Multiple Document Types for PRs generated through PS Module
How to create PRs with multiple Document Types as standard SAP allows to generate PR with only one Document Type?
Thanks in advance for any help.
Regards,
Mohan
Hi
Can be achieved through development.
Use user exit :
COZF0001 For PR doc changes to service
COZF0002For PR document type changes to non stock material
Regards
Similar Messages
-
Document type for MRP generated Purchase Requisition selection
Hi,
when I run MRP ,for externlal procurement items system is creating Purchase Requisition with Document type NB.How to make system to take different Document type automatically with MRP.
Thanks and Regards
Raghavendra PaiDear,
Follow below steps to fullfill your requirements:
1) Go to Tcode OMDT.
2) Click on MRP group
3) In front of your plant maintain your doc.type purchase requisitions for standard purchase ord which you want to generate at the time of MRP --PR generation.
4) Go to Tcode MM02---maintain MRP group same as above parameter in MRP-1 view .
Now run MRP..it will pick the defaulted Document type for PR generation via MRP.
Regards
Utsav -
Multiple Document Types For Purchase Requisition For Different Order Types
Dear SAP Gurus,
I want to have different document types of Purchase Requisition for different Order types.
For Example:
for Order Type ZT01- Document Type used should be YR01
for Order Type YA01- Document Type used should be ZR01
How could this be achieved?
Regards.hi
Kindly check the user exit for the same
COZF0001 or COZF0002
regards
thyagarajan -
PO document type for automatic PO is transportation module
Hi,
I am generting automatic POs through transportation module. I am able to assign plant, P.org and P. group through transportation planning point for automatic PO but it is always creating PO of NB type. Is there any configuration where I can change the PO type for automatic POs in transportation?
Thanks & Regards,
YuvnishHi
Check the path :-
IMG-->Material Mgt. -->Purchasing --> Define default Values for Document Type.
Regards
Amitesh Anand -
Separate Doc.Type for MRP generated PRs
Dear All
We are facing an issue with MRP process where we want to automate the process from MRP run to PO creation.
In source list we will add the existing contracts and make it relevant to MRP so that after MRP run we will get source (vendor defined in the contract) assigned purchase requisitions. After that, we will create a background job for ME59n in order to get the POs automatically after MRP run.
In this process we are facing issue with the auto PO generation through ME59n as funds management (FM) related parameters such as Fund and Fund center need to be enetered manually at the time of PO creation in our system. So in order to avoid this manual entry we want to define FM derivation which automatically populate the fund & fund center in the MRP generated PRs.
Further, we have two options for FM derivation one is valuation class and the second one is Document type. If we define the FM derivation based on the valuation class we cannot only restrict to MRP generated PRs. Second option is separate document type for MRP generated PRs.
Please provide pros and cons regarding the creation of new document type for MRP. Also, please provide your suggestions or any work arounds for the above discussed scenario. Your inputs are highly appreciated.
Thanks in advance.
PrabhasHi nagaraj
it makes sense . i will explore and tell you.
what about your source assignment standard program. hope it will assign source of supply if it is a valid unique source of supply else it will assign eprofile to your purcase request. check with technical resource how the satndard program behaves.
i will also explore my side again. check mm forum too on your purchase organisation assignment for your userexists.
one question to you.
when you create a PR for material and go to source of supply .why do we get many fixed vendors like contracts,info record if we have valid fixed vendors as sap ecc standard.but in my PR i may not have Purchase organisation information.
muthu -
Other document type for credit memos in MIRO
Dear,
i would like to use a seperate document type for credit memos posted with MIR0 compared to RE for invoices. I created a new Z transaction. And now I thought that I could enter this new transaction code in OMR4 (tablle V_169F), but I can not add a new customised transaction in this list. What can I do?
Or is there an other way to have another document type for credit memos?
Thank you.
LeenHi
You can create a new document type for credit memo through t code OBA7. Once the T code is created with all necessary parameters you can assign this to MIRO transaction.
You cannot create a customised transaction through OMR4. This is meant for assigning the Doc type to Invoice verification
Regards
Jaswanth -
Different Document Type For MRP Requirement
Hi All,
Can any one help me for this issue...
MRP run creates PRu2019s for externally procured materials with document type NB, is it possible to have different PR document types for MRP generated Std PRu2019s and Sub contracting PRu2019s without nay enhancement.
Thanks
Praveen
Edited by: Praveen Kumar Shukla on Sep 9, 2009 1:19 PMHi
You can set different MRP doc.type: purchase requisitions for standard purchase order / purchase requisition for subcontracting / purchase requisition for subcontracting at MRP group level
Using transaction OPPR u2013 Select plant u2013 Select/create MRP group under External procurement screen click on Scheduling/doc type.
And make sure that in material master u2013MRP1 view you are maintaining this MRP grp.
with regards,
VB -
Assign new document type for automatic MRP generated PR
Dear Experts ,
I want to have a document type ZMRP MRP generated Purchase Requisitions ( automatic ).
Also i want it to have a release procedure .
Where do i make the said assignment of document type ?
The same is the case for Purchase requisition for automatically generated PRs through Maintenence orders .
Regards
AnisHello Experts ,
I have done the assignments , but the system is still picking up the document type NB .
I may or may not define MRP group in the material master as MRP group is not relevant for my client .
I want to know , from where does the system still pick the document type NB ?
Regards ,
Anis -
Multiple Doc Types for a given Protocol Revision
We ar a large EDI shop. In our scope we have multiple Protocl Revisions and Multipl Document Types tied to the Revision.
For Example we have Protocol Revision X12_4010 and multiple Documents
850,856,860,824,997.
I am able to get docs through but only when the ISA information matches what is defined @ the protocol level. I.E. navigate to Protocols/Name/Protocol. It is the document paramaters here that I am having to make match. I am thinking this cant be right and I must of made a mistake in my config.
Any ideas how I can allow any ISA details @ the protocl level and do the overrides @ the partner level/business action level ?Hello,
Please setup sometime in your conveniece to disucss more. However to process every document you need to have an associated business action for e.g process_850 which encapsulates the Document Protocol revision i.e (Document Type and Revision e.g 850, 4010), where in you can define the envelope information.
While creating additional Business Action such as process_810 , you can make use of existing Document protocol revision thereby using the envelope information defined specific to process_810. Ideally you should override the Document protocol parameter specific to Trading partner.
Rgds,Ramesh -
Creating web app to search multiple document types
I don't know that this is a Servelt API question but Im not sure where to ask it. I needto write a wb app that enables users to search through multiple files, foldes and document types for particular strings within a faculty intranet. I don't know if this is a Java task or if I should take a different approach. I'm looking for ideas before I start the project. Thanks.
KenNot that I have any experience in this area but you might want to look into the Apache Lucene project:
http://lucene.apache.org/ -
Document type for outgoing Excise invoice
Dear Expert,
I would like to maintain different document type for Excise document generated at the time of J1IIN transaction. At present system generating document type SA. So we need to maintain different number range for these documents instead of SA document number.
I have maintained document type ED in Tax on goods movement - Basic Settings - Maintain company code settings, but still system taking document type SA.
Please advice.
Thanks,
Krishna KumarHi,
for outgoing excise invoice document type setting as above mentioned same path
Hi
pls maintain document type below mentioned path
Tax on Goods Movements
India
Basic Settings
Maintain Company Code Settings
whatever marked UTL FI DOC type for excise outgoing excise invoice
in that your maintain company code against ED document type
Thanking you
Regards
Mahesh -
Multiple document types per Network in Purchase Requisition stage
Hi,
PRs get created automatically whenever we attach the material component to an activity.Required Document type of PRs are maintained in transaction 'OPTT'.
My Client is using three document types for Imports, Material Procurement & Services Procurement respectively & he wants all the three document types to be mapped in Project System implementation.(All other modules have been implemented long back & now IM&PS modules are being implemented)
In transaction OPTT, only one entry is possible to maintain as Document Type. Can anybody share how to maintain three Document Types?
Thanks
KishoreHi Kishore
Let me clarify one thing that Tcode:OPTT is to specify purchasing item categories(account assignment categories) and a purchasing document type for purchase requisitions in the network, this is not the area where u create new document type.
1) u can create new document types in the IMG>Material Management >Purchasing > Purchase requisition>define document types. where in u have define the new document type with the allowed categories and link purchase requisition with the document types.
2) U have to link this document type to the PO document type.
3) Then go to the OPTT transaction maintain the account assignment categories for the new document type created.
Reward points if useful
Regards
Murali -
Default document type for FB50L
Hello Guys,
When i am trying to post a document through T.Code FB50L with ledger group ZL (Non-Leading Ledger)
The t.code FB50L is picking DocType SA by default. I need a separate DocType ZL for posting to non leading ledger.
How do i default DocType for FB50L.
Regards,
SKHello AP,
I want to Default Document type for FB50L.
The config part, it is done.
Any how i the issue is closed. I can change the document type at the posting
Regards,
SK -
New document type for value contract
Dear Gurus
I want to create new document type for value contract , can you suggest me the configuration as well as areas to be taken care.
Advance thanks to all
Regards
SrinivasHi,
Please click the below link which is self explanatory in creating contract with screenshots.
http://web.mit.edu/sapr3/windocs/bpsps05m.htm
If you wish to go through some stuff notes on the processing of contracts, click the below:
http://help.sap.com/saphelp_srm30/helpdata/en/75/c65d3a0eb60365e10000000a11402f/content.htm
Regards,
Kk -
Change the reverse document type for RE.
Hi,
We want to change the reverse document type for document type RE, can any one sugget the possible negative impact.hi
kindly note that if you are creating a new document type to be assigned as the reversal document type for RE then you need to assign the appropriate number range interval for the year.
if you are going to assign an existing document type as the reversal document type for RE then you will not be able to distingush the past and the new documents generated as both of them shall belong to the same document type.
regards
eashwar
Edited by: eashwar1 on Apr 15, 2010 2:38 PM
Maybe you are looking for
-
TS1538 HELP! My Iphone 4 is still not syncing with my itunes!!
I use my windows 8 laptop, and I don't know what else to do. Is there anyway I could fix it? I tried EVERYTHING in tech support. I've tried: Different cords Reseting settings Reinstalling itunes Restarting computer Checking AMD & etc. Apple support h
-
Not able to load jspx file from the classpath in Integrated OC4J
Hi, I am using integrated OC4J from my jdeveloper to deploy my application as an ear file. It contains one jar file (with ejb deployment desscriptors) and a war file (including Model and Viewcontroller project contents). The war file contails a jspx
-
App-v 5.0 Sequence AutoCAD 2013
Hi, I am currently trying to sequence autoCAD 2013 according to tips from http://www.naevette.com.au/sequencing-autodesk-autocad-2012-x64. However, during the sequence, when I started AutoCAD installation, program will notify me that Dotnet4 section
-
Increase the SGA_MAX_SIZE and SGA_TARGET parameters
HI , I am using oracle 10g R2 and windows server 2003 . My server is having 8 GB RAM . I want to increase the SGA_MAX_SIZE and SGA_TARGET parameters . I am using the below command , but getting the error SQL> alter system set sga_max_size=2000M scope
-
SQL query very slow on Data warehouse
Guys, Is there any soul who is an expert on SQL ? I do run this query agaist a 2 table and a view which has 30 million rows. Unfortunately the table is partitioned but not the Unique index. This query takes about 3 hours to run. Is there anyway of wr