Multiple Project Scheduling for the project at a same time

Hi Experts,
Is it possible to schedule multiple projects together at a same time. As my client is having more than 5 customer project running all together and he wants to schedule all the projects together so that there is no dates overlapping for similar activities for multiple project. As the activities are dependent on labour and machine and at one particular time the resource could be devoted either on one activity of the project.
I look forward for your revert
Thanks and Regards
Simon

Hi
One more thing, when i am changing the dates of the activity due to delay from customer end, then where can i see the comparison of old dates and new dates.. though i can see the report in CJ29 but when i change the date in the activity then in the report it shows new date in the new and old date column and does not display the old date in report in the old date column..
Please let me know if i need to do any configuration for that
Regards
Simon

Similar Messages

  • Project Server 2010 - Unable to open project, no valid Project Detail Page could be found for the project error

    I have a workflow being deployed for the first time on a farm. When I create a project with an EPT connected to the workflow it runs and can enter the required field in a PDP.  Then I Submit the workflow to go to the next stage and I get the "Unable
    to open project, no valid Project Detail Page could be found for the project" error.  After that the project is stuck on the same error.  All of the 18 stages have PDP and Schedules assigned to them.
    Any ideas on why the workflow cannot see the PDPs?  Is there a farm permissions that I am missing?  Thanks!

    Hi David,
    It starts to be a bit technical for me, but here is what I found on the web (seems to be an authentication issue with Sharepoint 2010):
    http://social.technet.microsoft.com/Forums/en-US/120ab535-63d2-4205-a51f-1987e9c0cf79/sharepoint-fba-the-content-type-texthtml-charsetutf8-of-the-response-message-does-not-match-the
    http://social.msdn.microsoft.com/Forums/silverlight/en-US/5cc70ff6-50d9-4cd3-b092-12007f4e495b/response-message-contenttypebindingtype-mismatch
    http://stackoverflow.com/questions/5263150/the-content-type-text-html-charset-utf-8-of-the-response-message-does-not-match
    Hope it will help you going forward in resolving your issue.
    Guillaume Rouyre - MBA, MCP, MCTS

  • I have Video camera movies that are HD format.. I am doing editing work on them using Final Cut Pro, but using DV PAL format for the projects I am editing. When I then tried to copy my work done in FCP Project that's originally DV PAL , into a new FCP Pro

    I have Video camera movies that are HD format.. I am doing editing work on them using Final Cut Pro, but using DV PAL format for the projects I am editing. When I then tried to copy my work done in FCP Project that's originally DV PAL , into a new FCP Project that is HD, and tried reconnect media with original HD movies (video), the sequence project got distorted for all the text, shapes used and all.. everything changed its orientation and scale.. Is there a way by which I can preserve my work done on DV PAL and switch it preserving its proportions, scale and orientation, but on a HD project sequence?? Appreciate your help and advice..

    Yes.  A couple of ways that might work.
    First Way
    What you need to do is load one of your hd clips in the viewer and edit into a new HD sequence.  Does it display correctionly? 
    OK, select the clip in the hd timeline and copy (command-c).  Now go to the HD sequence with the material that's distorted.  Select all (command-a) and paste attributes (option-v) and choose basic motion and distort.  That should maek things work.  What won't work is anything that you've adjusted as far as basic motion or distort in your PAL sequence.  That I'm pretty sure you'll have to redo.
    Second Way. 
    Choose your original PAL sequence and do a Media Manage changing the sequence preset to the appropriate HD paramenters with the media offline.  You then should be able to reconnect these clips with your original HD media.

  • How to add a new tab for the project?

    Dear All Experts,
        Could you tell me how to add a new tab for the project?
        Pls refer to the screenshot as below:
    Thanks!
    Xinling Zhang

    Hi,
        The new tab in cj20n , and the new tab can only be displayed in the highed level.Pls refer to below
        And in cj02, there is no this tab also in the wbs detailed screen,
    Thanks!
    Xinling

  • Give me some ideas for the project.

    Hi,folks
    I am not familiar with programming in web services. Now i have a project related to web services need to finish. I want to someone give me some ideas for the project. how can i implement the access control services. is there anyone can give me some related links for me to learn.
    Project Title: Implementing an access control service
    Project Description:
    Web services are emerging as a new approach to system construction and will make a major impact on the engineering of future business systems. They will allow a move from enterprise to inter-enterprise computing. However, with inter-enterprise computing, there are major problems with providing access to shared data, given that enterprises will not wish to share all data with partners.
    This project aims to investigate this problem by developing a prototype of an access control service that will help decide whether or not data access should be permitted. In essence, companies will outsource their access control to this service and so will not need to maintain their own access control lists for a potentially rapidly changing set of users.
    Suggested Platform: Windows or Linux
    Suggested Languages & Tools: Java

    Well, the approach I've come accross is a central server which is typically accessed indirectly from the web servers (e.g. through SOAP protocol or RMI).
    The remote server sends a user id and a password (or more likely a digest of the password), and receives a session token, basically just a random string of characters which is checked with the central server each time a secure transaction is attempted. The token will be stored in a session object, or perhaps directly in a cookie or in the URLs.
    Active session tokens are stored on the central server for comparison. This means the password doesn't have to be retained in the server.
    It's possible for the session token to be transfered if the user switches from one site to another on the same authentication server.
    Sun distributes one of these beasties, by the way, so you could take a look at their product specs.

  • How to create a validation for the project coding mask

    Hi,
    Would just like to ask how to create a validation for the project coding mask wherein the WBS elements hierarchy will be checked against the template saved. For example,
    project coding mask is XXXX-XXXXX-XX-X-X-X-00-X
    mother WBS should be XXXX-XXXXX-X and lower level WBS would be XXXX-XXXXX-XX.
    The validation should not allow a mother WBS to be XXXX-XXXXX-XX.
    How can we go about this?

    Hi Jacquiline Bersamin,
    You can use validation with the combination of the level and the coding mask.
    In the validation:
    Pre requisite: WBS level = 1
    Validation: Prps-posid = prps-posid :1-12:
    Message : Error
    If required you can give the parameters for your detail error message.
    Please let me know if this does not work.
    Thanks
    Regards
    Srinivasan Desingh

  • Cost report for the project

    Hi,
    Which report will show the material cost, Equipment cost, Resources cost & Activity cost for the Project.
    Prashant

    Hi,
    If you need actual cost, then CJI3 should be OK.
    Kind regards, Aleksandra

  • MS Project plan for the upgrade of 10.7 SC to 11i

    Can some kind person supply me with a MS Project plan for the
    upgrade of 10.7SC to 11i. Our applications are GL/AP/FA/Project
    Acc. Any other doco would be most helpful.
    Thank you
    [email protected]

    We have completed our first upgrade of FA from 10.7 SC to 11i. Most issues arose from the introduction of WorkFlow for Account Generator. In addition we have had difficulty activating the "security by book" new feature. This is still under investigation. We upgraded PO, AP, FA and GL. I can say that more than half of our time has been spent resolving FA issues.
    The length of time the task will take will depend on which functionality you use. Have you seen the upgrade kit on metalink? it has all the upgrade steps. From that you could determine how many steps you need to perform.
    Hope this helps.
    null

  • How to display Issues for the projects which user can view in the Project Center View

    Hello All,
    In the project center view, at the bottom, we need to add one table, which can show the Issues for the projects that are displayed in the project center view.(Projects visible to the current user).
    Example: A resource 1  can see the Projects Project 1, Project 2,Project 3 in the project center view. So resource 1 should be able to see all the issues that are entered against the Project 1, Project 2, Project 3, irrespective of the issue that has
    been assigned to any resource.
    Please help.

    Hi,
    You could simply edit the page and add the risks and issues webparts. This will display risks and issues assigned to the user.
    Click on edit page, then add webpart. In the Project We App section, pick up the risk webpart and then the issue webpart. Finally drag them to the bottom of the page and close the page.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Database design for the Project System!

    Hi
    I need the database design schema for the Project System .
    For example with the transaction code CJ20N at the left side all the Project Hierarchy is tabulated.
    I want to  know the relations between tables ?
    Would you please help me ?

    look logical database PSJ with tcode SE36
    grx. A.

  • ABAPER for the project system

    Dear Friends  ,
    i am ABAPER having 3 years of experience . Major developments are related to the MM SD  HCM PP etc . Module
    i am working in the user company  .
    Now there is a offer from another user company  who is offering me a job of ABAPER specifically for the Project SYSTEM  , plus onsite (Germeny ) for interaction with the Functional Consultant .
    Now dear Gurus please suggest , Is is rite to shift myself specifically for the PS System  or shall i go for other company like HCL , IBM who is offering me less pacakage as compare to above user company .
    Dear Gurus , u'r Response will be appreciated and will also be rewarded .

    Hi Sharma,
    adding to Vetri,
    I hope so this is not right place to discuss about careers.
    And one more thing try to avoid Company names
    Coming to your career path as you have good exposure with various modules, deffinetly it will be good if you work with PS Consultant.
    Packages is totally personal.
    Try to post same thread in
    SAP Community Network Forums » Community Discussions » Career Center
    Regards
    Guruprasad

  • Where can I get the project files for the online training that is available for adobe apps ... for now its Dw CC 2014

    I just need the link to where I can get the adobe project files for the online training that is available so I can go through it with actual practice ... Thanks !

    Links to project files are found on this tutorial's page (right side).
    See Creating your first web site in DW CC -
    https://helpx.adobe.com/dreamweaver/learn/tutorials/how-to/first-website-part1.html
    Nancy O.

  • [svn:fx-trunk] 7801: Submit on behalf of Pete - an update to the project settings for the flex4test project , the link type was wrong.

    Revision: 7801
    Author:   [email protected]
    Date:     2009-06-12 14:38:25 -0700 (Fri, 12 Jun 2009)
    Log Message:
    Submit on behalf of Pete - an update to the project settings for the flex4test project, the link type was wrong.
    Doc Notes: None
    Bugs: None
    Reviewer: none
    tests: compile & run
    Modified Paths:
        flex/sdk/trunk/development/eclipse/flex/flex4test/.actionScriptProperties

    Wait a second...there is more to that error message that I overlooked before.
    There might be something other than just the way I set the CODE and CODEBASE parameters wrong here
    Any ideas?
    Here is the entire messsage:
    load: class DisplayMonoApplet.class not found.
    java.lang.ClassNotFoundException: DisplayMonoApplet.class
         at sun.applet.AppletClassLoader.findClass(Unknown Source)
         at java.lang.ClassLoader.loadClass(Unknown Source)
         at sun.applet.AppletClassLoader.loadClass(Unknown Source)
         at java.lang.ClassLoader.loadClass(Unknown Source)
         at sun.applet.AppletClassLoader.loadCode(Unknown Source)
         at sun.applet.AppletPanel.createApplet(Unknown Source)
         at sun.plugin.AppletViewer.createApplet(Unknown Source)
         at sun.applet.AppletPanel.runLoader(Unknown Source)
         at sun.applet.AppletPanel.run(Unknown Source)
         at java.lang.Thread.run(Unknown Source)
    Caused by: java.io.IOException: open HTTP connection failed.
         at sun.applet.AppletClassLoader.getBytes(Unknown Source)
         at sun.applet.AppletClassLoader.access$100(Unknown Source)
         at sun.applet.AppletClassLoader$1.run(Unknown Source)
         at java.security.AccessController.doPrivileged(Native Method)
         ... 10 more

  • BAPI/FM for setting the user status for the Project definition and WBS elem

    Hi,
    I have to set the User Status for the Project Definition and the WBS elements in that project.
    The User status to be set is the same for the project and wbs elements.
    Please let me know if there is any BAPI/FM to set the user status..
    Thanks in advance.
    Regards
    Shiva

    Hi Shkithija,
    There is a dump encoutered in the form "PS_FLAG_GET_GLOBAL_FLAGS" for 'chk_precommit_ok' in the "BAPI_PS_PRECOMMIT".
    But it is showing SY-SUBRC = 0 when used along with BAPI_TRANSACTION_COMMIT.
    May i know what are input parameters we need to pass it to "BAPI_PS_PRECOMMIT".
    Do you have any idea.
    Please let me know
    Regards
    vishnu

  • Billing for the projects after cutover

    Dear All,
    I have uploaded initial stock and Goods issue for the projects that are open in the legacy system.
    I want to know how to do billing through FI as i have done PGI for the open projects in the legacy system,i upload the materials through MB1A .
    Please advice.
    Muzamil

    try revenue reposting KBxxxx transactions

Maybe you are looking for

  • SSRS get dates in parameters

    Hello All, I've a SSRS monthly sales report with the sales details for current year and last year. I've 4 paramaters in the report. StartDate1, EndDate1, StartDate2 (hidden), EndDate2 (hidden). For  StartDate1 - Beginning of Last month -  DateAdd(Dat

  • Elements 9 Organiser Mac OSX swiping Mouse

    How do I stop Organiser moving between thumbs when I swipe the mouse with my finger? I've switched this off in Mac OSX system preferences. How do I switch it off in Organiser?

  • Regarding the installation of portal

    hi there, i have installed sap netweaver ce  trail version with nwds , but was not able to find the portal component in the download from where can i download the portal component and for nw as ce 1.0 and is it necessary to install the portal for ins

  • Parameter in title

    Hi Everyone, I have a parameter called: Parm_AcademicPeriod I typed in the title: &Parm_AcademicPeriod Parameter can accept multiple values such as: '200910', '200920' (for academic terms) Title is showing:       Parm_AcademicPeriod: 200910, 200920  

  • Library instruments not found in Logic Express 9

    Hi, some of the instruments listed in the library in Logic Express 9 can not be found. See e.g.: This happens also to other instruments from the library although these were all installed with the Logic Express software. Can you help please? Thanks a