MTO Settlement

Pls help!
We use make-to-order scenario with both order and sales order as cost objects.
First question - the cost object is determined under cost object controlling by sales order > requirement class >  account assignment category.  If category is E, then sales order is the object, correct?  And the requirements type that the class is assigned to is included on sales order line item and appropriately assigned to the item category in configuration?  Please confirm understanding.
If we do not have requirements type defaulted in the sales order, then its assumed its make to order with production order as cost object?  Therefore, if we never wanted the sales order to be the cost object, we would not have to configure th area cost object controlling by sales order.  This point confuses me so please confirm.
When we settle the production orders or sales order, is the cost component split used to map the costs (cost element range) to the copa value fields?   I do see this configuration set up in the system under valuation in copa (KER4) and wondering if it comes into play during settlement of production (co88) and sales orders (va88)?
We have our allocation structure set up to settle costs to psg and we have the pa transfer structure set up as well. 
The pa transfer structure assigned in the production order type does include the cost element ranges for material, labor, overhead, but the value fields are mapped to the material variance, labor variance, overhead variance value fields, not the material, labor, overhead cost value fields. 
So if I don't see the material, labor, overhead cost value fields mapped in the pa transfer structure, how are costs actually flowing through to copa (material, labor, oh)?  are they missing from profitability transfer structure?  I do see them on the copa reports (ke24) so their must be config allowing this data to pass, which is why I think it might be the cost component structure.  Please confirm.
Thank you!!!!!

Hi,
1. If you dont want sales order as a cost object,
a. Either follow the steps I mentioned above, OR
b. Do Not assign any req type at all
2. There are 2 scenarios here,
a. SO is cost obj with non valuated stock (SAP recommends this)
b. SO is cost obj with valuated stock...
2.a -
Prod Order is settled upon sales order.. GR from prod order does not update any acc doc
Sales order is settled to COPA.. Here you can use a PA Trf Str where in you have replicated your Cost Comp Str... i.e. You can create as many assignment lines in KEI1 as your CCS in OKTZ and assign each one of them to a separtae value field
No question of variances in this case
2.b
Prod order is not settled upon sales order.... GR from Prod order updates acc doc.... However, variance from prod order can be settled to the sales order if you create variance account as a cost element... Else, it is settled to COPA
Upon PGI, the COGS is posted to Sales Order as a single line item
Here, in your PA Trf Str, you would create an Assignment line and tick "Qty Billed/Delivered".... This would update the Billing Qty to COPA upon settlement of Sales order
This Qty update will trigger KE4R.... i.e. You need to assign CCS to VF in KE4R for PV=01 and Rec Type = C.... This would update the CCS in COPA as per the Sales Order cost estimate
The Costing Key in KE40 should refer to "Sales order cost estimate" and not "Std Cost estimate"
Br, Ajay M
Hope, I have not confused you.. I am going to sleep as its 2 AM in India now.. Will reply tomorrow, if you need any assistance.. Byeeee.
Edited by: Ajay Maheshwari on Mar 19, 2011 1:40 AM

Similar Messages

  • MTO settlement rule

    Dear Gurus,
    In MTO scenario, how to transfer the production order costs to the sales order. Is it possible to assign the Sales order as a settlement rule. I tried to do it...but system is not accepting except the material as the settlement rule.
    Regards,
    Surya.

    Create Sales order using VA01  create Production Order using co08 Production Order with reference to sales order.
    After GI/Confirmation/GR   Goto settlement Individual processing KO88  there you can enter your Production order where the costs will be settled with reference to your sales order.
    Reward points if useful,
    Regards,
    MSH

  • MTO - Settlement of Sales Order to COPA

    Hi,
    We have a scenario wherein production order is created with reference to Sales order.
    No standard / Sale order BOM is maintained. As such no cost estimate is available for either Header material or sales order. Header material does not have any value.
    Goods are issued to production order with reference to such sales order, as special stock. So consumption posted to Sales order.
    Revenue is captured on Sales order.
    At this point of time, can I settle the sales order through VA88. What all will it settle.
    Is RA excution a must for VA88 settlement?
    Please suggest.

    HI,
    if you need to have WIP-value posting, result analysis is a must before settlement.
    Best regards, Christian

  • MTO Settlement Process

    Hi,
    We are executing Make to Order Scenario. We have converted planned order to production order and order confirmation,release and Billing was done.
    After billing what  are the steps do i need to take care for settling the values to COPA? Please advise me..
    Thanks
    KC

    Hi Ajay,
    Thanks for your mail. I am able to settle the Production order to Sales order. But i am not able to do the Sale Order settlement in VA88. I am getting the below error...
    There are no accrued amounts; settlement is not possible.
    Message no. KD256
    Diagnosis
    The sender has a results analysis key, but no accrued values.
    Either the accrual was not yet started for the sender, or the values to be settled from the accrual equal zero.
    Please help me
    Thanks
    KC

  • Error message while creating production order with KMAT material strategy25

    Hi PP Gurus I am running variant configuration cycle...Strategy 25, Custermer Req KEK (KMAT Matrl)
    Sales order & MRP Picked the components correctly as per the dependencies
    written. So Planned order generated against sale order.
    When I tried to convert planned order to Production order...I am getting the
    below error message..
    Error Message:
    You cannot make an assignment to make-to-order stock Message no. CO684
    Diagnosis The component cannot be allocated to an individual stock because
    make-to-order production and engineer-to-order production cannot be executed
    with this order.
    A possible cause is that you are trying to create an order with reference to a
    sales-order/project, where an account assignment to a sales order/project is not
    allowed in the settlement profile that is assigned to the chosen order type.
    This is inconsistant.
    System response The following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure Choose another order type.
    I used order type with SD1 as settelement profile.
    OVZG: default 046, settlement profile = SD1
    OPJH: Settlement profile = SD1
    Plz through some light on this if u have worked on Variant Configuration/MTO
    settlements.
    Question:
    1) Is creation of production order with KMAT material supported by SAP?
    2) If yes, why the above error occurs?
    Waiting for Ur reply
    With Best Regards

    Dear R.Brahmankar,
    I have check on the note, but it is not relevant to ecc6. The current system default setting is :
    Standrad setting for reqt class 046
    Special Stock E
    Acct Assgt Cat. M
    Valuation M
    Settlmt Profile SD1
    However if I change the Acct Assgt Cat. from M to E. It resolve the problem. I would like to know is this the right solution?
    Config in Acct Assgt M
    Consumption Posting = E
    Config in Acct Assgt E
    Consumption Posting = '  '
    In F1 key of Consumption Posting field it shown following:
    To flag the sales order item as cost- and revenue-carrying, enter an "E" (settlement via sales order).
    If you do not wish to flag the sales order item as cost- and revenue-carrying, do not enter anything.
    Dependencies
    If you are working with nonvaluated sales order stock, always flag the sales order item as cost- and revenue-carrying.
    If you are working with valuated sales order stock:
      In the case of complex make-to-order production, flag the sales order item as cost- and revenue-carrying
      In the case of sales-order-related mass production, do not flag the sales order item as cost- and revenue-carrying
    Should we change to E?
    Regards,
    Ong

  • Error While doing settlement for Sale Order in MTO scenario

    Hi,
    In MTO Scenario - when i try to settle Sales Order i am getting the below error. Even i have maintained the settlement cost element for PSG in allocation structure A1.
    Kindly help me
    Define a settlement cost element for receiver type PSG
    Message no. KD506
    Diagnosis
    In allocation structure A1 (controlling area BP01), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type PSG.
    Procedure
    Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
    Thanks
    Kishore

    Hi
    Please check your allocation structure , it looks that settlement cost element that you have assigned in the allocation strcuture is not having correct cost element category.
    Go to Allocation structure configuration (OKO6) and check your allocation structure A1.
    check settlement cost elements is it by cost element or you have assigned separate cost element for settlement.
    if you wants to settle with same cost element select By cost element.
    if you wants to settle with different cost element create a cost element and assign settlement cost element.
    http://help.sap.com/saphelp_di46c2/helpdata/EN/9d/1f4b6e5733d1118b3f0060b03ca329/frameset.htm
    hope this helps you.
    Regards

  • Settlement rule sould be SDI in MTO production order

    Hello,
    I have a problem with my MTO scenario.
    The Assignment Category of the Settlement Rule in my production order is MAT. It should be SDI.
    In OPL8 I can´t change it from PP1 to SDI.
    In OKO7 if I change the Default object type form MAT to SDI I can´t save the SO.
    In OPJH If I change the Settlement profile on Production Order type to SDI e get error.
    What should i do to solve this problem?
    Thank you all in advance
    Cátia Pereira

    Hi
    It depends on settings in Req Class (OVZG)  and Account Assignemnt Catg (AAC) in OME9
    If your AAC is E in Req Class, then your sales order is a CO object and Prod order has SDI instead of MAT
    Req Class in IMG can be checked - IMG > Contr > Prod Cost Planning > Cost Obj Contr > Prod Cost By Sales Order > Control of Req Class ....... 
    Br, Ajay M

  • Order settlement - MTO

    Hi Experts;
    I am new to MTO environment. I have a issue with production order settlement.
    1. Can u please guide me the steps which i need to follow and what is the difference between order settlement process comparing with MTS.
    2. What is the role of pricing indicator "S" and "v" with order settlement.
    3. Is there any relationship between moving / standard price of BOM components for the output material cost and moving price update of finished product.
    Request you to explain the concept behind the settlement.
    Thanks and Regards;
    Malka samarasinghe

    HI,
    pls. check the following link:
    http://help.sap.com/saphelp_erp60/helpdata/en/90/ba81d2446711d189420000e829fbbd/frameset.htm
    It is a decision based on customer needs  to follow "complex make-to-order production " or (the thing you require) "mass production on the basis of sales orders".
    In the second case "The flow of quantities and values corresponds to that of make-to-stock production, while the cost accounting method costs the products."
    There are a number of customizing steps to be made but it is possible to settle prod. order in MTO process not to sales order position but as it is in makt-to-stock process.
    Best regards, Christian

  • Settle ment rule for MTO

    Hi Gurus,
    Please tell me which settelemt category and who will be a reciever for production order in MTO.
    i have bit confusion.
    here i got the material as a receiver in settlement.
    Please clear me.
    Nilesh

    Hi,
    Which order type you are using and which settlement profile is assigned to it. To check it, please use KOAL T Code. Now double click on Order Type and check which Settlement profile is assigned? Now to check that settlement profile go through the following path
    IMG > Controlling > Internal Orders > Actual Postings > Settlement > Maintain Settlement Profiles
    Click on Settlement Profile. Now check that settlement profile which is assigned to that order type.
    Now check the Default Object Type. it must be MAT .
    The system considering the profile from strategy ex: SD1 - Sales order profile.This settlement profile itself settlement rule is assigned for MTO.
    The settlement profile assigned to order type with standard sett profile (PP01) at OK07.
    Hope clears to you.
    Regards,
    R.Brahmankar

  • MTO Production Order settlement - assignment field filled incorrectly

    Dear All
    Normally, once our production orders are settled the assignment field in the accounting document that gets generated contains the production order.
    However, in the case of our MTO production orders that get automatically created from a sales order, the assignment field is getting populated with the sales order # and item # on the sales order that generates the production order.
    This is causing some difficulties for our accounting folks.
    I checked the Sort key assigned to the GL account and it is assigned 036 (AUFNR).
    Any ideas? Could the MTO functionality override this? Is the sales order and sales order item # being pulled in from somewhere else during the goods movement?
    Also, wondering where I can see this in the system and if it's coming off the production order itself, or the material document posted for the production order, or just from the order settlement?
    Many Thanks!

    We've found an alternative process for this.
    Thank you.

  • Settle PP Orders to SD Order items using KO8G in a MTO Scenario

    Hi
    I've set a Make_to_Order scenario for a company.
    I need to settle the cost collected onto PP Order to the relative Sales Order Item.
    When I use the KO88 transaction, i can settle a single PP order without problems, but when I try to use the KO8G transaction for a mass settlement, the system issue the message KD233 No settlement for this Sender, in both Foreground and Background processing mode.
    Somebody has an idea how to solve this issue ??
    Why is possible settle a single Order with KO88, but teh system reject the same operation with KO8G transaction ??
    Thanks id advance for your help
    Kind regards
    Claudio

    HI
    Solved by myself.
    The right transaction to use is CO88 and not KO8G used for CO and PM Orders.
    Claudio

  • How does MTO relate to settlement?

    Hi,
    Need explanations from you all.
    (1) What is settlement? Please explain.
    (2) How does Make-To-Order relate to settlement?
    Thanks,
    Wooi Ling

    Closed.

  • MTO; change system status of sales order lines after settlement to "Closed"

    HI
    Is there a program (or transactin), to do mass change of system status for MTO sales order lines to "Closed" ?
    Thank you, Dejan

    Try using transaction "MASS" and object type "BUS2032".
    Shail

  • MTO...OH on sales order

    Hi Experts,
    Client is follwing MTO with non valuted sales order stock, after completion of production the production order is setteled to respective sales order.
    EX: Production cost: 100 rs. has been setteled to sales order, on this 100 and other rs 20 rs directly posted to sales order. Here i want to caluculate OH 120 rs....i have asigned Costing sheet in Sales order, i am trying to caluculate OH, those values are not updating in the sales order level....
    Please someone help....
    Thanks,
    Chandu

    Hi,
    You can settle to sales order with T.Code VA88.
    Regarding OH, check the validity period and OH Rates and also credit details of respectiv oh Key.
    Thanks.
    S.Subbiah.

  • MTO (Production order) & MTO (Sale order)

    What would be the end user activity in Controlling (CO) module for both MTO production and sale order scenarios in terms of planned and actual costing point of view? (Kindly mention T-Codes as well)
    I think in sales order scenario the sale order act as a CO object and collect both the revenue and costs itself. The order closing activity will be performed by SD user and so nothing will be done by CO user at the end for actual cost and in the planning phase only the activities needed to be planned on production cost center by the CO user. How and where to run the cost estimate if the process is triggered by the SD user and how to settle variances if the SD user is closing the order?
    N.B. Material Ledger is not activated and costing is done without variant configuration and the MRP is yet to be decided so let me know in both of the cases (i.e. with and without MRP)
    Thanks

    Hi SK,
    Make to Stock & Make to Order scenario functionality rational in terms of Fundamentals, only the difference of Cost Object is different which cost will determine to calculate.
    Month end Activity for both MTS & MTO will perform by CO users (where as in MTO all cost activity will consumed wit relate to SD process against SO wise..i.e @posting level in SD side)
    The following month end activity T Code listed out.
    Make to Stock
    Make to Order
    Template Allocation
    CPTJ - Template Allocation
    CPTA - Individual Processing (Single)
    VAN1 - Revaluation at Actual Prices
    CPTD - Collective Processing (Multiple)
    VA44 - Overhead
    Revaluation at Actual Prices
    Results Analysis
    MFN1 - Individual Processing (Single)
    KKA3 - Individual Processing
    CON2 - Collective Processing (Collective)
    KKAK - Collective Processing
    Overhead
    Settlement
    KGI2 - Individual Processing
    VA88 - Settlement
    CO43 - Collective Processing
    Preliminary Settlement for Co-Products, Rework
    CO8B - Individual Processing
    CO8A - Collective Processing
    Work in Process
    KKAX - Calculate (Single)
    KKAO - Calculate (Collective)
    Variances
    KKS2 - Individual Processing
    KKS1 - Collective Processing
    Settlement
    KO88 - Individual Processing
    CO88 - Collective Processing

Maybe you are looking for