MTTR , MTBR, break down analysis reports

Hello ,
I am new to PM module. I want to understand basic concept of MTTR and MTBR and the SAP config. required to get the above metioned reports in SAP.
It will be a great help if some one can elaborate steps required in config. and prerequisites to fetch the reports from the scratch.
Related links, documents will also be a great help for me.
Thanks

Hi AR1,
There are three cases which are important for the breakdown analysis. These are represented in the following diagram, which displays two reported breakdowns in each case.
Three Cases for Breakdown Analysis
Key Figures for Downtime
The key figures for downtime comprise the following figures:
u2022 Downtime entered/Time To Repair
u2022 Mean Time to Repair
The average duration of a machine breakdown, MTTR (Mean Time To Repair), is calculated from the individual history of a piece of equipment. This gives the following formula:
The key figure MTTR is calculated in hours.
First breakdown 10 hours
Second breakdown 05 hours
Number of breakdowns 02
MTTR = 10 + 5 / 2 = 7.5 hours
To calculate the key figure Mean Time To Repair, in the breakdown analysis (information structure S070) the effective breakdowns and the number of effective breakdowns are taken into account. In all other analyses (and the underlying information structures) the noted breakdown duration and the number of noted breakdowns are taken into account.
Key Figures for Duration Between Machine Breakdowns
The key figures for the duration between machine breakdowns comprise the following ratios:
u2022 Time between Repair
u2022 Mean Time between Repair
The average duration between two machine breakdowns, MTBR for short (Average Time between Repair), is calculated from the individual history of the equipment. This gives the following formula:
The key figure MTBR is calculated in hours.
The following example shows how the MTBR is calculated:
Acquisition date of pump A 01.01.94
First breakdown 10.01.94
Downtime 10 hours
Second breakdown 20.01.94
Downtime 5 hours
Number of breakdowns 2
MTBR = (19 * 24 - 10) / 2 or X + Y (hr) / 2
= (456 - 10) / 2 or (216 + 240 - 10) / 2
= 223 hours
Example: Average Duration Between Two Machine Breakdowns (MTBR)
Hope it may help to you
Regards
Srinivas

Similar Messages

  • How to Calcluate the MCI7 Report Break Down Analysis

    Dear Experts,
    Our User wants to know the Calculation of Break Down Analysis Report. MMTR & MTTF reports. The report shows the record not as per our data & calculation.
    Please explain with step by step process of calcuate the Break Down analysis.
    How can we check the Customization and formula with data for calculation the Break down analysis report.
    Please tell the process and any other related infromation how can we check the output data to calcuate with process.
    Thanks in advance.
    Regards
    Ajit

    Dear Sir,
    Our we have got the data in MCI7, in August 2011 Month selectin report shaows the Actual Break Donw 3,
    Mean Time to Repair 1.167 Hours, Mean Time Between Repair 38,365.083 H.
    But, Our Uses Calcuate the MTTR = Total Break Down Time / No. Of Break Down is ok
    MTBF = Available Time - Break Down Tiime / No. of Break Down not correct as per our record.
    Below is the MCI7 report data
    Equipment             ActBreakdn     MnTmToRepair        MnTmBetRepair
    Total                          3                     1.167 H        38,365.083 H
    Out Users calcuate the Acutal as per formula, MTBF should be calculate (i.e. 22 No fo Machine * 31 Days * 24 Hourd daily =  16368 total Availabel Time) - ( Break down time 3.50 Hours )  /  No of Break Down 3.
    Actaul MTBF calclauate 5454.83 H.
    But SAP Report Shows the 38,365.083 H.
    So We want to know the Formulat to calcuate the MTBF in SAP.
    Please explain , how we can check the exact data.
    Regd
    Ajit

  • How to get break down analsis IN PM

    hi
    can any body explain how to get break down analysis in
    MC17
    I MADE A notification(M2)
    and then respetIive order was generated and confirmed
    but iam not getting any data in mc17 againest the particulareqipment
    plz suggest how to /which transactions makes the data for MC17
                                           SASIKANTH
                                                 VST

    hi
    Breakdown analysis mainly calculate the MTBF & MTTR for that min 2 breakdown must be entered also kindly check whether you have specfied the Startup date in the equipment master,since this date will be taken as base for calculating the reports if you have not specfied then the First malfunction date will be taken for this pupose.
    for better understanding have a glimpse here http://help.sap.com/saphelp_46c/helpdata/en/b0/df293581dc1f79e10000009b38f889/frameset.htm
    regards
    thyagarajan

  • Breakdown analysis report MCI7

    Dear Experts,
    I created a break down notification for an equipment installed under a functional location and completed the notification after entering the breakdown hours with breakdown indicator checked.  Now if i run the MCI7 report with the functional location of the equipment, it does not give a break down analysis. Is it the way it usually responds or there are some additional settings we need to do?
    Please let me know
    Thanks,
    Boby

    Please ensure that the 'Startup date' field in the Equipment Master (Header tab) is filled. When there is only one Breakdown notification on a particular equipment and the 'startup date' is not filled, you will not get MCI7 report, because the first notification will be consumed as the 'startup date'. As soon as you fill this field, the MCI7 report starts, even if this only notification is created/completed before filling the field.
    Further you may go through the thread below:
    [MCI7|Re: Breakdown reports]
    Regards
    Jogeswara Rao

  • Query on MCJC - MTTR/MTBR Functional Location report in Plant Maintenance

    We have recently upgraded our SAP 4.7 system to mySAP ERP 2005 ecc6.0.
    We are facing problem in report derived using tcode'MCJC' in Plant Maintenance.When we execute MCJC (MCJC - MTTR/MTBR Functional Location ) transaction, there is no data appearing in the report output.This report is used to get the functional locationwise data from maintenance order. The transactions are entered for creating maintenance order & notifications through IW31. This is getting updated in table s070.
    This is a standard report and was working fine in SAP 4.7.

    Hello Mr Subrahmanyam,
                                            When you are saying that the Equipment is in Breakdown, it may happen that the whols FLock could be considered in Break down, but not necessary,
    say we take an Example of a Work Shop, where Mechanical Workshop is the Functional Location and it has N no of Equipments like Lath, Grinding m/c, Welding M/c, Shaper Etc.... in this case can you please tell me if only one of the above mentioned Equipment is under Break down can the Whole Mechanical Workshop be termed as under Shut down.
    What you are saying is correct in the Line Production, where we can have the Predessing as well as the Succeding Equipments, there for the Critical Equipment you generally have a Back-up Equipment, may be possible the capacity of the Backup might not be same as the mail Equipment, but still it can serve the Purpose for the Time Being. in that condition how can you say that the whole FLock is in Breakdown.
    Hope I am able to clarify.
    Regards,
    Yawar Khan

  • MTTR/MTBR Report in PM

    Dear Guru's,
       My client has a query that why SAP not Provides MTTR/MTBR report for functional location when an equipment is breakdown corresponding functional location is also breakdown but the system consider only the equipment, not consider the functional location that is linked to the equipment.
    Regards,

    Hello Mr Subrahmanyam,
                                            When you are saying that the Equipment is in Breakdown, it may happen that the whols FLock could be considered in Break down, but not necessary,
    say we take an Example of a Work Shop, where Mechanical Workshop is the Functional Location and it has N no of Equipments like Lath, Grinding m/c, Welding M/c, Shaper Etc.... in this case can you please tell me if only one of the above mentioned Equipment is under Break down can the Whole Mechanical Workshop be termed as under Shut down.
    What you are saying is correct in the Line Production, where we can have the Predessing as well as the Succeding Equipments, there for the Critical Equipment you generally have a Back-up Equipment, may be possible the capacity of the Backup might not be same as the mail Equipment, but still it can serve the Purpose for the Time Being. in that condition how can you say that the whole FLock is in Breakdown.
    Hope I am able to clarify.
    Regards,
    Yawar Khan

  • MTTR/MTBR report......

    Dear All,
    As per my knowledge we have mttr/mtbr reports straightway available in system, but they calculate from the start date till current time..............accumulative.
    But if i want some month wise comparison, or monthly MTTR/MTBR reports,,,,,,,,and others like COST Comparison,,,do we have available in SAP??
    PLz guide
    rgrd
    DM

    Dear
    For SAP std Report u have the look at MCI1 to MCI 8. If you need any specific dates not from Period wise , Better u can create ABAP report.
    The Breakdwon, Costing (MaterialactivityServices), Planner Grps, Actions (agst Brk down) in one report.
    Make mandatoty fields for Planr Grp, Wrk center, Cause, Damage at Notification , order.
    U can go for own according to the client requiremnet. I think u got some points from all submited earlier post also.
    If any ?
    Thenna

  • MTTR/MTBR REPORT---SAP PM

    Dear All,
    I created one Malfunction Notification on equipment for down time.But not able to see the MTTR/MTBR report for that equipment.
    Please suggest.
    Regards
    Vishal

    And pls can anyone say, what is the settings for MTTR AND MTBF in a sap pm.
    kindly share the details to [email protected]
    kindly help me to know the settings in implementation phase....
    siva

  • Site Web Analytics Reports - Top Pages - Visitor break down

    Hi,
    I would like to know if there is a way to get the top pages with visitors break down under the Site Web Analytics Reports?
    Please advice. And thank in advance.

    Hi,
    According to your post, my understanding is that you wanted to get the top pages with visitors break down under the Site Web Analytics Reports.
    I recommend to use the
    SharePoint flavored Weblog reader which aggregates stuff nicely.
    Here is a similar thread for your reference:
    http://social.technet.microsoft.com/Forums/en-US/d770105c-65bf-4db4-b3a4-b64b2b1206df/analytics-for-top-pages-by-visitor?forum=sharepointadminprevious
    Thanks,
    Linda Li                
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Linda Li
    TechNet Community Support

  • Drill Down and Drill UP on Web Analysis Report

    Hi all,
    I have a question regarding Drill down and Drill up on Web Analysis Report.
    The situation is the following:
    I've created a report with some account parent elements in row. The dimension account has a multiple hierarchy.
    I need to drill down on the child of these elements keeping the parente on top and so i've selected the option "Selected Member First".
    The drill down it's ok for the first drill to go on the next level but when i drill down once more to go on the next level of the selected member hierarchy the drill move this level out hierarchy.
    Can someone help me on this point?
    After that i've drilled just to the last level when i drill up on these elements to return on the previous level i note that in the report happens a strange thing:
    The Drill Up works fine but on the report appears another elements which is the same parent with anothe code/alias of another hierarchy instead of the Selected member.
    On this i've noted tha this 2 different parente have the same elements...I think that the children of the selected memeber can be shared members....Can be this the problem?
    Thanks for the help.
    Best Regards
    Eugenio Gualtieri

    Hi John,
    thanks for your answer.
    I've trayed to set the report on Smart View to virify tou test your advise.
    The situatio is the following:
    IS05101010-PUBBLICITA'
    702000 - VEND. DI SPAZIO PUBBLICITARIO
    702010 - RETTIFICHE VENDITE SPAZIO PUBBLICITARIO     
    W10004 - RICAVI PUBBL ICITA' ATTIVA (Q.EDIT) INTE     
    W10007 - RICAVI DA SPAZIO PUBBL. INTERASA     
    W10029 - RETTIFICA RICAVI PUBBL. INTERASA     
    ED05101010-PUBBLICITA'
    702000 - VEND. DI SPAZIO PUBBLICITARIO
    702010 - RETTIFICHE VENDITE SPAZIO PUBBLICITARIO     
    W10004 - RICAVI PUBBL ICITA' ATTIVA (Q.EDIT) INTE     
    W10007 - RICAVI DA SPAZIO PUBBL. INTERASA     
    W10029 - RETTIFICA RICAVI PUBBL. INTERASA     
    If I take only one parent member the drill up works fine but if i take all 2 memeber as above and i decide to drill up on one of the two element occur that the drill work for the two elements at the same time.
    Afetr the drill in this case the situation is:
    IS05101010-PUBBLICITA'
    ED05101010-PUBBLICITA'
    Can be a problem due to shared memebers?
    Thanks for your help.
    Regards
    Eugenio Gualtieri

  • BREAKDOWN ANALYSIS V/S MTTR-MTBR ANALYSIS

    Dear Friends,
    I want to know what is the difference between MTTR-MTBR analysis and Breakdown analysis?
    T-code for Breakdown Analysis is MCI7 in Standard analysis but this shows the MTTR-MTBR Analysis then if this is the MTTR-MTBR Analysis, then how can we find out the actual breakdown analysis from sap?
    Thanks in advance

    HI,
    Suppose take an equipment  K3001 -compressor
    It fails 2 times this month.
    Then Breakdown is 2.
    MTBF -  is Mean time between failure
    The running hour between these two breakdown is MTBF  For ex:  150 hr
    MTTR - is Mean time to repair.
    After Breakdown the time you take to repair and make it operable  is MTTR  for ex: 8 hr
    MCJB  &  MCJC   - MTTR  -MTBF  report

  • MTTR/MTBR Report edit.

    Dear SAP PM experts,
    In My case ,My MCJB Report is running correctly .But one notification type is not a breakdown. I want to generate the report without a one notification type.How to edit the report without  one notification type.
    Thanks,
    Jana

    Hello Mr Subrahmanyam,
                                            When you are saying that the Equipment is in Breakdown, it may happen that the whols FLock could be considered in Break down, but not necessary,
    say we take an Example of a Work Shop, where Mechanical Workshop is the Functional Location and it has N no of Equipments like Lath, Grinding m/c, Welding M/c, Shaper Etc.... in this case can you please tell me if only one of the above mentioned Equipment is under Break down can the Whole Mechanical Workshop be termed as under Shut down.
    What you are saying is correct in the Line Production, where we can have the Predessing as well as the Succeding Equipments, there for the Critical Equipment you generally have a Back-up Equipment, may be possible the capacity of the Backup might not be same as the mail Equipment, but still it can serve the Purpose for the Time Being. in that condition how can you say that the whole FLock is in Breakdown.
    Hope I am able to clarify.
    Regards,
    Yawar Khan

  • MTTR MTBR Report on Assembly Level

    Dear All
    Standard MCJB report give the MTTR and MTBR report on Equipment Level. we need it on Assembly level. for that we did changes on LIS. we create the new Info Structure by coping S070 and added Assembly.
    with this Assembly is now coming in the report but the Time is not getting Update. Please help me on this..
    Regards
    Ankit..

    Hello
    First You need to create the notification for assemblies then you can see the MTTR & MTBR Time in report.
    Can you explain that ,your creating any Notification for Assemblies if so please check the weather that notification in Completed status
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Jul 29, 2010 4:39 PM

  • MTTR/MTBR report..........Equipment

    Dear All,
    As per my knowledge MTTR/MTBR reports are calculated on the basis of START UP that we maintain in equipment master...and VALID from date have NO ROLE in this report.?? AM i rite ? One more thing there is one field 'TIME BETWN REPAIR" wat does it show, can anyone help?
    rgrds
    DM

    Hi deepak
    As you said for calculating the MTTR/MTBF the start up date will be taken up by the system,whereas if you not specified the start up date then the date of first malfunction end will be considered.
    you can also specify what is the MTTR/MTBF for the time period ie for last year by specifying the valid from date
    Time between repair is tme actauly take to get back the system in to operation, whereas Mean time is the average calculated based on time taken and breakdown entered
    regards
    thyagarajan

  • APEX IR report - breaking down columns

    Hello experts,
    I am creating Interactive Report and need break down couple columns.
    ex:
    country province city
    USA CA city1
    USA CA city2
    USA MA city3
    USA MA city4
    What I need to display is:
    USA CA city1
    ___ __ city2
    ___ MA city3
    ___ __ city4
    I can display this format using classic report. When I use IR report, the breaking down column goes on the top.
    How can I get the same format in IR ?
    BTW, I don't have any print server setup.
    Many thanks.
    Edited by: user2855902 on Oct 7, 2012 6:24 PM

    Thanks for the reply.
    I can go to the header and click control break, but the report format is not what I need.
    By clicking control break, I can get report:
    USA
    CA city1
    CA city2
    MA city3
    MA city4
    I need display "USA" at the left side.
    Thanks.

Maybe you are looking for

  • SF300-24PP PEO Fail Detected.

    Hi there, I have a bit of a problem with a SF300-24PP that has a POE failure message when we bootup the switch. Please help me as I need to get this switch up. Here is a log of what happens. Please see the attachments. My main concern is that the swi

  • Multiple Operations for File to IDoc scenario

    Hi all, I have a file to IDoc scenario where two IdocXML files (one for INSERT and one for CHANGE of Business Object) have to be picked up by file adapter and transfered to SAP System. In respect to the multiple operations PI 7.1 can handle I would l

  • Using External HD to backup and run mac OSX

    Howdy all, I'm going to install Snow Leopard "currently running Leopard 10.5.8" and I was hoping to put it on my 1.5 TB external HD, that way I don't need to burn it to a CD since that seems like a bit more work since I already have a external HD lyi

  • Missing Item Category Group in Sales Area data

    Hi, Can you please help us. We cannot load some materials to our product catalog because of missing item category group in our sales area in crm. Can you please let us know why this happens? I know that this can be fix by doing request load but what

  • I kepp getting runtime errors

    I keep getting run time errrors.  I reinstall iTunes and now can even open it.  It comes up all the time in all my other applications now.  Happend since I tried to load the last update a couple of days ago.  What can I do?