Multiple people working on one project

Hello,
A co-worker and I have run into a problem with robohelp and
network drives. We are currently switching over a guide of
procedures to Robohelp. We did have our project located on our
intranet for the rest of our team members to use when we are
finished. We are also going to be using Robo Help for more than
what we are doing right now. I've read here that the access
database that our project uses doesn't like network drives. My
questions are, what do I need to buy to be able to have two people
working in the same project at one time?
Thank You,

We did have our project located on our intranet for the rest
of our team members to use when we are finished. - That sounds like
the output and it is quite OK to put that on a network drive for
users to read.
What must not be on a network is you source project. To do
that you don't need to buy anything as RH comes with source
control. If you pop the original CD in, you will find an option to
install it. I am assuming you have a fairly recent version.
Before you proceed, go to
http://www.adobe.com/devnet/robohelp/
and take a look at Matthew Ellison's article on the subject. You
will probably need developer assistance to set it up.

Similar Messages

  • Multiple people working on one module pool - how?

    Hello SDN Community,
    I have a need for multiple people to be working on the same module pool.  Since the forms are in a shared include inside the main program, how is it handled the multiple people writing code at the same time for the same module pool?  Also the concurrent creation of screens in SE51 and pf-statuses in SE41?
    Thank you,
    Dean Atteberry.

    I was thinking about SAP module pool SAPMP50A (HR maintenance screen).  It has lots of screens, includes, pf-status, etc.  I realize that this has evolved over time and that lots had been added since original development.
    But the original SAPMP50A must have had a lot of screens designed for it.  Assuming it had, lets say 10 screens, did only one SAP developer build all 10 screens?   Or did SAP put multiple people on it?  And if so, how did they handle needing access to forms in same include with realities of editor locking?
    Best way that I can see this now is that only one developer to a given module pool.  Maybe a second one could build his part in a secondary module pool (and SE51/SE41) and then copy what they built to main module and SE51 and SE41.
    Just trying to think this thing thru.....

  • Can multiple people work on one form

    We do onsite assessments. I am attempting to determine the best method to have all of my assessors' feedback compiled into one form. Any help will be much appreciated!

    The only link I have is to manage your team account http://forums.adobe.com/thread/1460939?tstart=0
    The only Adobe program/process for team work that I know of is Adobe Anywhere, but that requires a very different process
    Adobe Anywhere http://www.adobe.com/products/adobeanywhere.html
    http://www.creativeimpatience.com/adobe-anywhere-enterprise-solution/

  • Can multiple people work on the same project at the same time with Creative Cloud for Teams?

    We have a project we are working on, and since it needs to be done in record time, multiple people need to be able to access the most current version. Is there a way to work on one project concurrently, like on Google docs?

    The only link I have is to manage your team account http://forums.adobe.com/thread/1460939?tstart=0
    The only Adobe program/process for team work that I know of is Adobe Anywhere, but that requires a very different process
    Adobe Anywhere http://www.adobe.com/products/adobeanywhere.html
    http://www.creativeimpatience.com/adobe-anywhere-enterprise-solution/

  • Multiple people working on same iWeb domain.

    I am trying to rebuild my site after upgrading to iWeb'08 and would love to be able to have multiple people work on different areas of the site to speed up the process. How do I sync them back without loosing links. Can I ever have them exist in one file again. I believe that I can manually publish to folder then put them all in same folder.
    If there is any advice you guys can give would be greatly appreciated.

    Advice?
    Don't try it.
    You would need multiple versions of the Domain.sites folder created by iWeb and there is no way to merge them into just one file.

  • Is it possible that 2 separate computers working on one project?

    Hi,
    I have the problem that 2 people must be able to work on the same project:
    (not necessary at the same time)
    1. Person does all the image adjustments (which is me the photographer)
    2. Person does all the metadata.
    The project is installed on my computer, Aperture is installed of both computers.
    So,
    Can 2 computers work on one Project?
    (we are connected in a network via Ethernet)
    Or how could this situation work?
    AP would save us a lot exporting and importing (where we usual loose the iptc data along the road) if this is possible.
    thanks for your help...

    There was an earlier (much earlier) post regarding this same topic when Aperture first came out. If memory serves me, the answer to your question is 'no', but that answer was for your not being able to have two people working on the same project library at the same time. However, if you can place the library file on a drive that has enough throughput across a network, then I don't see why you wouldn't be able to do what you want as long as only one person access the library at a time.
    However, performance is going to be your biggest issue.
    Jeff Weinberg

  • Book file & Dropbox: Multiple people working on same book file

    I am trying to use the book file and have run into multiple issues. We have saved the book file and all relevant InDesign files on dropbox. There are two of us who work on the book file at the same time. We have the book file open together but work on different files from the book, never working on the same file at the same time.
    A few of the issues we have run into are as follows:
    1. The book file does not show the InDesign files the other person added, when opening on a different computer.
    2. When saving the book file, from the panel, it will tell us someone else saved the file and if we want to overwrite their file.
    3. When working on of the files from the book and I try to save the file (ctrl+s) I get error messages telling me the network connection was modified by another process. InDesign then has en error message it needs to shut down and start back up to recover documents. After it starts back up it can't recover document due to error(11).
    Has anyone used the bookfile with a cloud service, while multiple people work on different files for the book? For example, we want one person to work on the files 1-5 and another on 6-10 for the book file at the same time.

    Only one person can work on a book file at the same time.
    You cannot work this way on the files.
    Person A adds a file to the book
    Saves
    Person B adds a file to the book
    Saves
    Persons B version overwrites Person A file.
    Consider giving 1 person the duty of updating the Book File.
    Only 1 person can work on a file at the same time - consider splitting files you're working on into folders
    Folder>Person A
    Folder>Person B
    Add files that person should be working on.
    Person in charge of updating the book file will update from both folders.
    The way you're working will not work.

  • Re-allocating Actual Costs and Actual Work from one project to multiple projects

    My company would like to track costs in one project and then re-allocate those costs to multiple projects.  Example: An end user would submit a timesheet against a task named 'Analysis' for Project A.  Once accepted and published, the
    costs for those hours would be subtracted from Project A and 60% of those costs would be transferred to the 'Analysis' task for Project X and 40% of the costs for those hours would be transferred to Project Y. 
    We believe we can accomplish this through reporting, but before we go this route, we wanted to make sure there was not a logical, supported way in MS Project Server to complete these actions.  Could a script be developed to accomplish this?
    Thank you!
    Tasha

    Out of the box Project and Project Server do not support this. However with VBA anything is possible. You could also use PSI to work directly with project data in teh Server db but that would take much longer to develop. Check you can do what you want
    in VBA then you can use the result to spec the server version afterwards.
    Rod Gill
    Author of the one and only Project VBA Book
    www.project-systems.co.nz

  • Multiple people working on same instance

    Can two people work on same instance at the same time. If one user makes the change and resfreshes the page, he sees the changes made by other user?
    Edited by: JoshMachine on Jul 8, 2009 9:00 AM

    Hi,
    Are you sure you want to go the Split-N (now called "Multiple" in Oracle BPM 10g) route? From your earlier thread, here's what I think you're trying to do:
    Just to clarify again - (1) One guy has a task assigned to him
    - (2) He assigns same task ( creates duplicate copy ) and assigns to some else in different role.
    - (3) Now both should edit the task , meaning if one changes the tasks , other person should see it as well.>
    I'll typically use a Split-N when I have a dynamic number of copies I want to create that is determined at runtime. Examples include:
    a) you form an adhoc committee of people in a role and you want them to approve disapprove a proposal and you determine who's on the committee and the number of people on the committee at runtime.
    b) you have a request for quote from a variety of different suppliers and if it's a large order you send out x number of requests to suppliers and if it's a small order you send out y number of requests to suppliers
    c) you have a batch of things (e.g. healthcare claims) represented by one work item instance and you want to have workers treat the individual claims as single work items inside the same process (a single work item might have 100 claims that would spawn 100 work items).
    If you're still thinking you need to use a Split-N activity, this thread explains how to use it: Re: multiple-join: get value of each participant
    I could be wrong, but I think you might be better served if you use a Split activity and not a Split-N.
    For your use case it sounds like you'd have two transitions coming out of the Split activity.
    To meet your first criteria ("One guy has a task assigned to him"), one transition would go to an Automatic activity where the original person is assigned the copy of the original instance (use "next.participant" feature to assign it to him). Following this Automatic activity, it would flow to an Interactive activity where only the original participant could edit the work item instance.
    To meet your second criteria ("He assigns same task ... and assigns to some else in different role"), you need to add a second transition that would go to an Automatic activity where the second person is assigned the copy of the original instance. Following this Automatic activity, it would flow to an Interactive activity where only the second person could edit the work item instance.
    Both Interactive activities would have a transition to the Split's Join activity.
    To meet your third criteria ("Now both should edit the task , meaning if one changes the tasks , other person should see it as well"), right mouse click the Split activity -> click "Properties" -> click "Advanced" on the left side -> uncheck the checkbox beside the text "Generate independent Copies". Now if one edits their copy, the other will see the change reflected.
    The only concern I have with this approach is a bug I encountered last week when I turned off generate copies in a Split using Oracle BPM 10g. In 10g, I noticed that the instance remained locked occasionally after one of the participants "touched" the instance. Once locked, I could not invoke the copy again. It did not happen every time, but often enough where I decided to work around the new 10g bug by leaving the property set to generate copies and writing to an outside database table once one of the people edit it and reading from the same outside database table before someone edits it.
    Hope this helps,
    Dan

  • Is it possible to define multiple web services in one project?

    I'd like to publish multiple components within one project as web services. but when I try to create it using the project New menu, it only prompts me and allows me to select one component . So does this mean only one web service can exist in one project?

    Sunil
    Thanks for the prompt reply.
    I think I should have worded my question more clearly.
    I have a project with multiple Java classes. I'd like to convert two of them into web services.
    There are two ways to co this.
    1. I right click on each class and select the Generate J2EE Web Service option. This will work correctly and allow multiple web services to be generated.
    but this is not what I want to do .
    What we are trying to do is to generate web services at the project level. I am following instructions in OTN web services tutorial :
    http://www.oracle.com/technology/obe/obe1013jdev/ws/wsandascontrol.htm
    So , this is what I do :
    1. Right-click on my project and select New from the context menu.
    2. In the New Gallery, expand Business Tier in the Categories list and select Web Services, then select Java Web Service from the Items list. Click OK.
    3. In the Select J2EE Web Service Version dialog, select J2EE 1.4 (JAX-RPC) Web Service, then click OK.
    4. Click past the welcome page
    5. This brings me to the page where I can select the web service and class.
    This is where I am stuck - it seems I can only select one web service here . Unless I am missing something.
    Or should I just repeat the process multiple times - running the wizard once for each class ?
    Thanks for the help.

  • Multiple users working in one Photoshop file?

    We have been doing a lot of photoshop work recently in the office and have quickly run into a problem.  Due to some poor communication on my part, two of us ended up working within the same photoshop file at the same time on separate computers.  Unaware of this, both of us kept saving our work, every time overwriting the other persons work.  After we discovered this hours of work was lost.  My question is this: is there a way where multiple people can work within a single photoshop file without saving copies for each person to work within or is there a way to prevent someone from overwriting a .PSD file while it is open by another user?

    BUMP
    Did you ever find a solution to this problem? I would imagine every single team of designers runs into this and I'm surprised it's virtually nonexistent in forums.

  • How do i work on one project and bounce between two computers

    I have one project that I would like to work between my mac book pro and my mac pro and i cannot seem to find an answer to this question

    What Tom said…and just to add: if you have any custom effects, pay attention to "Note" in the first section of this kb doc. (Speaking from experience, you can avoid a lot of stress by remembering to do that – especially if you're working on a job on someone else's system.)
    Russ

  • How can multiple users work on one source file?

    Hi There,
    I'm currently working on a project that I would like to hand-off to another person to finish. I've tried sending the source file located in at: Home>Movie>iMovie Projects but apparently that doesn't work as the second user is unable to work on the project.
    Is this achievable? If so, how?
    Thank you in advance for any help! It's greatly appreciated =)

    For iMovie 09, you:
    You have to plug in an external drive, and within iMovie, drag the project file to the external drive. It will ask you if you want to "copy project" or "copy project and events".
    If you want to move the project and not just make a copy, then hold down the Command key while you drag the project file to the external drive.
    iMovie 08 does not have the capability of having project files on the external drive, but you can try to manually copy it to the external drive with the finder, and then move the associated events +from within iMovie+ (critical for the other machine to find the files) and when copying the project file to the other computer, it would be critical to find the iMovie project folder in the Movies folder and put it in exactly the same place on the other machine. Otherwise iMovie won't find it.
    The way you want to use it, iLife09 might be worth the upgrade, especially if my suggestions don't work.

  • Multiple users working on same project

    Hi,
          I'm working on a project that will involve 2 (maybe more) engineers. Generally a single folder will contain a projects specific vi's and our standard vi's and a single engineer has all control. Our engineers are in different locations so I was wondering if anyone may suggest a way or point me to some information to manage this.
          We have LV 7.1,8.2 and 8.5 available
           Thanks,

    Search these forums & the NI site for Source Code Control  & Configuration Management tools in Google also.
    You can use MS VSS, Tortoise SVN, Clearccase, Perforce, etc., with LabVIEW.
    LabVIEW 7.x does integrate well with any of the SCC tools. But LV 8.x seamlessly does so; so, you can manage your project code well from within LV itself.
    - Partha
    LabVIEW - Wires that catch bugs!

  • Best workflow for 2 people working on a project?

    2 students owning CC subscription.
    What is the best workflow to work on the same project?

    Put everything in a Dropbox folder. One of you can share it with the other.

Maybe you are looking for

  • "Cannot open page....server stopped responding"

    This is the second time that my ipod errors out. 1. when using safari i get this error message " cannot open page...server stopped responding" 2. any app that connects to the internet times out. ie weather, bankofamerica --I tried resetting everythin

  • Account assignment not possible - item not yet calculated

    Dear SAP Gurus, While creating the Shipment Cost Document I am receiving following error. Account assignment not possible - item not yet calculated Message no. VY081 When I double click on the Item to enter the conditions the screen goes blank at the

  • Column formatting based on grouping data value- advanced data grid

    Hello Everyone, I am using advanced data grid to display hierarchial data nested upto depth 4. I have to color the leaf nodes conditionally based on  the grouped column value. Say for Eg., If the data is something like Company      Manager          

  • Parallel function call and thread issue

    Sorry to post one issue here which is related to code. i was debugging a code which was wrote long time back by one developer. the issue is two function is called parallel using thread and one function set a variable true at end and another function

  • TS1424 my iphone cennot connect to itunes store

    I try to update my apps and I get a mesage cannot connect to itunes store on the iphone 4s can someone help thank's