Multiple pgi against single delivery.

Hi all
For example, if we prepare one Delivery Order for 1,000 kg. we will be despatching the same as per readiness of materials at our end or from different warehouses or as per requirement of the buyer. Some times, we need to despatch the entire quantity at a time and some times the despatch will be made in 2-3 times as per requirement on different dates. If PGI cannot do more than once with same delivery number, how we can effect despatches on different dates. If we make different delivery orders, the volume will be much more and planning and controlling will be also difficult. Please provide other solution for this.
Regards,
Ratna

Hi,
Instead of complicating things at PGI level, why dont you create partial delivery docs from a single sales order or multiple ones.
In this scene, whatever the quantities of material you want to dispact by PGI, just enter that quantity while creating delivery document.
Just check if partial delivery is allowed for customer and customer material master.
Plz clarify if this solution doesnt work out.
regards,
Siddharth.

Similar Messages

  • Multiple shipment agaisnt single delivery

    Hi Gurus,
    Can we have multiple shipment documents against a single delivery. If yes what are the instances where we can have this scenario. i.e. what we need to do in the config and also which process business need to follow to satishfy this scenario.
    Thanks.
    Laxmi.

    Hi Laxmikanta,
    Yes we can do multiple shipment for single delivery please follow the below steps.
    1) Once you create a delivery go to t-code VT01N
    2) Create the first shipment as you generally do.
    3) If you want to create another shipment then you need to change the shipment type and create subsquent shipment.
    4) You can create as many subsequent shipment as you want.
    5) For this you need to remove the check mark from the delivery status " Do not select deleveries already in subsequent legs"
    Once done you will be able to create as many shipments as possible.
    Hope this helps.
    Thanks and Regards
    Rohit.

  • Multiple notification against single inspection lot (03 inspection type)

    Dear friends
    While recording the defects multiple times against single inspection lot (03type) , all the defects are added in single notification, but my client requirement is they want different notification.  if any body knows please tell me.
    Note : in inspection type there is a option of multiple notification against single inspection lot, but this is
    not working (i think it will work only serial number,equipment and  functional location get changed)
    Please do the needful
    Regards

    Hi Karthikeyan
    As you mentioned it is not possible to create notification  other than based on the object types.
    A work out can be make an action box in the notification for creating another notification with the help of ABAP ( call transaction QM01) and while doing this the entire datas of the inspection lot gets copied into the notification. you may have to use a user exit also.
    Defect can be recorded in the item level by the user.
    Sounds difficult but certainly possible
    Regards
    gajesh

  • BAPI to store multiple plants against single material

    Hi ,
    Is there a BAPI to store multiple plants against single material and  to store multiple sales organizations against single material.
    Thanks
    Regards,
    Vipin

    Hi,
    Im afraid whether you will be able to upload multiple plant and sales view together in one post. Probably check the BAPI which one of our sdn guys have suggested.
    I have only used IDocs to post and through that i can say you for sure, it is only possible to upload one at a time.
    And so does through your MM01 and MM02. You can attach only one plant at a time.
    Regards,
    Yogesh

  • Three billing docs against single delivery

    Hello Experts,
                   The client want to divide the Bill into three equal parts and send the billing document  to three different bill to party for a single delivery .  The Billing documents for each bill to should be individual and payment receipt also done individually for each of them separately.
    ie. - three billing docs against single delivery and three payment  receipt.
    How can I think on it . Please help me .
    Regard
    kamal

    If you have different bill to parties for a particular delivery, Invoice split should happen automatically as one invoice can have only one bill to party. But if you don't have different bill to parties and still you want to split, then you can get use of a VOFM data transfer routine and get this done. If you provide more details on your requirement, we can help more.
    Nice job.  You posted the exact same thing I already posted 3 days before...

  • Multiple PGI against a sinlge Delivery document

    Hi Gurus,
    Can we have multiple PGI's against a single delivery documents?
    If yes please provide me the step to do the config.
    Thanks.
    Laxmi.

    Dear Laxmikanta,
    as you are saying its clients requirement, It was hard for me to imagine why would anyone need such strange requiremnt.
    I think of one scenario why it would be needed lets say
    User created a delivery with few items in the delivery and now only wants to partialy deliver it. then add few more matrials in the delivery and again do PGI,
    for such requirement simply suggest them to delete the delivery and create the new one.
    Regards,
    Paresh

  • Multiple vendors against single shipment document

    Hi All
    I am working on a project where more then one mode of transportation are used .
    1) I have configured routes and stages and assigned different forwarding agent against every route .
    2) I have not maintained any forwarding agent at VT01N header level as i want to bill different forwarding agent against every stages .
    3) Different stages with vendor assigned to then is coming In VT01N under STAGES tab.When i am doing VI01 there is no item and the error log message is "Item not created because service agent SP not in reference document".
    4) My question is how to bill these different forwarding and handling agents against single shipment document.If i enter forwarding agent at shipment header level then shipment cost is calculated against that vendor only.
    Please help me ASAP to get rid of this problem as realization is going to start very soon.
    Best Regards
    Parveen Thakur
    9309460061

    Hi,
    "Item not created because service agent SP not in reference document".
    I think you entered wrong partner function shipment item categories in T_56, for item category detail maintain partner function CR - Forwarding agent
    Check that you should set partner function CR for delivery document
    Then your delivery document service agent partner function CR should entered,then same will be copy in shipment(help you if one delivery with only one forwarding agent)
    Then maintain the different vendors against each stage in VT01N (Do not maintain at header)
    Then in VI01 items will appear then at item level tick mark to TRANSFER,then system will create P.O for different stage.
    Kapil

  • To Combine Multiple STOu2019s into Single Delivery

    Hi,
    What are the configuration settings to be done to combine multiple STOu2019s into one single delivery in VL10B. 
    My requirement is to combine multiple STOu2019s contains different DELIVERY DATES and having SAME SUPPLYING AND RECEIVING PLANT into one single delivery.
    Thanks & Regards,
    Victor.

    Hi
    Delivery in STO is created for single order and for same delivery date, same delivery no. for different delivery date and  for multiple STO is not possible and its not logically correct,since after creation of delivery you will be doing picking and packing and Goods Issue.
    Please check
    Kishor

  • Two PGI in single delivery process

    hi All.,
    Two material document created (movement type 601) in single delivery process.
    pls very urgent to my client.
    lakshmanan

    HI
    Its a data inconsistency problem, we too faced this once before.. problem is inventory balance updated with -ve balance, hence system will not allow you to do any goods movements for those materials, what we did was to under movement types we updated allow -ve balances.
    Ideally what you do is do stoc found and stock lost for inventory balances.
    SAP did not given any solution for this.
    Reg
    Shan1242

  • Posting multiple invoices against single purchase order line item

    Hi,
    We receive invoices on completion of certain milestones and Goods receipt is done when the final lot of material is delivered.  For example the purchase order may be to deliver 1 quantity of Machine.  Material is supplied in bits like Gear Box, Engine and body.  Invoice is received when Gear Box, Engine is supplied. Final invoicing is received on completion of delivery (taking into account what has already been delivered)
    Goods Receipt in SAP needs to be posted only once when complete machinery is delivered (the tracking for different parts delivered is done outside SAP).  However, the multiple invoice needs to be posted in SAP referring to same PO item (Please note PO quantity for complete assembled material is only 1).
    This needs to be treated as material and not service in SAP.  Can you please suggest how to book multiple invoices for same purchase order line item?
    Thanks

    Hi Charan
    Thanks for your reply.  However, both the options are not feasible.  Invoices can be received in different periods, sometimes over different months or years, hence needs to be booked immediately.
    Also, i cannot create material master for each component as the quantity for the final material is only 1.
    Any other alternatives?
    regards
    Sameer

  • Multiple result recording against single MIC

    Dear Experts,
    In Case of calibration, for example i have assigned as one MIC to Operation, now after generation of Inspection Lot can we record multiple reading against single MIC. Please guide
    thanks
    DM

    Hi,
    I presume that apart from inspectopn point u have done all necessary steps .
    Is lnspection lot generating .
    1)If it is get generated then while result recording it will ask for identification.
    2)Enter any indentification (for ex a, b, c etc ) and save the result. Don't take UD as u want to take multiple result recording for that MIC
    3)Again go to result recording tab
       Follw step 2  & 3 as long as u want to thak no of results.
    IF not clear clear tell me ur requirement in detail & what u steps u have applied.
    Amol

  • Multiple IC Billing from Single Delivery

    Hi,
    we are using SAP IS Retail ECC6 with multiple company inside it. currently, we do PO intercompany (PO Type NB) with delivery type NLCC. management need to split the Billing document from single delivery. company A create PO to company B. delivery document created by VL10B on company A. this delivery document good issued by company B and gr done by company A. for example, on delivery item X with 100 quantity already PGI. but management need company B create billing with quantity sold done company A.
    i already change on vov7 as per picture below:
    on VTFL i already configured as below:
    on V/CL, auto batch determination not active
    but when we create an invoice via VF01 > selection list. the open quantity is disabled (grayed):
    can anyone help me, why its still grayed? if there is any wrong configuration please let me know.

    Go VF01, click on selection list button (fn key - F2) and you can modify the quantity there.
    Note - you should be in the main VF01 screen and not the after you click enter or click process.

  • Multiple Proof of Delivery against one Delivery

    Hello Experts,
    Is it possible in ECC to post multiple Proof of Deliveries (POD's) against a single delivery?  Also need to know if it is possible, can is still be done after the first POD has been billed.  Is there a user exit or note that can be applied to accomplish this?  Let me know if this makes sense.  Thanks in advance.
    -Eric

    MoazzaM,
    Thanks for your reply.  We are a distributor, and our business requires the need for certain customers to be able to confirm their delivery prior to the billing process.  If we were delivering a truckload of supplies to a customer, and that truckload made up one line of a sales order (for example a truckload of generators).  We would create one delivery for that sales order line.  The customer may not unload that entire truck in a day.  They would only post a POD against what they unloaded.  If on day 2, they verified another portion of the truck, then they would not be able to post another POD against the same delivery line.  Am I correct in understanding your response?
    Is there a user exit that can be invoked to change this?
    What about t-code VLPODF, what is the purpose of this t-code?

  • Multiple order of a one customer.Require single Delivery and single invoice

    Dear Gurus,
    I have a customer say 10005000 (xyz)
    i have now n no. of orders from this particular customer of different material and diff. quantities.
    e.g. Order no. 1000 have mat. A Qty.50, mat.B Qty.100, mat.C Qty.200  (Date: 01/09/10)
    Similarly Order no. 1001 have D Qty.10, mat.E Qty.40, mat.A Qty.60      (Date: 03/09/10)
    and so on
    Now I want to create Single Delivery No. for 10005000 instead of individual deliveries.
    how can i????
    Or if i have multiple deliveries of a single customer and i want single Invoice no. against all deliveries.
    Please suggest.
    Harry

    Now I want to create Single Delivery No. for 10005000 instead
       of individual deliveries.  how can i????
    Or if i have multiple deliveries of a single customer and i want
         single Invoice no. against all deliveries.
    For both these questions, many times, it has been answered in this forum.  Please put some efforts to search the forum.
    thanks
    G. Lakshmipathi

  • How to Restrict Single Delivery Date for PO with Multiple Line Items

    Dear Experts,
    How to Restrict Single Delivery Date for PO with Multiple Line Items.
    System needs to through Error Message if User Inputs Different Delivery Dates for PO with Multiple Line Items in ME21N Tcode.
    Can we achive this by Some Enhancement in SAP or Not ???
    If so how to do it.
    Any Inputs is highly appreciated.
    Thanks and Regards,
    Selvakumar. M

    Hi Selvakumar,
    we can resrict the PO to have a single delivery date in all the line items by means of giving a error message or overwiting the delivery date keyed/determined in the line item.
    You can use the BADI -> ME_PROCESS_PO_CUST. In which you need to implement the method PROCESS_SCHEDULE.
    (for technical aid - This method will be called for each and every PO line item, From the imporing parameter im_schedule we can get all the details of current PO line, even we can change the data in the current PO line. )
    Regards,
    Madhu.

Maybe you are looking for

  • Forced iTunes to quit now it won't open anymore and it took Quicktime down

    I moved my iTunes files over when I got a new computer and I have added a lot to of new material since then. Recently I plugged my iPod into the old computer to access it's hard drive and, much to my surprise, it was still authorized for the old iTun

  • How to add images/photos to multiple item entries quickly?

    We've got about 10,000 items in our database, and we've got pictures of all of them. We've got all of the items in the Business One database individually, with price and cost and barcode, etc. But we want to add the photo of each one to its respectiv

  • Problem accessing oracle databse with JSP

    hI i'M TRYING TO ACCESS A ORACLE 8I DATABASE VIA A JSP. THE DATABASE IS LOCATED REMOTELY ON THE NETWORK AND I' USING JDEVELOPER 9i VERSION 9.0.3.1 wHEN I RUN MY JSP, I WANT IT TO DISPLAY THE RESULT OF A QUERY ON MY JSP PAGE but instead i get this err

  • MIRO - Postings during Foreign invoices - Exchange rate variance

    Hi I noticed while posting foreign exchange PO's where there is both price variance and exchange rate difference the system posts price variance in foreign currency with a local currency amount of 0 and posts foreign exchange variance in local curren