakash,
    make to order:
    it is a buisness scenario where the company produces goods according to the
    needsand specifications of the customer,the product sold is not stored on the shelves.the product could be very similar but merely change a portion for differen t of its forms for different sales orders.the production cycle is trigered according to how the customer likes to see the product but not the company.
    Make to order Scenario
    1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.
    2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.
    3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.
    (a) Make to order using sales order
    (b) Make to order using project system (not relevant for SD application)
    4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.
    5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things
    the strategy group (MRP 3) in MMR
    the MRP group (MRP1) in MMR
    the item category and MRP type (MRP 1)
    6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.
    make to stock:
    here the production is done irrespective of the customer orders, it is usually done on the basis of the sales forecasts not on the customer specifications, it is usually a push strategy,company produces the products and they are sold.
    there is no customising of the product.
    STO
    Whenever you need to transfer the materials from one plant to another plant belonging to one company or belonging to two company code stock transfer order is raised by the delivering company.
    STO:
    Transfer of goods from one location to another location,it may be between plants within the same company code or in different company code's plants.
    within the company code,bet plants, receiving plant will raise the STO in Supplying/issuing plant-ME21n,
    Supplying plant will deliver the goods to receiving plants , then we need to pick n post the Goods Issue-VL02n, nw when we can observe that the STO qtty will be added into receiving plant and reduced in Delievering plant.
    Configure Intercompany Stock Transport Order
    Material should exist in both the plants (Delivering & Ordering),
    Internal customer should be assaigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assaign the supply source ( Delivering Plant).
    Create a puchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assaign the purchase order number here nt. and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery docume
    Billing (Intercompany pricing conditions should be set).
    Assign points if useful

  • Difference between MTO/MTS vs Consumption Based Planning?

    Hi,
    What is the Difference between MTO/MTS vs Consumption Based Planning?.
    In what scenario we used these types?? could you please explain me with examples...
    Regards,
    Raj

    Hi,
    MTS = Make to stock, you are simply wanting to build up stock and so this will generate requirements even if there are no Sales orders or demand of any kind. This is the most common option
    MTO = make to order, you only want these items when there is a specific
    But consumption based planning is not completely different, you are still using MTS / i.e. you are creating requirements based on the settings in MRP instead of any demand (but the same applies to MTS)
    So MTS and consumption based planning are more or less the same thing.
    You would use MTO if you produce items only when you have an order.
    So if you have warehouse space and sell a lot of an item, you can use MTS or consumption based planning because you know that you will always be likely to be able to sell the stock.
    If you make things for specific orders (such as special sizes or specifications to match the customer's requirements. Or if you don't sell many of an item and the lead times for production are very short (or you don't have much warehouse space) then you would wait for an order before making the item (MTO
    Steve B

  • Repetitive Component Scrap for MTS scenario using MFBF transaction

    Hi,
    We are trying to replicate the functionality of posting a backflush document to process Repetitive material component Scrap for MTS scenario with BOM explosion using MFBF transaction into a custom RF program.
    We tried to use 'BAPI_REPMANCONF1_CREATE_MTS' to backflush the Scrap for the above scenario. But it did not help. And no other BAPI's exist. BDC'ing the transaction doesn't help as it contains Table Controls and lot of subscreens an dit is highly volatile for a RF screen.
    In view of above restrictions, we are not able to find a solution of how to implement the above functionailty in a RF program.
    Can someone please help us in this regard.
    Thanks.

    Any Body plz ? .. Even I need this.

  • MTO & MTS

    Hello Gurus,
    What are the MTO & MTS. Explain me clearly with example.
    Bye

    Hi,
    MTO  - Acronym for Make -To- Order. Material which are made against a specific sales order / project / network order. The requirement created for MTO materials will be individulal. Stock of the materil will be maintained in separate stock segment of the order / project. Stocks can be valuated on non-valuated. In valuated stock, every material movement creates a corresponding accounting document, whereas in non-valuated stock materal movements do not create aaccounting document. production orders / puchase orders for MTO materilas will be account assigned to sales orders / networks / WBS element etc.
    MTS - Acronym for Make-To-Stock. Stock is maintained at plant level. There is no separate stock segment. Production order / Purchase order etc. are not account assigned. Every material movement creates an accounting document.Requirements / inventory are mainatained and tracked at plant level.
    Hope it provides basic information sought by you.
    Regards
    Muraleedharan.R

  • MTO/MTS--------------------Yesterday

    Hi all
    Very one Explined MTO/MTS Yesterday very nice
    Can any one send materail for configration
    pls

    hi,
    Business procedures material based on MRP irrespective of the sales order ie Make to order
    If the standard product is going to be change slightly according to the customer requirement then businss manufacturing that particular material for particular customer called as Make to order.
    Inventory is going to be maintained in special stock indicator E order inhabd
    Configuration
    Create material master by maintaining general item category group- 0001(make to order)
    Availability check - 02
    Transportation Group - 0001
    go to va01 and raise sales order
    item category:TAk
    Schedule line category : cp
    Requirement type KE
    Requirement class 040
    Check TOR and avalability check
    special stock : E
    VOV7
    of TAK
    billing relivence : A
    Pricing :X
    go to mb1c
    maintain stock with a special stock indicator E
    mavement type 61
    Special stock E
    specify sales order number line item number and saveit
    go to VL01N main data
    Go to VF01
    save it
    note for make to order you cannot maintain availability check
    sreekanth.vaka

  • Re: MTO & MTS for same product

    Hi Experts,
    How to configure both MTO & MTS for a same product.
    Regards,
    Vivek

    Hi Experts,
    I am having a requirment for MTO Subcontracting order.The customer issues raw material for the production for the FG product. Now I want that the system should do the Planning for the FG by MRP & also to calculate the the raw material required. The system should also be able to created purchase requisition for the deficit raw material. The raw material should not have any financial implication i.e. they are are only relevent for stock posting & not for any valuation purpose.
    Here my client is the subcontractor. So he does production for Other clients as well.
    Please advise.
    Regards,
    Vivek

  • Business Scenario ( Mix of MTO & MTS) how to configure

    Hi,
    Our customer has a business scenario , which uses a combination of make against order and make to stock. In its case 90% of production is against make to order and 10% is against make to stock.
    Its requirements are that in case of make to Order scenario it should be able to know which production orders have been created against a particular sales order and the manufacturing variance at the time of order settlement should flow to COPA under specific sales order.
    In case of rest of 10% production it should have the flexibility of producing material as made to stock.
    How to fulfill the above requirements , pls provide details answers , helpful answers will be awarded points.
    Regards
    Milind Nair

    Hii Milind,
    What you can do is to check your consumptions of orders. In order to that you can select either single strategy or more than one strategies. As I saw that you receive your sales order for 90% sales, then you can choose different strategy and for purely make to stock for your 10% of sale, you can choose different strategy. For more documentation please refer to the following link:
    http://help.sap.com/saphelp_47x200/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm
    cheers!!!
    kapil

  • MRP configuration Settting for MTO & MTS

    Hi Experts,
                          I have a scenario.When we are running MRP for MTS,It should not consider the sales order so ,what are all the configuration settings should maintain  to get result.
                            For MTO, sales orders should  be considered.so what are all configuration settings have to maintain.
    In this scenario, same Materials we are taking for MTS & MTO.
    Flow chart,for your reference.
    Plz guide me.
    Thanks & Regards,
    Bhargavi.

    Hi Bharghavi,
    In case of MTS, if you do not want to consider sales orders then you can use strategy 10 or 11....settings in the material master MRP3  view as shown below.....
    In case of MTO use planning strategy 20 and make settings as shown below.....
    as these are standard planning strategies no need to make any configuration....If you want to use both planning strategies for same material then check the link posted by Mr. Caetano
    Using two planning strategies for the same material
    Thanks
    Kumar

Maybe you are looking for

  • Can't add song to library

    I have an mp3 song in my music library on the PC, all the songs in the folder are in the Itunes list but one. I cannot get that song to appear in the itunes library list so I can get it on the ipod.  I've tried adding to the library, dragging and dro

  • Cluster resource 'Analysis Services' of type 'Generic Service' in clustered role 'SQL Server' failed.

    Windows Server 2012 R2 SQL Server 2012 After a recent cluster failover from node 1 to node 2, the Analysis Services role is in a failed state, with the service stopped. When attempting to start the service, there are two error messages captured in Fa

  • I cannot disable the full keyboard  navigation

    Hello I have quite a problem. As it says above, I cannot disable the full keyboard navigation option, whenever I try to, it re-activates itself in the preferences, even if I just change tabs and return within the preferences. Furthermore, the keys se

  • Is there such a thing as an Exchange modeling tool? What I am looking for is....

    I am designing or trying to do a conceptual design to include two sites with under 30ms response times between sites. I want to include a four member DAG. I have a design that I would like to have reviewed by some type of tool. I just need to see if

  • FI Posting from IDOC Invoic02..... Help getting error ....

    The error reads : - G/L account 501001 requires a valid tax code This error has only started since we applied the PI01 price to the IV document, if we remove this then the posting are all ok. In the IDOC with the price using PI01 there is a new segme