Multi level follow up material in BOM

Dear All,
Our client have a requirement for multi lvel follow up material in BOM.
for example
BOM for Finish Good made of A.
if material A is depleted then used material B
if material B is depleted then used material C
if A and B have stock used A(higher priority)
I tried to used follow up material in MRP4 and BOM but it can not be used for multi level like this case.
Is there any solution for this?
Best regards,
Fred

Hi anyway I tested the BOM master data like this
F/G 1 Master Box
|--- A 10 PCS  Alt Group Z1  Priority 1 Usage 100% Strategy 2 (100% Check)
|--- B 10 PCS  Alt Group Z1  Priority 2 Usage 100% Strategy 2 (100% Check)
|--- C 10 PCS  Alt Group Z1  Priority 3 Usage 100% Strategy 2 (100% Check)
Stock A is depleted
Stock B enough
stock C enough
Expected result F/G only used B 10 PCS
Actual result is
F/G 1 Master Box
|-- A 10 PCS
|-- B 10 PCS
|-- C 10 PCS
Do ou have ides how should the percentage in BOm is maintain?
Best regards,
Fred

Similar Messages

  • RE: how to explode multi level bom ?

    hi sd experts,
    I really appreciate if anyone explain me how explode multi level BOM
    if possible pls send me best practices
    thanks
    regards
    shabnum

    Hi Shabnum,
    For ex:
    main material is 101(material No)
    Subitems for 101 are: 102,103, 104 & 105
    102 also has 2 two sub items i.e., 106 & 107
    I created material masters for all the items i.e., 101 to 107 and posted stocks and maintained prices individually in VK11.
    I created BOM in CS01 seperately for 101 & 102
    I changed the Item Category Group for both the main items 101 & 102 from NORM to ERLA and tried creating the Sales Order.
    For 101 BOM is exploding correctly in order but for 102 it is not exploding.
    If I enter both the materials 101 & 102 as 2 line items then BOM is exploding for both the materials.
    Then do the Config in :
    Pls check the Item category configuration for your header material for the following field:
    Structure Scope: whether it is A or B...A is for explode single level & B is for explode multi-level bill of material. In your case, it should be maintained as "B"
    This would work for you
    Reward if it helps
    Regards
    Srini

  • Multi level BOM explosion

    Hi,
    For multilevel BOM explode I have to use the "Functional Module" CS_BOM_EXPL_MAT_V2. I checked it in system but I didnt understand which input parameters I need to give (Which are mandatory) as ther are lot of input fields available.
    Please suggest whether this Functional Module is fine OR there is any other way? also suggest about the input field data.

    Dear
    Function module CS_BOM_EXPL_MAT_V2 is used for BOM explosion for a given material. It belongs to function group CSS4 u2013 BOM explosions. This function module can explose multi-level BOM with a given validation date.
    You need to specify necessary input parameters to call this function module, such as CAPID u2013 App ID, DATUV u2013 Validation date, MEHRS u2013 Multi-level, MTNRV u2013 Material number, STLAL u2013 alternate, STLAN u2013 BOM usage.
    Some useful tables you can provide to your ABAPer and discuss the same .
    TABLES: MARA,                               "Master Data
            MAKT,                               "Matl Desc.
            MARC,                               "Plant Data for Matl.
            MAST,                               "Bom to material link
            STKO,                               "Bom Header
            STPO.                               "Bom Item
    Refer : Multi-level BOM explosion using CS_BOM_EXPL_MAT_V2
    Regards
    JH
    Edited by: Jiaul Haque on Jan 3, 2011 10:24 PM

  • Multi Level BOm is not working in SAP afs

    Hi Experts,
             I am facing issue in MRP.For multi level bom's ,Requirements is not getting generates.Is there any settings is there to active multi level bom for afs materials.
    please suggest solution
    Thanks and Regards,
    Deepika.

    Hello Deepika,
    As we know AFS materials are planned at SKU level (Grid and stock categories)  you can use AFS MRP (/N/AFS/MD02) only.
    Please refer OSS note Note 981747 - FAQ - AFS Production Planning
    Question 5 Made-To-Order Planning -Multi-Level (MD50) does not work for AFS Materials and Sales Orders containing AFS materials.
    Answer: Made to Order Multi level planning functionality was never enhanced for AFS and hence transaction MD50 is not supported.
    Steps are as,
    1. Create a MTO/PTO sales order for an AFS material.
    2. Run AFS MRP using transaction code /AFS/MD02.
    3. Convert the planned order to production order.
    Best Regards,
    R.Brahmankar

  • For  MTO scenario,multi level bom is not working sap afs pp

    Hi Experts,
                  We are implementing MTO scenario for our client. I have maintained  strategy group for FERT is 40 and strategy group for HALB and ROH are 20.
                   For single level BOM , requirements is not getting generates properly.
                  I would like to know What are all the settings is required to create AFS BOM.(single and multi level)
                   Please suggest me.
    Thanks & Regards,
    Deepika.

    Hello Deepika,
    As we know AFS materials are planned at SKU level (Grid and stock categories)  you can use AFS MRP (/N/AFS/MD02) only.
    Please refer OSS note Note 981747 - FAQ - AFS Production Planning
    Question 5 Made-To-Order Planning -Multi-Level (MD50) does not work for AFS Materials and Sales Orders containing AFS materials.
    Answer: Made to Order Multi level planning functionality was never enhanced for AFS and hence transaction MD50 is not supported.
    Steps are as,
    1. Create a MTO/PTO sales order for an AFS material.
    2. Run AFS MRP using transaction code /AFS/MD02.
    3. Convert the planned order to production order.
    Best Regards,
    R.Brahmankar

  • How to know the parent material in BOM  if we know the last level material

    Dear all,
    We have around 40000 material codes with 18 digits. We can't remember all these. If we know the material code, we can easily find out sublevel or downlevel material by CS03,CS11 ,.....
    But if we know the material code , how to find upper level material code in BOM ?
    How to know the parent material in BOM  if we know the last level material ?
    Pl' answer.

    Hi Kishore,
    Have u tried with report CS15.  Give last Level Material  ->goto nect Screen->select "Multi level " check box then excute.
    it will give All Parent material of Last material, u can indentify with BOM level NO.
    regards
    pradeep

  • Multi-level BOM explosion using CS_BOM_EXPL_MAT_V2

    Hi All,
    I would like to know, if anyone has used the function module 'CS_BOM_EXPL_MAT_V2' to prepare a report to read multi-level BOM just like CS12. If anyone has, can you please let me know how we can read the individual materials in the BOM from this FM.
    Hope my question is clear, await inputs.
    Vivek

    Hi vivek,
    We use this code to restrict the BOM line item for particular movements. C if that can help u out.
    CALL FUNCTION 'CS_BOM_EXPL_KND_V1'
        EXPORTING
          capid                       = ''
          datuv                       = sy-datum
          emeng                       = 1
         mehrs                       = 'X'
          mtnrv                       = i_mseg-matnr
          stlal                       = '1'
          stlan                       = '1'
          stpst                       = 0
          svwvo                       = 'X'
          werks                       = i_mseg-werks
          vbeln                       = aufk-kdauf
          vbpos                       = aufk-kdpos
            VERID                       = ' '
          vrsvo                       = 'X'
          IMPORTING
            TOPMAT                      =
            DSTST                       =
         TABLES
           stb                         = ZStb
            MATCAT                      =
        EXCEPTIONS
          alt_not_found               = 1
          call_invalid                = 2
          material_not_found          = 3
          missing_authorization       = 4
          no_bom_found                = 5
          no_plant_data               = 6
          no_suitable_bom_found       = 7
          conversion_error            = 8
          OTHERS                      = 9
      IF sy-subrc <> 0.
          MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
                  WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
      SORT zstb BY mtart.
      LOOP AT zstb.
        IF zstb-mtart = 'Material type ' OR zstb-mtart = 'Material type ' .
        ELSE.
          DELETE zstb .
        ENDIF.
      ENDLOOP.
      CLEAR: v_menge, v_matnr, v_bwart, vv_menge, vvv_menge, zstb.
      LOOP AT zstb.
        SELECT menge matnr bwart
        INTO   (v_menge,v_matnr,v_bwart)
        FROM   aufm
        WHERE  aufnr = i_mseg-aufnr
        AND    werks = i_mseg-werks
        AND    matnr = zstb-idnrk
        AND    ( bwart = '261' OR bwart = '262' ).
              and    meins = 'FT2'.
         LOOP AT zstb.
          SELECT SINGLE matnr INTO vv_matnr FROM mara  WHERE  matnr = v_matnr
                                       AND mtart = zstb-mtart.
          IF sy-subrc = 0.
            CASE v_bwart.
              WHEN '261' .
                vv_menge = vv_menge + v_menge.
              WHEN '262' .
                vvv_menge = vvv_menge + v_menge.
            ENDCASE.
          ENDIF.
             ENDLOOP.
        ENDSELECT.
        CLEAR vf_menge.
        vf_menge = vv_menge - vvv_menge.
        CLEAR vv_menge.
        CLEAR vvv_menge.
    Regards,
    Vishal

  • Product Costing - Standard Cost Component Split on Multi Level BOM's

    Hi,
    We are the process of introducing SAP for all back office and manufacturing activities.
    I am currently trying to verify that the product cost calculation for Multi-Level BOMs in our Legacy system matches the cost roll up or cost estimate in SAP at not only a Total Cost Level but the cost component split must be accurate also. So far, all the costs roll up correctly at a total cost level but I have noticed one issue:
    When I run a cost estimate for a single level BOM the cost estimate will split the components accurately into Material, Labor, Fixed Overhead and Variable overhead, However, when this component is then used in the next level of manufacturing all the Labor, Fixed Overhead and Variable Overhead Cost is grouped under Material.
    Q1.) Is there a SAP setting or config change that will keep the previous Labor, Fixed OH and Variable OH cost in these categories as the material is rolled up to finished product level?
    Q2.) Is there a standard report / view where I can see the Finished Goods Standard Cost split by each of there rolled up Components? This would need to split the Total Material, Total Labor, Total Fixed OH and Total VO required to make the Finished Product. 
    Q3.) Is there a standard report / view where I can see the added value (Absorption) by component split (Labor, Fixed OH, Variable OH) for every Manufactured Part?
    Any help you can provide would be greatly appreciated.
    Thanks & Regards,
    Brian

    Actuall I just tried again and it did ask for me S number and I put it in and I did not have "authorization" to access
    Error Message - Access denied (R/3)
    What happened?
    You do not have permission to access this Object
    What can you do?
    Please contact a consulting adminstrative
    Error code: WEBSMP106-20080214172231-0015
    Error details: 2491DD9-702/1A053/3162-71A9CFA5-3CB9265-2992F9
    Service Name: SAPIDB
    Service Server: WEBSMP106
    Process-ID: 4640
    Thread-ID: 6020
    Sorry for any inconvenience.
    Your SAP Service Marketplace Team

  • Full BOM component qty when follow-up material is effected.

    Dear Experts,
             How to ensure discontinuation / follow-up is implemented on FULL BOM's
             component qty, and not partial.
              Example : A requires 3B, and B is follow-up with C upon discontinuation.
                             Planned order of A should only contain 3B or 3C, not mixture eg. 1B
                             and 2C etc.
              How can the control be implemented ?

    Dear Pradeep, Rajesha & all,
          Assume BOM of "A" indicates component B qty 10 is follow-up with component C qty 10.
          Material B (say, balance 1 qty) is received into Store Y (MRP Relevant). Thus to exclude material B from MRP, we have to manually transfer stock to store X (Not MRP Relevant).
          This would mean, we have to perform manual tracking such that this store transfer is done, to force SAP to direct to material C, so that we either accept 10B or 10C in planned order and nothing else.
         Not forgetting, I could have another follow-up in another bom such that 1B = 1C. Thus, the material 1B I transfered to store X (Not MRP relevant) can actually be use in this case.
    <b>    Thus, from BOM explosion, is there a way to control discontontinuation to follow-up, based on full component qty specified in BOM ?</b>
    <u><b>My Setting as follows :</b></u>
    <b>(1)</b> Material Master of "B" : MRP4 specify (a) Discontinuation Indicator "1", (b) effective-out date, (c) Follow-up material "C"
    <b>(2)</b> In Bom of "A" (parent of "B") :
    - Item "B", indicate discontinuation group "A1"
    - Create item "C" and indicate follow-up group "A1" and qty to be follow-up upon B discontinuation.
    Thank you for your guidance !

  • Gneration of multiple Production Order from multi level BOM

    Hi Experts,
    My customer has multi level BOM. meaning child item also has its own BOM - 4 Level.
    FG-Pack - Make
          FG - Make
               SFG - Make
                    RM - Buy
    Their process is once they create Production Order for final Finished Good, System should also create Production order for child which it self are of make type and has own BOM defined in system.
    They wish that once the create Production order for FG-Pack, system should automatic generate production order for FG and SFG as both of these has BOM defined and are of procurement type Make.
    So first they will close the chile production order and receives qty. in ware house, they will issue this child qty. against main production order, and then completes the main production order.
    So they remains informed about the child item stock.
    My question is SAP Business One supports creation of multiple Production Order?
    BR
    Samir Gandhi

    Hi Samir Gandhi,
    There is no build-in function for this task. You need add-on or SDK for the job.
    If the sub level BOM items are phantom, you can create a big production order including all sub BOM components. That is system supported.
    Thanks,
    Gordon

  • OCM for Revesion level in the Material Master and for the BOM

    Hello,
    I use My SAP 6.
    I have implemented OCM. It's used for 2 things:
    - The first is for revision level in the Material Master.
    - the second is for the BOM.
    Today, the customizing is good, it's work.
    My need is to have the same change number for those 2 evolutions:  for the material master evolution and for the BOM evolution.
    It's possible, and how?
    Thanks for your answers.
    Bérenger

    I do not think this is possible. Service level is usually used for safety stock planning.

  • Import multi-level BOM into Oracle

    We have a client requirement to create BOM based on level using Pl/Sql, Data will be coming in the below format:-
    Item Description      BOM LEVEL
    a               *1*     
    aa               *2*     
    aaa               *3*     
    aab               *3*     
    aaba               *4*     
    aabb               *4*     
    ab               *2*     
    aba               *3*     
    abb               *3*     
    we want the above data in table to be inserted in below format:
    Assembly Item     Component Item
    a               Aa
    Aa               Aaa
    Aa               Aab
    Aa               Aac
    A               Ab
    Ab               Aba
    Ab               Abb
    Aab               aaba
    Please suggest.
    Thanks,
    Urvashi Arora
    Edited by: user10992307 on 08-May-2012 23:07

    When you look at one row in your source data, there is no way to tell what is the parent item for the component you are looking at.
    So you will have to write a program that walks thru the data and builds parent=child relationship. It will be a tricky program but once that is done, all you have to do is to insert into bom interface tables and Oracle will take care of the rest.
    Oracle BOM interface will take care of building a multi-level structure.
    Sandeep Gandhi

  • Configured material(Material Variants) with VC multi-level configuration

    Hi experts,
    I have a question about VC, VC can be a multi-level configuration, and it can be configuration level by level in sales order, this configurable material replace by a configured material(Material Variants ) . however I can only config the first level in Material Variants(MM02 MRP3; the configrable material is a multi-level)! how to solve it?
    If we can not multi level config the VC materil in the configured material, how can it replace the configurable material in sales order?
    Thanks
    lance

    Hi Lance,
    You can do straight away also without user exit .
    There is feature called Variant Matching in Variant configuration. If you can go throgh this and do the step by step configuration and in configuration profile setting you have to set Variant matching Indicator , then Make the Exclusion characterstics ,
    With all the steps , Once the Configurable material is configured in Sales order if it finds the variant matched with the existing variant in the system , then Config Material will be replaced by Material Variant as a line item in the sales order.
    Thanks
    Ankaiah

  • Difference Between Summarized & Multi Level BOM Comparison

    Hi Colleagues,
    Could you please help me on this? I would like to know what is the difference between Summarized BOM & Multilevel BOM Comparison.
    Currently I am using Tcode CS14 to compare the BOM but I could not find the differences. Also I am using FM CS_BOM_EXPL_MAT_V2 to explode the BOM so I would like to know the difference to write a report for this.
    Thanks & Regards,
    Nagaraj

    Hi,
    Refer this link which explains clearly the Difference Between Summarized & Multi Level BOM Comparison
    http://help.sap.com/saphelp_45b/helpdata/EN/ea/e9befc4c7211d189520000e829fbbd/frameset.htm
    After going through  this link on the left hand side there is heading for BOM compariso,under that 4 sub headings are there please refer that
    hope this will help,if you have any query revert back
    Edited by: Girish  Adaviswamy on Apr 15, 2009 5:40 AM

  • Query for a Multi level BOM

    For a parent item, I require all the child items that are there in multi - level BOM

    Hi Hema
    This query not give you exactly what you need, but can give you an idea of who to get the result you want.
    select S0.ItemCode, S0.ItemName, isnull(sum(S5.Quantity * S6.AvgPrice), isnull(sum(S2.Quantity * S3.AvgPrice), S0.AvgPrice)) 'Costo del artículo'
    from OITM S0 left join OITT S1 on S0.ItemCode = S1.Code
                left join ITT1 S2 on S1.Code = S2.Father
                left join OITM S3 on S2.Code = S3.ItemCode
                left join OITT S4 on S3.ItemCode = S4.Code
                left join ITT1 S5 on S4.Code = S5.Father
                left join OITM S6 on S5.Code = S6.ItemCode
    group by S0.ItemCode, S0.ItemName, S0.AvgPrice
    order by S0.ItemCode
    Hope this help you
    Slds.,
    Esteban

Maybe you are looking for