Multiple Receiving Quality Collection Plans

I am trying to setup collection plans to capture results when receiving a PO. I am able to see only 1 collection plan and i don't see my new collection plan, is there any profile option or setup to enable multiple receiving collection plans ?
Thanks,
Aarti

Hi,
We have an OPM template ( TEMPLATE OPM RECEIVING INSPECT ) from which you have to build your own collection plan.
I have some old notes from the past which I will share with you here.
RECEIVING INSPECTION AND OPM QUALITY AND COLLECTION PLAN ERROR DEBUGGING INFORMATION
     Steps Required Prior to Executing Test
1.     In Oracle Quality, new Quality collection elements and collection plan have been seeded.
2.     In Oracle Inventory, item is Process Quality enabled.
3.     In OPM Quality System Parameters, set Lot Optional to Yes and Delayed Lot Entry to No.
4.     In OPM Quality, optionally set up an OPM sampling plan for incoming inspection.
5.     In OPM Quality, create an approved item specification and a supplier specification validity rule associated with the sampling plan.
6.     a) In Oracle Quality, create a collection plan (e.g. call it OPM RECEIVING INSPECTION and copy elements from the seeded collection plan from 1 above called TEMPLATE OPM RECEIVING INSPECT ) with seeded collection elements that correspond with the OPM Quality sample group.
The Collection Plan will be setup by the end-user with Collection Triggers so that, only for specific conditions allowed by the collection triggers for the Inspection transaction, will this collection plan be applicable during RCV Transaction (aka enabling)
.e.g. for Quality Collection Transaction. ‘Inspection Transactions (Oracle Purchasing) set up Collection trigger of ‘Item’ Condition ‘equals’ and From value of ‘9010’.
7.     After the plan has been copied over, please verify if all the elements and actions are correctly copied over. The details of elements and actions are listed out in the Technical Design document for reference. For example, verify that actions for assigning a value to the Sample Disposition Code, Quantity, Inspection Result are present. Verify that the Action on Inspection Result for Accept and Reject are correct etc. Please verify the element settings such as Mandatory-flag, read-only flag etc are as per the Technical Design document .
8.     Also, navigate to Quality à Setup à Collection Elements form and verify the Sample Disposition Code seeded element is correctly seeded – Refer to Technical Design document for reference.
9.     In Oracle Quality, the profile option QA: PO Inspection set to “Oracle Quality” instead of “Oracle Purchasing”.
10.     In Purchasing Receiving Options, set Receipt Routing to ‘INSPECTION REQUIRED’
User Implementation Guide consideration for Receiving Inspection.
1. It is recommended that the total receipt line quantity be recorded as either the amount of material accepted or rejected based on the final sample group disposition, since partial quantities typically do not apply to Process items.
i.e If the Inspection result is “Accept” then Accepted Quantity must be equal to Quantity and Rejected Quantity must be zero. If the Inspection result is “Reject” then Rejected Quality must be equal to Quantity and Accepted Quantity must be zero.
2. With reference to the ‘Reject the Input’ action with an error message to prevent recording inspection when sample disp is Pending or Cancel etc., there is one point to note, viz. - When you have a ‘Reject the Input’ action, there is a corresponding error message this column is not a Translated column.. Hence the Quality Manager who manages collection plans setup, can alter this message content to suit their needs as appropriate during implementation.
3. It was also clarified that in Oracle Quality, user can enter more than one row of result in the collection plan. In the OPM scenario, most of the times, user will enter only one row of result and this is the recommendation.
4. To ensure that the tie-up between the quality records and the sample inspection in the OPM data model for future usage is operative, then please make sure that Oracle Alerts sub-system in functioning.
Debgging information
1. If get error
APP-QA-16135: Quality Results cannot be entered because no Collection Plans apply" in the Receiving Transaction form.
a,. Add a transaction named "Inspection Transaction" to this plan
b, . Don't setup a spec for this collection plan in Oracle Quality - so under the Specification pushbutton, the 'No specifications used' radio button will be selected
2. Is the receiving option receipt routing set to ‘Inspection required”
3.The design does not allow for accept or reject of partial quantities – is the ct using partial quantities ?
4.This is a one shot deal on the collection plan entering of quality results. Is the ct trying to re-enter results in the collection plan again?
5. Receiving inspection requires the sample group to be at a final disposition. Is the customer using single sample, sample groups or multi-sample sample groups when this occurs? Is the automatic single sample disposition workflow set to auto or manual?
Because neither the quantity or sample result is being picked up, maybe the sample group for the sample(s) is not at a final disposition. This may explain why this is being regarded as intermittent.
6. Note bug 5300577
Once a sample or sample group has been assigned a final disposition of Accept, Accept with Variance, Reject, or Cancel, it should not be updateable to another disposition. Please check what is the customer's scenario that allows them to change from the Reject disposition to Accept with Variance. Are they entering a second sample against the same receipt and sample group as the first sample? Or perhaps the second sample belongs to a different sample group than the first sample?
7. To clarify . When you open the screen to enter results in Oracle Quality, it will reflect whatever is the current sample group disposition that corresponds to the item/receipt. I believe collection plans in Oracle Quality only allow data to be entered and saved once. After this point, the user cannot go back to this screen from Oracle Purchasing. If the user does not save any data, then s/he can re-enter the form multiple times and see the up-to-date sample group disposition automatically populated.
8. In Oracle Quality, user can enter more than one row of result in the collection plan. In an OPM scenario, most of the times, user will enter only one row of result.

Similar Messages

  • Quality collection Plan for OM processing

    Hi Gurus,
    My client wants to implement Quality module while shipping the products to customer.
    If we implement Quality module how to attach the Quality collection plan result to respective sales order after updation of Quality result in Quality module.
    How to check the details in sales order form of this result?
    Regards
    AL

    Hi,
    Collections Plans can be enabled at RMA receiving if the Item attribute "RMA Inspection Required" is set to yes.
    Define the collection plan Type as "Receiving Inspection" and set the following profile
    QA:PO Inspection to Oracle Purchasing.
    Thanks
    -Arif.

  • Personalize Quality collection plan form

    Dear Expert,
    currently we are implementing R12.1.3 in one of the client.
    Client requirment is to personalize Oracle quality collection plan --Enter Result form. for specific collections.
    Is it suggestable to personalize that form for that collection plan as the form is global for all collection plan.
    Please suggest.
    Thanks,
    Atul Ramteke

    Hi;
    I suggest please review:
    Master Note For Collections [ID 1147234.1]
    http://docs.oracle.com/cd/E18727_01/doc.121/e13612/T240092T240190.htm
    Regard
    Helios

  • Quality Collection Plan assignment

    Hi All,
    I'm just trying to assign a collection plan to a particular user.
    What i did is
    1. Created collection plan
    2. Add the user login to the User group
    3. Grant privilege of the collection to the user group
    But the collection plan is not available in the user login
    Am i missing anything????

    Hi,
    Collections Plans can be enabled at RMA receiving if the Item attribute "RMA Inspection Required" is set to yes.
    Define the collection plan Type as "Receiving Inspection" and set the following profile
    QA:PO Inspection to Oracle Purchasing.
    Thanks
    -Arif.

  • Quality Collection Plan Data Interface in Oracle Apps 11i

    Hi All,
    I want to Know is there any Public API available for Create and import Collection Element.
    Thanks in Advance
    Nikunj

    Quality Collection Plan is a module in Oracle Applications - this is not a Java programming question.
    If you want to know if there is a Java API to import data into a collection plan, this is still not a Java question, it is an Oracle Applications question.

  • Oracle Quality: Need a way to copy and paste collection plan records

    Hi,
    We use a Quality collection plan, along with a few child plans, to store inspection requirements. The user wants to be able to copy an existing plan record and paste to a new record for further updates. Any good ways to accomplish that?
    Please advice. Thanks!

    Hi,
    User want this functionality during the transaction or when updating collection plan results in Quality result?
    Ashish

  • Oracle Quality Module - Collection Plan name

    The collection Plan name field in Orcale quality module - collection plan form (QLTPLMDF) does not accept special characters. Why is this so and what is the rationale behind this?
    Here is the wording from Oracle Quality user Manual
    Collection plan names can include alphanumeric characters and spaces. Collection
    plan names can have up to 30 characters, and the first 25 characters must be
    distinctive. The only special characters that can be included in a collection plan name
    are the underscore (_) and the single quotation mark (’). any special
    I am working with a customer who wants to use decimals (Example: 35.24.101) so that search will be easier. Some screens does not allow searching by description so need to have these in the collection name/code
    Any solution you can think of?
    Thanks

    Hi,
    When you create the collection Plan , actually you are creating the name of the table with required column names as collection elements in the data base.
    This is the reason you are not allowed to do so as per your query.
    thanks,
    Raja

  • Is there APIs for Oracle Quality Module - Collection Plan, Specifications ?

    We are converting Collection Plan, Specifications etc and was wondering whether there exists API?
    Thanks

    I have found packages to create Collection Plans (QA_PLANS_PUB) and Specifications (QA_SPECS_PUB). Both allow you to add elements to the Plan or Spec.
    However, both assume that the Collection Element already exists so that it can be added to the Plan or Spec. And I can't find an API or package to create the Collection Elements. Does such a package exist?

  • WIP collection plan trigger

    Customer would like to apply a quality inspection hold between 140 to 150 sequence number and for the star items / config items that are configured using ATO Model “INTELLIX BMT 300 UNIT”.
    Please help us in setting a collection trigger for above requirement.

    Collection plan going to followin error on cloned Test serverlog, while it is workng fine on our Production server:Please post the details of the application release, database version and OS.
    Concurrent Manager encountered an error while attempting to start your immediate concurrent program &PROGRAM. Routine &ROUTINE received a return code of failure.Please check the CM log file for details about the error.
    Thanks,
    Hussein

  • Collection plan going to error on cloned Test server

    Collection plan going to followin error on cloned Test serverlog, while it is workng fine on our Production server:
    Concurrent Manager encountered an error while attempting to start your immediate concurrent program &PROGRAM. Routine &ROUTINE received a return code of failure.
    Kindly help me in this regards.
    Thanks

    Collection plan going to followin error on cloned Test serverlog, while it is workng fine on our Production server:Please post the details of the application release, database version and OS.
    Concurrent Manager encountered an error while attempting to start your immediate concurrent program &PROGRAM. Routine &ROUTINE received a return code of failure.Please check the CM log file for details about the error.
    Thanks,
    Hussein

  • Oracle 11i - Collection Plans (Discrete Manufacturing)

    In Oracle Quality, Collection Elements can use SQL validation code to provide a LOV for data entry into a Collection Plan.
    Collection Element values can also be determined using SQL code that includes using Token field values for data already entered into the current Collection Plan (e.g. JOB) as part of the query. However, the result of this query must be a unique value.
    Can anyone tell me if its possible to use Token fields from Collection Elements already entered into a Collection Plan as part of the validation code to display a LOV?
    I cannot see any way to do this.
    Thanks
    Edited by: user11340385 on Dec 17, 2012 11:29 AM

    Thanks Peter,
    I'm a newbie and it got posted there by accident.
    I did notice this afterwards but then couldn't find somewhere for "EBS Discrete Manufacturing".
    What's the best place for it and can it be moved there without me resending it?

  • Collective Planned orders Scheduling for lower level orders with reference to the Superior order

    Hi All,
    Collective planned order scheduling.
    I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
    My problem is
    when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
    For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
    Could some one tell me why this is not happenning at planned order level.
    As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
    Please give your thoughts on this asap.
    Mahee.

    Hello Mahee
    Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
    * No scheduling of overall networks is executed although a directly manufactured component is assigned.
    Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
    BR
    Caetano

  • Conditional base routing to multiple receiver's for syncronous interface

    Hi All,
    I have a requirement of sysnchronous interface where i need to send the message to 2 diffrent systems based on the routing condition. Based on routing condition we will determine the receiver to send message and response shloud send back to sender.
    Please let me know my requirement is possible using sysnchromous call i.e sending to multiple receiver's based on conditon. Thanks.
    Regards,
    KK
    Message was edited by:
            kalpana k

    Aamir,
    I dont think BPM is required here,XI always use mesasgeID as the reference.
    lets say you sent a request then XI generates message ID :11111 (for Ex)
    and for the response XI again generate another message ID:22222(for Ex),but referencing to MessageID:11111,it cant be to some other request message ID.(always reference is maintained by XI for Sync calls)
    so we dont need to maintain any relationship between request and respone ,explicitly.it is being taken care by XI itself for sync calls.
    response1 for a request1 wont go to someothers  request2.
    I dont know whether you get my point what I was trying to say.
    and just using Xpaths in receiver determination would give the solution.but need to have two Receiver agreements.
    I might be wrong !
    thank you,
    regards,
    Babu Sri

  • Accounts Receivable and collections report project-wise

    Dear all,
    My client wants accounts receivable and collections reports project wise. are there any reports in PS which satify this requirements. If no, pls suggest me how to cater to this requirement.
    Pls help me on this issue.
    Thank you very much in advance.
    Regards,
    Vishnu.

    Hi,
    If your cash flow scenario is very complex with partial payments, deferred debt, down payments etc., none of the standard reports including FBL5N / FBL1N will be helpful. If the scenario is fairly simple , FBL5N / FBL1N  should work for you.
    In a complex scenario, you may have develop your own reports based on the basic logic of FBL5N.
    Regards
    Murali

  • Integrtion Scenario using BPM with two sender and multiple receiver

    integrtion Scenario using BPM with two sender and multiple receiver
    How many Application Components are required?

    Hi Vinod,
    1) In integration repository you can have one or many software components it depends on your landscape orchestration
    2) In integration direcory you need at least one service for bpm and one or many for each system in your bpm
    also each connection between systems and bpm must have receiver determination and so on.
    Advice: Please treat BPM as a separate system.
    best,
    Wojciech

Maybe you are looking for

  • G580 wireless device not recognized in windows Xp service pack 3

    Hi i bought a new laptop last week, g580 and the serial no is **********. I have installed windows xp service pack 3 and the laptop cannot detect the wlan device when i check in the hardware/device manager/network adapter , i also get a message when

  • Does iTunes work with Windows 8?

    Does anyone know iTunes work with Windows 8? I know 10.7 was just realeased and I wondered if it added Windows 8 support or will I have to wait for iTunes 11? Windows 8 is not beta anymore, it is RTM although I know a public release isn't until Octob

  • Adobe Reader conflicts with Adobe Acrobat?

    It looks like there are some conflicts between Adobe Reader and Adobe Acrobat: I just downloaded Adobe Reader 9 without problems but when running the downloaded file(.exe) the seup is interrupted before Adobe Reader 9 could be completelly installed.

  • NPD Workflow Cancel Locks IE

    This is a really strange one 2 different users on two different PCs are having issue with in 6.1.0.1, patched to 32. Thought Id post here first before I open SR. They open an NPD activity ususally from an email notification they have received. They c

  • I am having trouble do upload my songs from cd to icloud(I Match).

    Hi. I am having trouble to upload the songs from my cd to I Cloud(IMatch). I´ve got to upload the all the songs that were in my Itunes. But now, when I transfer the songs from cd to I Tunes, I can´t upload them to I Cloud(I Match) anymore.