Hi,
I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
In standard SAP its not possible.Any user exits available for this..
Regards,
S.P.Selvathangam

Dear Selvathangam Palanisamy ,
                                                   My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
Either go to QA02 and then select it from the list of multiple plans.
Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
Thanks

Similar Messages

  • How can 2 diff prices for 2 GRs of same material and same Qty be ??

    Hi Guys
    When i am doing 2 Goods Receipts (GR) for same material and same Qty with different Batch characteristic, the material price (in the Quantity tab of MIGO screen) is getting changed. Two different prices are coming to the two different GRs. How this can be ??
    Actually it has to pick the std. material price from material master as "S" is the price control .
    May anyone tell how is the Batch characteristic configured to an automatic split valuation (Valuation type) and thus a new price is copied to the field in the GR screen. (MSEG-DMBTR)
    Kindly Rush asnwers !!
    MaruthiRam

    Hi Ram,
    Please check wheather the split valuation is activated  or not for this material.
    if it is activated,
    go to mm03.
    select accouintg view, enter the valuation type ; in your case  BATCH1.
    then you can see the value of this batch material.
    again go to mm03,
    enter second batch in the valuation type.
    you can see the batch2 material value.
    regards
    srinivas

  • How to set up the inspection plan for the material in super BOM

    Hello,
    how to get the accurate inspection plan of the IQC for the material which was class item in a super BOM?
    I've gotten the characteristic value from the sales order, and get the PO after MPR. The problem is how to specify the target value and the range of inspection characteristic in inspection plan, because the value is temporary?
    Thanks!
    Lin

    Hello,
    I think you need to create MIC which linked with the configuration characteristic, and specify "inspection by configuration" for the inspection type.
    then the configuration value in the sales order can be transfered to the inspection lot when production released or goods receipts if you use inspection type 03 or 04. that means the value range for the MIC will be determined dynamically for each sales order.
    Regards, Winnie

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • I bought 2 same plan for Lightroom accidentally and need to terminate and cancel both of them,please help me

    I bought 2 same plan for Lightroom accidentally and need to terminate and cancel both of them,please help me

    Unfortunately, you will have to contact Adobe directly to do this sort of thing, with the best bet being by phone. They may, or may not, be willing to refund you your purchase cost.

  • No inspection lot can be opened for this material and vendor -QA228

    Hi every one !
    Iam  getting  Error while doing Migo -"No inspection lot can be opened for this material and vendor-QA228"
    we analyze the issue asfollow -
    1.checked Quality Lot-Available
    2.Quality info record- Availble
    3. Quality plan is exist.
    But stil throwing  above Error.

    Hi,
    Check the below threads,
    [No inspection lot can be opened for this material and vendor;
    [No inspection lot can be opened for this material and vendor;

  • Assignments of materials and vendors to inspection plans for the plant 1500

    Hi to all,
    Please give me solution for make assignments of materials and vendors to inspection plans for the plant 1500.
    Thanks,
    NAgesh

    hi gang,
    try to make usage decision ,kindly check in material document which you have created while making the GR, check in which storgare location you have specified and try to transfer the stock from quality to unrestricted.and also make a note on batch number also if you have activated the batch management
    regards
    thyagarajan

  • No inspection lot can be opened for this material and vendor

    dear sir
    i m facing this error while  doing gr. also how to confirm certificate
    plz guide me
    No inspection lot can be opened for this material and vendor

    Sujit/Raj
    I got th similar error. I closed the issue as Raj said because there was an open inspection lot. Im still nto able to figure out the background or root cause for thi.
    The QIno record doe not have release Qty active and release date is 12/31/9999. Then why we have to close the previous inspection lot before recieving another. It seems like there is a condition or something that tells Inspection are to be done in stages and hence previous or pending inspection lot needs to be closed. But where i this condition coming from, where should i check.
    I created PO and performed GR. I noticed if i perform GR and if the Inpection lot has status REL SPCO SPRQ IRCH then this happens. If the status is just REL SPCO SPRQ  then I'm able to do multiple reciepts and this error does not show up.
    Any idea or suggestions?

  • HT1349 should i replace the battery if my laptop is 3 years old and wont start up or recieve power ... took it to apple and the guy readjusted my battery and it was fine for two days and same thing happened? thinking of buying a new battery

    should i replace the battery if my laptop is 3 years old and wont start up or recieve power ... took it to apple and the guy readjusted my battery and it was fine for two days and same thing happened? thinking of buying a new battery

    I am bemused and have to ask how one "readjusts" a battery?

  • Auto To working for one material and not working for other material

    Hi,
    Hope everybody is doing fine.
    I have configured the auto TO. Its working fine for one material and not working for the other material. I checked the material master and wm 1,2 views have the same fileds / values. What could be wrong?
    I didn't setup the back ground processing job. Is that is affecting it?
    thanks for any help.
    regrads,
    KHAN

    Thnaks,
    You are right but then what could be wrong? Its working for one material and not working for otehr material? Any clue?
    Appreciate your time charlie

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • I purchased the Adobe Creative Complete Plan for Annual Prepaid, and the Check Out just wouldn't proceed. It is still loading after click the confirm button. Dear adobe staff, please assist urgently.

    I purchased the Adobe Creative Complete Plan for Annual Prepaid, and the Check Out just wouldn't proceed. It is still loading after click the confirm button. Dear adobe staff, please assist urgently.

    I am having a similar problem. I am using Chrome and tried on Mac and on PC but the same. Its not completing my order and on PC saying:
    We were unable to process your payment please contact our customer support.......... etc
    But strangely its giving a confirmation button again. It gave me this error upon reconfirmation:
    PMT_000011 : adbehme, en_IE, There is money to authorize, But no Aurthorize delegated were applicable, 12834289525

  • I'm using same icloud and same apple ID on two iphones. Now i get calls from same number on both iphones at the same time. How to turn off that?

    I'm using same icloud and same apple ID on two iphones. Now i get calls from same number on both iphones at the same time. How to turn off that?

    Apple ID's are not device specific, so when you changed it on the iPad 2 it changed it on the iPhone 4 as well, since it's the same account still. What you need to do is create a second Apple ID (so you'll have two accounts, one for iPhone 4 and a seperate one for iPad 2).
    To create a new Apple ID on your iPad 2:
    1) Go into Settings > Store.
    2) If you are already signed in, tap your Apple ID on the screen and you will be given a few options, one of which is to sign out of your account.
    3) After you sign out, now click the "Sign in" button.
    4) Tap "Create New Apple ID" and follow the instructions on-screen.

  • Measuring Instrument Needs to be added in inspection plan for each part

    Hi
    How to assign the Measuring Instrument in the quality inspection plan for all the materials.
    Whether i need to assign as material assignment or as PRT.
    how to use prt to assign to the operation in the quality plan (task list)
    Thanks
    VRAJ

    Hi,
    when i try to assign the Equipment for first Inspection Characteristics.
    the system thru the ERROR as,
    Production resource/tool is not intended for this type of task list
    Message no. CF230
    Diagnosis
    You want to use the production resource/tool in a task list or work order with task list type Q. However, according to usage 004 of the PRT, this task list type does not exist.
    Procedure
    Change the usage of the PRT in the master record or select a PRT which can be used in this task list type.
    How to resolve this issue.

Maybe you are looking for

  • Invoking Web Service with PKI Authentication from BPEL process

    Hello -- I am trying to test calling a Web service utilizing PKI-based authentication from BPEL running under the 10.1.2.0.2 Process Manager. When I access the service from a browser I am prompted for Username and Password the first time. When I atte

  • InDesign opens CS2 docs in CS3

    Does anyone know of a way to get InDesign (or any other CS3 app) to stop defaulting to opening ALL documents in the most current version (CS3) when they were created in a previous version. I need to keep my legacy documents in the version they were c

  • Can't run updates

    I get this when trying to update: [davek@arch64 ~]$ su Password: [root@arch64 davek]# pacman -Syu :: Synchronizing package databases... core                      33.4K  149.6K/s 00:00:00 [#####################] 100% extra                    412.8K  5

  • Great picture, no audio!!

    Trying to play audio from a Pro to a Samsung TV that has every connection known to mankind. Get a great picture (Pro to HDMI terminal) but can't get sound to work with separate audio cable no matter what I do. Gone into sound panel on preferences, ch

  • Trying to use 2 different Dimension tables and make a hierarchy on some columns which are split into these dimensions .. how do I do that

    Trying to use 2 different Dimension tables and make a hierarchy on some columns which are split into these dimensions .. how do I do that