Multiple materials in MATMAS03 - occurrence of E1MARAM element

Hello,
Looking in the MATMAS03 IDOC the element E1MARAM has the occurrence 1..9999. It then seems possible to send several materials within the same IDOC. However when sending materials with the program RBDSEMAT it always create an individual IDOC for each material.
Has anyone found a solution to sending multiple E1MARAM segments within the same IDOC? This would then mean that XI will only receive one IDOC message, which is the solution I'm looking for.
Regards,
Per

Hello,
That was a very interesting article. I am glad I am now aware of this functionality. However I have some additional requirements that might be difficult to use with this.
I need to extend the IDOC with some extra own developed fields, which I think will not be a problem with this method. However changes to these extra fields should also trigger that the material should be sent in the next run so change pointers will not work so well for me. With BD10 it was possible to select which materials to be sent during runtime. It does not seem possible here to change selection field values during runtime.
If you want to send only materials belonging to a special plant (E1MARCM-WERKS) then that was not possible since changing that field to a selection parameter caused the job to cancel.
But overall I would say this is a very good new concept.
Thanks,
Per

Similar Messages

  • Standard Report to check consumption values for multiple materials

    Hi,
    Is there any standard report to check "consumption" values for multiple materials? The user needs to check the consumption values over a period of time for multiple materials (VERP, ROH) before deciding the re-order and safety stock values for them. Any help on this will be greatly appreciated.
    Thanks,
    Swapnil

    Dear Swapnil,
    Report MCRE is widely used for the material cosnumption than checking in COOIS.
    Also these reports can help you.
    MCPF                 Material analysis: Dates                
    MCPO                 Material analysis: Quantities           
    MCPW                 Material analysis: Lead time            
    Regards
    Mangalraj.S

  • How to maintain One product cost collector for multiple materials and configuration setting

    Hi experts,
    my requirement is that i want to maintain one product cost collector for multiple materials ans also i want to know the configuration setting for the same.
    I have used KKF6N but it is not working in my case. I went through KKF6M also but there i found multiple cost collectors.
    please guide me in the same.
    Thanks in advance.

    Hi Shripad,
    you cannot assign same  Product cost collector to different material.
    Because you creating cost collector for material combination of material /production version,material /Bom Routing.
    so please create individual cost collector for every material.
    if you have any query kindly revert back.
    Please mark the answer as helpful if it is helpful to you.
    Because march 5 onwards scn has stopped awarding points to liked content.
    Starting now: No more points for likes on comments/replies
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Multiple Materials on a single object

    I'm sure I'm missing something...but I'm finding it impossible to use multiple materials form the 3D toolkit on a single object unless I separate the material differences to separate objects....which I'm sure is crazy. But if I import an object with multiple materials, there seems to be no way to assign the toolkit materials separately. If I drag a toolkit material to one part of the object...the entire object turns into that material. It would seem it would be right if you dragged a toolkit material to the materials list of the object....but that won't work either. Anyone know what I am missing here?
    Thanks in advance for any help

    Right click on the object and select Tools -> Separate Meshes which will divide the object into it's component parts (i.e. parts that aren't part of the same polygonal mesh will be divided)
    From there, you can apply materials to them individually.
    To rejoin them (you don't have to) just select them all, then right click and select Tools -> Collapse Hierarchy.

  • Is it possible to combine multiple Pur Reqs for multiple materials to one vendor into one PO through MD07?

    We have material planners who use MD07 (traffic signal screen) Stock/Requirements List, Collective Access tab to review material requirements by MRP Controller.  Once the list is created, they select individual materials and review them in MD04.  In a lot of cases, Purchase Reqs (PRs) are reviewed and adopted into POs individually for each material.  Sometimes they will combine multiple PRs for one material into one PO.  This is a good practice.  However, from what I have found, it is not possible to combine multiple PRs for multiple materials into one PO.  If this was done it would dramatically reduce the number of POs that we are issuing to suppliers.  Problem statement:  We issue too many POs which causes additional influxes down the line (receiving dock/goods receipts processing, receiving issues, invoices, invoice issues, etc.).  Does anyone know of a way to address this problem without a major overhaul in approach or customization of the system?  Thank you in advance!   

    Hello Michael
    As far as I know, this is not possible directly from MD07, only from the MM transactions.
    The following thread suggests the following procedure to convert several PRs into one PO:
    Conversion of multiple PR into single P.O
    Drag and drop the first PR from the item overview to the shopping card on top of ME21N,
    then open the PO detail delivery schedule tab and drag  and drop all other PR to the shopping card shown  in the schedule tab
    You can use the same procedure, calling the order conversion from MD07 and then drag and drop another PRs into this PO.
    BR
    Caetano

  • Creation of Transfer order with multiple materials at a time(no reference)

    Hello All,
    Can you please tell me  the transaction to create transfer order (TO) with multiple materials, LT01 has the abiity to create only one material at a time, any transaction available to create with multiple materials ? Please reply.
    Thanks
    John

    Yes, see transaction LT10 to select multiple materials.

  • One inspection lot for multiple materials of purchase order line items

    Hi All,
    My client requirement is one inspection lot for multiple materials of purchase order line items.
    Please share your thoughts.
    Thanks in advance for early reply.
    Regards,
    Jishu

    I totally agree with Amol.
    I don't think I would touch that development nor would I ever tell a client it could reliably be done through development.
    Knowing what I know about the table structures, I don't think you could create any development for this that could use a significant amount of the existing tables and functionality.  I think you'd have to create all your own Z tables and basically rebuild the functionality.  Tying it back in with SAP data will be difficult.
    You're even looking at all custom screens for your results recording and UD as well.  And if you have follow-on functions like batch classification requirements, batch determination, COA publication, results copy functions, use of DMR and sampling procedures, physical samples, quality notifications, etc. etc.. you could be looking a whole lot of development.
    Craig

  • MD04 but for multiple materials

    Hi,
    Would just like to ask is there a standard report that lists down planning results for multiple materials?
    It's like Stock/Requirements List (MD04) but for multiple materials....the info/fields I need are the ones found in MD04.
    Thanks.
    Best Regards,
    Armie

    Dear Armie,
    You can't see MD04 details for multiple materials. Actually, it is impossible because MD04 is a screen designed for a single material.
    However, if you want multiple material planning details, you would use
    function LM61XU11 MD_STOCK_REQUIREMENTS_LIST_API to collect your own data and display it.
    Regards,
    Onat

  • Transfer order of multiple materials between WM and MM warehouses

    Hi
    i have a requirement to manage with a custom program or with standard transaction the transfer of multiple materials (KITS) between WM warehouse and MM warehouse and inside the same warehouse . How can i achieve this functionality
    Can you advice ?
    thanks in advance

    can you describe in a more technical way what you mean by "movement between WM warehouse and MM warehouse"
    Maybe you can give an example how you do that for a single movement

  • MRP FOR MULTIPLE MATERIALS

    Dear cons
    For MRP we are using t-CODE- md62 for requirement demand.Then we have created a z- t-code which is a replica of t-code- MD02. In MD02 T-CODE one single material option is availble. so we chose one BDC of new t-code- ZMD02. In this Z-t-code it is possible to upload multiple material.But the problem is for each material the system is creating an individual Purchase requisition even though I have uploaded multiple materials, Our motto is to create  a single purchase requisition for these multiple material just like the t-code- ME51N where entering of multiple items .are available. So is there any standard T-code availble to create a single pur. requisition for multiple materials in one time.Any advice for other option.

    Hi Nirupama,
    In standard system we dont have any such facility/transaction to create a single PR for a bulk of material. Which ever T-codes are available to run MRP for multiple materials (ex:MD01), those give individual PR for each individual material. You may refer to SAP notes also for this.
    Regards,
    sachin

  • Multiple materials input to planning board

    Hi,
    does anyone know if there is a way to specify multiple materials ( for instance thru copy/paste ) in the planning board MF52???
    Any help appreciated !
    danny

    Hi Danny,
    I don't think there is, but as you see, you could create a product group for these materials, and use it to access the planning table.
    Regards,
    Mario

  • MD03 for multiple materials

    Hi Friends,
    I want to execute MD03 with multiple materials (15 or 20 selective materials), also i want save this as variant and run every hour. 
    How could i make this? Any user exit is there to do this?
    Please help.
    Thanks
    Srini

    Hi,
    You can use the User Exit: M61X0001
    With this you need to get the Coding done from your ABAPer such that it will consider your Materials..
    With this the criteria can be considerd is:
    materials to be planned using MRP procedures,
    materials of a certain MRP controller
    externally procured materials or materials produced in-house
    With MD01/MDBT you can use the User Exit Key (which you will define in OMIX) and Plan every houre as per your requirement..
    Regards,
    Siva

  • Manual TO for multiple materials

    Hi All,
    I want to create manual transfer order for multiple materials in a single TO, but when I use LT01 I have the option of entering only one material code. So, please tell me how can I create a transfer order with multiple material codes manually...
    Thanks in advance..
    Reg
    Noopur

    Hi,
    In standard system you can use only LT01 and LT10 for creating manual TO. In LT10 you can select several materials (quants) at once (but e.g. you cannot change the quantity).
    If you want something better, you have to go to development in my opinion.
    Regards,
    Csaba

  • Multiple materials in a production process order.

    Is there a way to create one single process / production order for  multiple materials?
    Will material group help? or something similar to a Purchase Order with multiple line items?
    Help is appreciated.

    Hi,
    Go for joint production, your problem will be solved
    Maintain as coproduct for both the material.
    Create Prod order on any single material.
    Joint production will be in MRP2 & Costing 1
    Give proper apportionment structure for both the products.
    Customize in OKLE.
    Subbu.
    Edited by: Subbu SP on Nov 12, 2010 5:05 AM

  • Print multiple photos on one sheet in Photoshop Elements 11

    I want to print multiple photos on one sheet in Photoshop Elements 11
    I am using Mac OS10 10.7.5  I am using Photo shop Elements 11.  Could you please help me?  New to photoshop elements.  Thanks.  Jodie

    Well, you can start with File>Picture Package. If that doesn't offer a layout that works, create a new file (file>new>blank file) the size of your paper at the  resolution you want, then copy paste your pictures into it and use the Move tool to position them.

Maybe you are looking for