Hi, i have three plants.
How i can take single MRP RUN for these three plant,instead of individually, along with some specific areas of the three plants. ??
Regards
DHIRAJ

Hi
MD 02  is MRP run for Single item multi level.
But MD 01 is Online MRP. In this you can included more plants and with in plant you can exclude certain areas and location.
This can be achieved by creating scope of planning in OM0E and run MRP in MD 01 with is scope of planning.
The same can be achieved in MDBT in back ground
Regards
J . Saravan

Similar Messages

  • Multi-level mrp run

    lets say i have a FG which has a bom that consists of a Semi-FG (SF1) and a Packaging material. This SF1 also has a bom which consists of a Raw mat.(RM1) and another Semi-FG(SF2). SF2 has yet another bom, which consists of 3 more raw materials - RM2, RM3, RM4.
    my question is that whenever i execute an mrp run, why is it that requirements are only captured for the FG, the SF1, and the PM. a PIR for the FG has been created, set for 3 mos. the FG has a strategy group 40, while everything else has strategy 10 (make to stock)?

    Hi raf ,
    Please check with  MRP type & Porcurement Type for all semi finished materials at MRP view (MM02).
    MRP type=PD & Proc Type= E
    I assume stock of all  semi material is zero. With above condition if u run MRP for Fert (F1)Material with PIR at MD02, both dependent req and procurement proposal will be created for Semi finished material.
    u can see the planning result at MD04
    Please check and come back
    Regards
    Pradeep

  • MRP Run for Multiple plants

    Hi Guys:
    IN SAP R/3
    My client has requirement to merge planning of material for multiple plants and run the MRP under one head plant.
    For example:
    Plant : 1000, 1001, 1002, where plant 1000 is a head plant who had authorization to perform MRP run.
    if I run MRP Sepeartely:Each plant has below requirement for one material number (M1)
    Plant 1000 : 3 EA
    Plant 1001 : 2 EA
    Plant 1002 : 5 EA
    Instead of running MRP per plant, my client needs to run MRP for multiple Plants  that Consolidate  total requirement for all plants.
    and generate PR--->PO , In the PO, M1 should be delivered to 3 different plant locations by vendor and Po Will be issued from Head Plant 1000?
    Is there any Report in SAP , Where MRP Controller can See Requirements from Different Plants @ Central Purchasing  level after one Multi Plant MRP run, So that he can decide on how much to allocate to each plant?
    Thanks for help
    Thanks
    Sweth

    Hi,
    If u want to perform the MRP in one plant for all the plant requirement is depends on the bussiness process.
    You can try the following scenario:
       Planning in one plant nd production in other plant - Respective master data and special procurement have to maintain.For 
    further clarity please follow the below link
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm.
    We can evaluate the PR and PO by providing the authorisation object for the multiple plant to the respective users.
    Revert me back in case of clarification.
    Thanks
    P.Srinivasan

  • Run MRP for multi Plant

    Dear all
    I want to ask you about running MRP for multi plant based on SAP ECC EHP4.
    I have a situation as below:
    I have 2 plant are 1000 and 2000. In plant 1000, I create a production order in plant 1000. The component is store in both of plant 1000 & 2000.
    So, when I run MRP. Does system will check stock from both plant 1000 & 2000?
    Because my company is keeping raw material in 2 plant, and there are one plant have been used for production.
    I want you confirm that Does SAP ECC EHP4 can run MRP for multi plant and the system will check stock on multi Plant?
    Thanks

    Hello,
    The scope of planning is used to control whether the total planning run is executed on a multi-plant level
    several plants
    one MRP area
    several MRP areas
    a combination of plants and MRP areas.
    Here the planning will cover all the material which is relevant for planning in all the above given areas.
    You can carry out the total planning run for the scope of planning online or in background mode. The planning run, however, must always be started with parallel processing.
    Hope it helps. Please revert back.
    Alok Tiwari

  • Mrp run for multi-plant

    Hi,
         My client is having the productionn of material 'x' in two plants- 0001 & 0002.  How i have to run the MRP for material 'X' by considering the both the plants?.

    Dear,
              Extend the material for both the plant and if sale order is from plant one and u do not have capacity then distribute the material for two plant and run the mrp . planned order will generated for both plant acc. to ratio. then make the confirmation.
             now if u want to sale the material from the plant in which u received the sale order then transfer the stock from other plant also to first plant by making stock transport order . and in this way you can sale your material from first plant and moreover you can also see the profit and loss plant wise.
    hope by doing this ur problem will get resolved. reward the points if u get success in this.
    regards
    Deepak

  • Can mrp run consider material availability for more then one plant?

    Hı PP Gurus,
    My Case:
    Material "A" is maintained for plant "X" and "Y" for example. When i execute mrp for material A i have to specify a plant. And the system creates planned orders just considering the quantity in that plant. But i want mrp to see the quantities of both plant.
    I mean when i execute mrp the system must consider the quantities for both plant and create planned order or not.
    Is there a way to fix it?
    Thank you indeed.
    Evren Temiz

    You can use Scope of Planning for this.
    Total planning covers the planning of all the materials that are relevant for requirements planning and includes the BOM explosion for materials with a bill of material.
    You can use total planning for a single plant or you can use the scope of planning to control whether the total planning run is executed on a multi-plant level
    If you have activated MRP with MRP areas, you can also combine MRP areas in the scope of planning as an alternative to plants.
    With the help of the scope of planning, you can control whether the total planning run is to be carried out:
    1. For one plant (as previously without scope of planning)
    2. For several plants
    3. For an MRP area
    4. For several MRP areas
    You define the scope of planning for the total planning run in Customizing for MRP, in the IMG activity Scope of planning for total planning run .
    You can carry out total planning for a scope of planning online or as a background job. The planning run must always be started with parallel processing.
    You can use the scope of planning for total planning in Material Requirements Planning, Master Production Scheduling and Long-Term Planning.
    Please refer to the below links -
    http://help.sap.com/saphelp_46c/helpdata/en/35/b0e95c87a62488e10000009b38f9b7/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/d7/5c9366f47811d1a6ba0000e83235d4/frameset.htm
    Hope this helps you.

  • Material in two plants, I run MRP with the BOM is not found in prod plant

    Hi all,
    I have plant 1020 material 12345
    Plant 1020 is the production plant for material 12345
    The material 12345 exists in plant 1070.
    The material 12345 in plant 1070 has no MRP.
    Plant 1020 material 12345 config in MM03
    MRP1 --> MRP Type = PD
    MRP1 --> MRP Controller = G03
    MRP3 --> Planning material = PLAN_1020_GR03
    MRP3 --> Planning plant = 1020
    Plant 1070 material 12345 config in MM03
    MRP1 --> MRP Type = P3
    MRP1 --> MRP Controller = 017
    MRP3 --> Planning material = empty
    MRP3 --> Planning plant = empty
    The BOM in cs11 for plant 1020 material 12345
    has 3 components
    Comp#1
    Comp#2
    Comp#3
    The Dependency is code
    TABLE TB_1020_SUPERBOM (PP_nuance_interne = $ROOT.PP_nuance_interne,
    PP_dim_billette_bom = $ROOT.PP_dim_billette_bom,
    PP_CODE_LONG_BILL = $ROOT.PP_CODE_LONG_BILL,
    pp_component_bom =$self.pp_component_bom).
    The dependency is not found because it is looking for it in the plant 1070 and not the plant 1020.
    When the MRP runs for a Delivery type stock transfer order I get
    CONFIG_1020_BILLET <---- This is the BOM item component field in CS11 in the Basic data tab
    Comp#2
    Comp#3
    instead of
    Comp#1
    Comp#2
    Comp#3
    When I run MRP for the same material, if there's no
    "Delivery based on Stock transfert orders" the MRP associates the correct components
    Hope this explains m'I situation.
    Regards!
    Curtis

    Hi,
    If you want a reply in one line, it would be SAP R/3 does not supoort this feature.
    You will have to go for APO module.
    There are few things which can be done in R/3 side, as in maintaining a scope for MRP run in OM0E, maintaining special procurement key etc etc, but all these will not do any check of stock in another plant & can only help in a very limited way if all any for your specific need.
    But SAP R/3 provides a cross plant evaluation via MD48 to know the stock & demands at all plants, this can help only for evaluation purpose.
    Hope it clarifies.
    Regards,
    Vivek

  • During MRP run unwanted plant and storage location include and exclude

    Hi There,
    During MRP run how to include and exclude the unwanted plant and storage location pls let me know the required configuration settings.
    Thanks in advance.

    HI,
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run :-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards
    KK

  • Plannning Material and Plant for MRP Run

    Hi,
    If I have a material (01) extended on 2 plants, on one plant (A) we have production and planning/MRP + stock and on the other one (B), just stocking and transfer. B's requirements are to be entered and planned at A. I also want stock at B to be considered with stock at A when MRP runs at A. In the material master, I have some settings. I want to know if these would be any good:
    Material 01 on Plant A:
    MRP PD
    Strategy 40
    Lot size EX
    Coverage profile applied
    Material 01 on Plant B:
    MRP ND/PD tried both
    Strategy 40
    Lot size EX
    Coverage profile applied (same)
    Planning material: Material 01 itself
    Planning plant: Plant A
    I particularly want to know about points 5 and 6. Will they make any difference if I run MRP on scope of planning(all plants) or just plant A? Will stock at B be considered? What difference does that setting make in my case? Please help!
    Thanks!

    No sales on Plant A. Only transfers and STO's. Stock is STO'd to Plant B (and other Plants, as well)
    Plant B sells the stock.
    Yes, I want to load the forecast in Plant A (COPA to SOP to DM to MRP). What do I do in this case?
    I tried another case, as well. In that I put a special procurement on the material in Plant B view and marked it as external procurement. (the planning material and plant were there, didn't remove)
    Then I entered the forecast in both plants separately (PIRs for both Plants) The requirements from Plant B made STPO Planned orders in Plant B and STCK Planned orders in Plant A. I am using coverage profiles (period is month, standard length 25 days, target 10 days for 1st period for 2 months, target 10 days for 2nd period  for 1 month, target 10 days for the rest of the horizon) Not using any consumption modes.
    The results I am getting don't make sense to me. I have attached screen shots for both plants MD04 and the MRP + work scheduling views

  • Only one MRP run for diffrent companies plants

    Hi PP expert,
    my bizness scenario  is . there 2 companies  code one company code has 2 plant and another comp has 3 plant..only one product is assembling in all plant. suppose  finish material  X is producing in all company plants
    but  finish material X have component K and L, L is manufacturing in only one plant and supply to all company plant
    my client want to produce material component "L" for all plants  for his monthly  requirement with MRP run.
    component L is semi finish material and its is component of X
    but i am not under standing how will get requirement from  same company plants and other company plants. for Monthly MRP run
    Kindly suggest me how will take requirement from others companies plants for MRP run...
    kindly suggest me step by step
    Regards
    Aqueel

    Dear Friend,
    Only one MRP Run i.e. the Total MRP Run is possible at different plants but all must be under same company code.
    in your case ,plants are under different comp.codes , so it s quite difficult.
    Here I have to check the posiibility of using the special procurement key  to tranfer the material  between plants assigned to different comapny codes.  The particular Keys are ..
    40--Stock transfer (proc.from alter.plant);   70 -- Withdrawal from alternative plant   or 80----Production in alternative plant*
    If it is possible , then you can use this option of Special Procurement key.
    Otherwise you can use Plant to plant transfer movements like 647 to transfer beween plants against the Purchase order.
    Regards,
    Edited by: Girishprasad Subhash Pawar on Jun 28, 2010 12:26 PM
    Edited by: Girishprasad Subhash Pawar on Jun 28, 2010 12:30 PM

  • MRP run in seperate plant

    dear sap gurus,
    my user want to activate mrp run to only 1 plant (let's say plant A).
    But he also want that all reservation in the other plant (plant B which not activate for MRP run) also being calculate for consumption in mrp run for plant A.
    These reservation is a request for a material from plant B to plant A
    Please, suggest me how to solve this problem.
    thanks,
    ting

    Hi
    Select alternate production in sp procure ment key of material master
    Ensure that alternate plant is configured in the sp procurement key in customisation
    This will solve your problem
    regards
    Vijay

  • MRP run for sub contracting plant

    Hi all,
    Please let me know if this scenario is possible:-
    I have two plant A and B. A is manufacturing plant and B is sub contracting plant. For one FG I plant there is demand of 100. After MRP run planned order is created for 100 for FG. For raw material purchase requisition for 50 is created and delivering plant will be B.
    In md04 for plant A I can see pur req for 50 and for plant B in md04 I can see 50 as stock requirement.
    Now use wants that if MRP is run for plant B, it should generate planed order against stock requirement.
    Strategy 11 we are using.
    Please let me if it is possible
    Regards,
    D.Dutta

    Hi ,
    Cross plant planning is possible ( like Plant A & B) , no need to run MRP in two plants separately  . but you need to the follow the following config .
    1) Define special procurment key ( Spro> MRP> Master data --> Define spl procurement key)
          You can copy standard key 40 , ( you have to defined supply plant and recving plant)
    2) Identify the Materials which are to be cross plant planning and go to material master MRP 2 view and assign Speial procuremnt key
    3) run MRP for FG in Plant A and down level MRP for  RM/PM/SFG  will be generated in plant B.
    I hope this will help your requirement .
    Thanks
    sekhar

  • Plant stocks in MRP run

    Hi All,
    I have a material maintained in 3 plants say A, B, C. The stock is also maintained in all 3 plants. The production happens only in plant C. MRP is run in plant C.
    But while MRP run, I want that system should consider the stock in all plants - A, B, C.
    Regards,
    Manish

    Hi
    It can be achieved only by APO.
    In R/3, we can run MRP at Plant Level (Maximum). When you run MRP at Plant C, System will consider the stock at C Only.
    From Plant C to Plant A requirements should flow (It can be done by using special Procurement Key)
    From Plant A to Plant B Requirements can flow by using special procurement Key
    Here we should understand that from Plant C requrements can flow to Plant A only directly.
    Generally we will requirements that system should consider the stock in all plants as well as requirements should go to 1 or more plants automatically.
    We can do this by using Quota arrangement. But it doest not solve the issue.
    regards,
    Nag

  • MRP RUN- KIT BOM explosion not working

    We setup one layer BOM’s for our maintenance KITs as parent material and components as child material.  For  example KIT is TS10000-K1 and components are TS10001, TS10002 etc setup as next layer with in the BOM. Both KITS and components are defined as material types ERSA (Spare parts). These one layers BOMs are setup as production BOMs and expected to create purchase requisitions for KITS and components by exploding BOMs during MRP runs. We use purchase requisitions and convert them into POs to procure both KITS and components. We DO NOT USE Panned orders and Production orders. 
    The safety stocks / reorder point are considered as demand for KITS and components as we do not have any external demand for KITS and components.  
    MRP run is creating purchase requisitions automatically for both KITS and components as per safety stocks and reorder point defined in MRP Views of Material Master. This is working as expected.  
    The issue is: KIT BOM’s are not exploding to generate purchase requisitions for the dependent components of KIT BOM. Please suggest the way to resolve this issue. 
    Split valuation: Also we plan to use split valued KITS with both new and refurbished. So we need BOM explosion for split valued KITS
    also (after the 1st issue is resolved).   
    I verified the following items to make sure the required configuration and data setup is defined correctly.
    1) Planning file activated Plant - OMDU 
    2) Executed MRP run with Total Planning - MDBT and MD02 (single item, multiple levels)
    3) BOM explosion for MRP activated- OS23 
    4) MRP type in MRP1 view- PD and VB (I tried both separately but BOM is not exploding).
    5) Procurement type “F” (MRP 2 view) and lot size “EX”  
    6) Planning strategy in MRP 3 view (tested w/o planning strategy and with strategies 10 and 40. But BOM is not exploded)
    7) BOM status and usage (status is active and usage is for production-CS02 and OS20)  
    8) BOM Validity date (Valid) 
    9) BOM structure in CS12 (BOM is exploding in CS11) 
    10) Availability check  
    11) Selection of BON ID to have BOM usage indicator assign (OS31).
    12) No alternate BOMs or production versions or work scheduling view are used.
    Please review the above 2 issues and suggest any workable solution. Thanks in advance!
    NOTE: I extensively used MRP with multi-level BOM explosion in my earlier projects without any issue. However the above issue is a  bit strange  why one layer BOM is not exploded in this case. 
    Regards
    Srini  

    Hi
    Thanks for your response. I reviewed all SAP notes and none of them are applicable to my scenario.
    1808396 - BOM changes not considered by MRP: I have not changed BOMs.
    1781324 - MD11: Valid BOM alternative is not found. We do not have alternative BOMs.
    1791009 - No BOM explosion after changing production version: We am not using production versions.
    Our Material KITS are PM spare assemblies set up as BOMs and consists of individual spare parts as components. We are creating purchase requisitions and not planned orders. We are not using PP functionality/Production orders.
    MRP is generating purchase requisitions for KITS and components as per ROP and safety stocks. In other words it is working as expected.  The issue is BOMs which are parent assemblies are not exploding to the next lower level components.
    Please note that I am not getting any error messages when MRP is executed.
    Regards
    Srini.

  • MRP run t-code

    Hi experts,
    Run MRP (online) for the plant what is the t-code
    Thanks

    Hy Kumar,
    MD40     Online MPS Run
    MD01      Online MRP Run
    MDBT       As Background Job
    Other Help ful T.code for MRP
    MD61     Create PIR
    MD62     Change PIR
    MD63     Display PIR
    MD67     Staggered Split (PIR)
    MD73     Display Total Requirements
    MS64     Copy Version
    MD41     Single-Item, Multi-Level
    MD42     Single-Item, Single-Level
    MD43     Single-Item, Inteactive
    MD50     Single-Item, Sales Order
    MD02     Single-Item, Multi-Level
    MD03     Single-Item, Single-Level
    Regards,
    Dhaval