Hi,
I want to address projects related senario in which during PR creation only high level details of a product is known e.g. Substation is to be procured. So RFQ is also floated for Substation (only one line item in PR/RFQ). Now when vendor sends the quotation it contains many line items because he will enter all details line transformers, coolers in the quotation.So in quotation maintenance we should add all the lines against only one RFQ item.Also purchase order also should contain all those line items and goods receipt should be possible for all single line items separately. Total cost should go in main line item i.e. Substation.
Please help me addressing this senario
Regards

Hello,
Actually we are picking based on full pallets/partial pallet (LE quantities) and if multiple partial picks for the same material in same outbound delivery then system proposes partial pallets, which is just wastage of time to consolidating again rather 'sum it up' total quantity of same material and pick the maximum full pallets as it going to same customer...
Whole thing triggered up, when multiple back orders with partial quantities and putting together in the delivery (as and when the material is available...) and then TO creation/picking...
regards,
JPS

Similar Messages

  • Removing Multiple Skype Accounts against one ID ?

    Hi , I need to get the procedure to remove multiple accounts generated against one email ID?

    After 2 hours worth of searching with no answer, I decided to run a test and it worked. This is what I did to have multiple Game Center IDs on iOS7. (People responding may have over looked this detail because they assumed it was obvious, but it wasn't)
    Answer: you MUST have multiple Apple ID accounts, however, you use the main one to log in to SETTINGS > ITUNES & APP STORE.
    1. I deleted the Alternate Email Address associated with my account
    2. I created an entire new Apple ID with this email address
    3. I login in to SETTINGS > ITUNES & APP STORE with my original Apple ID (credit card on file)
    4. I login to Game Center, iCloud, etc... with my kid's NEW Apple ID
    So purchasing still goes under our shared account and game center, iCloud, etc... go under my kid's Apple ID.
    ^ ^ ^ ^ This is the simple straight forward answer I was looking for ^ ^ ^ ^

  • Can I create multiple presentation templates against one content item?

    I want to create multiple presentation templates that publish the same content item in different ways.
    As far as I can tell from the publisher GUI this is not possible.
    Am I missing something?

    It may not be feasible to have two PT associated with a DT technically. But there is a workaround / solution for your requirement. thats what i meant in my prev post.
    To accomplish your requirement in a simple fashion try doing this
    1) copy the contents of all PT, DT and Content Items with all its folders in the _NEWS (portlet templates) folder to a new folder called 'PortletA' (or) make use of the News portlet template to create a portlet
    2) Now modify the DT's and PT's according to your requirement.
    3) Create a portlet using "Published Content" webservice and configure the 'Main' to your portlet.
    4) if you create and pblish new article, you can find two html's are getting published.
    If this doesn't resolve your requirement,
    Create two sets of Dt & Pt's. In the article PT, try to add the other Pt as "related items to publish", so on publishing one the other one gets published.
    Bharat Karthik
    [email protected]
    http://www.eminenttech.com/
    Edited by bharatkarthik at 09/05/2007 2:35 PM

  • Multiple OINM lines for one INV1 (or other document) line

    Hello,
    I'm trying to do report application using warehouse journal table (OINM) and I see that sometimes exists more than one line in OINM corresponding to one document line (eg. INV1). What is the reason of that multiplicity? Item at the position is managed by batches but only one batch is used in the document.
    Thanks for reply.
    K.

    Hello,
    If you using FiFo as stock valuation method, then it may happens, that for the same bacth number you have more than one fifo layers. (Please note batch is a property).
    Regards
    János

  • Multiple po's against one PR

    Hi all,
            Is it possible to create more than po's for one Purchase requisition?If so,will it allow us to post GR against both PO's?
    Waiting for your reply
    regards,
    Mona

    Hi Mona,
    Practically in business you may need to have more than one PO for a single PR because of various reasons one may be PR may be there for 10,000 pcs & it is a consumption of 3 months where i release PO on monthly basis, for this reason SAP allows to have multiple PO.
    If you want to control this one way is to make qty field supress & create PO with respect to PR, but this is not wise to do. if at all you have a requirement like this you can do it, so that PO qty is not modifiable.
    Regards

  • Autoreconcile many statement lines against payment batch

    Hi all,
    I'm trying to reconcile many bank statement lines against one payment batch via the Autoreconcilation report. But is this possible? If yes, what are the steps which i should follow?
    First of all i created invoices in AP, validate and account them. Then i submit Payment Process Request and the payment is created successfully. Then i have lines in Cash Management with data associated to the invoices which i paid before. But when i start Autoreconcilation report the status of the lines is still 'Unreconciled'. In the Statement lines i populate BANK_TRX_NUMBER field with the number of the payment batch, in the CUSTOMER_TEXT field i populate the value with the supplier and in the INVOICE_TEXT field i populate the value with the invoice number which is already paid by the PPR.
    I have Reconciliation Exceptions as follows:
    Statement line amount is not within the tolerance range How to solve this? I set the Reconcilation options and the tolerance range and if i submit the autoreconcilation program to reconcile one line with one payment it is working fine but when they are more than 1 line against 1 payment ?
    EBS Version : 12.1.3.
    Thanks in advance,
    Bahchevanov.

    Hi,
    1) please check whether you are using the correct bank statement for reconciliation in case if you have multiple bank accounts / Statements.
    2) Check whether the payments that were unreconciled were all functional currency or foreign currency payments ...in which case exchange rates might be causing this ..
    References:Autoreconciliation Execution Report Shows Exception No Matching Payment Batch [ID 166716.1]
    Autoreconciliation Has No Matching Payment and No Matching Payment Batch Errors for Foreign AP Payments [ID 1387334.1]
    Regards,
    Ivruksha

  • Posting multiple VAT lines through BAPI

    At my customer we are importing vendor invoices from a third party system into SAP. For this we use BAPI "BAPI_INCOMINGINVOICE_CREATE1"
    The third party system also calculates the TAX amounts. Therefore, we need to be able to post multiple VAT lines for one invoice line item. This has to do with the fact that we have deductible and non deductible taxes. To do this we would like to use the TAXDATA Table from the BAPI. However, when we post multiple lines here for one Tax Code, we get an error for duplicates in RBTX.
    Has anyone ever dealt with this problem before? How can we post multiple tax lines for a single invoice tax line, either using the above BAPI or using a workaround. I do have to mention that using the BAPI for the initial posting is needed since we have to do with certain Dutch legislation that can only be handled using this BAPI.
    Regards,
    Sjaak van den Berg

    I guess u need to add
    POSCHEDULEX-PO_ITEMX = X.
    before appending the table Parameter POSCHEDULEX
    One for each append statement on table internal table POSCHEDULEX
    Regards
    Alok Pathak

  • Create one order with reference to multiple quotations

    Hi gurus,
      Is it possible in standard SAP to create one sales order with multiple quotations, or to create one order with reference to multiple orders, if yes what is the procedure.
    Regards,
    kishore.

    Hi Kishore,
    Yes, You can create a Sales Order with reference to multiple quotes or Sales Orders.
    The Procedure is as follows
    1. Goto T. Code VA01 (CREATE SALES ORDER)
    2. Give Sales document type and Sales Area
    3. After entering into the Create Sales Order screen, click on top left menu which is "Sales Document"
    4. In that list, you have an option " Create With reference", in that again you have two options "To Sales Document" and "To Serial Number"
    5. Select "To sales Document", then a window will be opened which has all the tabs like "Inquiry, Quotation, Order, Contract, Shc. Agg, Billing doc"
    6. Select any one tab which you want to copy (say quotation), give the quotation number there and click on copy.
    7. Then all the line items and Header data will be copied from quotation to that sales order.
    8. Like this you can do for any number of times.
    Hope this is clear
    Reward if helpful
    Thanks
    Praveen

  • Multiple free goods for one item in standalone CRM

    Hi Gurus,
    We are trying to implement multiple free goods for one item in standalone CRM.
    As per SAP.help.com, it says that we can configure multiple free goods scenario in standalone CRM system.
    We tried to set up this in our system.  Basically we want to implement the scenario, where a user wants to  purchase item A, he should get a prompt for choosing between two free goods  B and C.
    We did the relevant IMG settings required for Free goods at  IMG ->CRM -> Basic Functions -> Free Goods.-> Set up Free Goods
    We also did the relevant item category determination where we have made an entry with
    Item Usage = " Free Goods" , Main item cat. = "TAN' , Item Category = "TANN".
    Now we went to create condition records in the path  "SAP Menu -> Master Data -> Prices and Conditions -> SAPCND/GCM - Maintain condition"
    We chose Application ="PRT", MaintenanceGrp="PRT_FGOODS", Maintenance context ="GCM"
    Then while creating conditon records , when I try to create two condition records where the Main Product is same but free good product is different, the system is not allowing to save these two condition records.
    it is giving error "Overlapping validity periods for two condition records".
    Please advice, if i am missing something. Thanks in advance for your help.
    thanks,
    Randhir
    Edited by: Randhir Soni on Feb 8, 2010 8:12 AM

    Constraints in free goods in R3 taken from SAP library
    Free goods can only be supported on a 1:1 ratio. This means that an order item can lead to a free goods item. Agreements in the following form are not supported: u2018With material 1, material 2 and material 3 are free of chargeu2018 or u2018If material 1 and material 2 are ordered at the same time, then material 3 is free of chargeu2018.
    Free goods are not supported in combinations with material structures (for example, product selection, BOM, variants with BOM explosion).
    Free goods are only supported for sales orders with document category C (for example, not quotations).
    Free goods are not supported for deliveries without reference to a sales order.
    Free goods cannot be used in make-to-order production, third-party order processing and scheduling agreements.
    If you defined a free goods for variants in a generic article (only SAP Retail), you can only process the variants in the purchase order and goods receipt individually (as single articles). In other words, you cannot process them using the generic article matrix.
    This answers your qn Not possible in R3
    If you are on Retail scenario this is possible thro bonus buy schemes
    But a lot of customizations needs to be done and you need a retail server to do that
    Regards
    Raja

  • Not more than one service order against same sales document item

    A service order gets created against the sales order item as per
    standard SAP process. As credit management is active, when the order
    is under credit block  for the customer the service order gets created only after the
    credit block is released.
    On revising the order line value the sales document goes for a block
    again. Service order is locked. Both seem to be logical.
    But on releasing the credit block  this time ,  it creates one more service order against the same sales order item. Would logically expect the service order is
    unlocked on release from credit block.
    Can u pls explain this behavior ??  How do u avoid a new order creation and unlocking of the service order when the credit block is released.
    Would like to avoid any change in the service order status once it has been created irrespective of subsequent credit status of the sales order.
    regards
    Ramanujam

    Hi  lisa ,
    It is not possible to enter more than one service performer for a service in sales order .
    But you can  perform the service with two people and have two service confirmations.
    The time entered in service confirmation will be reflected in invoice only(if time and material).
    Also you cannot enter the time sheet with respect to sales order , it is only valid for project task and
    and time types.
    Regards,
    Harish

  • Problem in uploading multiple PO line items thro bapi_po_create1...

    Hi All,
    I want to upload Purcase details thro BAPI_PO_create1.I am able to upload PO for single line item. If i pass multiple line items i am getting error.
    Error is "Purchase order still contails faulty items".
    Pls see my code,and help to solve this pls.Thanks in Advance.
      *iTEM 1
        ls_poitem-po_item = '00010'.
        ls_poitemx-po_item = '00010'.
        ls_poitemx-po_itemx = 'X'.
        ls_poitem-material = '11C650004'.
        ls_poitemx-material = 'X'.
         ls_poitem-MATL_GROUP = '125'.
         ls_poitemx-MATL_GROUP = 'X'.
         LS_POITEM-STGE_LOC = '1101'.
         LS_POITEMX-STGE_LOC = 'X'.
    MATERIAL DESCRIPTION.
        SELECT SINGLE MAKTX
          FROM MAKT
          INTO ls_poitem-short_text
          WHERE MATNR = ls_poitem-material AND
                SPRAS = 'EN'.
        ls_poitemx-short_text = 'X'.
       ls_poitem-quantity = '100'.
        ls_poitemx-quantity = 'X'.
        ls_poitem-po_unit = 'KG'.
        ls_poitemx-po_unit = 'X'.
        ls_poitem-po_unit_iso = 'KG'.
        ls_poitemx-po_unit_iso = 'X'.
        ls_poitem-net_price = '220.57'.
        ls_poitemx-net_price = 'X'.
        ls_poitem-price_unit = '1'.
        ls_poitemx-price_unit = 'X'.
        LS_POITEM-TAX_CODE = 'NT'.
        LS_POITEMX-TAX_CODE = 'X'.
        LS_POITEM-ACCTASSCAT = 'F'.
        LS_POITEMX-ACCTASSCAT = 'X'.
        ls_poitem-plant = '1100'.
        ls_poitemx-plant = 'X'.
    APPEND : ls_poitem TO gt_poitem,
    ls_poitemx TO gt_poitemx.
    CLEAR:LS_POITEM,LS_POITEMX.
    ITEM 2
        ls_poitem-po_item = '00020'.
        ls_poitemx-po_item = '00020'.
        ls_poitemx-po_itemx = 'X'.
        ls_poitem-material = '11C650003'.
        ls_poitemx-material = 'X'.
    MATERIAL DESCRIPTION.
        SELECT SINGLE MAKTX
          FROM MAKT
          INTO ls_poitem-short_text
          WHERE MATNR = ls_poitem-material AND
                SPRAS = 'EN'.
        ls_poitemx-short_text = 'X'.
        ls_poitem-quantity = '100'.
        ls_poitemx-quantity = 'X'.
        ls_poitem-po_unit = 'KG'.
        ls_poitemx-po_unit = 'X'.
        ls_poitem-po_unit_iso = 'KG'.
        ls_poitemx-po_unit_iso = 'X'.
        ls_poitem-net_price = '230.57'.
        ls_poitemx-net_price = 'X'.
        ls_poitem-price_unit = '1'.
        ls_poitemx-price_unit = 'X'.
        LS_POITEM-TAX_CODE = 'NT'.
        LS_POITEMX-TAX_CODE = 'X'.
        LS_POITEM-ACCTASSCAT = 'F'.
        LS_POITEMX-ACCTASSCAT = 'X'.
        ls_poitem-plant = '1100'.
        ls_poitemx-plant = 'X'.
    APPEND : ls_poitem TO gt_poitem,
    ls_poitemx TO gt_poitemx.
    CLEAR:LS_POITEM,LS_POITEMX.

    Hi Sree,
    Thanks for ur reply. After i passed storage location the PO is created.
    One more problem is multiple schedule line is not created.It considers only the first line alone.
    If possible can u pls give some ideas to solve the problem
    Thanks.

  • BAPI_PO_CREATE1 for Multiple service line items

    Hi Exports,
    I am using BAPI_PO_CREATE1 to create service PO. I am facing problem when each line item(ebelp) has multiple service line items. I am unable to map multiple service line items to a single line item (ebelp) properly.
    Can anyone help.
    Regards,
    Kiran

    Hi ,
    I am able to create service PO when only one service line item is there.
    If multiple service line items are there. then i have to put the below code with in the loop.
    here i am facing the probelm.
            w_poservices-pckg_no    = g_pckg.
            w_poservices-line_no    = g_pckg.
            w_poservices-outl_ind   = c_x.
            w_poservices-subpckg_no = g_pckg + 1.
            w_poservices-service    = w_sdata-srvpos.
         w_poservices-short_text = w_idata-ktext1.
         w_poservices-quantity   = w_idata-menge.
         w_poservices-base_uom   = w_idata-meins.
         w_poservices-gr_price   = w_idata-tbtwr.
         w_poservices-matl_group = w_idata-matkl.
            APPEND w_poservices TO i_poservices.
            CLEAR: w_poservices.
            w_poservices-pckg_no    = g_pckg + 1.
            w_poservices-line_no    = g_pckg + 1.
            w_poservices-ext_line   = 0000000010.
            w_poservices-outl_ind   = c_x.
         w_poservices-subpckg_no = g_pckg + 2.
            w_poservices-service    = w_sdata-srvpos.
            w_poservices-short_text = w_sdata-ktext1.
            w_poservices-quantity   = w_sdata-menge.
            w_poservices-base_uom   = w_sdata-meins.
            w_poservices-gr_price   = w_sdata-tbtwr.
            w_poservices-matl_group = w_idata-matkl.
            APPEND w_poservices TO i_poservices.
            CLEAR: w_poservices.
            w_posrvaccessvalues-pckg_no    = g_pckg + 1.
            w_posrvaccessvalues-line_no    = g_pckg + 1.
            w_posrvaccessvalues-serno_line = 01.
            w_posrvaccessvalues-serial_no  = 01.
            w_posrvaccessvalues-quantity   = w_idata-menge.
            APPEND w_posrvaccessvalues TO i_posrvaccessvalues.
    thank you.
    Regards,
    Kiran

  • Service PO with Multiple service Line Items

    Hi,
    i am working on Service Po Creation by using BAPI BAPI_PO_CREAT1. I am able to create service for multiple line items but the problem is single line item my have multiple service line items in that case my object is not working. Can any one suggest solution for this.Here i am attachng what i written logic
               T_POITEM-PCKG_NO      = V_PACKNO.
            T_POSERVICE-PCKG_NO = V_PACKNO.                    "'0000000001'.
              T_POSERVICE-LINE_NO = V_LINENO.                    "'0000000001'.
              T_POSERVICE-OUTL_IND = 'X'.
              T_POSERVICE-EXT_LINE = '0'.           "V_EXTLIN.                  "'0'.
              T_POSERVICE-OUTL_LEVEL = '0'.           "V_EXTOUT.                "'0'.
              T_POSERVICE-SUBPCKG_NO = V_PACKNO + 1.               "'0000000003'. "(Dummy No.)
              T_POSERVICE-QUANTITY = ITAB-SERV_QUANTITY.
              T_POSERVICE-BASE_UOM = ITAB-BASE_UOM.
              T_POSERVICE-PRICE_UNIT = '1'.
              T_POSERVICE-GR_PRICE = ITAB-GR_PRICE.
              T_POSERVICE-SHORT_TEXT = ITAB-SERV_TEXT.             "'SERVICE TEST'.
              APPEND T_POSERVICE.
              V_LINENO = V_LINENO + 1.
    *          V_PACKNO = V_SUBPACKNO.
              T_POSERVICE-PCKG_NO = V_PACKNO + 1.
              T_POSERVICE-LINE_NO = V_LINENO.
              T_POSERVICE-EXT_LINE = V_EXTLIN + 10.             "'0'.
              T_POSERVICE-OUTL_LEVEL = '0'.                          "V_EXTOUT.                "'0'.
              T_POSERVICE-OUTL_IND  = SPACE.
              T_POSERVICE-QUANTITY = ITAB-SERV_QUANTITY.
              T_POSERVICE-SUBPCKG_NO = '0000000000'.
              T_POSERVICE-BASE_UOM = ITAB-BASE_UOM.
              T_POSERVICE-PRICE_UNIT = '1'.
              T_POSERVICE-GR_PRICE = ITAB-GR_PRICE.
              T_POSERVICE-SHORT_TEXT = ITAB-SERV_TEXT.                            "'SERVICE 1'.
              T_POSERVICE-PLN_PCKG   = V_PACKNO + 1.
              T_POSERVICE-PLN_LINE   = V_LINENO.
    *          T_POSERVICE-MATL_GROUP = '0082'.
              APPEND T_POSERVICE.    
    *          SET PCKG_NO AS SUB_PCKG_NO IN TABLE POSRVACCESSVALUES THIS:
              T_POSERVALUE-PCKG_NO = V_PACKNO + 1.                                       "'0000000003'.
              T_POSERVALUE-LINE_NO = V_LINENO.
              T_POSERVALUE-SERNO_LINE = '01'.                "'01'.
              T_POSERVALUE-SERIAL_NO = '01'.              "   '01'.
              T_POSERVALUE-QUANTITY = ITAB-SERV_QUANTITY.       "'10.000'.
              APPEND T_POSERVALUE.

    by following instructions in 420332 note.

  • Service Procurement with Multiple Service Line items

    Dear Experts,
    We have the following Business Scenario. Request your inputs in addressing this issue.
    Business scenario : Most of the Procurement for our client is of services. So, we need to configure services with multiple service line items. This Shopping cart to create PR in ECC. PR to PO conversion to take place in ECC. Now onwards client needs Supplier integration for confirmation of services and sending invoices by Vendor.
    Guidance required in the following
    1 In Shop functionality if we select services, PR is being created in ECC with only one Service Line item. Whereas if we go for Request functionality, then always it is routing to Bidding process (which is not required for client). Can we create SC with multiple service line items with out request functionality?? Or Can we root the Request functionality with out Bidding process??
    2 If we convert the PR to PO in ECC (Classic Scenario), can we go for SUS integration. In such case which is the best way of supplier integration. Can you please guide us on basic steps on installation (can we go for different client in the same server) and configuration.
    Request your inputs in this regard
    Thank you,
    Ravi

    Hello,
    We suffered the same problem in our company.  We have found a way to work with the SRM shopping cart multiple line rollup to ECC single line purchase order.
    If the multiple shopping cart line items contain the same location code and cost assignment they will rollup into one ECC purchase order.  The system seems to 'think' it is helping you by consolidating your information.
    In the Basic Data section of the shopping cart there is a Service line item field.  If you enter something in each in that field for each line it will keep it's own line in ECC.
    Your implementation may differ slightly from ours but I recommend playing with the location code, cost assignment and Basic Data service line fields until you can see a pattern.  Basically you need to find a method to make each line a separate entity so they don't rollup.
    Good luck,
    Corinne

  • Multiple tax lines for same item

    Hi,
    Is it possible to have multiple tax lines for same item in an invoice in AR.
    Business Need - A few items have multiple tax applicable ( e.g. VAT, Service tax, etc ). And for regulatory purpose customer wants to show each tax separately.
    please Advise.
    thanks,
    K

    Hi Hikumar,
    With tax groups you have what is called compound taxes.
    A tax group is consisted of more than one tax codes and these tax codes may be related or not to each other,you can also specify the precedence of the tax codes in a tax group.
    On the Invoice or order item line, the tax group code is entered and the tax engine calculates the tax for each tax code that belongs to the tax group.
    If the user wants to see the taxes of this line he will see detailed the tax amounts and rates of each tax code that belong to this group.
    In my case i have used a tax group with 3 tax codes with the structure:
    Item line amount 1000
    1)The first line is a specific sales tax(12%) with taxable basis the amount of the item line=1000*12%=120
    2)The second line is a VAT(23%) tax with taxable basis the amount calculated from the first tax of the group=120*23%=27,6
    3) The third line is a VAT(23%) tax with taxable basis the amount of the item line=1000*23%=230
    For each item line that has the above tax group, the system creates three seperate tax lines
    Your case does not seem so complicate as mine.
    You can find more information on the AR user guide and the Oracle receivables tax manual.
    On which Ebs version are you working on?
    If you sent me more detailed you requirement i can quide you on the way to implement it and test it.
    I hope this helps.
    Regards
    Olga