MTS Production with Configurable Material

Hi Experts,
I am working on IS Mill solution. we also have the configurable material. Normally the client's business is MTO. But in some cases they want to use Make To Stock also. But the problem is for make to stock with configurable material is not possible.
As it is possible if they have APO (IS-Mill functionality). But here we are using ECC-MRP.
Can anybody suggest some SAP note for this??
Thanks in Advance !!
SISL

Hi SISL
I am working at a Danish company named Vestas Wind Systems and we want also to start up doing make-to-stock using configurable material and would like to avoid a very high number of material variants.
We are already using APO in our company (SNP) and therefore I believe it should be a possibility.
Is this tied together with characteristic based planning in APO?? I have heard that this characteristic based planning only is possible on one level, is that also your experience??
I would really like to get my hands on some documentation on how to use SAP ECC and APO to handle make-to-stock of configurable materials, so if you can provide me with such documentation, it would be highly appreciated. It seems like you have some experience in this area.
Thanks a lot in advance.
Best Regards
Kim Hald Kristensen
SAP PLM Specialist

Similar Messages

  • BAPI_SALESORDER_CREATEFROMDAT2 with configurable material

    Hello everybody.
    I have been looking for information and I can't find how to do it. I can create the sales order, but without any configuration value.
    Please, Can anyone tell me who I have to call BAPI_SALESORDER_CREATEFROMDAT2 with configurable material?
         lv_configid = ld_itm_number1."item position
          lv_inst_id = lv_inst_id  + 1.
          CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
            EXPORTING
              input  = lv_inst_id
            IMPORTING
              output = lv_inst_id.
          lv_root_id = lv_root_id + 1.
          CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
            EXPORTING
              input  = lv_root_id
            IMPORTING
              output = lv_root_id.
          li_order_cfgs_ref-posex = ld_itm_number1.
          li_order_cfgs_ref-config_id = lv_configid.
          li_order_cfgs_ref-root_id = lv_root_id.
          APPEND li_order_cfgs_ref.
          li_order_cfgs_part_of-config_id  = lv_configid.
          li_order_cfgs_part_of-parent_id  = lv_inst_id.
          li_order_cfgs_part_of-inst_id    = lv_inst_id.
          li_order_cfgs_part_of-obj_type   = 'MARA'.
          li_order_cfgs_part_of-class_type = '300'.
          li_order_cfgs_part_of-obj_key    = it_pedidos_pos-matnr.
          APPEND li_order_cfgs_part_of.
          li_order_cfgs_refinst-posex     = ld_itm_number1.
          li_order_cfgs_refinst-config_id = lv_configid.
          li_order_cfgs_refinst-inst_id   = lv_inst_id.
          APPEND li_order_cfgs_refinst.
          li_order_cfgs_inst-config_id = lv_configid.
          li_order_cfgs_inst-inst_id   =  lv_inst_id.
          li_order_cfgs_inst-obj_type      = 'MARA'.
          li_order_cfgs_inst-class_type    = '300'.
          li_order_cfgs_inst-obj_key = it_pedidos_pos-matnr.
          li_order_cfgs_inst-quantity = 1.
          CONDENSE  li_order_cfgs_inst-quantity.
          li_order_cfgs_inst-complete      = 'T'.
          li_order_cfgs_inst-consistent    = 'T'.
         li_order_cfgs_inst-persist_id_type = 'G'.
         li_order_cfgs_inst-quantity_unit = 'ST'.
          APPEND li_order_cfgs_inst.
          li_order_cfgs_value-config_id = lv_configid.
          li_order_cfgs_value-inst_id = lv_inst_id.
          li_order_cfgs_value-charc = 'Z_MC_NOMBRE'.
          li_order_cfgs_value-value = it_pedidos_pos-nombre_serigr.
          APPEND li_order_cfgs_value.
          li_order_cfgs_value-inst_id = lv_inst_id.
          li_order_cfgs_value-charc = 'Z_MC_LETRA'.
          li_order_cfgs_value-value = it_pedidos_pos-tipo_letra.
          APPEND li_order_cfgs_value.
    Thank you in advance.
    Regards.

    Hi REIS did you get any answer to your pb I have exactly the same request .
    these internal id for instance and configuration are confusing .
    Thanks for your return if your pb has been solved since .
    Rgards
    Yvon

  • Product costing configuration material   and study material

    Hi all,
    Can any one pass me the Product costing configuration material and study material email id is [email protected]
    thanks in advance
    Regards
    vijay
    Edited by: vijay matlani on May 11, 2008 11:17 AM

    hi
    Product costing documentation
    http://www.sap-topjobs.com/SpecialPP/746.html
    nagesh

  • Planning with configurable material

    Hello All,
    We are using a Configurable material and i have a question about the configurable material. The Configurable FERT material should be a MTO and all the configured components should be MTS. I want to enter the forecast for the components in Md61 and put them in stock and the requirement from the Configurable finished good should consume the PIRs. can anyone tell me what strategies i should use at each level. Thanks in Advance.

    Hello
    I have tried above suggestion, but they did not work. The sub assemblies (variant components) are not being consumed by the Fert level requirement. It is creating Another new requirement, it is not consuming the PIRS for the sub assemblies. Can someone suggest me what to do here.
    Edited by: jags on Nov 28, 2009 5:58 AM

  • Make-to-order production with configuration( str type 25)

    Hi,
    WE are using above planning strategy. When we try to convert the planned order, we are getting following message
    "You cannot make an assignment to make-to-order"
    We have checked sap notes also.
    Pl let us know what are the setting required in settlement profile.
    Regards
    Vineet

    Hi Vineet,
    This Strategy is for Variant configuration that is it is for congfigurable material for this you need to maintain in Sales view 2 Item category should be 0002 and the classification view you should have class as 200 or 300.
    The get planned order you need to create the saleorder after that you need to run the MRP then you need to convert the planned order to Production order since this is make to order scenario you cant manually create the planned order and convert for that.
    Regards,
    Satish

  • Configurable material - Error converting plan order to production order CO6

    While I am coverting planned order to production order with configurable material, I am getting the follwoing error:
    You cannot make an assignment to make-to-order stock
    Message no. CO684
    As read in previous forum messages I am check settlement profile assigned for  new order type (ZSD01) with standard sett profile (SD1) at OKO7 and set "Valid receivers" with value "1" in Order, Material, Profit.segment, Sales order and Order item.
    Configurable material have item category group "0002", MRP type "PD", Lot size "EX", Strategy group "25" and "Individual requirements".
    Sales order with configurable materiale have item category "TAC".
    Where is the problem?
    Thank you in advance
    Oscar

    Hi,
    There are some OSS Notes to address this problem..(OSS Note: 311651, 432109 etc..)
    But all ae for older versions of SAP.
    Regards,
    Siva

  • PIR for Configurable material

    Hi,
    We are working with configuration material scenario. This configuration material is use for Planned Independent Requirement (PIR).
    I have maintain the Planning profile and create the PIR (MD61) Here select the characteristic’ value, its characteristic value have maintained object dependency for selection of components.
    PIR  MD02 MD04 CO40  Production order,
    In production order the component are not selected as per characteristics.
    Pl Tell me what is the wrong?? While we work in Sale order creation and production order components are select as per characteristic selection.
    Pl helps me what is the wrong for creation of PIR.
    Regards
    Rajesh Tiwari

    Hi
    In most cases the configurable materials are manufactured in make-to-order configurable strategy(25). if you have used this strategy in mrp3 view for the fert materials as well as its variants. In this situation u can only creat CIR not PIRs.
    Please use CIR using MD81 and it will definitly search for the conf. profile and demands the characterstics.
    Nanduri

  • Configurable material in scheduling agreement

    When I use DS scheduling agreement with LPN as item category with configurable material, I cannot input value for configuration. But if I use normal TAN instead of LPN, I can input value for configuration.
    Why?
    Does SAP do not allow configurable material in scheduling agreement or quantity contract?
    Thanks in advance for any suggestion.

    Deat Amy,
    Please check the item category settings related  to configuration through VOV7 transaction.
    Go to VOV7 transaction then select item category LPN then go in to the detain here you check the configuration related settings under Bill Of Material /Configuration tab.
    If want you refer the standard Config.at Mat.Levl itemcategory TAC settings, same way you can do settings for your item category then try.
    Note:- Not advaisable to change the standard one, so you copy the standard itemcategories do the changes,
    I hope this will help you,
    Regards,
    Murali.
    Edited by: Murali Mohan.Tallapaneni on Nov 13, 2008 5:20 AM

  • Configurable material - Partial cancellation of sale order

    Hi
    I created a sale order with configurable material with variant pricing. For example 50 Qty( VA01). If  i do the partial cancellation in VA02 for example 25 qty, the following message is getting popped up.
    Changing date/quantity may result in differen
    - Please configure
    Can anyone suggest what are all the settings i need to do? or any other procedure is there for partial cancellation of configurable material?
    Thanks in advance.
    Regards,
    Raman

    Hi
    The scenario is
    Create a sale order on VA01 for configurable material with variant configuration for the quantity 50. The material doesnt have BOM.
    Change the quantity in VA02 for the above material the following warning message is appearing.
    Change in quantity / date may result in different BOM. Pls configure.
    I am not going to create PR or Delivery document as a subsequent document for the same.
    Pls advice. Why the message is getting pop-up.
    Thanks in advance
    Raman

  • About configurable material

    hello,
    any body pls explain me. i am facing to issues pls provide me solution
    1) my scenario is make to order with configurable material.
    when i am creating sales order in configuration i have maintined characteristic which were mainly required and status is showing green but when i am going to save it showing inconsistency check message and showing the same material again and asking for enter the data.again means it showing twice then only its allowing to save. i dont have any sales order BOM i have only PROD BOM and component is recursive.
    2) i have maintained dependency in BOM.
    dependy is procedure.
    formula is $self.qty = width*thickness.
    when the time of check i didn't get any error and released.
    but when MRP run i haven't get result on base of my dependency. just which qty i have maintained in BOM only i am getting. pls suggest me where i am doing wrong. actually now we r in GOLIVE.
    THANKS & REGARDS
    Bhakta

    thanks for ur reply
    actually i have maintained dependency formula mentoined below
    Z_WOOD_CROSS_QTY:
    10$self.z_QTY_JSSL = (((((32.5(WIDTH/25.4))/(121212))6)
    20 NO_OF_Pallets))
    30 if packing = 'hisexp' or packing = 'ownexp' and length > 3000,
    40$self.z_QTY_JSSL  = (((((32.5(WIDTH/25.4))/(121212))5)
    50  NO_OF_Pallets))
    60 if packing = 'hisexp' or packing = 'ownexp' and length > 2000
    70and length <= 3000,
    80$self.z_QTY_JSSL = (((((32.5(WIDTH/25.4))/(121212))4)
    90NO_OF_Pallets))
    100 if packing = 'hisexp' or packing = 'ownexp' and length > 1000
    110 and length <= 2000,
    120$self.z_QTY_JSSL = (((((32.5(WIDTH/25.4))/(121212))3)
    130NO_OF_Pallets))
    140 if packing = 'hisexp' or packing = 'ownexp' and length <= 1000,
    150
    160$self.z_QTY_JSSL = (((((32.5(WIDTH/25.4))/(121212))3)
    170NO_OF_Pallets))
    I have maintained
    Thickness: 0.6mm
    Width:1250mm
    Length: 2010
    When I am doing MRP run it should consider line 40-70
    But it considering line 80 - 110 only
    Its giving result as 1.64 in place of 2.04
    Pls help me to resolve this issue. .
    THANKS & REGARDS
    CH.Bhaktavatsalam

  • Credit Memo Invoice - Configurable Material

    I have a sales order with configurable material and the appropriate invoice.
    Sales Order has type "credit memo request" and the invoice is a "_credit memo_".
    It is not possible to release the document to Accounting/COPA.
    Error message is "Error reading the material cost estimate for sales order xxxx".
    What can I do to proceed? Which Customizing settings are necessary? Because it is correct, that there is no material cost estimate because the material is calculated while creating the sales order.
    Thanks for your feedback in advance!
    Best regards,
    Pamela Glatz
    Application Services/CO

    HI,
    Please check whether u have configured any costing key with setting for reading the cost estimate of the material.
    As you said, the cost estimate of the material doesnt come in your scenario, there should not be any configuration in copa to read the cost estimate(thru costing key)
    Regards
    Sudhakar Reddy

  • MTS configurable material

    Hi,
    I'm having scenario of MTS for configurable material. We dont have APO. And we are not using VC. We have Is-Mill package. How to do the MTS for configurable material. If u any update please reply me.
    I tried with FERT material with Material is configurable in Basic data 2. I maintained 300 class type. I maintained configuration profile also. In PIR we are not able to give exact values. There we need to give usage probability. So, i planned to edit the characteristic fields in production order. I tried with the help of ABAP'er. But i didnt get the solution.
    Anybody plz help me.
    Naren

    Hi Naren,
    Please follow these steps
    1. I think you have posted the another sales order stock to unrestricted by mb1b and movement type 411 E.
    2. Now you have another sales order in your hand for which you want to deliver the qty which is in unrestricted.
    3. now again go to mb1b and choose movement type 413, now enter the req qty mentiones for your sales order, then choose the required field such as storage location and finally the sales order against which you want to deliver the materials(which is in unrestricted area), when you complete this activity you can deliver the material against the desired sales order.
    Please check and revert.
    Thanks,
    Hrishi

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Error message while creating production order with KMAT material strategy25

    Hi PP Gurus I am running variant configuration cycle...Strategy 25, Custermer Req KEK (KMAT Matrl)
    Sales order & MRP Picked the components correctly as per the dependencies
    written. So Planned order generated against sale order.
    When I tried to convert planned order to Production order...I am getting the
    below error message..
    Error Message:
    You cannot make an assignment to make-to-order stock Message no. CO684
    Diagnosis The component cannot be allocated to an individual stock because
    make-to-order production and engineer-to-order production cannot be executed
    with this order.
    A possible cause is that you are trying to create an order with reference to a
    sales-order/project, where an account assignment to a sales order/project is not
    allowed in the settlement profile that is assigned to the chosen order type.
    This is inconsistant.
    System response The following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure Choose another order type.
    I used order type with SD1 as settelement profile.
    OVZG: default 046, settlement profile = SD1
    OPJH: Settlement profile = SD1
    Plz through some light on this if u have worked on Variant Configuration/MTO
    settlements.
    Question:
    1) Is creation of production order with KMAT material supported by SAP?
    2) If yes, why the above error occurs?
    Waiting for Ur reply
    With Best Regards

    Dear R.Brahmankar,
    I have check on the note, but it is not relevant to ecc6. The current system default setting is :
    Standrad setting for reqt class 046
    Special Stock E
    Acct Assgt Cat. M
    Valuation M
    Settlmt Profile SD1
    However if I change the Acct Assgt Cat. from M to E. It resolve the problem. I would like to know is this the right solution?
    Config in Acct Assgt M
    Consumption Posting = E
    Config in Acct Assgt E
    Consumption Posting = '  '
    In F1 key of Consumption Posting field it shown following:
    To flag the sales order item as cost- and revenue-carrying, enter an "E" (settlement via sales order).
    If you do not wish to flag the sales order item as cost- and revenue-carrying, do not enter anything.
    Dependencies
    If you are working with nonvaluated sales order stock, always flag the sales order item as cost- and revenue-carrying.
    If you are working with valuated sales order stock:
      In the case of complex make-to-order production, flag the sales order item as cost- and revenue-carrying
      In the case of sales-order-related mass production, do not flag the sales order item as cost- and revenue-carrying
    Should we change to E?
    Regards,
    Ong

  • Configurable material  with make to stock

    Hi,
      My scenario is like  final products Distemper red 1kg, distemper  red 5kg and 10kg like this.But  Sales order will be Distemper red  1000kg.Based upon the availability of stock customer will get 5kg,10kg Depending upon the pack, price also differs depends upon the pack.
    In RG1 register they are updating only Distemper red total stock.
    If i go for variant configuration i should create distemper as variant and all finished material as normal and variant should be assigned(distemper red) in mrp 3 view.
    Moreover planning also done for only distemper red while packing they will go for different quantity.
    For Configurable material PIR can't be done.
    So how to proceed further, what about RG1 resister it should not update all pack wise only distemper red total quantity.
    Regards,
    S.Suresh.

    Hi,
    As BNR said you need to work with Material Variants for having Variant Configuration with Make to Stock.
    Pls. find the helpful details for maintaining Material Variants :
    Maintaining Material Master Records for Variants
    Prerequisites
    A configurable material exists, for which you create a material variant. The configurable material
    has all the necessary settings in the configuration profile, class assignment, dependencies, and
    so on.
    Procedure
    1. From the material master menu, choose Material   Create general   Immediately.
    Enter a material number, an industry sector, and a material type for materials kept in
    stock.
    You must process the following views:
    Basic Data*
    Sales Data*
    MRP Data*
    For material variants, you maintain the usual material master data, such as
    availability check, strategy groups, and so on. This documentation describes the data
    that you need to maintain specifically for material variants.
    2. Maintain the required basic data.
    Do not select Material is configurable for a material variant.
    In the basic data, you can link the material variant to a configurable material. This
    configuration applies to all plants. To manufacture the material variant in-house, you
    must maintain the variant at plant level, so that BOMs, routings, and so on can be
    determined. Cross-plant variants can be used in Purchasing, but are not supported in
    Sales.
    3. Maintain the sales data.
    You can only use the variant in sales orders if you maintain sales data for the variant.
    4. In the MRP data, enter a configurable material for configuring the variant at plant level.
    5. Choose Configure variant.
    You see the value assignment screen with the characteristics of the configurable
    material.
    Configure the variant.
    6. Once you have maintained all the data, save your material variant.
    Bill of Material (BOM)
    To do a requirements explosion for a configured material, you must maintain the data in the
    material master record and link a BOM to the configured material.
    If the material of the material variant is the same as the configurable material, the link
    is already there.
    You can either create a BOM especially for the configured material (perhaps using the copy from
    function) or allocate the configured material to the BOM for the configurable product. The second
    option is the more common solution.
    If you allocate the configured material to the BOM for the configurable product, the BOM for the
    configurable product is interpreted and exploded according to the characteristic values assigned.
    The interpretation includes the processing of selection conditions and the setting of field values in
    BOM items according to the relevant actions.
    Allocating a Configured Material to a BOM
    To allocate the configured material to the BOM of the configurable product, proceed as follows:
    1. From the bills of material menu, choose Bills of material   Material BOM   Alloc. config.
    mat.   Create.
    2. Enter the name of your configured material in the Material field.
    You see a screen on which your configured material is shown as the first allocation.
    Select the allocation and choose the All allocs for BOM function to see all the materials
    allocated to this BOM.
    3. Save your allocation.
    Task List
    To produce a configured material, you need to allocate a task list to the configurable material
    once you have created the material master.
    If the material of the material variant is the same as the configurable material, the link
    is already there.
    You can either create a task list especially for the configured material (perhaps using the copy
    from function) or allocate the configured material to the task list for the configurable product in the
    task list maintenance function. The second option is the more common solution. If you allocate
    the configured material to the task list for the configurable product, the task list for the
    configurable product is interpreted and exploded in the production order according to the
    characteristic values assigned. The interpretation includes the processing of selection conditions
    in the operations or activities, sub-operations, sequences of operations, and production
    resources/tools (PRTs).
    Allocating a Task List to a Configured Material
    To allocate the configured material to the task list of the configurable material, proceed as
    follows:
    1. From the routings menu, choose Routings   Routing   Change.
    2. Enter the number of the configurable material.
    3. Choose Goto   Overview.
    4. Choose Routing   Material allocation   New entries and enter the number of the
    configured material you want to allocate to the task list.
    5. Save your allocation.
    Creating Cross-Plant Material Variants
    Use
    For material variants that are procured externally, you can define the assignment to a
    configurable material in the basic data of the material master, because no plant-specific data
    needs to be determined for these variants.
    Procedure
    1. In the material master menu, choose Material   Create (General)   Immediately.
    Enter a material number, an industry sector, and a material type for materials kept in
    stock.
    Select the views that you want to process.
    2. Maintain the required basic data.
    Do not select Material is configurable for a material variant.
    3. Under Client-specific configuration, enter the configurable material of which you are
    creating a variant.
    4. Choose Configure variant.
    You see the value assignment screen with the characteristics of the configurable
    material.
    Configure the variant.
    5. Once you have maintained all the data, save your material variant.
    Result
    The variant can be entered in a purchase order. The configuration of the variant is copied from
    the material master.
    Cross-plant material variants can be used in Purchasing. However, they are not
    supported in Sales.
    Strategies for Variants
    Definition
    Low Variance
    This section describes how to plan products that have a practical limited number of possible
    combinations of characteristics and characteristic values. Technically speaking this section
    describes the use of variants to sell configurable materials.
    Variants can be used to facilitate the work with configurable materials. Variants of a configurable
    material are, for example, defined to prefabricate frequently required configurations and place
    them in stock, which is why variants were formerly called stockable types.
    For some configurable materials, it may be difficult to determine the variants of a configurable
    material. To use the strategies for variants effectively you must have an estimate of future
    consumption for each variant.
    If the configuration is not changed during the Sales Order stage, production can occur at the
    Production Before Sales Order stage. Then the customers must purchase the variants as they
    are or as they were planned. The benefit is that the products can be shipped immediately to the
    customers, if they are in stock.
    Make to Stock Production for Variants
    Variants can be planned on the finished product level using any make-to-stock strategy, such as
    Planning with Final Assembly (40)  or Net Requirements Planning (10)
    The planning of variants with make-to-stock strategies combines the advantages of make-tostock
    production (very short delivery time) with the advantages of variant configuration (one BOM
    and one routing for a whole product family).
    Make to Order Production for Variants
    Variants can be planned on the finished product level using any make-to-order strategy, such as
    Planning w/o Final Assembly (50) or Planning with a Planning Material (60)
    The planning of variants with make-to-order strategies combines the advantages of make-toorder
    production (planning without final assembly or cost tracking on the sales order level) with
    the advantages of variant configuration (one BOM and one routing for a whole product family).
    Integration
    Hope this helps.
    Regards,
    Tejas

Maybe you are looking for

  • How can I sync the standard Outlook calendar with the "Calendar in iCloud"? I just get 2 calendars which are not synchronized.

    I am using a PC with Windows 7 and MS Office/Outlook 2007 together with the latest iCloud control panel. Everything seems to be fine, but the synchronization works only for the calendar "Calendar in iCloud". Which is the one coming from my iPhone. Wh

  • Internal table - work area not long enough

    Subject changed by moderator.  Please try to use a more meaningful subject in future The work area "ITAB" is not long enough. how to solve this problem. Edited by: Matt on Nov 14, 2008 10:20 AM

  • What to upload in a server

    Hi, I am new to JSP. I have created a index.jsp page in Netbean. When I uploaded the index.jsp in the server it dint run. Can any one please tell me what all I should upload into server for a jsp page to run? Thank you. ghosh

  • Incorrect log in details on update

    I hope this is in the correct section, if not I apoligise. I have issues when updating apps on the phone from the store. It comes up with my partners log in details. When i sycnd i was logged in on my name via Itunes when i come to update apps since

  • IPhoto 7.1 update won't install

    I have installed the iLife 08 update but still cannot get iPhoto 7.1 to install. I get message telling me that an eligible iPhoto application cannot be found in the Applications folder. iPhoto 7.0 is there. Why won't the update recognize it?